GUANGLAN ROAD URBANPLANNING TYPOLOGY Urban Planning
Competiton
CLIENT China State Construction Engineering Corporation TIME May, 2022
--
LOCATION Pudong District,
Aug, 2022
Shanghai
I n t h i s p r o j e c t , I a m m a i n ly responsible for the following pa r t s . 1 , T h e c o n c e p t o f t h e volume of main towers. 2, The diesign for the groundfloor of sockel, and regular floorplan of the towers. 3, The renewal of the historic street. 4, Drawing of a part of diagrams and 3D Section. 3
Concept Generation
1. Commercail Canyon
2. Historic Village
3. Pearl Necklace
Masterplan
Project Description The overall planning and design concept is derived from two central thoughts: First, the site situation and its environment. The vicinity of lush green parks, beautiful water and sports facilities plays an equally important role as the precise analysis of traffic flows and pedestrian accessibility by public transport through the two subway stations and the underground connection to the planned commercial area in the east. But most importantly the historic old street with the protected listed buildings along the riverline. We consider this being a seldom and precious good that has to be brought back to new life. All of these factors have a big influence not only on how the new masterplan and especially the plot of the new Headquarters for CSCEC are being layouted and organised but moreover on how they actually work and are being percieved by their future users and the public. The second thought is obvious: What if we could create an entirely harmonious new quarter, connecting all plots together by one architectural design language and programming. A place which enriches everybody’s lifes, which is uplifting in atmosphere and services the people that are working there, living there or coming for a visit. Following their sports activities or simply wanting to have a good time out enjoying a variety of commercial and cultural choices.
4. Transition of Scales
5. Sustainable Quarter 4
Headquarter
Historic Proctected Area
Commercial Office Hotel Access To -2
Exit from -2
Office drop-off
Exit
Exit
ff drop-o uarter Headq
Exit
ff
drop-o
Exit
CEO
vice
& Ser Exit & Service
Exit
Office Lobby
Office
Lob
by
Me
tro
Exit
sta
tion
& Ser
vice
To -2
y bb Lo
Exi t
Void
Hot el
Void Void
Gathering Area
Lo bb y
Connecting different Functions
Void dr op -o ff
Exit
Service
Exit
Exi t
Hot el
Exit
Void
Void Restaurant
Restaurant
Restaurant Exit protected Tree Exit
Exit
To -2
Co. Working Place
Art Gallery
Concept Store
Coffee & Bar
Groundfloor Plan
Interweaving the Old and the New
Function Diagrams
Pedstrian flows
Subway access
Car circulation
Firestuck route
Firestuck route
Program distribution
Programming of Public Areas 5
Headquarter Office Hotel
Hotel On the regular levels of hotel you will see the hotel rooms and on top of that the serviced apartments all in a regular floorplan layout with efficient organisation of the cores and circulation.
Offices The regular floorplans are all ver y efficiently lorganised around a central core each letting big amounts of daylight deep into the spaces.
Headquarters The tower levels of the headquater are very efficiently organised with central elevator cores and flexible office spaces all around with spectacular views and lots of natural daylight.
Standard Floor Plan
+4 Pð
Headquater Typical Floor Layout
Hotel Typical Floor Layout
2IILFH
2IILFH
Pð
Pð
Office 1 Typical Floor Layout
Office 2 Typical Floor Layout 6
3D Section
Office 2 Lobby
Commercial -1st Floor
Commercial -2nd Floor
Restraunt
Caynon Connection
Commercial Area
Historic Quarter
River
Historic Quarter 7
NEW HEART ON THE BLOCK TYPOLOGY Commercial Group Competiton
TIME Jan, 2023
--
Aug, 2023
STATUS 2. Prize LOCATION Düsseldorf
In this competition, I am mainly responsible for the following parts. 1, the design of parts of podium and the regular floorplan o f t h e t w o t o w e r , t h at i s t h e o f f i c e t o w e r a n d a pa r t m e n t s , including the design of stucture. 2, The drawing of sections. 3, the analyse of the functions for each part and the drawings of diagrams. 8
Project Description The office tower will be seen as a high point in the group. The volume is kept parallel orientation to the street, to keep city view slim and block traffic noise. Arrangement of the residential building in the eastern soundproof area to maximize the quality of living. Alignment following the urbanplanning grid of the city. A new square is created between the buildings: the "New Heart" of the quarter. Stepping of the building cubatures in order to maintain distances, to ensure sunshine and to maximize the views towards the Rhine and the city center.
Rooftop Restaurant with Sky-garden
Transmission of the floor-by-floor staggering in the base area to activate the lower floors for the public. Connection of the multistorey base to the new pedestrian bridge on the first floor and use of hybrid program modules. Greening of all terrace areas distributed over the entire height. Creation of high-quality working and living environments . The tower with a rooftop use over three levels as a glazed "sky garden" with a view over the city.
Vertical Garden as public area of office for communication
Concept Generation Vertical Garden as open space for Residential
Office as flexible and collaborative office spaces
1. Isolation from noise
2. Adopt to the urbanplanning grid
3. Stepping for a view of the Rhine
Conventional living with a flexible mix of apartments and a view of the Rhine
Commercial living with a flexible mix of apartments and roof terraces
Event space Terrace & garden as public space of events
4. Three-dimensional greenery
5. Connection with the city
6. Sky-garden as 'Crown' 9
First Floor Plan 10
View of the “Green Fuge” with terraces for office users
Public staircase with a view over the city
Ramp around water
Standard Floor Plan_Office 18-24F
+109.45 m
27.OG
+73.50 m
18.OG
+46.55 m
11.OG
Standard Floor Plan_Office 11-17F
5. OG +10.50 m
Standard Floor Plan_Office 03-10F
2.OG
Section A-A 11
Rooftop restaurant
Commercial housing
office
Conventional housing
Vertical garden
Roof garden
Green terrace
Vertical garden
Event space Bookstore
Mobility hub
Entrance of housing
Restaurant Retail Supermarket
Daycare Fitness
Entrance of office
Mix of hybrid usage Activation of all area
Water
Exit of housing
Office and living Clear division
Maximum quality for staying Sustainability for the urban climate
Express lift
Elevator for Office
Personal lift
Standard Floor Plan_Reside 16-21F
Elevator for commercial housing
Elevator for conventional housing
Entrance of office
Bridge
Landsacape staircase
Activation of the B level New centerpiece
27.OG
Elevator for Service
Delivery
Entrance of housing
Staircase The spiral
Elevator for Service
Entrance to Rooftop restaurant
Exit of housing
Clear traffic Express lift to the roof top
Service corridor in B1
Central delivery zone FW lifts as freight elevators
+109.45 m
+78.45 m
18.OG
21.OG
+73.50 m
Standard Floor Plan_Reside 10-15F +52.20 m
11.OG
+46.55 m
+15.75 m
2.OG
Standard Floor Plan_Reside 03-09F
14.OG
3.OG
+10.50 m
Section B-B 12
HONGSHI
TOWER
TYPOLOGY Office Building CLIENT Hongshi TIME APR, 2019
Project
Hoding
Group
--
Present
STATUS Will be completed
in
LOCATION Hangzhou,
Zhejiang
2025
I n t h i s p r o j e c t , I a m m a i n ly responsible for the following parts. 1, to build the BIM-model in Revit, and export the Floor plans and section. 2, designing of the landscape elements, skywalk, and part of inerior-room. 3, drawing of details. 13
Project Description This project is an office building designed for a famous Chinese enterprise in Hangzhou, China. The height limit of the project is 160m, of which 1 to 4 floors are podiums. What's more, there are 5 floors of underground commercial space.
Ground floor plan
Skywalk Design According to the requirements of government planning, we need to add a skywalk on the south façade to connect the Hongshi Tower with the opposite Hangzhou Bank. As shown here are the plan and section of the flyover I designed, and a quick rendering with Enscape
1. Element Facade construction Color: RAL 9006
4
2. Metal Color: DB 703 3. Steel construction Color: RAL 9006 4. Point drainage
Floor plan skywalk 1
2 3
Elevation skywalk
Section skywalk 14
5
6
7
8
9
1
10
2
4500
9000
3
7000
36000 9000
9000
8400
4 8400
5 9000
6
7
4500
9000
8 9000
9 9000
10 4500
11
12
9000
9000
13 9000
14 4500
狣狨狢S NKOMNZ IUTZXUR ROTK
4500
+159.98
4500
9 4500
3400 1300 3000 1300 3000 1300 3000 1300 3000 1300 3000 1300 1300 7300
5LLOIK
+89.09 Level 21
5LLOIK
+84.79 Level 20
5LLOIK
+80.49 Level 19
5LLOIK
+76.19 Level 18
1300
+93.39 Level 22
3000 3000
1300
+71.89 Level 17
5LLOIK
+67.59 Level 16
1300
5LLOIK
5LLOIK
+63.29 Level 15
5LLOIK
+58.99 Level 14
5LLOIK
1300
9000
+97.69 Level 23
5LLOIK
5LLOIK
+54.69 Level 13
5LLOIK
36000
5
6
7
8
9
3490 1300 3000 1300 3000 1300 3000 1300 3000 1300 3000 1300
+19.80 Level 5
+SVRU_KK )GTZKKT
+15.15 Level 4
3000
5LLOIK
3350 1300
)USSKXIOGR 2UHH_ 5LLOIK 2UHH_
± 0.00 Level 1
-0.10
)GLK
9[TQKT 6RG`G
)GX XGSV
1.30
1300
2.00
9NUV
3750
9NUV
-4.27
5200
2.00
-2.24
;TJKXMXU[TJ 6GXQOTM TUXSGR
)GX XGSV
1300
2200
8U[MN VXUIKYYOTM QOZINKT '96
3.50
)GX XGSV
+5.85 Level 2 5LLOIK 2UHH_ +0.00
1200
1.20
+0.00
1.20
)GX XGSV
+10.50 Level 3
3350 9200
1.30
4500
9NUV
)GX XGSV
2200
;TJKXMXU[TJ 6GXQOTM TUXSGR
)GX XGSV
1300
2.20
'96
1.30
)GX XGSV
'96
2.20
9000
+24.10 Level 6
5LLOIK
1OZINKT
1.50
9000
3500 3200 3200
5850
'96
2.20
9000
20600
4500
B
3500
4500
+28.40 Level 7
5LLOIK
1300
4650
8KYZG[XGTZ
3700
B
8KIKVZOUT 2U[TMK
3500
C 4500
C
+32.70 Level 8
5LLOIK
+SVRU_KK )GTZKKT
1OZINKT
1.30
2UHH_ UL .UTMYNO
Storage FPS
)GYNOKX Y ULLOIK
3000
1300
4300
8KYZG[XGTZ
9000
Copyroom
9000
Tea Kitchen
+37.00 Level 9
5LLOIK
;TJKXMXU[TJ 6GXQOTM TUXSGR
)GX XGSV
1500
AE FAS RS
DPS
+41.30 Level 10
1300
D
+SVRU_KK )GTZKKT
1.30
RS FAS AE
D
3+6
3.35
DPS
3.35
9 Steps x 159 / 250
5LLOIK
4.55
UP
ELV
S01
Anterroom
5LLOIK
HV
Anterroom
DN
DN
9000
36000
9 Steps x 159 / 250 9 Steps x 159 / 250
+45.60 Level 11
5LLOIK
2200
RS
9 Steps x 159 / 250
S02 E06
E
5LLOIK
21.00
UP
E
4300
SE
+49.90 Level 12 5LLOIK
;TJKXMXU[TJ 6GXQOTM ]OZN IO\OR JKLKTIK
2950
E10
4300
E09
4300
E08
5LLOIK
4650
E07
5LLOIK
4650
SE
2K\KR 狤狦 , 2 狣狢狤 狦狪 9 2 狣狢狤 狥狪
9000 36000
5LLOIK
AE
9000
AE
5LLOIK
4300
4500
4500
F 9000
F
5LLOIK
4300
G
+^NOHOZOUT 8UUS
668
4300
G
4790
1300
9000
3000
5LLOIK
4300
9000
3490
1300
10
36000 4500
+102.48 Level 24
,'8
1300
8
+106.78 Level 25
1300
5LLOIK
4300
7
+111.08 Level 26
1300
5LLOIK
4300
6
3000
5LLOIK
4300
Standard floor plan 5
+115.38 Level 27
5LLOIK
1300
10
3000
9
+119.68 Level 28
5LLOIK
1300
8
5LLOIK
3000
7
+123.98 Level 29
5LLOIK
1300
6
5LLOIK
4500
159980
5
5LLOIK
3000
9000
+128.28 Level 30
5LLOIK
3000
9000 36000
+2<
3000
9000
668
4300
B 4500
+132.58 Level 31 5LLOIK
2UHH_ UL .UTMYNO
5LLOIK
4790
4500
4500
C
+136.88 Level 32
5LLOIK
4300
狤狦狫 狨狩 Ss
B
)UTLKXKTIK
3000
2K\KR 狧 , 2 狣狫 狪狢 9 2 狣狫 狩狢
5LLOIK ) 狣狩狢 狨狩 Ss
C
5LLOIK (
+141.18 Level 33
2U[TMK
1300
E05
4300
E04
4300
E03
9000
E02
9000
E01
5LLOIK 5LLOIK
3000
D
4300
D
3000
9 Steps x 159 / 250 DPS
4300
UP
S01
FAS
5LLOIK
4300
ELV
4300
DN
Anterroom
9 Steps x 159 / 250
DN
9000
9 Steps x 159 / 250
5LLOIK
4300
HV
S02 E06
E
)UTLKXKTIK
4300
RS
5LLOIK
4300
AE FAS
4300
E10
FPS
9 Steps x 159 / 250
Anterroom
SE
E09
4300
E08
UP
E
E07
AE
<OIK 6XKYOJKTZ 5LLOIK
4300
SE
RS
4700
AE
4300
AE
+145.88 Roof
*OTOTM XUUS 1200
5LLOIK ' 狥狥狢 狥狦 Ss 9000
9000
5LLOIK * 狤狧狣 狣狥 Ss
+150.58
4700
F
9000 36000
F
36000
4700
G 4500
G
4700
+159.98
-6.40 Level B1 -9.90 Level B2 -13.40 Level B3 -16.90 Level B4 -20.60 Level B5
10 1
Standard floor plan
7000
2
8400
3
8400
4
9000
5
4500
6
9000
7
9000
8
9000
9
4500
10
9000
11
9000
12
9000
13
4500
14
Section 15
4
1
2
1
3
1
1
5
2 6
4
3
Detail Main Entrance
1. Suspended ceiling Color: RAL 9010
Detail MEP
1. Pergola structure(100×400mm) Color: RAL 9006
2. Sunshading lamella Color: DB 703
2. Perforated metal panel Color: DB 703
3. Element Facade construction Color:RAL 9006
3. Element Facade construction Color:RAL 9006
4. Drainage gutter
4. Steel frame Color: RAL 9006
7
8
5. Natural ventilation 6. Lamella 7. Sunshading lamella Color: DB 703 8. Suspended ceiling Color: RAL 9010
16
Stone bank facade west
Floorplan Plaza
Landscape Elements Design Stone bank facade south On the ground in front of the main buidling, I have designed such kind of plants bed with stone bank. Such kind of deisgn will be used all over the square. At the bottom of the stone is embedded with LED spotlights.
Stone bank section 17
Landscape of Sunken Plaza On the underground of the plaza there is a sunken plaza, which as the main landscape node. A waterfall is set up facing the tower, which can be clearly seen from the square on the groundAt the same time, it also serves as the connection between the above-ground office area and the underground business area.
* The two perspectives come from the rendering company Floorplan Sunken plaza
18
Q I A N TA N G S M A R T CENTER TYPOLOGY Office Building
Project
CLIENT Deli TIME Oct, 2020
Group
--
Present
STATUS Will be completed in LOCATION Hangzhou,
2023
Zhejiang
In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the dr awing of diagrams. 19
Project Description This project is a competition in the planning of Genbei new area, Hangzhou. Our group won the first prize of the project in the fall of 2020 and have developed it so far. It is located in the newly developed Qiantang Smart Center in this area. It is a comprehensive building with five towers that combine both business and office. Since they have not been rented out yet, as of now, the owner has no requirements for the arrangement for the functions of the interior space. So our work now is mainly on the exterior of the building.
* The two perspectives came from the rendering company 1
2
3 4
5 6
7 8 9 10 11
8.34
12 13
14
15 16
17
18 19 20
46.60
21
22 23 24
16.65
25 26 27 28 29 30 31 32
33
42.39 5
34 8.34
120.93 8.34
20 2.30 5 1.66 5
4.51 5
2.00 1.82 5 1.82 5 2.00
2.85
1.66 5
8.34
7.99
75
8.34
4.12
75
7.99
8.34
5 111.55
2.85
2.00 1.82 5 1.82 5 2.00
3.78
73 51.66 5
6.67 5
7.99
2.00
E. D
4.52
1.64
1.355
E. D
4.12 4.1315
2.00
7.99
8.68
15.985
16.58
C 16.02
C
Building A
Building B B A
2.00
2.00
1.74
B A
42.39 5
79.93 122.32 5
1
.1.
.2. .3. .4.
.5..6..7.
2
.8. .9..10.
3 4
.11. .12.
5 6
7 8 9 10 11
12 13
.13. .14.
.15.
.16.
44.19 8.68 5
3.45
15 16
.17. .18.
17
18 19 20
.19. .20..21. .22..23..24. .25. .26. .27.
21.54 5 2.40 1.47 5
5.74 5
2.73
8.68 5
80
6.50
21
22 23 24
.28. .29.
25 26 27 28 29 30 31 32
.30. .31.
.32.
44.19 174.26 5
8.34
6.50
80
8.68 5
2.73 1.64 5 2.85 1.251.15
3.45
2.40 1.47 5
.33.
33
.34. .35.
34
.36. .37..38..39. .40. .41. .42. .43. .44.
21.54 5 5.74 5
2.73
8.68 5
80
6.50
.45. .46.
.47.
44.19
8.34
6.50
80
8.68 5
2.73 1.64 5 2.85 1.251.15
3.45
2.40 1.47 5
5.74 5
2.73
8.68 5
.K. .J. .I.
Building E
.A. 44.19
21.54 5
44.19
21.54 5
.H. .G. .F. .E. D. .C.
.B.
4.1315
3.78
Building D
29.175
25.395
Building C
.B.
3.78
27.78
5.94
.H. .G. .F. .E. D. .C.
2.04 70 2.85 41 2.34
5.99
2.035 1.695
.K. .J. .I.
2.73 1.64 5 2.85 1.251.15
14
.A.
44.19
175.66
.1.
.2. .3. .4.
.5..6..7.
.8. .9..10.
.11. .12.
.13. .14.
.15.
.16.
.17. .18.
.19. .20..21. .22..23..24. .25. .26. .27.
.28. .29.
.30. .31.
.32.
.33.
.34. .35.
.36. .37..38. .39..40. .41. .42. .43. .44.
.45. .46.
.47.
Grund floorplan 20
.47.
.46.
.44.
.40.
.36.
.35.
.30.
.27.
.29.
.23.
.19.
.18.
.13.
± 49.83
.12.
.10.
.6.
.2.
.1.
± 49.83 OK Attika ± 48.49 Roof
3.85
3.85
± 48.49 Roof
± 44.64 F12
3.85
3.85
± 44.64 F12
± 40.79 F11
3.85
3.85
± 40.79 F11
± 36.94 F10
3.85
3.85
± 36.94 F10
± 33.09 F9
3.85
3.85
± 33.09 F9
± 29.24 F8
± 25.39 F7
3.85
49.98 3.85
± 25.39 F7
49.83
3.85
3.85
± 29.24 F8
± 21.54 F6
3.85
3.85
± 21.54 F6
± 17.69 F5
.33.
.34.
.17.
.31.
.16.
.15.
.14.
± 13.84 F4
3.85
3.85
± 13.84 F4
.32.
3.85
3.85
± 17.69 F5
± 9.99 F3
4.79
4.79
± 9.99 F3
± 5.20 F2
5.20
± 5.20 F2
± 0.00 F1
± 0.00 F1
8.685
8.475
8.475
8.475
8.685
80
6.50
8.34
6.50
80
8.685
8.475
8
8.475
8.685
80
6.50
8.34
6.50
80
8.685
8.475
8.475
8.475
8.685
91.37
91.37
Elevation north .K.
± 49.83 OK Attika
3.85 3.85
3.85
3.85
3.85
3.85
3.85
3.85
3.85
3.85
49.83 3.85
3.85
3.85
3.85 3.85
3.85
± 13.84 F4
3.85
3.85
± 9.99 F3
± 9.99 F3
4.79
± 5.20 F2
± 5.20 F2
± 5.20 F2
± 5.20 F2
5.20
5.35 -0.15
0
± 17.69 F5
± 13.84 F4
± 9.99 F3
4.79
± 9.99 F3
± 0.00 F1
27.78
Elevation east Building D
-0.15
± 0.00 F1
9.72
9.72
8.34
± 25.39 F7
± 21.54 F6
± 17.69 F5
± 13.84 F4
3.85
± 13.84 F4
4.79
3.85
3.85
3.85 49.98 3.85 3.85
± 21.54 F6
± 17.69 F5
3.85
± 17.69 F5
5.35
± 29.24 F8
± 25.39 F7
3.85
3.85 3.85 49.98 3.85 3.85
± 21.54 F6
8.34
± 33.09 F9
± 29.24 F8
± 25.39 F7
± 21.54 F6
9.72
± 36.94 F10
± 33.09 F9
± 29.24 F8
± 0.00 F1
± 40.79 F11
± 36.94 F10
± 33.09 F9
± 29.24 F8
Elevation west Building D
3.85
3.85
3.85
3.85 3.85 3.85
± 33.09 F9
9.72
± 44.64 F12
± 40.79 F11
± 36.94 F10
± 25.39 F7
± 48.49 Roof
± 44.64 F12
± 40.79 F11
± 36.94 F10
0
± 48.49 Roof
± 44.64 F12
± 40.79 F11
8.34
± 49.83 OK Attika_
± 48.49 Roof
3.85
3.85
± 48.49 Roof
27.78
.K.
.K.
± 44.64 F12
9.72
Building C&D&E
3.85
.H.
.H.
4.79
.C.
± 49.83 OK Attika
1.34
± 49.83 OK Attika_
.A.
.C.
5.20
.A.
.A.
.A.
3.85
.C.
.C.
49.98
.H.
1.34
.K.
.H.
9.72
9.72
8.34
± 0.00 F1
9.72
27.78
27.78
Elevation West Building E
Elevation East Building E 21
RAISED ACCEDSS FLOOR
RAISED ACCEDSS FLOOR
-0.15
Detail Section-glas
Detail Section-window
Level 1 +00.00
Detail Elevation
Detail Floor plan 22
Standard Facade
Parapet Main Entrance
4
6
5
4
2. Lamella
1
3. Suspended ceiling Color: RAL 9010
2
4. Element Facade construction Color:RAL 9006
4. Element Facade construction Color:RAL 9006
5. Obvious frame
5. Perforated metal Color: DB 703
6. Perforated metal Color: DB 703
Detail section
Detail elevation
7. Outer edge of structure 5;:9/*+
5 4 6
6. Ventilation grille 7. Outer edge of structure
8. Outer edge of facade
3 4
Detail section
8. Outer edge of facade
7 8
7
6
8
/49/*+
Detail floor plan
Detail Main Entrance
6
Detail floor plan
2
3. Dark gray door frame Color: DB 703
6
2 . D a r k g r a y u n c o v e re d profil Color: DB 703 3. Fire blocking 4. Sheet metal cladding
4. Draniage channels
5
5. Metal sheet Color: RAL 9006
7
3
6. LED Spotlight
5. Lamella 6. Element Facade construction Color:RAL 9006
1 1
2
5
1
1. Silver aluminum sheet Color:RAL 9006
Lamella Detail
1. Obvious frame Color: DB 703 2. Dark gray uncovered profil Color: DB 703
Detail elevation
3. Recessive beam
2
1
2. Sunshading lamella Color: DB 703
1. Backing bord and fire blocking
3
1. Suspended ceiling Color: RAL 9010
1
3 4 5
6
7. Metal lamella
3 4
23
9
6
6
3
2
7
1
7
2
10
3
5
7
8
Detail Attica
1. Silver aluminum sheet Color:RAL 9006 2. Sheet metal cladding 3. Subconstruction
7. Raised accedss floor 8. Suspended ceiling Color: RAL 9010
4. Recessive beam
9. Dark gray uncovered profil Color: DB 703
5. Shading
10. Fire blocking
6. Element Facade construction Color:RAL 9006
1
2
3 1
1
Detail Standard Facade
1. Silver aluminum sheet Color:RAL 9006 2. Backing bord and fire blocking 3. Dark gray uncovered profil Color: DB 703
6
3
1
6
4
5
5
4
8
3
1
4
2
1
1
1
1
5. Element Facade construction Color:RAL 9006 6. Suspended ceiling Color: RAL 9010 7. Metal opening Color: DB 703
4. Openable insulation board Color: DB 703
24
PUJIANG
CENTER
TYPOLOGY Urban Planning
Competition
CLIENT Pujiang County Planning Bureau TIME Sep, 2021 LOCATION Pujiang,
--
Nov, 2021
Chengdu
In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the drawings of diagrams. 25
Project Description
Landscape
The aim of the futuristic urban design is to develop a strong urban pattern with a memorable design analogy in order to create a distinguishing indentity for Pujiang New Town and its Citizen. What I showed in this portfolio are my works in the first phase of the competition. With the future transformation of the agricultural wetland and following urbanization into a business and commercial zone, a unique waterpark with recreational attractions and cultural activities will become a new gathering place for visitors as well as employees of high-class start-up companies. The Pujiang Citizen Center will be a new vibrant area space within Pujiang New Town.
Concept Generation
Water Areas
Buildings
Peoples Flow
Elevated Bridge
Forest and Parkland
Eventplaces and Eco Highlights
Adventure Forest
Building Green
Urban Green
Wetland Eco-Landscape 26
City Scale
Traffic Pedestrians Plaza Pedestrians Bridge Pedestrians Shoreline Pedestrians Offices Drop-off Pedestrians
Urban Structure
Building Heights
Apparently formed by the water the smoothly cur ved building ensemble are offering interesting perspectives from different angles. According the urban genesis all building complexes within the southern plots are placed along the main roads, creating an urban appearance along the streets.
The height development emphasizes the main citizen center with buildings not higher than 50m forming a new landmark at Northern tip of central green axis.
Street Hierarchy and Scale
Park Scale
The main road system is deÞned by the main existing trafÞc arteries in east-west direction. The secondary street grid in both directions connects the development zone with the surrounding.
A connecting park functions as the spine of the whole event and business district. The gardens attract visitors and residents, at the same time, provide recreational high-quality outdoor space inside each plot.
The pedestrian circulation for Pujiang New Town is of special interest. The site with its spacious plazas is mostly reser ved for pedestrians. Therefore the connecting skywalks are carefully arranged, separating pedestrians from vehicular traffic and connecting various attractions inside the waterpark within short walking distances. The user reaches the parking garage conveniently from the south and east. From there, the visitor can reach the cores of the office buildings and have direct access to either the shopping podiums or the high rise office buildings.
Delivery
Pedestrians
Rescue ways
Drop-off
Onground Parking
Underground Parking 27
The office space designed for the modern company headquarters are placed in a block structure. In combination with the park quality of the main green axis. These ofÞces have a very high quality that gives clients and visitors a very welcome feeling. Each group of headquarter offices and ofÞces for start-up companies has its own characteristic appearance and architectural features. Such intelligent and distinct business identiÞcation will attract prestigious companies. Ground floor plan___Office
Elevation___Office 28
* The perspective came from the rendering company
3rd floor plan___Office
Section___Office 29
Sponge City All stormwater is caught at Þrst point of contact, detained, cleansed and either reused (either in buildings or for irrigation) or sent with a controlled outßow into the municipal system. This ‘treat at Þrst point of contact’ approach means that the development is 100% protected against the effects of localized flooding because stormwater management is conceptualized from the beginning. Sponge City is only possible by the clever integration of blue-green-grey infrastructure tools – from green roofs, rain gardens, permeable pavement, cisterns and swales to larger underground storage elements. Our tested toolkit of InÞltration, Retention, Detention, Cleansing, Reuse, and Controlled Drainage Tools – verified through multiple highlight projects in China – form an infrastructure safety barrier that is also integrated in the open space design. • Sponge City concept focuses on the use of six key elements: • InÞltration • Retention • Detention and Cleansing • Reuse • Drainage • All park spaces have a natural inÞltration zone for retaining /cleansing • Detention also occurs in the water bodies • Reuse is for each block, where water is decentrally caught, stored, treated and reused on site • Drainage follows natural topography, firstly cleansed prior to entering the river or municipal pipe system
Green Areas, Wetland Greem Roof(Retain) Blue Roof(Collect) Permeable Paving Rain Gardens &Tree Pit Storage Water Channel Cleaning Biotope Swales Multi-Functional Water Storage + Plaza Blue Super Tree Green Super Tree Surface Transport, Water Feature Use
Biotope
Retention Roof
Wetland
Reuse
for water feature
Blue Roof Water Channel
Smart Outflow Control
Public Sewer
Reuse
Reduced Outflow
for irrigation
Underground Cistern
Smart Outflow Control
33% reuse for toilets & irrigatation 66% for rentention/slow runoff
Underground Cistern
33% reuse for toilets & irrigatation 66% for rentention/slow runoff
Public Sewer Reduced Outflow
30
SCHENGZE RESIDENTIAL TYPOLOGY Residential
Area
Design
CLIENT China Eagle Real Estate Co.Ltd TIME May, 2022
--
Present
LOCATION Shengze,
Suzhou,
Jiangsu
In this project, I am mainly responsible for the following parts. 1, the design of pixel on facade according to script. 2, the design of regular floorplan for apartments. 3, the drawing of floorplan and interior-design for the underground wellness center. 31
Design of Unit
Project Description The aim of the project is to create a high-end residential area, and on the underground there will be a big wellness-center to improve the quality of life for the people who live here. According to the shape of plot, we have adopted a relatively regular layout for the 3 group of residential buildings, whose height are different. The height increases from south to north. To reach the same kind of architectural language as the masterplan, on the facade we use different kinds of pixels, which can also provide different interior feeling for different rooms.
Bedroom
Underground Wellness Center
Toilet
Living Room
High-rises
Middle-rises
Low-rises
Masterplan
Regular Floorplan__Low-rise 32
Facade Design Final loggia Outside volume
Skybox
Initial loggia Inside volume
Final balcony Inside volume
Balcony
Initial balcony Outside volume
33
Underground Wellness Center
34
Functions of Wellness Center The wellness center located on the underground of the high-rise apartments in the middle. It includes not only different kinds of spor ts area, but also sauna, massage, and matching tea bar. In the middle of the wellness center is a green space, which according to a huge staircase connecting with the groud.
LINEAR The lamellas stand in linear, provide decorations for the runway and rooms in spa, and add more privacity for each room .
BOX
4. Massage
The box composed of stone pixel and be used as the background wall for tea bar, as well as rooms for staff.
1 4
BLOCK The several blocks provide a high-end atmosphere in the lobby.
5
FREEFORM The free curve provides the tea bar a long bench, which is the centre of the bar.
1. Tea bar
5. Reception
2 3 BOX
2. Sauna
6. Fitness studio
6
FREEFORM The free curve provides the people in jacuzzi a flowing and relaxing atmosphere.
3. Relax
7
BLOCK The block provides people in this area a whole swimming pool.
7. Swimming pool 35