Han Li - Portfolio

Page 1



GUANGLAN ROAD URBANPLANNING TYPOLOGY Urban Planning

Competiton

CLIENT China State Construction Engineering Corporation TIME May, 2022

--

LOCATION Pudong District,

Aug, 2022

Shanghai

I n t h i s p r o j e c t , I a m m a i n ly responsible for the following pa r t s . 1 , T h e c o n c e p t o f t h e volume of main towers. 2, The diesign for the groundfloor of sockel, and regular floorplan of the towers. 3, The renewal of the historic street. 4, Drawing of a part of diagrams and 3D Section. 3


Concept Generation

1. Commercail Canyon

2. Historic Village

3. Pearl Necklace

Masterplan

Project Description The overall planning and design concept is derived from two central thoughts: First, the site situation and its environment. The vicinity of lush green parks, beautiful water and sports facilities plays an equally important role as the precise analysis of traffic flows and pedestrian accessibility by public transport through the two subway stations and the underground connection to the planned commercial area in the east. But most importantly the historic old street with the protected listed buildings along the riverline. We consider this being a seldom and precious good that has to be brought back to new life. All of these factors have a big influence not only on how the new masterplan and especially the plot of the new Headquarters for CSCEC are being layouted and organised but moreover on how they actually work and are being percieved by their future users and the public. The second thought is obvious: What if we could create an entirely harmonious new quarter, connecting all plots together by one architectural design language and programming. A place which enriches everybody’s lifes, which is uplifting in atmosphere and services the people that are working there, living there or coming for a visit. Following their sports activities or simply wanting to have a good time out enjoying a variety of commercial and cultural choices.

4. Transition of Scales

5. Sustainable Quarter 4


Headquarter

Historic Proctected Area

Commercial Office Hotel Access To -2

Exit from -2

Office drop-off

Exit

Exit

ff drop-o uarter Headq

Exit

ff

drop-o

Exit

CEO

vice

& Ser Exit & Service

Exit

Office Lobby

Office

Lob

by

Me

tro

Exit

sta

tion

& Ser

vice

To -2

y bb Lo

Exi t

Void

Hot el

Void Void

Gathering Area

Lo bb y

Connecting different Functions

Void dr op -o ff

Exit

Service

Exit

Exi t

Hot el

Exit

Void

Void Restaurant

Restaurant

Restaurant Exit protected Tree Exit

Exit

To -2

Co. Working Place

Art Gallery

Concept Store

Coffee & Bar

Groundfloor Plan

Interweaving the Old and the New

Function Diagrams

Pedstrian flows

Subway access

Car circulation

Firestuck route

Firestuck route

Program distribution

Programming of Public Areas 5


Headquarter Office Hotel

Hotel On the regular levels of hotel you will see the hotel rooms and on top of that the serviced apartments all in a regular floorplan layout with efficient organisation of the cores and circulation.

Offices The regular floorplans are all ver y efficiently lorganised around a central core each letting big amounts of daylight deep into the spaces.

Headquarters The tower levels of the headquater are very efficiently organised with central elevator cores and flexible office spaces all around with spectacular views and lots of natural daylight.

Standard Floor Plan

+4 Pð

Headquater Typical Floor Layout

Hotel Typical Floor Layout

2IILFH

2IILFH

Office 1 Typical Floor Layout

Office 2 Typical Floor Layout 6


3D Section

Office 2 Lobby

Commercial -1st Floor

Commercial -2nd Floor

Restraunt

Caynon Connection

Commercial Area

Historic Quarter

River

Historic Quarter 7


NEW HEART ON THE BLOCK TYPOLOGY Commercial Group Competiton

TIME Jan, 2023

--

Aug, 2023

STATUS 2. Prize LOCATION Düsseldorf

In this competition, I am mainly responsible for the following parts. 1, the design of parts of podium and the regular floorplan o f t h e t w o t o w e r , t h at i s t h e o f f i c e t o w e r a n d a pa r t m e n t s , including the design of stucture. 2, The drawing of sections. 3, the analyse of the functions for each part and the drawings of diagrams. 8


Project Description The office tower will be seen as a high point in the group. The volume is kept parallel orientation to the street, to keep city view slim and block traffic noise. Arrangement of the residential building in the eastern soundproof area to maximize the quality of living. Alignment following the urbanplanning grid of the city. A new square is created between the buildings: the "New Heart" of the quarter. Stepping of the building cubatures in order to maintain distances, to ensure sunshine and to maximize the views towards the Rhine and the city center.

Rooftop Restaurant with Sky-garden

Transmission of the floor-by-floor staggering in the base area to activate the lower floors for the public. Connection of the multistorey base to the new pedestrian bridge on the first floor and use of hybrid program modules. Greening of all terrace areas distributed over the entire height. Creation of high-quality working and living environments . The tower with a rooftop use over three levels as a glazed "sky garden" with a view over the city.

Vertical Garden as public area of office for communication

Concept Generation Vertical Garden as open space for Residential

Office as flexible and collaborative office spaces

1. Isolation from noise

2. Adopt to the urbanplanning grid

3. Stepping for a view of the Rhine

Conventional living with a flexible mix of apartments and a view of the Rhine

Commercial living with a flexible mix of apartments and roof terraces

Event space Terrace & garden as public space of events

4. Three-dimensional greenery

5. Connection with the city

6. Sky-garden as 'Crown' 9


First Floor Plan 10


View of the “Green Fuge” with terraces for office users

Public staircase with a view over the city

Ramp around water

Standard Floor Plan_Office 18-24F

+109.45 m

27.OG

+73.50 m

18.OG

+46.55 m

11.OG

Standard Floor Plan_Office 11-17F

5. OG +10.50 m

Standard Floor Plan_Office 03-10F

2.OG

Section A-A 11


Rooftop restaurant

Commercial housing

office

Conventional housing

Vertical garden

Roof garden

Green terrace

Vertical garden

Event space Bookstore

Mobility hub

Entrance of housing

Restaurant Retail Supermarket

Daycare Fitness

Entrance of office

Mix of hybrid usage Activation of all area

Water

Exit of housing

Office and living Clear division

Maximum quality for staying Sustainability for the urban climate

Express lift

Elevator for Office

Personal lift

Standard Floor Plan_Reside 16-21F

Elevator for commercial housing

Elevator for conventional housing

Entrance of office

Bridge

Landsacape staircase

Activation of the B level New centerpiece

27.OG

Elevator for Service

Delivery

Entrance of housing

Staircase The spiral

Elevator for Service

Entrance to Rooftop restaurant

Exit of housing

Clear traffic Express lift to the roof top

Service corridor in B1

Central delivery zone FW lifts as freight elevators

+109.45 m

+78.45 m

18.OG

21.OG

+73.50 m

Standard Floor Plan_Reside 10-15F +52.20 m

11.OG

+46.55 m

+15.75 m

2.OG

Standard Floor Plan_Reside 03-09F

14.OG

3.OG

+10.50 m

Section B-B 12


HONGSHI

TOWER

TYPOLOGY Office Building CLIENT Hongshi TIME APR, 2019

Project

Hoding

Group

--

Present

STATUS Will be completed

in

LOCATION Hangzhou,

Zhejiang

2025

I n t h i s p r o j e c t , I a m m a i n ly responsible for the following parts. 1, to build the BIM-model in Revit, and export the Floor plans and section. 2, designing of the landscape elements, skywalk, and part of inerior-room. 3, drawing of details. 13


Project Description This project is an office building designed for a famous Chinese enterprise in Hangzhou, China. The height limit of the project is 160m, of which 1 to 4 floors are podiums. What's more, there are 5 floors of underground commercial space.

Ground floor plan

Skywalk Design According to the requirements of government planning, we need to add a skywalk on the south façade to connect the Hongshi Tower with the opposite Hangzhou Bank. As shown here are the plan and section of the flyover I designed, and a quick rendering with Enscape

1. Element Facade construction Color: RAL 9006

4

2. Metal Color: DB 703 3. Steel construction Color: RAL 9006 4. Point drainage

Floor plan skywalk 1

2 3

Elevation skywalk

Section skywalk 14


5

6

7

8

9

1

10

2

4500

9000

3

7000

36000 9000

9000

8400

4 8400

5 9000

6

7

4500

9000

8 9000

9 9000

10 4500

11

12

9000

9000

13 9000

14 4500

狣狨狢S NKOMNZ IUTZXUR ROTK

4500

+159.98

4500

9 4500

3400 1300 3000 1300 3000 1300 3000 1300 3000 1300 3000 1300 1300 7300

5LLOIK

+89.09 Level 21

5LLOIK

+84.79 Level 20

5LLOIK

+80.49 Level 19

5LLOIK

+76.19 Level 18

1300

+93.39 Level 22

3000 3000

1300

+71.89 Level 17

5LLOIK

+67.59 Level 16

1300

5LLOIK

5LLOIK

+63.29 Level 15

5LLOIK

+58.99 Level 14

5LLOIK

1300

9000

+97.69 Level 23

5LLOIK

5LLOIK

+54.69 Level 13

5LLOIK

36000

5

6

7

8

9

3490 1300 3000 1300 3000 1300 3000 1300 3000 1300 3000 1300

+19.80 Level 5

+SVRU_KK )GTZKKT

+15.15 Level 4

3000

5LLOIK

3350 1300

)USSKXIOGR 2UHH_ 5LLOIK 2UHH_

± 0.00 Level 1

-0.10

)GLK

9[TQKT 6RG`G

)GX XGSV

1.30

1300

2.00

9NUV

3750

9NUV

-4.27

5200

2.00

-2.24

;TJKXMXU[TJ 6GXQOTM TUXSGR

)GX XGSV

1300

2200

8U[MN VXUIKYYOTM QOZINKT '96

3.50

)GX XGSV

+5.85 Level 2 5LLOIK 2UHH_ +0.00

1200

1.20

+0.00

1.20

)GX XGSV

+10.50 Level 3

3350 9200

1.30

4500

9NUV

)GX XGSV

2200

;TJKXMXU[TJ 6GXQOTM TUXSGR

)GX XGSV

1300

2.20

'96

1.30

)GX XGSV

'96

2.20

9000

+24.10 Level 6

5LLOIK

1OZINKT

1.50

9000

3500 3200 3200

5850

'96

2.20

9000

20600

4500

B

3500

4500

+28.40 Level 7

5LLOIK

1300

4650

8KYZG[XGTZ

3700

B

8KIKVZOUT 2U[TMK

3500

C 4500

C

+32.70 Level 8

5LLOIK

+SVRU_KK )GTZKKT

1OZINKT

1.30

2UHH_ UL .UTMYNO

Storage FPS

)GYNOKX Y ULLOIK

3000

1300

4300

8KYZG[XGTZ

9000

Copyroom

9000

Tea Kitchen

+37.00 Level 9

5LLOIK

;TJKXMXU[TJ 6GXQOTM TUXSGR

)GX XGSV

1500

AE FAS RS

DPS

+41.30 Level 10

1300

D

+SVRU_KK )GTZKKT

1.30

RS FAS AE

D

3+6

3.35

DPS

3.35

9 Steps x 159 / 250

5LLOIK

4.55

UP

ELV

S01

Anterroom

5LLOIK

HV

Anterroom

DN

DN

9000

36000

9 Steps x 159 / 250 9 Steps x 159 / 250

+45.60 Level 11

5LLOIK

2200

RS

9 Steps x 159 / 250

S02 E06

E

5LLOIK

21.00

UP

E

4300

SE

+49.90 Level 12 5LLOIK

;TJKXMXU[TJ 6GXQOTM ]OZN IO\OR JKLKTIK

2950

E10

4300

E09

4300

E08

5LLOIK

4650

E07

5LLOIK

4650

SE

2K\KR 狤狦 , 2 狣狢狤 狦狪 9 2 狣狢狤 狥狪

9000 36000

5LLOIK

AE

9000

AE

5LLOIK

4300

4500

4500

F 9000

F

5LLOIK

4300

G

+^NOHOZOUT 8UUS

668

4300

G

4790

1300

9000

3000

5LLOIK

4300

9000

3490

1300

10

36000 4500

+102.48 Level 24

,'8

1300

8

+106.78 Level 25

1300

5LLOIK

4300

7

+111.08 Level 26

1300

5LLOIK

4300

6

3000

5LLOIK

4300

Standard floor plan 5

+115.38 Level 27

5LLOIK

1300

10

3000

9

+119.68 Level 28

5LLOIK

1300

8

5LLOIK

3000

7

+123.98 Level 29

5LLOIK

1300

6

5LLOIK

4500

159980

5

5LLOIK

3000

9000

+128.28 Level 30

5LLOIK

3000

9000 36000

+2<

3000

9000

668

4300

B 4500

+132.58 Level 31 5LLOIK

2UHH_ UL .UTMYNO

5LLOIK

4790

4500

4500

C

+136.88 Level 32

5LLOIK

4300

狤狦狫 狨狩 Ss

B

)UTLKXKTIK

3000

2K\KR 狧 , 2 狣狫 狪狢 9 2 狣狫 狩狢

5LLOIK ) 狣狩狢 狨狩 Ss

C

5LLOIK (

+141.18 Level 33

2U[TMK

1300

E05

4300

E04

4300

E03

9000

E02

9000

E01

5LLOIK 5LLOIK

3000

D

4300

D

3000

9 Steps x 159 / 250 DPS

4300

UP

S01

FAS

5LLOIK

4300

ELV

4300

DN

Anterroom

9 Steps x 159 / 250

DN

9000

9 Steps x 159 / 250

5LLOIK

4300

HV

S02 E06

E

)UTLKXKTIK

4300

RS

5LLOIK

4300

AE FAS

4300

E10

FPS

9 Steps x 159 / 250

Anterroom

SE

E09

4300

E08

UP

E

E07

AE

<OIK 6XKYOJKTZ 5LLOIK

4300

SE

RS

4700

AE

4300

AE

+145.88 Roof

*OTOTM XUUS 1200

5LLOIK ' 狥狥狢 狥狦 Ss 9000

9000

5LLOIK * 狤狧狣 狣狥 Ss

+150.58

4700

F

9000 36000

F

36000

4700

G 4500

G

4700

+159.98

-6.40 Level B1 -9.90 Level B2 -13.40 Level B3 -16.90 Level B4 -20.60 Level B5

10 1

Standard floor plan

7000

2

8400

3

8400

4

9000

5

4500

6

9000

7

9000

8

9000

9

4500

10

9000

11

9000

12

9000

13

4500

14

Section 15


4

1

2

1

3

1

1

5

2 6

4

3

Detail Main Entrance

1. Suspended ceiling Color: RAL 9010

Detail MEP

1. Pergola structure(100×400mm) Color: RAL 9006

2. Sunshading lamella Color: DB 703

2. Perforated metal panel Color: DB 703

3. Element Facade construction Color:RAL 9006

3. Element Facade construction Color:RAL 9006

4. Drainage gutter

4. Steel frame Color: RAL 9006

7

8

5. Natural ventilation 6. Lamella 7. Sunshading lamella Color: DB 703 8. Suspended ceiling Color: RAL 9010

16


Stone bank facade west

Floorplan Plaza

Landscape Elements Design Stone bank facade south On the ground in front of the main buidling, I have designed such kind of plants bed with stone bank. Such kind of deisgn will be used all over the square. At the bottom of the stone is embedded with LED spotlights.

Stone bank section 17


Landscape of Sunken Plaza On the underground of the plaza there is a sunken plaza, which as the main landscape node. A waterfall is set up facing the tower, which can be clearly seen from the square on the groundAt the same time, it also serves as the connection between the above-ground office area and the underground business area.

* The two perspectives come from the rendering company Floorplan Sunken plaza

18


Q I A N TA N G S M A R T CENTER TYPOLOGY Office Building

Project

CLIENT Deli TIME Oct, 2020

Group

--

Present

STATUS Will be completed in LOCATION Hangzhou,

2023

Zhejiang

In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the dr awing of diagrams. 19


Project Description This project is a competition in the planning of Genbei new area, Hangzhou. Our group won the first prize of the project in the fall of 2020 and have developed it so far. It is located in the newly developed Qiantang Smart Center in this area. It is a comprehensive building with five towers that combine both business and office. Since they have not been rented out yet, as of now, the owner has no requirements for the arrangement for the functions of the interior space. So our work now is mainly on the exterior of the building.

* The two perspectives came from the rendering company 1

2

3 4

5 6

7 8 9 10 11

8.34

12 13

14

15 16

17

18 19 20

46.60

21

22 23 24

16.65

25 26 27 28 29 30 31 32

33

42.39 5

34 8.34

120.93 8.34

20 2.30 5 1.66 5

4.51 5

2.00 1.82 5 1.82 5 2.00

2.85

1.66 5

8.34

7.99

75

8.34

4.12

75

7.99

8.34

5 111.55

2.85

2.00 1.82 5 1.82 5 2.00

3.78

73 51.66 5

6.67 5

7.99

2.00

E. D

4.52

1.64

1.355

E. D

4.12 4.1315

2.00

7.99

8.68

15.985

16.58

C 16.02

C

Building A

Building B B A

2.00

2.00

1.74

B A

42.39 5

79.93 122.32 5

1

.1.

.2. .3. .4.

.5..6..7.

2

.8. .9..10.

3 4

.11. .12.

5 6

7 8 9 10 11

12 13

.13. .14.

.15.

.16.

44.19 8.68 5

3.45

15 16

.17. .18.

17

18 19 20

.19. .20..21. .22..23..24. .25. .26. .27.

21.54 5 2.40 1.47 5

5.74 5

2.73

8.68 5

80

6.50

21

22 23 24

.28. .29.

25 26 27 28 29 30 31 32

.30. .31.

.32.

44.19 174.26 5

8.34

6.50

80

8.68 5

2.73 1.64 5 2.85 1.251.15

3.45

2.40 1.47 5

.33.

33

.34. .35.

34

.36. .37..38..39. .40. .41. .42. .43. .44.

21.54 5 5.74 5

2.73

8.68 5

80

6.50

.45. .46.

.47.

44.19

8.34

6.50

80

8.68 5

2.73 1.64 5 2.85 1.251.15

3.45

2.40 1.47 5

5.74 5

2.73

8.68 5

.K. .J. .I.

Building E

.A. 44.19

21.54 5

44.19

21.54 5

.H. .G. .F. .E. D. .C.

.B.

4.1315

3.78

Building D

29.175

25.395

Building C

.B.

3.78

27.78

5.94

.H. .G. .F. .E. D. .C.

2.04 70 2.85 41 2.34

5.99

2.035 1.695

.K. .J. .I.

2.73 1.64 5 2.85 1.251.15

14

.A.

44.19

175.66

.1.

.2. .3. .4.

.5..6..7.

.8. .9..10.

.11. .12.

.13. .14.

.15.

.16.

.17. .18.

.19. .20..21. .22..23..24. .25. .26. .27.

.28. .29.

.30. .31.

.32.

.33.

.34. .35.

.36. .37..38. .39..40. .41. .42. .43. .44.

.45. .46.

.47.

Grund floorplan 20


.47.

.46.

.44.

.40.

.36.

.35.

.30.

.27.

.29.

.23.

.19.

.18.

.13.

± 49.83

.12.

.10.

.6.

.2.

.1.

± 49.83 OK Attika ± 48.49 Roof

3.85

3.85

± 48.49 Roof

± 44.64 F12

3.85

3.85

± 44.64 F12

± 40.79 F11

3.85

3.85

± 40.79 F11

± 36.94 F10

3.85

3.85

± 36.94 F10

± 33.09 F9

3.85

3.85

± 33.09 F9

± 29.24 F8

± 25.39 F7

3.85

49.98 3.85

± 25.39 F7

49.83

3.85

3.85

± 29.24 F8

± 21.54 F6

3.85

3.85

± 21.54 F6

± 17.69 F5

.33.

.34.

.17.

.31.

.16.

.15.

.14.

± 13.84 F4

3.85

3.85

± 13.84 F4

.32.

3.85

3.85

± 17.69 F5

± 9.99 F3

4.79

4.79

± 9.99 F3

± 5.20 F2

5.20

± 5.20 F2

± 0.00 F1

± 0.00 F1

8.685

8.475

8.475

8.475

8.685

80

6.50

8.34

6.50

80

8.685

8.475

8

8.475

8.685

80

6.50

8.34

6.50

80

8.685

8.475

8.475

8.475

8.685

91.37

91.37

Elevation north .K.

± 49.83 OK Attika

3.85 3.85

3.85

3.85

3.85

3.85

3.85

3.85

3.85

3.85

49.83 3.85

3.85

3.85

3.85 3.85

3.85

± 13.84 F4

3.85

3.85

± 9.99 F3

± 9.99 F3

4.79

± 5.20 F2

± 5.20 F2

± 5.20 F2

± 5.20 F2

5.20

5.35 -0.15

0

± 17.69 F5

± 13.84 F4

± 9.99 F3

4.79

± 9.99 F3

± 0.00 F1

27.78

Elevation east Building D

-0.15

± 0.00 F1

9.72

9.72

8.34

± 25.39 F7

± 21.54 F6

± 17.69 F5

± 13.84 F4

3.85

± 13.84 F4

4.79

3.85

3.85

3.85 49.98 3.85 3.85

± 21.54 F6

± 17.69 F5

3.85

± 17.69 F5

5.35

± 29.24 F8

± 25.39 F7

3.85

3.85 3.85 49.98 3.85 3.85

± 21.54 F6

8.34

± 33.09 F9

± 29.24 F8

± 25.39 F7

± 21.54 F6

9.72

± 36.94 F10

± 33.09 F9

± 29.24 F8

± 0.00 F1

± 40.79 F11

± 36.94 F10

± 33.09 F9

± 29.24 F8

Elevation west Building D

3.85

3.85

3.85

3.85 3.85 3.85

± 33.09 F9

9.72

± 44.64 F12

± 40.79 F11

± 36.94 F10

± 25.39 F7

± 48.49 Roof

± 44.64 F12

± 40.79 F11

± 36.94 F10

0

± 48.49 Roof

± 44.64 F12

± 40.79 F11

8.34

± 49.83 OK Attika_

± 48.49 Roof

3.85

3.85

± 48.49 Roof

27.78

.K.

.K.

± 44.64 F12

9.72

Building C&D&E

3.85

.H.

.H.

4.79

.C.

± 49.83 OK Attika

1.34

± 49.83 OK Attika_

.A.

.C.

5.20

.A.

.A.

.A.

3.85

.C.

.C.

49.98

.H.

1.34

.K.

.H.

9.72

9.72

8.34

± 0.00 F1

9.72

27.78

27.78

Elevation West Building E

Elevation East Building E 21


RAISED ACCEDSS FLOOR

RAISED ACCEDSS FLOOR

-0.15

Detail Section-glas

Detail Section-window

Level 1 +00.00

Detail Elevation

Detail Floor plan 22


Standard Facade

Parapet Main Entrance

4

6

5

4

2. Lamella

1

3. Suspended ceiling Color: RAL 9010

2

4. Element Facade construction Color:RAL 9006

4. Element Facade construction Color:RAL 9006

5. Obvious frame

5. Perforated metal Color: DB 703

6. Perforated metal Color: DB 703

Detail section

Detail elevation

7. Outer edge of structure 5;:9/*+

5 4 6

6. Ventilation grille 7. Outer edge of structure

8. Outer edge of facade

3 4

Detail section

8. Outer edge of facade

7 8

7

6

8

/49/*+

Detail floor plan

Detail Main Entrance

6

Detail floor plan

2

3. Dark gray door frame Color: DB 703

6

2 . D a r k g r a y u n c o v e re d profil Color: DB 703 3. Fire blocking 4. Sheet metal cladding

4. Draniage channels

5

5. Metal sheet Color: RAL 9006

7

3

6. LED Spotlight

5. Lamella 6. Element Facade construction Color:RAL 9006

1 1

2

5

1

1. Silver aluminum sheet Color:RAL 9006

Lamella Detail

1. Obvious frame Color: DB 703 2. Dark gray uncovered profil Color: DB 703

Detail elevation

3. Recessive beam

2

1

2. Sunshading lamella Color: DB 703

1. Backing bord and fire blocking

3

1. Suspended ceiling Color: RAL 9010

1

3 4 5

6

7. Metal lamella

3 4

23


9

6

6

3

2

7

1

7

2

10

3

5

7

8

Detail Attica

1. Silver aluminum sheet Color:RAL 9006 2. Sheet metal cladding 3. Subconstruction

7. Raised accedss floor 8. Suspended ceiling Color: RAL 9010

4. Recessive beam

9. Dark gray uncovered profil Color: DB 703

5. Shading

10. Fire blocking

6. Element Facade construction Color:RAL 9006

1

2

3 1

1

Detail Standard Facade

1. Silver aluminum sheet Color:RAL 9006 2. Backing bord and fire blocking 3. Dark gray uncovered profil Color: DB 703

6

3

1

6

4

5

5

4

8

3

1

4

2

1

1

1

1

5. Element Facade construction Color:RAL 9006 6. Suspended ceiling Color: RAL 9010 7. Metal opening Color: DB 703

4. Openable insulation board Color: DB 703

24


PUJIANG

CENTER

TYPOLOGY Urban Planning

Competition

CLIENT Pujiang County Planning Bureau TIME Sep, 2021 LOCATION Pujiang,

--

Nov, 2021

Chengdu

In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the drawings of diagrams. 25


Project Description

Landscape

The aim of the futuristic urban design is to develop a strong urban pattern with a memorable design analogy in order to create a distinguishing indentity for Pujiang New Town and its Citizen. What I showed in this portfolio are my works in the first phase of the competition. With the future transformation of the agricultural wetland and following urbanization into a business and commercial zone, a unique waterpark with recreational attractions and cultural activities will become a new gathering place for visitors as well as employees of high-class start-up companies. The Pujiang Citizen Center will be a new vibrant area space within Pujiang New Town.

Concept Generation

Water Areas

Buildings

Peoples Flow

Elevated Bridge

Forest and Parkland

Eventplaces and Eco Highlights

Adventure Forest

Building Green

Urban Green

Wetland Eco-Landscape 26


City Scale

Traffic Pedestrians Plaza Pedestrians Bridge Pedestrians Shoreline Pedestrians Offices Drop-off Pedestrians

Urban Structure

Building Heights

Apparently formed by the water the smoothly cur ved building ensemble are offering interesting perspectives from different angles. According the urban genesis all building complexes within the southern plots are placed along the main roads, creating an urban appearance along the streets.

The height development emphasizes the main citizen center with buildings not higher than 50m forming a new landmark at Northern tip of central green axis.

Street Hierarchy and Scale

Park Scale

The main road system is deÞned by the main existing trafÞc arteries in east-west direction. The secondary street grid in both directions connects the development zone with the surrounding.

A connecting park functions as the spine of the whole event and business district. The gardens attract visitors and residents, at the same time, provide recreational high-quality outdoor space inside each plot.

The pedestrian circulation for Pujiang New Town is of special interest. The site with its spacious plazas is mostly reser ved for pedestrians. Therefore the connecting skywalks are carefully arranged, separating pedestrians from vehicular traffic and connecting various attractions inside the waterpark within short walking distances. The user reaches the parking garage conveniently from the south and east. From there, the visitor can reach the cores of the office buildings and have direct access to either the shopping podiums or the high rise office buildings.

Delivery

Pedestrians

Rescue ways

Drop-off

Onground Parking

Underground Parking 27


The office space designed for the modern company headquarters are placed in a block structure. In combination with the park quality of the main green axis. These ofÞces have a very high quality that gives clients and visitors a very welcome feeling. Each group of headquarter offices and ofÞces for start-up companies has its own characteristic appearance and architectural features. Such intelligent and distinct business identiÞcation will attract prestigious companies. Ground floor plan___Office

Elevation___Office 28


* The perspective came from the rendering company

3rd floor plan___Office

Section___Office 29


Sponge City All stormwater is caught at Þrst point of contact, detained, cleansed and either reused (either in buildings or for irrigation) or sent with a controlled outßow into the municipal system. This ‘treat at Þrst point of contact’ approach means that the development is 100% protected against the effects of localized flooding because stormwater management is conceptualized from the beginning. Sponge City is only possible by the clever integration of blue-green-grey infrastructure tools – from green roofs, rain gardens, permeable pavement, cisterns and swales to larger underground storage elements. Our tested toolkit of InÞltration, Retention, Detention, Cleansing, Reuse, and Controlled Drainage Tools – verified through multiple highlight projects in China – form an infrastructure safety barrier that is also integrated in the open space design. • Sponge City concept focuses on the use of six key elements: • InÞltration • Retention • Detention and Cleansing • Reuse • Drainage • All park spaces have a natural inÞltration zone for retaining /cleansing • Detention also occurs in the water bodies • Reuse is for each block, where water is decentrally caught, stored, treated and reused on site • Drainage follows natural topography, firstly cleansed prior to entering the river or municipal pipe system

Green Areas, Wetland Greem Roof(Retain) Blue Roof(Collect) Permeable Paving Rain Gardens &Tree Pit Storage Water Channel Cleaning Biotope Swales Multi-Functional Water Storage + Plaza Blue Super Tree Green Super Tree Surface Transport, Water Feature Use

Biotope

Retention Roof

Wetland

Reuse

for water feature

Blue Roof Water Channel

Smart Outflow Control

Public Sewer

Reuse

Reduced Outflow

for irrigation

Underground Cistern

Smart Outflow Control

33% reuse for toilets & irrigatation 66% for rentention/slow runoff

Underground Cistern

33% reuse for toilets & irrigatation 66% for rentention/slow runoff

Public Sewer Reduced Outflow

30


SCHENGZE RESIDENTIAL TYPOLOGY Residential

Area

Design

CLIENT China Eagle Real Estate Co.Ltd TIME May, 2022

--

Present

LOCATION Shengze,

Suzhou,

Jiangsu

In this project, I am mainly responsible for the following parts. 1, the design of pixel on facade according to script. 2, the design of regular floorplan for apartments. 3, the drawing of floorplan and interior-design for the underground wellness center. 31


Design of Unit

Project Description The aim of the project is to create a high-end residential area, and on the underground there will be a big wellness-center to improve the quality of life for the people who live here. According to the shape of plot, we have adopted a relatively regular layout for the 3 group of residential buildings, whose height are different. The height increases from south to north. To reach the same kind of architectural language as the masterplan, on the facade we use different kinds of pixels, which can also provide different interior feeling for different rooms.

Bedroom

Underground Wellness Center

Toilet

Living Room

High-rises

Middle-rises

Low-rises

Masterplan

Regular Floorplan__Low-rise 32


Facade Design Final loggia Outside volume

Skybox

Initial loggia Inside volume

Final balcony Inside volume

Balcony

Initial balcony Outside volume

33


Underground Wellness Center

34


Functions of Wellness Center The wellness center located on the underground of the high-rise apartments in the middle. It includes not only different kinds of spor ts area, but also sauna, massage, and matching tea bar. In the middle of the wellness center is a green space, which according to a huge staircase connecting with the groud.

LINEAR The lamellas stand in linear, provide decorations for the runway and rooms in spa, and add more privacity for each room .

BOX

4. Massage

The box composed of stone pixel and be used as the background wall for tea bar, as well as rooms for staff.

1 4

BLOCK The several blocks provide a high-end atmosphere in the lobby.

5

FREEFORM The free curve provides the tea bar a long bench, which is the centre of the bar.

1. Tea bar

5. Reception

2 3 BOX

2. Sauna

6. Fitness studio

6

FREEFORM The free curve provides the people in jacuzzi a flowing and relaxing atmosphere.

3. Relax

7

BLOCK The block provides people in this area a whole swimming pool.

7. Swimming pool 35



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.