Han Li - Portfolio

Page 1

NEW HEART ON THE BLOCK

TYPOLOGY

Commercial Group Competiton

CLIENT

Die Developer

Projektentwicklung GmbH

TIME

Jan, 2023 -- Feb, 2023

LOCATION

Düsseldorf

In this competition, I am mainly responsible for the following parts. 1, the design of the regular floorplan of the two tower,that is the office tower and apartments, including the design of stucture for them. 2, Facade design and the drawing of sections. 3, the analyse of the functions for each part and the drawings of diagrams.

3

Project Description

The office tower will be seen as a high point in the group. The volume is kept parallel orientation to the street, to keep city view slim and block traffic noise. Arrangement of the residential building in the eastern soundproof area to maximize the quality of living. Alignment following the urbanplanning grid of the city. A new square is created between the buildings: the "New Heart" of the quarter. Stepping of the building cubatures in order to maintain distances, to ensure sunshine and to maximize the views towards the Rhine and the city center.

Transmission of the floor-by-floor staggering in the base area to activate the lower floors for the public. Connection of the multi-storey base to the new pedestrian bridge on the first floor and use of hybrid program modules.

Greening of all terrace areas distributed over the entire height. Creation of high-quality working and living environments . The tower with a rooftop use over three levels as a glazed "sky garden" with a view over the city.

Concept Generation

4. Three dimensional Sockel 1. Isolation from noise 5. Connection to the City 2. Adopt to the urbanplanning grid 6. Sky-garden as 'Crown' 3. Stepping for a view of the Rhine Vertical Garden as the area for communication Rooftop Restaurant with Sky-garden
4
Lobby Office and Concept Store as three dimensional adventure world
FW FW Express Büro Büro FW FW Schnitt AA Schnitt AA Schnitt BB Schnitt BB 1. OG 2. OG 3. OG 12. OG 19. OG 25. OG Standard Floorplan 5

Program Functions

Connection with the city New heart of the area

office and living Clear division of function

Facade Design

Hybrid usage mix Activation of all around

Central delivery zone FW-Lifts as freight elevators

Maximum quality of living Sustainability for urban climate

PV panel

1.3.

Single color frameless glass

Protection against sunlight in the space between the facades

2.4.

Baffle plate Protection against sound and wind

Element facade with opening sash

Section 2-2 Section 1-1 04 03 02 01 6
Lobby Office Hotel Residential Retail Restaurant Green space 27. OG 27. OG 19. OG 19. OG 12. OG 14. OG 12. OG 12. OG 9. OG 2. OG 5. OG 5. OG

GUANGLAN ROAD URBANPLANNING TYPOLOGY

Urban Planning Competiton

CLIENT

China State Construction Engineering Corporation

TIME May, 2022 -- Aug, 2022

LOCATION

Pudong District, Shanghai

In this project, I am mainly responsible for the following parts. 1, The concept of the volume of main towers. 2, The diesign for the groundfloor of sockel, and regular floorplan of the towers. 3, The renewal of the historic street. 4, Drawing of a part of diagrams and 3D Section.

7

Project Description

The overall planning and design concept is derived from two central thoughts: First, the site situation and its environment. The vicinity of lush green parks, beautiful water and sports facilities plays an equally important role as the precise analysis of traffic flows and pedestrian accessibility by public transport through the two subway stations and the underground connection to the planned commercial area in the east. But most importantly the historic old street with the protected listed buildings along the riverline. We consider this being a seldom and precious good that has to be brought back to new life. All of these factors have a big influence not only on how the new masterplan and especially the plot of the new Headquarters for CSCEC are being layouted and organised but moreover on how they actually work and are being percieved by their future users and the public.

The second thought is obvious: What if we could create an entirely harmonious new quarter, connecting all plots together by one architectural design language and programming. A place which enriches everybody’s lifes, which is uplifting in atmosphere and services the people that are working there, living there or coming for a visit. Following their sports activities or simply wanting to have a good time out enjoying a variety of commercial and cultural choices.

Concept Generation

1. Commercail Canyon 2. Historic Village 3. Pearl Necklace 4. Transition of Scales
8
5. Sustainable Quarter Masterplan
Hoteldrop-off Office drop-off Exit Exit Service Concept Store Art Gallery Co. Working Place Exit Exit Restaurant CEOdrop-off Lobby HotelLobby Exit Office Lobby Exit Exit Exit Service Exit Gathering Area Exit Coffee Bar Headquarterdrop-off Exit Metrostation protected Tree OfficeLobby Connecting different Functions Interweaving the Old and the New Programming of Public Areas Pedstrian flows Firestuck route Firestuck route Subway access Program distribution Groundfloor plan Car circulation Historic Proctected Area Function Diagrams 9 Commercial Office Hotel Headquarter Access

Hotel

On the regular levels of hotel you will see the hotel rooms and on top of that the serviced apartments all in a regular floorplan layout with efficient organisation of the cores and circulation.

Offices

The regular floorplans are all very efficiently lorganised arou nd a central core each letting big amounts of daylight deep into the spaces.

Headquarters

The tower levels of the headquater are very efficiently organis ed with central elevator cores and flexible office spaces all around with spectacular views and lots of natural daylight.

Standard
Typical
Layout Office 2 Typical Floor Layout Office 1 Typical Floor Layout Headquater Typical Floor Layout 10 Office Hotel Headquarter
floor planHotel
Floor
3D Section Office 2 Lobby Commercial -1st Floor Commercial -2nd Floor RestrauntCaynon Connection Commercial Area Historic Quarter Historic Quarter River 11

TYPOLOGY

Residential Area Design

CLIENT

China Eagle Real Estate Co.Ltd

TIME

May, 2022 -- Present

LOCATION

Shengze, Suzhou, Jiangsu

In this project, I am mainly responsible for the following parts. 1, the design of pixel on facade according to script. 2, the design of regular floorplan for apartments. 3, the drawing of floorplan and interior-design for the underground wellness center.

SCHENGZE RESIDENTIAL
12

Project Description

The aim of the project is to create a high-end residential area, and on the underground there will be a big wellness-center to improve the quality of life for the people who live here. According to the shape of plot, we have adopted a relatively regular layout for the 3 group of residential buildings, whose height are different. The height increases from south to north.

To reach the same kind of architectural language as the masterplan, on the facade we use different kinds of pixels, which can also provide different interior feeling for different rooms.

Design of Unit

High-rises

Middle-rises

Low-rises

Bedroom Living Room
13
Toilet Masterplan Underground Wellness Center Regular Floorplan__Low-rise
Skybox
14 Final loggia Outside volume Final balcony Inside volume Initial loggia Inside volume Initial balcony Outside volume
Facade Design
Balcony
Underground Wellness Center 15

Functions of Wellness Center

The wellness center located on the underground of the high-rise apartments in the middle. It includes not only different kinds of sports area, but also sauna, massage, and matching tea bar. In the middle of the wellness center is a green space, which according to a huge staircase connecting with the groud.

BOX LINEAR
The box composed of stone pixel and be used as the background wall for tea bar, as well as rooms for staff. The block provides people in this area a whole swimming pool. The several blocks provide a high-end atmosphere in the lobby. The lamellas stand in linear, provide decorations for the runway and rooms in spa, and add more privacity for each room The free curve provides the tea bar a long bench, which is the centre of the bar.
BOX
FREEFORM
The free curve provides the people in jacuzzi a flowing and relaxing atmosphere.
FREEFORM
BLOCK BLOCK
16
1. Tea bar 5. Reception 4. Massage 2. Sauna 6. Fitness studio 7. Swimming pool
4 5 1 2 3 7 6
3. Relax

HONGSHI TOWER

TYPOLOGY

Office Building Project

CLIENT

Hongshi Hoding Group

TIME

APR, 2019 -- Present

STATUS

Will be completed in 2025

LOCATION

Hangzhou, Zhejiang

In this project, I am mainly responsible for the following parts. 1, to build the BIM-model in Revit, and export the Floor plans and section. 2, designing of the landscape elements, skywalk, and part of inerior-room. 3, drawing of details.

17

Project Description

This project is an office building designed for a famous Chinese enterprise in Hangzhou, China. The height limit of the project is 160m, of which 1 to 4 floors are podiums. What's more, there are 5 floors of underground commercial space.

Skywalk Design

According to the requirements of government planning, we need to add a skywalk on the south façade to connect the Hongshi Tower with the opposite Hangzhou Bank. As shown here are the plan and section of the flyover I designed, and a quick rendering with Enscape

Floor plan skywalk Ground floor plan Section skywalk Elevation skywalk 1. Element Facade construction Color: RAL 9006 2. Metal Color: DB 703 3. Steel construction Color: RAL 9006 4. Point drainage
1 2 3 4 18
+15.15 Level 4 +5.85 Level 2 ± 0.00 Level 1 -6.40 Level B1 -9.90 Level B2 +10.50 Level 3 +19.80 Level 5 +24.10 Level 6 -13.40 Level B3 -16.90 Level B4 +28.40 Level 7 +32.70 Level 8 +37.00 Level 9 +41.30 Level 10 +45.60 Level 11 +54.69 Level 13 +58.99 Level 14 +63.29 Level 15 +67.59 Level 16 +71.89 Level 17 +76.19 Level 18 +80.49 Level 19 +84.79 Level 20 +89.09 Level 21 +93.39 Level 22 +97.69 Level 23 +102.48 Level 24 +106.78 Level 25 +111.08 Level 26 +115.38 Level 27 +119.68 Level 28 +123.98 Level 29 +128.28 Level 30 +132.58 Level 31 +136.88 Level 32 +141.18 Level 33 +145.88 Roof +159.98 14 14 13 13 12 12 11 11 4 4 3 3 2 2 1 1 -20.60 Level B5 159980 20600 +49.90 Level 12 10 10 8 8 6 6 5 5 7 7 9 9 7000840084009000450090009000900045009000900090004500 +159.98 +150.58 -0.10 +0.00 4700 4700 4700 4700 4300 4300 4300 4300 4300 4300 4300 4300 4300 4790 4300 4300 4300 4300 4300 4300 4300 4300 4300 4300 4790 4300 4300 4300 4300 4300 4300 4300 4650 4650 4650 5850 3200 3200 3500 3500 3500 3700 2950150022001300220013002200130052001200920013003350130033501300300013003000130030001300300013003000130030001300300013003490130 0300013003000130030001300300013003000130030001300300013003000130030001300300013003490130073001300300013003000130030001300300013 0030001300300013003000130034001200 21.00 7000840084009000450090009000900045009000900090004500 -4.27 -2.24 +0.00 Anterroom Anterroom ELV SE SE AE AE HV DPS RS S01 UP DN S02 UP DN E01E02E03E04E05 E07E08E09E10 E06 B B C C D D G G 10 10 8 8 6 6 5 5 7 7 E E 9 9 F F 36000 45009000900090004500 36000 4500 9000 9000 9000 4500 36000 45009000900090004500 36000 4500 9000 9000 9000 4500 Steps 159 250 Steps 159 250 Steps 159 250 Steps 159 250 AE RS FPS AE FAS FAS Anterroom Anterroom ELV SE SE AE AE Storage Copyroom Tea Kitchen HV DPS FPS S02 S01 UP DN UP DN E07E08E09E10 E06 B B C C D D G G 10 10 8 8 6 6 5 5 7 7 E E 9 9 F F 36000 45009000900090004500 36000 4500 9000 9000 9000 4500 36000 45009000900090004500 36000 4500 9000 9000 9000 4500 Steps 159 250 Steps 159 250 9 Steps 159 250 Steps 159 250 RS FAS AE RS DPS RS FAS AE
Standard floor
Section 19
Standard floor plan
plan

Detail Main Entrance

Detail MEP 1. Suspended ceiling Color: RAL 9010

2. Sunshading lamella Color: DB 703

3. Element Facade construction Color:RAL 9006

4. Drainage gutter

1. Pergola structure(100×400mm) Color: RAL 9006

2. Perforated metal panel Color: DB 703

3. Element Facade construction Color:RAL 9006

4. Steel frame Color: RAL 9006

5. Natural ventilation

6. Lamella

7. Sunshading lamella Color: DB 703

8. Suspended ceiling Color: RAL 9010

20 1 1 1 1 5 6 7 8 2 2 3 3 4 4

Landscape Elements Design

On the ground in front of the main buidling, I have designed such kind of plants bed with stone bank. Such kind of deisgn will be used all over the square. At the bottom of the stone is embedded with LED spotlights.

Stone bank facade west Stone bank facade south Stone bank section
21
Floorplan Plaza

Landscape of Sunken Plaza

On the underground of the plaza there is a sunken plaza, which as the main landscape node. A waterfall is set up facing the tower, which can be clearly seen from the square on the groundAt the same time, it also serves as the connection between the above-ground office area and the underground business area.

Floorplan Sunken plaza 22
* The two perspectives come from the rendering company

QIANTANG SMART CENTER TYPOLOGY

Office Building Project

CLIENT

Deli Group TIME

Oct, 2020 -- Present

STATUS

Will be completed in 2023

LOCATION

Hangzhou, Zhejiang

In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the drawing of diagrams.

23

Project Description

This project is a competition in the planning of Genbei new area, Hangzhou. Our group won the first prize of the project in the fall of 2020 and have developed it so far. It is located in the newly developed Qiantang Smart Center in this area. It is a comprehensive building with five towers that combine both business and office. Since they have not been rented out yet, as of now, the owner has no requirements for the arrangement for the functions of the interior space. So our work now is mainly on the exterior of the building.

.1. .1. .2. .2. .13. .13. .15. .15. .16. .16. .18. .18. .23. .23. .27. .27. .29. .29. .30. .30. .32. .32. .33. .33. .35. .35. .36. .36. .40. .40. .44. .44. .46. .46. .A. .A. .C. .C. .H. .H. .K. .K. B B C C D D .19. .19. .12. .12. .10. .10. .6. .6. 13 13 14 14 15 15 20 20 22 22 27 27 31 31 33 33 34 34 .47. .47. 9 9 6 6 1 1 17 17 18 18 .I. .I. .B. .B. 16 16 19 19 2 2 .14. .14. .17. .17. .31. .31. .34. .34. .3. .3. .4. .4. .5. .5. .7. .7. .8. .8. .9. .9. .11. .11. .20. .20. .21. .21. .22. .22. .24. .24. .25. .25. .26. .26. .28. .28. .37. .37. .38. .38. .39. .39. .41. .41. .42. .42. .43. .43. .45. .45. 3 3 4 4 5 5 7 7 8 8 10 10 11 11 12 12 23 23 24 24 25 25 26 26 28 28 29 29 30 30 32 32 .J. .J. D. D. .E. .E. .F. .F. .G. .G. 21 21 E. E. A A 7.998.34202.30 1.66 4.51 2.001.82 1.82 2.002.851.66 8.347.99754.128.344.12757.998.34111.552.852.001.82 1.82 2.003.7873 1.66 6.67 7.99 120.93 8.34 46.60 16.65 42.39 8.34 16.021.35 5 1.64 4.52 8.68 1.74 16.58 79.93 42.39 122.32 15.98 44.19 21.54 44.19 21.54 44.19 175.66 8.68 2.731.64 2.851.251.153.452.401.47 5.74 2.738.68 806.508.346.50808.68 2.731.64 2.851.251.153.452.401.47 5.745 2.738.685 806.508.346.50808.68 2.731.645 2.851.251.153.452.401.47 5.74 2.738.68 174.26 44.19 21.54 44.19 21.54 44.19 1.69 2.03 5 5.99 2.34 41 2.85 70 2.04 5.94 529.17 525.39 3.78 3.78 27.78 2.00 2.00 2.00 2.00 4.13 15 4.13 Grund floorplan
* The two perspectives came from the rendering company
24 Building C Building D Building E Building B Building A

Elevation north Building C&D&E

Elevation west Building D

Elevation east Building D

Elevation West Building E

Elevation East Building E

F2 5.20 F1 0.00 F4 13.84 F5 17.69 F6 21.54 .1. OK Attika 49.83 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .2. .13. .15. .16. .18. .23. .27. F3 9.99 .19. .12. .10. .6. F12 44.64 .14. .17. 8.68 8.47 8.47 8.47 8.68 80 6.50 8.34 6.50 80 8.68 8.47 8.47 5.20 4.79 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 91.37 49.83 F2 ± 5.20 F1 ± 0.00 F4 13.84 F5 17.69 F6 21.54 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .29. .30. .32. .33. .35. .36. .40. .44. .46. F3 ± 9.99 .47. F12 44.64 .31. .34. 49.83 49.98 4.79 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 8 8.68 80 6.50 8.34 6.50 80 8.68 8.47 8.47 8.47 8.68 91.37 F2 5.20 F1 0.00 F4 13.84 F5 17.69 F6 21.54 OK Attika 49.83 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .A. .C. .H. .K. F3 9.99 F12 44.64 1.34 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 4.79 5.35 0 49.98 9.72 8.34 9.72 27.78 F2 5.20 F1 0.00 F4 13.84 F5 17.69 F6 21.54 OK Attika 49.83 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .A. .C. .H. .K. F3 9.99 F12 44.64 49.98 9.72 8.34 9.72 27.78 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 4.79 5.20 F2 5.20 F1 0.00 F4 13.84 F5 17.69 F6 21.54 OK Attika 49.83 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .A. .C. .H. .K. F3 9.99 F12 44.64 1.34 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 4.79 5.35 0 49.98 -0.15 9.72 8.34 9.72 27.78 F2 5.20 F1 0.00 F4 13.84 F5 17.69 F6 21.54 OK Attika 49.83 F7 25.39 F8 29.24 F9 33.09 F10 36.94 F11 40.79 Roof 48.49 .A. .C. .H. .K. F3 9.99 F12 44.64 9.72 8.34 9.72 27.78 -0.15 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 4.79 5.20 49.83
25
Level 1 +00.00 -0.15
Detail Section-glas Detail Section-window Detail Elevation
26
Detail Floor plan

1. Suspended ceiling Color: RAL 9010

2. Sunshading lamella Color: DB 703

3. Recessive beam

4. Element Facade construction Color:RAL 9006

5. Obvious frame

6. Perforated metal Color: DB 703

7. Outer edge of structure

8. Outer edge of facade

1. Obvious frame Color: DB 703

2. Dark gray uncovered profil Color: DB 703

3. Dark gray door frame Color: DB 703

4. Draniage channels

5. Metal sheet Color: RAL 9006

6. LED Spotlight

7. Metal lamella

1. Backing bord and fire blocking

2. Lamella

3. Suspended ceiling Color: RAL 9010

4. Element Facade construction Color:RAL 9006

5. Perforated metal Color: DB 703

6. Ventilation grille

7. Outer edge of structure

8. Outer edge of facade

1. Silver aluminum sheet Color:RAL 9006

2. Dark gray uncovered profil Color: DB 703

3. Fire blocking

4. Sheet metal cladding

5. Lamella

6. Element Facade construction Color:RAL 9006

Main Entrance Detail Main Entrance Standard Facade Detail section Detail elevation Detail floor plan
Detail 1
Parapet
Lamella
Detail sectionDetail elevation Detail floor plan 27 1 1 1 3 3 4 1 1 5 6 6 6 7 7 4 4 4 4 5 5 6 6 6 8 7 4 8 2 2 2 2 3 3 3 5 5
Detail Attica Detail Standard Facade 1. Silver aluminum sheet Color:RAL 9006 2. Sheet metal cladding 3. Subconstruction 4. Recessive beam 5. Shading 6. Element Facade construction Color:RAL 9006 1. Silver aluminum sheet Color:RAL 9006 2. Backing bord and fire blocking 3. Dark gray uncovered profil Color: DB 703 4. Openable insulation board Color: DB 703 7. Raised accedss floor 8. Suspended ceiling Color: RAL 9010 9. Dark gray uncovered profil Color: DB 703 10. Fire blocking 5. Element Facade construction Color:RAL 9006 6. Suspended ceiling Color: RAL 9010
28 3 3 4 4 5 5 6 6 6 7 1 1 1 1 1 1 1 1 2 3 3 3 4 1 1 6 7 7 8 8 9 10 2 2 2 5
7. Metal opening Color: DB 703

PUJIANG CENTER

TYPOLOGY

Urban Planning Competition

CLIENT

Pujiang County Planning

Bureau

TIME

Sep, 2021 -- Nov, 2021

LOCATION

Pujiang, Chengdu

In this competition, I am mainly responsible for the following parts. 1, the design of the part of office building, including the build of revit model and drawings. 2, the partly plan of the landscape. 3, the analyse of the system of sponge city. 4, the drawings of diagrams.

29

Project Description

The aim of the futuristic urban design is to develop a strong urban pattern with a memorable design analogy in order to create a distinguishing indentity for Pujiang New Town and its Citizen. What I showed in this portfolio are my works in the first phase of the competition.

With the future transformation of the agricultural wetland and following urbanization into a business and commercial zone, a unique waterpark with recreational attractions and cultural activities will become a new gathering place for visitors as well as employees of high-class start-up companies. The Pujiang Citizen Center will be a new vibrant area space within Pujiang New Town.

Concept Generation

Water AreasBuildings

Landscape

Peoples FlowElevated Bridge Eventplaces and Eco Highlights Forest and Parkland Adventure Forest Urban Green Building Green
30
Wetland Eco-Landscape

Traffic City Scale

Pedestrians Plaza

Pedestrians Bridge

Pedestrians Shoreline

Pedestrians Offices

Drop-off

Pedestrians

The pedestrian circulation for Pujiang New Town is of special interest. The site with its spacious plazas is mostly reserved for pedestrians. Therefore the connecting skywalks are carefully arranged, separating pedestrians from vehicular traffic and connecting various attractions inside the waterpark within short walking distances.

Structure

Apparently formed by the water the smoothly curved building ensemble are offering interesting perspectives from different angles.

According the urban genesis all building complexes within the southern plots are placed along the main roads, creating an urban appearance along the streets.

Building Heights

The main road system is deÞned by the main existing trafÞc arteries in east-west direction. The secondary street grid in both directions connects the development zone with the surrounding.

The user reaches the parking garage conveniently from the south and east. From there, the visitor can reach the cores of the office buildings and have direct access to either the shopping podiums or the high rise office buildings.

DeliveryPedestrians

Rescue ways

Urban
Street Hierarchy and Scale
Park Scale
The height development emphasizes the main citizen center with buildings not higher than 50m forming a new landmark at Northern tip of central green axis. A connecting park functions as the spine of the whole event and business district. The gardens attract visitors and residents, at the same time, provide recreational high-quality outdoor space inside each plot.
Drop-off
Onground ParkingUnderground Parking
31

The office space designed for the modern company headquarters are placed in a block structure. In combination with the park quality of the main green axis. These ofÞces have a very high quality that gives clients and visitors a very welcome feeling. Each group of headquarter offices and ofÞces for start-up companies has its own characteristic appearance and architectural features. Such intelligent and distinct business identiÞcation will attract prestigious companies.

Elevation___Office 32
Ground floor plan___Office
3rd floor plan___Office Section___Office
33
* The perspective came from the rendering company

Sponge City

All stormwater is caught at Þrst point of contact, detained, cleansed and either reused (either in buildings or for irrigation) or sent with a controlled outßow into the municipal system. This ‘treat at Þrst point of contact’ approach means that the development is 100% protected against the effects of localized flooding because stormwater management is conceptualized from the beginning. Sponge City is only possible by the clever integration of blue-green-grey infrastructure tools – from green roofs, rai n gardens, permeable pavement, cisterns and swales to larger underground storage elements. Our tested toolkit of InÞltration, Retention, Detention, Cleansing, Reuse, and Controlled Drainage

Tools – verified through multiple highlight projects in China – form an infrastructure safety barrier that is also integrated in the open space design

• Sponge City concept focuses on the use of six key elements:

• InÞltration

• Retention

• Detention and Cleansing

• Reuse

• Drainage

• All park spaces have a natural inÞltration zone for retaining /cleansing

• Detention also occurs in the water bodies

• Reuse is for each block, where water is decentrally caught, stored, treated and reused on site

• Drainage follows natural topography, firstly cleansed prior to entering the river or municipal pipe system

Green Areas, Wetland

Greem Roof(Retain)

Blue Roof(Collect)

Permeable Paving

Rain Gardens &Tree Pit

Storage

Water Channel

Cleaning Biotope

Swales

Multi-Functional

Water Storage + Plaza

Blue Super Tree

Green Super Tree

Surface Transport, Water Feature Use

Retention Roof Blue Roof Smart Outflow Control Smart Outflow Control Biotope Wetland Water Channel Reuse for water feature Reuse for irrigation Public Sewer Reduced Outflow Public Sewer Reduced Outflow Underground Cistern 33% reuse for toilets & irrigatation 66% for rentention/slow runoff Underground Cistern 33% reuse for toilets & irrigatation 66% for rentention/slow runoff
34

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.