PORTFOLIO BOOK 4_ PRACTICE 2015-2016
HANS VILJOEN
3
PORTFOLIO
CONTENTS
BOOK 4_ PRACTICE 2015-2016
HANS VILJOEN
The Vineyard Hotel _Manor House Conference Centre
07
The Vineyard Hotel _Jack Barnett room refurbishment
17
UCT Graduate School of Business
21
Tafelberg Housing Challenge
31
Apartment Achmat 35 House Viljoen 37 House Rossouw 39 McGilvray Studio 45
5
Lady Anne Barnard’s historical Manor House was adapted to a range of conference facilities. The centuries old oak roof structure were exposed, and in the process the new services and structure too. design development, construction drawings & construction
Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference
2016 The Vineyard Hotel Claremont, Cape Town, SA
7
9
Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference
11
Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference
1800
opaque film 1395
clear gap
opaque glass film fixed to underside of glass, with clear gaps as indicated. to be confirmed with arch.
200
50
200
50mm dia. stainless steel handrail, to fit on top of glass
50 475
ELECTRICAL ENGINEER:
1720
EQ EQ
575
STRUCTURAL ENGINEER:
existing steel beam
EQ
stainless steel handrail and fixing to match those at Courtyard Restaurant
EQ
200
existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position
50 475 1720
EQ
1720
EQ
EQ
575
EQ
1000
EQ
EQ EQ
5725
2290
EQ EQ EQ
1720
EQ
1000
5 4 3
EQ
1
first floor ceiling plan existing steel beam
boardroom 1 ex. timber 95 m²
1 : 50
100
EQ
second overflow downpipe, if new floor drain is made in ground floor
boardroom 2 ex. timber 38 m²
first floor ceiling plan
180 32
1 : 50
100 180
COPY RIGHT: THE DESIGN SHOWN ON THIS DRAWING IS COPY RIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.
6
first floor plan
1 : 50
silicone sealant
0
NOTES GENERAL SPECIFICATION: * ALL WORK TO COMPLY WITH THE CURRENT NATIONAL AND LOCAL BUILDING REGULATIONS. * ALL WORK TO COMPLY WITH THE MODEL PREAMBLES FOR TRADES, 1992 EDITION. * THESE DRAWINGS MUST NOT BE SCALED. WORK FROM FIGURED DIMENSIONS ONLY OR CONSULT THE ARCHITECT. * DIMENSIONS AND LEVELS ARE TO BE CHECKED, THE LATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTING OUT OF SHOP DRAWINGS. * STRUCTURAL WORK TO STRUCTURAL ENGINEER'S DETAILS. * WORK TO MECHANICAL AND ELECTRICAL ENGINEER'S DETAILS. COPY RIGHT: THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ARCHITECT'S DETAILS, SCHEDULES FINISHING THE DESIGN SHOWN ON THIS DRAWING IS COPYAND RIGHT AND REMAINSSCHEDULES. THE PROPERTY OF THE ARCHITECT. * TO BE CONSTRUCTED IN ACCORDANCE WITH PART T OF SANS 10400. NOTES GENERAL SPECIFICATION: NOTES FOR ELECTRONIC ISSUE * ALL WORK TO COMPLY CURRENT NATIONAL AND This drawingWITH mayTHE be issued electronically. This REGULATIONS. drawing contains external references / links which LOCAL BUILDING should be bound intoMODEL the drawing prior toFOR issue, please also * ALL WORK TO COMPLY WITH THE PREAMBLES refer to revision notes on these drawings: TRADES, 1992 EDITION. * THESE DRAWINGS MUST NOT BE SCALED. WORK FROM FIGURED DIMENSIONS ONLY OR CONSULT THE ARCHITECT. * DIMENSIONS AND LEVELS ARE TO BE CHECKED, THE LATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTING OUT OF SHOP DRAWINGS. * STRUCTURAL WORK TO STRUCTURAL ENGINEER'S DETAILS. * WORK TO MECHANICAL AND ELECTRICAL ENGINEER'S DETAILS. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ARCHITECT'S DETAILS, SCHEDULES AND FINISHING SCHEDULES. * TO BE CONSTRUCTED IN ACCORDANCE WITH PART T OF SANS 10400.
FOR CONSTRUCTION
49mm glass floor glass to have 50mm painted strip along edge, colour to match steel and chemically set exist. in onservices T-section Rheinzink cover steel T-section ex ipe 200, sitepainted with Velvaglo, to manufacturer's spec. colour: matt signal white ANP39003
passage
exist. timber 52 m²
NOTES FOR ELECTRONIC ISSUE This drawing may be issued electronically. This drawing contains external references / links which should be bound into the drawing prior to issue, please also refer to revision notes on these drawings: B 20160720 HV balustrade detail A 20160627 HV steel beam 2 20160513 HV glass sizing 1 20160329 HV first issue for info REV DATE DR DETAILS
32mm dia. round bar existing steel beam 32
1st floor
16
15
14
13
12
11
10
9
8
7
6
40
5
steel U-channel staggerbolted to T-section with dome nuts, finish to be matt stainless steel
second overflow downpipe
steel T-section ex ipe 200, sitepainted with Velvaglo, to manufacturer's spec. colour: matt signal white ANP39003
balustrade detail 1:5
exist. stainless steel downpipe
glass to have 50mm painted strip along edge, colour to match steel and chemically set on T-section
100
02A.MH. FIRST FLOOR_terrace rooms
existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position
32mm dia. round bar
12mm glass chemically set in U-channel with silicone pointing
39575
T-section brace to align with glass edge
MECHANICAL ENGINEER:
4
steel U-channel staggerbolted to T-section with dome nuts, finish to be matt stainless steel
ELECTRICAL ENGINEER:
3
39575
49mm glass floor
+2721 425 1710
STRUCTURAL ENGINEER:
existing steel beam existing steel beam
2
silicone sealant
02A.MH. FIRST FLOOR_terrace rooms
TELEPHONE:
ARCHITECT: REVEL FOX & PARTNERS
QUANTITY SURVEYOR:
second overflow downpipe
opaque film clear gap
first floor plan 1 : 50
PROFESSIONAL TEAM:
CONTRACTOR:
2
40
T-section brace to align with glass edge opaque glass film fixed to underside of glass, with clear gaps as indicated. exist. stainless to be confirmed with arch. steel downpipe clear gap
second overflow downpipe, if new floor drain is made in stainless steel handrail and ground floor fixing to match those at Courtyard Restaurant
2895
MECHANICAL ENGINEER:
1
12mm glass chemically set in U-channel with silicone pointing
5725
1395
clear gap
EQ
50mm dia. stainless steel handrail, to fit on top of glass
2290
EQ 50
EQ
200
opaque film
+2721 425 1710
QUANTITY SURVEYOR:
opaque film clear gap
1800
clear gap
TELEPHONE:
ARCHITECT: REVEL FOX & PARTNERS CONTRACTOR:
clear gap
2895
PROFESSIONAL TEAM:
stainless steel elbow 100
FOR CONSTRUCTION
balustrade detail 1:5
exist. services in Rheinzink cover new leaf catcher at downpipe inlet
existing steel beams
existing rheinzink gutter to be
terrace room 3
adjusted: existing steel beam new side-outlet in gutter with pipe running flat, horizontally stainless steel elbow and down in same position
conc. slab 38 m²
ex. stair
second overflow downpipe, if new floor drain can be added to ground floor
frameless glass balustrade fixed to edge of T-beam, to detail
49mm thick glass second overflow downpipe, if floor, by glass specialist new floor drain can be added to ground floor rheinzink downpipe 5000
bridge short section 1 : 25
20
T-section beam to SE's detail
1120
20
1120
terrace room 4
terrace room 2
exist. timber + carpet 54 m²
20
1120
exist. timber + carpet 79 m²
20
1120
20
bridge long section 1 : 25
stainless steel handrail to detail
1120
Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt
02A.MH. FIRST FLOOR_terrace rooms
HV balustrade detail VINEYARD HOTEL HV steel beam HV glass sizing MANOR HOUSE HV first issue for info DR DETAILS CONFERENCE FACILITY
20160720 20160627 20160513 20160329 DATE
TITLE
new bridge to terrace rooms
existing steel beams
existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position frameless glass balustrade 7
1000
39575
B A 2 1 REV
1000
tiles 10 m²
new leaf catcher at downpipe inlet stainless steel handrail to detail
02A.MH. FIRST FLOOR_terrace rooms
terrace room 1
exist. timber + carpet 38 m²
frameless glass balustrade fixed to edge of T-beam, to detail
SCALE VINEYARD HOTEL As indicated DATE MANOR HOUSE 2016.02.10 CONFERENCE FACILITY TITLE
PROJECT NO.
DESIGNED pp / tk DRAWN hv CHECKED nb
DRAWING NO.
REV.
9667/18to5000 new bridge terrace rooms
B
39575
7 5000
frameless glass balustrade 49mm thick glass floor, by glass specialist
20
1120
20
1120
20
1120
20
1120
20
1120
rheinzink downpipe
bridge short section
T-section beam to SE's detail
1 : 25
Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt
bridge long section 1 : 25
Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference
clear gap
SCALE As indicated
DESIGNED pp / tk
DATE 2016.02.10
DRAWN hv CHECKED nb
PROJECT NO.
DRAWING NO.
9667/18 5000
REV.
B
13
ALIGNMENT LINE Z
ALIGNMENT LINE Z
30
isoboard ceiling new drywall with acoustic insulation, consisting of: 9/12/15 mm acoustic board, 2.5 mm Flexible Noise Barrier (FNB), 50/100mm rockwool insulation, 9/12/15 mm acoustic board
contact NEELTJIE WILKENS (Genesis Acoustics) 082 569 1028 / 086 00 22 157
acoustic double glazing by specialist
aircon supply duct, stop short of double glazing
aircon duct
oregon infill between trusses 30
oregon timber to match oregon above wall A
acoustic insulation RGB LED concealed strip light
exist. bottom chord
concealed LED RGB light strip
165 x 305 g/ms I-beam
165 x 305 g/ms I-beam
3838 3838
25
alternative I-beam fill
50
9x9mm rebate
245
165 x 305 g/ms I-beam
9mm melawood mitred Lshaped closer piece and insulation by Aluglass
42375
42375
25
acoustic insulation by specialist
9mm melawood mitred Lshaped closer piece and insulation by Aluglass 100 x 90 acoustic panel track
100 x 90 acoustic panel track
100 x 90 acoustic panel track
100
plasterboard ceiling
3100
RGB LED concealed strip light
2750
plasterboard light cove
steel I-beam
ALIGNMENT LINE Z
ALIGNMENT LINE Z
skim-plastered plasterboard ceiling
02A.MH. FIRST FLOOR_terrace rooms
02A.MH. FIRST FLOOR_terrace rooms
02A.MH. FIRST FLOOR_terrace rooms
39575
39575
39575
section through wall A 1 : 10
Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt
section through wall B 1 : 10
section through wall C 1 : 10
3205
9mm melawood mitred L-shaped closer piece and insulation by Aluglass
02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling
top of I-beam
13
50
60
42375
02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling
60
100 x 90 acoustic panel track
150
02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling
16mm melawood board, with finish to match acoustic panels
30
90
16mm melawood board, with finish to match acoustic panels
Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference
structure to SE's dwg and detail
15
COPY RIGHT: THE DESIGN SHOWN ON TH AND REMAINS THE PROPER
NOTES GENERAL SPECIFICATION: * ALL WORK TO COMPLY W LOCAL BUILDING REGULATI * ALL WORK TO COMPLY W TRADES, 1992 EDITION. * THESE DRAWINGS MUST N FIGURED DIMENSIONS ONL * DIMENSIONS AND LEVELS ON SITE, BY THE CONTRACT ANY WORK OR SETTING OU * STRUCTURAL WORK TO ST * WORK TO MECHANICAL DETAILS. THESE DRAWINGS ARE TO B ARCHITECT'S DETAILS, SCHE SCHEDULES. * TO BE CONSTRUCTED IN A SANS 10400.
NOTES FOR ELECTRONIC ISS This drawing may be issued This drawing contains exter should be bound into the d refer to revision notes on th
FOR INF
4 3 2 1 REV
20160721 20160615 20160608 20160607 DATE
HV HV HV HV DR
ore dry con first DET
VINEYARD MANOR HO CONFEREN TITLE
section thr panel trac
SCAL 1 : 10
DATE 2016.
PROJECT NO.
DRAW
9667/18 50
Refurbishment of 49 hotel suites in a wing of the hotel, originally built by the architect, Jack Barnett. New balconies and an outdoor deck area were also added. The interface between the reception area and a courtyard were also re-done in this phase. construction drawings & construction
Practice | Revel Fcx & Partners | Vineyard Hotel - Jack Barnett rooms refurbishment
2015 The Vineyard Hotel Claremont, Cape Town, SA
17
248
247 257
store 255
253
249 251
Practice | Revel Fcx & Partners | Vineyard Hotel - Jack Barnett rooms refurbishment
259
19
2015-2016 UCT Graduate School of Business V&A Waterfront, Cape Town, SA New academic conference centre in historical context, at the old Breakwater Prison, which RF&P adapted to the Graduate School of Business in 1992. sketch design, design development 21
23
Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre
25
Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre
Gb
F
T_Graduate School for Business_Academic Conference Centre
E
Db
D
C
B
A
Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre
G
27 DWG TITLE
north-east elevation DATE
2016.02.15
29
Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre
2016 Tafelberg Housing Challenge Seapoint, Cape Town, SA Reclaim the CIty and Ndifuna Ukwazi launched a challenge to architects to present proposals to develop a derelict shool site in Seapoint for affordable housing. This scheme of 3000m2 housing and 1500m2 commercial space was presented. concept design 31
33
Practice | ifekt | Tafelberg Housing Challenge
tv
bench
books
2016 Apartment Achmat Cape Town CBD, SA.
ex. wc
hanging space
floor plan 1 : 50 @ A3
new whb
new sink new wc
broom
drawers
new sh wm td
fr
gr
To the client’s request, this existing 100m2 apartment across Cape Town Railway Station is renovated to minimalism. A simple new kitchen and bathroom forms the major part of the renovation. Exsting partitions are removed and replaced with glass partitions and curtains for privacy. concept, design development 35
2015 House Viljoen Potchefstroom, North-West, SA A new 220m2 house was designed in response to the ‘Transvaal’ tradition of simple pitched roofs - an excercise in restraint and minimal design. concept, design, council drawings 37
2015 House Rossouw Woodstock, Cape Town, SA Refurbishment of Victorian semidetached two bedroom house. Redesign of kitchen and bathroom, unified with a skylight above the wall that separates these two rooms. survey, concept to completion 39
41
Practice | ifekt | House Rossouw
43
Practice | ifekt | House Rossouw
2015 House McGilvray Kalk Bay, Cape Town, SA An addition of a small artist studio in the roof, accessible with a spiral stair from the now-double-volume kitchen. The existing eave line is extended with the new volume slightly overhanging the main house. concept, design development, 3d modelling, client presentation, council submission, tender & construction documents 45
TENDE
1 : 50
SCALE DATE
DWG NO. JOB NO.
14-MCG
02.21
REV
@ A3
SE OF ISSUE: new roof ridge u/side of new ceiling
new studio FFL
House McGilvray
DATE
DWG NO.
REV
00.31
1200
new 125mm dia s/s chimney flue from exist. braai
1200
1200
1200
new 22x140 SAP fascia, painted same colour as roof sheets new roof ridge
u/side of new ceiling
W 05 new kliplok-profile sheeting on exist. roof structure
ex. ceiling height
new studio FFL
02.21.2
South Elevation - 1-50 1 : 50
A3
47
Roof perspective
House McGilvray
@
Practice | ST^AR | McGilvray Studio
REFERENCE 02 u/side of new eave soffit to exist. roof
DATE
DWG NO.
00.30
REV
DATE
+- 1040
Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay
+- 825
Roof perspective 2
new 12mm MD fibre-cement sheeting with epoxy joints @ 1200mm c/c, painted same colour as roof sheets
The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa
A3
NO
new galv. m/s balustrade: 4x 10x50mm flat bar rails: @250,500,750 & 1000 AFFL (new deck) 50x25mm RHS gms section: balusters on corners and at centre
West elevation - 1-50
REVISION SCHEDULE
exist. plaster & paint
02.21.1 @
REFERENCE 02 u/side of new eave soffit to exist. roof
West & South elevation
REFERENCE 02 u/side of new eave soffit to exist. roof
1 : 50
2400
ex. ceiling height
1000
W 04
ROJECT TITLE
225 250 250 250
Dx 01
new residential-profile aluminium gutter, fixed to new 22x140 SAPine fascia. both same colour as roof sheets
DESCRIPTION
new kliplok-profile sheeting on exist. roof structure
B
6685
existing fence 3630
150
150
1785
150
on
1000
2345 new RWDP
W 05 970 new steel sheeting on exist. roof structure
0
12
9 11
10
2800
8
13
A New steel & timber staircase 3700
new steel column 2, to SE detail new aluminium window with timber sill @ 1200AFFL 5565
150
Exist. roof structure
new steel sheeting on exist. roof structure
B Ex. tanning deck
new RWDP
7
150
350
w ne
r be tim
6
14
+15.60
w ne
new steel sheeting on exist. roof structure 5
06.40
re ctu tru s ub rs be tim
W 03
700
21.8 m2 new2timber
new aluminium fixed panel window
C
Practice | ST^AR | McGilvray Studio
EQ
new aluminium window with timber sill
38 lab 8x . s n 3 conc o r be ex. tim n w ns o e n tte ba
New Studio
5750 new aluminium window with timber sill, see D&W sched.
W 02
2650
EQ
W 04
New timber bench +450 AFFL new steel beam 3 above
EQ
new timber on ex. slab
3300
A
New roof structure above new steel column 3, exposed, to SE detail
350
Ex. Balcony
5145
remove exist. braai flue and replace with new 125 dia. s/s chimney flue
Dx 01
1785
995
150
820
850
SITE BOUNDARY 5865
new steel column 4, to SE detail
new galv. m/steel balustrade
C
49
TENDER
CHCK'D
ARA
DRAWN
SCALE
HV
NEW TIMBER FLOOR
DATE
exterior: kliplok sheeting insulation: 75mm Polyester Fibre structure: 114x38 SAP studs and rails interior: painted plasterboard
A
2015.04.16 As indicated@ A3
DWG NO.
NEW TIMBER WALL
JOB NO.
New precoloured colourbond ultra kliplokprofile sheet metal roofing at 1 degree pitch, on 50x76 SAPine purlins @ max. 1000mm c/c, on 50x228 SAPINE rafters @ max. 1200mm c/c
14-MCG
site boundary
REV
02.11 B
PURPOSE OF ISSUE:
NEW SHEET-METAL ROOF
NGL
330
New 22mm SAP planks on 114x50 SAP new roof ridge joists @ max. 450mm c/c u/side of new ceiling
2
02.11
new kliplok on exist. roof structure
ex. roof void
new timber
Tender - Draft 01 Tender - Draft 02
15.60 ex. ceiling height
new studio FFL
new roof ridge
50x228 SAPine timber rafter
Ex. Bedroom
exist. tiles
ex. timber
12.86
12.86
exterior 12mm MD fibrecement board gms head-wall flasing
38x38mm SAPine ceiling batten
Ground Floor
u/side of new ceiling
A
Ex. Garage
3105
50 12mm gypsum ceiling board
new kliplok-profile steel sheeting on exist. roof structure
50x114 SAPine timber stud
Section B-B
1 : 10
1 : 50
A3
@
A3
51
021 788 5751 021 788 2714 021 788 7285 design@studiostar.co.za
02.11.1
Callout of Sec B-B
T / F E
interior
The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa
Street Level
CLIENT PROJECT TITLE
Garage Level
insulation
@
Practice | ST^AR | McGilvray Studio Section B-B
22x75 SAPine shadow cornice
02.11.2
NO DATE A 6 2015.02.17 B 9 2015.04.16
Ex. Bathroom
3050
new bulkhead
gms barge flashing
2755
new kliplok-profile steel sheeting on
REVISION SCHEDULE
heighest point of t/o exist. slab over bathroom +60
new bulkhead
Joanne McGilvray
New Studio 855
Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay
new drywall
DESCRIPTION
new drywall
2400
W 02
REFERENCE 01 to align with exist. gutter
ARA HV
@ A3 CHCK'D DRAWN
SCALE DATE
2015.04.16 1 : 20
REV DWG NO.
06.40 B
JOB NO.
14-MCG
165
800
330
215
DESCRIPTION
u/side of new ceiling
185
400
new flat flush-skimmed plasterboard ceiling
REVISION SCHEDULE
new roof ridge
new gms box gutter new gms capping
NO DATE B 9 2015.04.16
350
REFERENCE 01 to align with edge of existing gutter new kliplok metal sheeting. pitch to match exist. roof pitch
PURPOSE OF ISSUE:
new gms ridge flashing new kliplok metal roof @ 1deg. pitch
TENDER
new kliplok roof sheeting on exist. roof structure
06.40.1
06.40.2
sliding window detail - section D-D
sliding window detail - plan
1 : 20
1 : 20
@
A3
@
A3
Practice | ST^AR | McGilvray Studio
Window bench detail new uPVC rainwater downpipe, concealed in wall
021 788 5751 021 788 2714 021 788 7285 design@studiostar.co.za studiostar.co.za
new skimmed plasterboard eave soffit CONTINUOUS WITH, AT SAME HEIGHT AS EXIST. ROOF EAVE u/side to align with REFERENCE 02
REFERENCE 01 to align with edge of existing gutter
new steel beam 4 fixed new studio FFL to u/side of steel beam 2, with gap new 76x50 SAPine battens to fix plasterboard eave soffit to 195
+- 700 as wide as up to REFERENCE 01
114 x 50 SAPine beams, ends notched to hold timber sill at slightly lower level
Joanne McGilvray
3300
timber to match new studio floor timber
new 22x250 SAP timber sill, with slight fall to outside
REFERENCE 01 350 to align with exist. gutter
460
+- 400
20
new timber planks bench to match floor timber
new 12 mm plasterboard ceiling, fixed to u/side of new floor joists
2400
1535
1760 1515
800
new 50x228 SAPine floor joist
new studio FFL + 460
new galv. m/s balustrade: 4x 10x50mm flat bar rails: @250,500,750 & 1000 AFFL (new deck) 50x25mm RHS gms section: balusters on corners and at centre
new steel beam 2, exposed, to SE's spec.
exist. masonry wall, raise if necessary
W 04
CLIENT PROJECT TITLE
new steel column, to SE's spec.
NEW TIMBER BENCH
new three-slider aluminium window
T / F E W
W 05
Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay
new uPVC downpipe, concealed in wall
The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa
new fixed aluminium window
Tender - Draft 02
new 22x140 SAP fascia new steel beam 3, to SE's spec.
53