HANSviljoen_portfolio #4

Page 1

PORTFOLIO BOOK 4_ PRACTICE 2015-2016

HANS VILJOEN

3


PORTFOLIO

CONTENTS

BOOK 4_ PRACTICE 2015-2016

HANS VILJOEN

The Vineyard Hotel _Manor House Conference Centre

07

The Vineyard Hotel _Jack Barnett room refurbishment

17

UCT Graduate School of Business

21

Tafelberg Housing Challenge

31

Apartment Achmat 35 House Viljoen 37 House Rossouw 39 McGilvray Studio 45

5


Lady Anne Barnard’s historical Manor House was adapted to a range of conference facilities. The centuries old oak roof structure were exposed, and in the process the new services and structure too. design development, construction drawings & construction

Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference

2016 The Vineyard Hotel Claremont, Cape Town, SA

7


9

Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference


11

Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference


1800

opaque film 1395

clear gap

opaque glass film fixed to underside of glass, with clear gaps as indicated. to be confirmed with arch.

200

50

200

50mm dia. stainless steel handrail, to fit on top of glass

50 475

ELECTRICAL ENGINEER:

1720

EQ EQ

575

STRUCTURAL ENGINEER:

existing steel beam

EQ

stainless steel handrail and fixing to match those at Courtyard Restaurant

EQ

200

existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position

50 475 1720

EQ

1720

EQ

EQ

575

EQ

1000

EQ

EQ EQ

5725

2290

EQ EQ EQ

1720

EQ

1000

5 4 3

EQ

1

first floor ceiling plan existing steel beam

boardroom 1 ex. timber 95 m²

1 : 50

100

EQ

second overflow downpipe, if new floor drain is made in ground floor

boardroom 2 ex. timber 38 m²

first floor ceiling plan

180 32

1 : 50

100 180

COPY RIGHT: THE DESIGN SHOWN ON THIS DRAWING IS COPY RIGHT AND REMAINS THE PROPERTY OF THE ARCHITECT.

6

first floor plan

1 : 50

silicone sealant

0

NOTES GENERAL SPECIFICATION: * ALL WORK TO COMPLY WITH THE CURRENT NATIONAL AND LOCAL BUILDING REGULATIONS. * ALL WORK TO COMPLY WITH THE MODEL PREAMBLES FOR TRADES, 1992 EDITION. * THESE DRAWINGS MUST NOT BE SCALED. WORK FROM FIGURED DIMENSIONS ONLY OR CONSULT THE ARCHITECT. * DIMENSIONS AND LEVELS ARE TO BE CHECKED, THE LATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTING OUT OF SHOP DRAWINGS. * STRUCTURAL WORK TO STRUCTURAL ENGINEER'S DETAILS. * WORK TO MECHANICAL AND ELECTRICAL ENGINEER'S DETAILS. COPY RIGHT: THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ARCHITECT'S DETAILS, SCHEDULES FINISHING THE DESIGN SHOWN ON THIS DRAWING IS COPYAND RIGHT AND REMAINSSCHEDULES. THE PROPERTY OF THE ARCHITECT. * TO BE CONSTRUCTED IN ACCORDANCE WITH PART T OF SANS 10400. NOTES GENERAL SPECIFICATION: NOTES FOR ELECTRONIC ISSUE * ALL WORK TO COMPLY CURRENT NATIONAL AND This drawingWITH mayTHE be issued electronically. This REGULATIONS. drawing contains external references / links which LOCAL BUILDING should be bound intoMODEL the drawing prior toFOR issue, please also * ALL WORK TO COMPLY WITH THE PREAMBLES refer to revision notes on these drawings: TRADES, 1992 EDITION. * THESE DRAWINGS MUST NOT BE SCALED. WORK FROM FIGURED DIMENSIONS ONLY OR CONSULT THE ARCHITECT. * DIMENSIONS AND LEVELS ARE TO BE CHECKED, THE LATTER ON SITE, BY THE CONTRACTOR BEFORE COMMENCEMENT OF ANY WORK OR SETTING OUT OF SHOP DRAWINGS. * STRUCTURAL WORK TO STRUCTURAL ENGINEER'S DETAILS. * WORK TO MECHANICAL AND ELECTRICAL ENGINEER'S DETAILS. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ARCHITECT'S DETAILS, SCHEDULES AND FINISHING SCHEDULES. * TO BE CONSTRUCTED IN ACCORDANCE WITH PART T OF SANS 10400.

FOR CONSTRUCTION

49mm glass floor glass to have 50mm painted strip along edge, colour to match steel and chemically set exist. in onservices T-section Rheinzink cover steel T-section ex ipe 200, sitepainted with Velvaglo, to manufacturer's spec. colour: matt signal white ANP39003

passage

exist. timber 52 m²

NOTES FOR ELECTRONIC ISSUE This drawing may be issued electronically. This drawing contains external references / links which should be bound into the drawing prior to issue, please also refer to revision notes on these drawings: B 20160720 HV balustrade detail A 20160627 HV steel beam 2 20160513 HV glass sizing 1 20160329 HV first issue for info REV DATE DR DETAILS

32mm dia. round bar existing steel beam 32

1st floor

16

15

14

13

12

11

10

9

8

7

6

40

5

steel U-channel staggerbolted to T-section with dome nuts, finish to be matt stainless steel

second overflow downpipe

steel T-section ex ipe 200, sitepainted with Velvaglo, to manufacturer's spec. colour: matt signal white ANP39003

balustrade detail 1:5

exist. stainless steel downpipe

glass to have 50mm painted strip along edge, colour to match steel and chemically set on T-section

100

02A.MH. FIRST FLOOR_terrace rooms

existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position

32mm dia. round bar

12mm glass chemically set in U-channel with silicone pointing

39575

T-section brace to align with glass edge

MECHANICAL ENGINEER:

4

steel U-channel staggerbolted to T-section with dome nuts, finish to be matt stainless steel

ELECTRICAL ENGINEER:

3

39575

49mm glass floor

+2721 425 1710

STRUCTURAL ENGINEER:

existing steel beam existing steel beam

2

silicone sealant

02A.MH. FIRST FLOOR_terrace rooms

TELEPHONE:

ARCHITECT: REVEL FOX & PARTNERS

QUANTITY SURVEYOR:

second overflow downpipe

opaque film clear gap

first floor plan 1 : 50

PROFESSIONAL TEAM:

CONTRACTOR:

2

40

T-section brace to align with glass edge opaque glass film fixed to underside of glass, with clear gaps as indicated. exist. stainless to be confirmed with arch. steel downpipe clear gap

second overflow downpipe, if new floor drain is made in stainless steel handrail and ground floor fixing to match those at Courtyard Restaurant

2895

MECHANICAL ENGINEER:

1

12mm glass chemically set in U-channel with silicone pointing

5725

1395

clear gap

EQ

50mm dia. stainless steel handrail, to fit on top of glass

2290

EQ 50

EQ

200

opaque film

+2721 425 1710

QUANTITY SURVEYOR:

opaque film clear gap

1800

clear gap

TELEPHONE:

ARCHITECT: REVEL FOX & PARTNERS CONTRACTOR:

clear gap

2895

PROFESSIONAL TEAM:

stainless steel elbow 100

FOR CONSTRUCTION

balustrade detail 1:5

exist. services in Rheinzink cover new leaf catcher at downpipe inlet

existing steel beams

existing rheinzink gutter to be

terrace room 3

adjusted: existing steel beam new side-outlet in gutter with pipe running flat, horizontally stainless steel elbow and down in same position

conc. slab 38 m²

ex. stair

second overflow downpipe, if new floor drain can be added to ground floor

frameless glass balustrade fixed to edge of T-beam, to detail

49mm thick glass second overflow downpipe, if floor, by glass specialist new floor drain can be added to ground floor rheinzink downpipe 5000

bridge short section 1 : 25

20

T-section beam to SE's detail

1120

20

1120

terrace room 4

terrace room 2

exist. timber + carpet 54 m²

20

1120

exist. timber + carpet 79 m²

20

1120

20

bridge long section 1 : 25

stainless steel handrail to detail

1120

Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt

02A.MH. FIRST FLOOR_terrace rooms

HV balustrade detail VINEYARD HOTEL HV steel beam HV glass sizing MANOR HOUSE HV first issue for info DR DETAILS CONFERENCE FACILITY

20160720 20160627 20160513 20160329 DATE

TITLE

new bridge to terrace rooms

existing steel beams

existing rheinzink gutter to be adjusted: new side-outlet in gutter with pipe running flat, horizontally and down in same position frameless glass balustrade 7

1000

39575

B A 2 1 REV

1000

tiles 10 m²

new leaf catcher at downpipe inlet stainless steel handrail to detail

02A.MH. FIRST FLOOR_terrace rooms

terrace room 1

exist. timber + carpet 38 m²

frameless glass balustrade fixed to edge of T-beam, to detail

SCALE VINEYARD HOTEL As indicated DATE MANOR HOUSE 2016.02.10 CONFERENCE FACILITY TITLE

PROJECT NO.

DESIGNED pp / tk DRAWN hv CHECKED nb

DRAWING NO.

REV.

9667/18to5000 new bridge terrace rooms

B

39575

7 5000

frameless glass balustrade 49mm thick glass floor, by glass specialist

20

1120

20

1120

20

1120

20

1120

20

1120

rheinzink downpipe

bridge short section

T-section beam to SE's detail

1 : 25

Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt

bridge long section 1 : 25

Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference

clear gap

SCALE As indicated

DESIGNED pp / tk

DATE 2016.02.10

DRAWN hv CHECKED nb

PROJECT NO.

DRAWING NO.

9667/18 5000

REV.

B

13


ALIGNMENT LINE Z

ALIGNMENT LINE Z

30

isoboard ceiling new drywall with acoustic insulation, consisting of: 9/12/15 mm acoustic board, 2.5 mm Flexible Noise Barrier (FNB), 50/100mm rockwool insulation, 9/12/15 mm acoustic board

contact NEELTJIE WILKENS (Genesis Acoustics) 082 569 1028 / 086 00 22 157

acoustic double glazing by specialist

aircon supply duct, stop short of double glazing

aircon duct

oregon infill between trusses 30

oregon timber to match oregon above wall A

acoustic insulation RGB LED concealed strip light

exist. bottom chord

concealed LED RGB light strip

165 x 305 g/ms I-beam

165 x 305 g/ms I-beam

3838 3838

25

alternative I-beam fill

50

9x9mm rebate

245

165 x 305 g/ms I-beam

9mm melawood mitred Lshaped closer piece and insulation by Aluglass

42375

42375

25

acoustic insulation by specialist

9mm melawood mitred Lshaped closer piece and insulation by Aluglass 100 x 90 acoustic panel track

100 x 90 acoustic panel track

100 x 90 acoustic panel track

100

plasterboard ceiling

3100

RGB LED concealed strip light

2750

plasterboard light cove

steel I-beam

ALIGNMENT LINE Z

ALIGNMENT LINE Z

skim-plastered plasterboard ceiling

02A.MH. FIRST FLOOR_terrace rooms

02A.MH. FIRST FLOOR_terrace rooms

02A.MH. FIRST FLOOR_terrace rooms

39575

39575

39575

section through wall A 1 : 10

Z:\9667 Vineyard\9667-18 Manor House Conference Facility\03 Working drawings\8000 Revit\9667-18_8015_20160614_manor house conference_RVT2016.rvt

section through wall B 1 : 10

section through wall C 1 : 10

3205

9mm melawood mitred L-shaped closer piece and insulation by Aluglass

02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling

top of I-beam

13

50

60

42375

02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling

60

100 x 90 acoustic panel track

150

02C.MH.2900 AFFL 42475 02A.MH.2800 ceiling

16mm melawood board, with finish to match acoustic panels

30

90

16mm melawood board, with finish to match acoustic panels

Practice | Revel Fcx & Partners | Vineyard Hotel - Manor House Conference

structure to SE's dwg and detail

15

COPY RIGHT: THE DESIGN SHOWN ON TH AND REMAINS THE PROPER

NOTES GENERAL SPECIFICATION: * ALL WORK TO COMPLY W LOCAL BUILDING REGULATI * ALL WORK TO COMPLY W TRADES, 1992 EDITION. * THESE DRAWINGS MUST N FIGURED DIMENSIONS ONL * DIMENSIONS AND LEVELS ON SITE, BY THE CONTRACT ANY WORK OR SETTING OU * STRUCTURAL WORK TO ST * WORK TO MECHANICAL DETAILS. THESE DRAWINGS ARE TO B ARCHITECT'S DETAILS, SCHE SCHEDULES. * TO BE CONSTRUCTED IN A SANS 10400.

NOTES FOR ELECTRONIC ISS This drawing may be issued This drawing contains exter should be bound into the d refer to revision notes on th

FOR INF

4 3 2 1 REV

20160721 20160615 20160608 20160607 DATE

HV HV HV HV DR

ore dry con first DET

VINEYARD MANOR HO CONFEREN TITLE

section thr panel trac

SCAL 1 : 10

DATE 2016.

PROJECT NO.

DRAW

9667/18 50


Refurbishment of 49 hotel suites in a wing of the hotel, originally built by the architect, Jack Barnett. New balconies and an outdoor deck area were also added. The interface between the reception area and a courtyard were also re-done in this phase. construction drawings & construction

Practice | Revel Fcx & Partners | Vineyard Hotel - Jack Barnett rooms refurbishment

2015 The Vineyard Hotel Claremont, Cape Town, SA

17


248

247 257

store 255

253

249 251

Practice | Revel Fcx & Partners | Vineyard Hotel - Jack Barnett rooms refurbishment

259

19


2015-2016 UCT Graduate School of Business V&A Waterfront, Cape Town, SA New academic conference centre in historical context, at the old Breakwater Prison, which RF&P adapted to the Graduate School of Business in 1992. sketch design, design development 21


23

Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre


25

Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre


Gb

F

T_Graduate School for Business_Academic Conference Centre

E

Db

D

C

B

A

Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre

G

27 DWG TITLE

north-east elevation DATE

2016.02.15


29

Practice | Revel Fcx & Partners | UCT Graduate School of Business - New Conference Centre


2016 Tafelberg Housing Challenge Seapoint, Cape Town, SA Reclaim the CIty and Ndifuna Ukwazi launched a challenge to architects to present proposals to develop a derelict shool site in Seapoint for affordable housing. This scheme of 3000m2 housing and 1500m2 commercial space was presented. concept design 31


33

Practice | ifekt | Tafelberg Housing Challenge


tv

bench

books

2016 Apartment Achmat Cape Town CBD, SA.

ex. wc

hanging space

floor plan 1 : 50 @ A3

new whb

new sink new wc

broom

drawers

new sh wm td

fr

gr

To the client’s request, this existing 100m2 apartment across Cape Town Railway Station is renovated to minimalism. A simple new kitchen and bathroom forms the major part of the renovation. Exsting partitions are removed and replaced with glass partitions and curtains for privacy. concept, design development 35


2015 House Viljoen Potchefstroom, North-West, SA A new 220m2 house was designed in response to the ‘Transvaal’ tradition of simple pitched roofs - an excercise in restraint and minimal design. concept, design, council drawings 37


2015 House Rossouw Woodstock, Cape Town, SA Refurbishment of Victorian semidetached two bedroom house. Redesign of kitchen and bathroom, unified with a skylight above the wall that separates these two rooms. survey, concept to completion 39


41

Practice | ifekt | House Rossouw


43

Practice | ifekt | House Rossouw


2015 House McGilvray Kalk Bay, Cape Town, SA An addition of a small artist studio in the roof, accessible with a spiral stair from the now-double-volume kitchen. The existing eave line is extended with the new volume slightly overhanging the main house. concept, design development, 3d modelling, client presentation, council submission, tender & construction documents 45


TENDE

1 : 50

SCALE DATE

DWG NO. JOB NO.

14-MCG



02.21

REV

@ A3

SE OF ISSUE: new roof ridge u/side of new ceiling



new studio FFL

House McGilvray

DATE

DWG NO.

REV

00.31

1200

new 125mm dia s/s chimney flue from exist. braai

1200

1200

1200

new 22x140 SAP fascia, painted same colour as roof sheets new roof ridge 

u/side of new ceiling

W 05 new kliplok-profile sheeting on exist. roof structure

ex. ceiling height 

new studio FFL 

02.21.2

South Elevation - 1-50 1 : 50

A3

47

Roof perspective

House McGilvray

@

Practice | ST^AR | McGilvray Studio



REFERENCE 02 u/side of new eave soffit to exist. roof

DATE

DWG NO.

00.30

REV

DATE

+- 1040

Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay

+- 825

Roof perspective 2

new 12mm MD fibre-cement sheeting with epoxy joints @ 1200mm c/c, painted same colour as roof sheets

The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa

A3

NO

new galv. m/s balustrade: 4x 10x50mm flat bar rails: @250,500,750 & 1000 AFFL (new deck) 50x25mm RHS gms section: balusters on corners and at centre

West elevation - 1-50

 REVISION SCHEDULE

exist. plaster & paint

02.21.1 @

REFERENCE 02 u/side of new eave soffit to exist. roof

West & South elevation

REFERENCE 02 u/side of new eave soffit to exist. roof

1 : 50

2400

ex. ceiling height

  

1000

W 04

ROJECT TITLE

225 250 250 250

Dx 01

new residential-profile aluminium gutter, fixed to new 22x140 SAPine fascia. both same colour as roof sheets

DESCRIPTION



new kliplok-profile sheeting on exist. roof structure


B

6685

existing fence 3630

150

150

1785

150

on

1000

2345 new RWDP

W 05 970 new steel sheeting on exist. roof structure

0

12

9 11

10

2800

8

13

A New steel & timber staircase 3700

new steel column 2, to SE detail new aluminium window with timber sill @ 1200AFFL 5565

150

Exist. roof structure

new steel sheeting on exist. roof structure

B Ex. tanning deck

new RWDP

7

150

350

w ne

r be tim

6

14

+15.60

w ne

new steel sheeting on exist. roof structure 5

06.40

re ctu tru s ub rs be tim

W 03

700

21.8 m2 new2timber

new aluminium fixed panel window

C

Practice | ST^AR | McGilvray Studio

EQ

new aluminium window with timber sill

38 lab 8x . s n 3 conc o r be ex. tim n w ns o e n tte ba

New Studio

5750 new aluminium window with timber sill, see D&W sched.

W 02

2650

EQ

W 04

New timber bench +450 AFFL new steel beam 3 above

EQ

new timber on ex. slab

3300

A

New roof structure above new steel column 3, exposed, to SE detail

350

Ex. Balcony

5145

remove exist. braai flue and replace with new 125 dia. s/s chimney flue

Dx 01

1785

995

150

820

850

SITE BOUNDARY 5865

new steel column 4, to SE detail

new galv. m/steel balustrade

C

49


TENDER

CHCK'D

ARA

DRAWN

SCALE

HV

NEW TIMBER FLOOR

DATE

exterior: kliplok sheeting insulation: 75mm Polyester Fibre structure: 114x38 SAP studs and rails interior: painted plasterboard

A

2015.04.16 As indicated@ A3

DWG NO.

NEW TIMBER WALL

JOB NO.

New precoloured colourbond ultra kliplokprofile sheet metal roofing at 1 degree pitch, on 50x76 SAPine purlins @ max. 1000mm c/c, on 50x228 SAPINE rafters @ max. 1200mm c/c

14-MCG

site boundary

REV

02.11 B

PURPOSE OF ISSUE:

NEW SHEET-METAL ROOF

NGL

330

New 22mm SAP planks on 114x50 SAP new roof ridge  joists @ max. 450mm c/c u/side of new ceiling

2



02.11

new kliplok on exist. roof structure

ex. roof void

new timber

Tender - Draft 01 Tender - Draft 02

15.60 ex. ceiling height 

new studio FFL

new roof ridge

50x228 SAPine timber rafter



Ex. Bedroom

exist. tiles

ex. timber

12.86

12.86

exterior 12mm MD fibrecement board gms head-wall flasing

38x38mm SAPine ceiling batten

Ground Floor 

u/side of new ceiling 

A

Ex. Garage

3105

50 12mm gypsum ceiling board

new kliplok-profile steel sheeting on exist. roof structure

50x114 SAPine timber stud

Section B-B

1 : 10

1 : 50

A3

@

A3

51

021 788 5751 021 788 2714 021 788 7285 design@studiostar.co.za

02.11.1

Callout of Sec B-B

T / F E



interior

The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa



Street Level



CLIENT PROJECT TITLE

Garage Level

insulation

@

 Practice | ST^AR | McGilvray Studio Section B-B 

22x75 SAPine shadow cornice

02.11.2

NO DATE A 6 2015.02.17 B 9 2015.04.16

Ex. Bathroom

3050

new bulkhead

gms barge flashing

2755

new kliplok-profile steel sheeting on

REVISION SCHEDULE



heighest point of t/o exist. slab over bathroom +60

new bulkhead

Joanne McGilvray

New Studio 855

Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay

new drywall

DESCRIPTION

new drywall

2400

W 02


REFERENCE 01 to align with exist. gutter

ARA HV

@ A3 CHCK'D DRAWN

SCALE DATE

2015.04.16 1 : 20

REV DWG NO.

06.40 B

JOB NO.

14-MCG

165

800

330

215

DESCRIPTION

u/side of new ceiling 

185

400

new flat flush-skimmed plasterboard ceiling

REVISION SCHEDULE

new roof ridge 

new gms box gutter new gms capping

NO DATE B 9 2015.04.16

350

REFERENCE 01 to align with edge of existing gutter new kliplok metal sheeting. pitch to match exist. roof pitch

PURPOSE OF ISSUE:

new gms ridge flashing new kliplok metal roof @ 1deg. pitch

TENDER

new kliplok roof sheeting on exist. roof structure

06.40.1

06.40.2

sliding window detail - section D-D

sliding window detail - plan

1 : 20

1 : 20

@

A3

@

A3

Practice | ST^AR | McGilvray Studio

Window bench detail new uPVC rainwater downpipe, concealed in wall

021 788 5751 021 788 2714 021 788 7285 design@studiostar.co.za studiostar.co.za

new skimmed plasterboard eave soffit CONTINUOUS WITH, AT SAME HEIGHT AS EXIST. ROOF EAVE u/side to align with REFERENCE 02

  

REFERENCE 01 to align with edge of existing gutter

new steel beam 4 fixed new studio FFL to u/side of steel beam 2,  with gap new 76x50 SAPine battens to fix plasterboard eave soffit to 195

+- 700 as wide as up to REFERENCE 01

114 x 50 SAPine beams, ends notched to hold timber sill at slightly lower level

Joanne McGilvray

3300

timber to match new studio floor timber

new 22x250 SAP timber sill, with slight fall to outside

REFERENCE 01 350 to align with exist. gutter

460

+- 400

20

new timber planks bench to match floor timber

new 12 mm plasterboard ceiling, fixed to u/side of new floor joists

2400

1535

1760 1515

800

new 50x228 SAPine floor joist

new studio FFL + 460

new galv. m/s balustrade: 4x 10x50mm flat bar rails: @250,500,750 & 1000 AFFL (new deck) 50x25mm RHS gms section: balusters on corners and at centre

new steel beam 2, exposed, to SE's spec.

exist. masonry wall, raise if necessary

W 04

CLIENT PROJECT TITLE

new steel column, to SE's spec.

NEW TIMBER BENCH

new three-slider aluminium window

T / F E W

W 05

Additions & Alterations to exist. house, erf 90094, 216 Main Road, Kalk Bay

new uPVC downpipe, concealed in wall

The Studio, 3 Colyn Road, Kalk Bay, 7975, Cape Town, South Africa

new fixed aluminium window

Tender - Draft 02

new 22x140 SAP fascia new steel beam 3, to SE's spec.

53