HardiS ha h
ewingcole ARCHITECTURE INTERNSHIP timelinE May 2019 - present My experience at EwingCole has been an amazing look into a diversity of projects, all in various phases. From the conceptual design phase to the construction document phase, I have been able to gain exposure to various tasks and been able to sit in on meetings at different levels of a project. Working full time for the summer of 2018 allowed me to gain familiarity with the full duration of an RFP process and work to its completion. Over the course of working part-time during my Fall and Spring semesters, I was challenged to be more flexible and be able to assist on a variety of projects wherever necessary. The projects within showcase a few snapshots of various marketing efforts, requests for proposals, conceptual design drawings, and construction details that I have been able to assist in creating through the past year at EwingCole. E-mail.hardidshah96@gmail.com Contact no.+1 443 805 3788
PORTFOLIODIRECTORY
SUMMER2018.RFP WORKS
04.07
MARKETING EFFORTS
FALL2018.LEED DOCUMENTATION
12.15
UNISPHERE - UNITED THERAPEUTICS
FALL2018.CONSTRUCTION DRAWINGS
18.19
VARIOUS PROJECTS
FALL2018.SPACE PLANNING RFP
s
08.11
and conceptual design
SPRING2019.CONCEPTUAL DESIGN UNITED THERAPEUTICS
16.17
summer 2018 rfp for university of maryland marketing efforts This work was done as an extension of a project where we went beyond the minimum requirements set by the client to explore the design further.
Programs Used: revit & photoshop
first floor axon teaching chemistry lab
third floor axon research chemistry lab
19
summer 2018 rfp for university of maryland marketing efforts This work was done as an extension of a project where we went beyond the minimum requirements set by the client to explore the design further.
Programs Used: rhinoceros 5, autocad, bluebeam, & photoshop
first level Existing General Chemistry Teaching/Upper Level Lobby
second level Organic Chemistry Teaching/ Organic Chemistry Research
Chemistry Teaching Chemistry Research Chemistry Support 2ႈFH :ULWHXS Collaboration Mech/Elec/Data
third level Biochemistry Research/ Organic Chemistry Research
Second Floor Organic Chemistry Teaching / Organic Chemistry Research
fourth level Penthouse/Organic Chemistry Research
Chemistry Teaching Chemistry Research Chemistry Support 2ႈFH :ULWHXS Collaboration Mech/Elec/Data
chemistry teaching chemistry research chemistry support office/ write-up collaboration Chemistry Teaching mech/elec/ data Chemistry Research Chemistry Support 2ႈFH :ULWHXS Collaboration Mech/Elec/Data
Credit 4.4_parking capacity EXISTING
NEW CONSTRUCTION
.
1 / A2.1.A
1 / A2.1.B
MATCHLINE - SEE
1 / A2.3.B
MATCHLINE - SEE
1 / A2.3.A
NEW CONSTRUCTION
MATCHLINE - SEE
.
MATCHLINE - SEE
EXISTING
FDC
SWM PLANTER
ELECTRICAL UTILITY VAULT
SSE SWM PLANTER
SSE
FDC
SSE
PLANTER
SSE
1
SSE
ADA VAN PRKG
TERRACE
2
DN
ADA VAN PRKG
POOL DN
OPEN TO BELOW
PLANTER
DN
DN PARKING CAPACITY
PARKING CAPACITY
125
124
123
122
121
120
119
118
117
116
115
114
113
112
111
MATCHLINE - SEE
1 / A2.1.A
MATCHLINE - SEE
1 / A2.1.C
3
4
5
6
7
8
9
10
11
12
13
14
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
15
16
17
110 127
126
132
133
134
135
136
137
138
139
140
99
100
101 109 108
DN
UP
UP
143
144
145
146
147
148
149
150
151
152
102
103
104
105
106
LOADING DOCK
UT DUMPSTER HOTEL DUMPSTER
1 / A2.1.B
142
1 / A2.1.C
141
MATCHLINE - SEE
131
EXISTING HOTEL
EXISTING HOTEL
Credit 4.3_alt fueling station unisphere - united therapeutics
.
NEW CONSTRUCTION
1 / A2.1.A
EXISTING
1 / A2.1.B
fall 2018 leed documentation
MATCHLINE - SEE
FDC
SWM PLANTER
ELECTRICAL UTILITY VAULT
SSE SWM PLANTER
SSE
FDC
SSE
PLANTER
SSE
LEED Credits which were documented include: 4.3 & 4.4- Alternative Fuel & Parking Capacity 7.1 & 7.2- Heat Island Effect 8.1 & 8.2- Daylighting & Views
1
SSE
ADA VAN PRKG
2
DN
ADA VAN PRKG
POOL DN PLANTER
DN
MATCHLINE - SEE
1 / A2.1.A
MATCHLINE - SEE
1 / A2.1.C
3
4
5
6
7
8
EV PEDESTAL MTD. CHARGING STATION
EV PEDESTAL MTD. CHARGING STATION
EV PEDESTAL MTD. CHARGING STATION
EV PEDESTAL MTD. CHARGING STATION
9
10
11
12
13
14
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
15
16
17
UT DUMPSTER HOTEL DUMPSTER
EXISTING HOTEL
1 / A2.1.C
LOADING DOCK
1 / A2.1.B
Programs Used: revit, bluebeam, & illustrator
MATCHLINE - SEE
UP
MATCHLINE - SEE
130
MATCHLINE - SEE
129
1 / A2.3.B
128
MATCHLINE - SEE
107
1 / A2.3.C
1 / A2.3.C
MATCHLINE - SEE
1 / A2.3.A
MATCHLINE - SEE
MATCHLINE - SEE
MATCHLINE - SEE
PARKING CAPACITY
3' - 6"
level 4
level 5 3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
Credit 8.1_daylighting
3' - 6"
Credit 5.1_site development 3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
Credit 8.2_views
1 1/2"
ALL MATERIAL TO BE STAINLESS STEEL TYPE 304
3"
1"
PERIMETER OF CELL BANK
3
3
PERIMETER OF CELL BANK
3/4"
1 1/2"
3
ALL MATERIAL TO BE STAINLESS STEEL TYPE 304
FOR EXISTING FLOOR ANCHORS THAT ARE PART OF CELL BANK CONSTRUCTION, COORDINATE THEIR RELOCATION WITH CELL BANK VENDOR
4"
3
4"
3/4"
1 1/2"
4"
4 5/8"
9"
5"
1 1/2"
5" L6" x 6" x 5/16"
1 1/2"
3/4"
3/4" HILTI KWIK BOLT TZ EXP. ANCH, (4-5/16" NOM. EMBED) (TYP.)
9"
3"
FLOOR RAIL
STEEL ANGLE - (STAINLESS STEEL) 6" x 6" x 5/16" WITH BASE PLATE SURFACE MOUNTED TO FLOOR
1/4" STAINLESS STEEL BASE PLATE w/ (3) EXP. ANCHOR
cell bank corner guard base plate plan detail
3" = 1'-0" - Cell Bank Corner Guard Base Plate Plan Detail
2
SCALE: 3" = 1'-0"
cell bank corner guard plan detail
3" = 1'-0" - Cell Bank Corner Guard Plan Detail
SCALE: 3" = 1'-0"
fall 2018 construction drawings various projects 1 1/2"
ALL MATERIAL TO BE STAINLESS STEEL TYPE 304
CELL BANK CORNER GUARD DETA
3"
I have included in this page one detail drawing that I had created 1" been placed, through my part-time employment, for a Pfizer. I have on various other CD phases for a number of projects which included drawing custom details of exterior envelope and interior finishes in Revit.
P r o g r a m s U s e d : r e v i PERIMETER t & b OF l uCELL e bBANK eam
3
3/4"
L6" x 6" x 5/16"
As indicated
4"
3/4"
PERIMETER OF CELL BANK 4 1/2"
4 5/8"
2018.06.01 4"
3
3/4"
1
3/4"
1/4" BASE PLATE w/ (3) EXP. ANCHOR 3/4"
3"
STEEL ANGLE - (STAINLESS STEEL) 6" x 6" x 5/16"
FLOOR RAIL
3/4" HILTI KWIK BOLT TZ EXP. ANCH, (4-5/16" NOM. EMBED) (TYP.)
option a
option b
fall 2018 space planning Ostermayer laboratory rfp This RFP was for the renovation of an existing educational lab facility for which multiple options were created. Each option had a different circulation type between the prep spaces, lab spaces, and the teaching areas. Along with these, collaborative student spaces were also incorporated.
Programs Used: autocad & illustrator option c
existing photos
spring 2019 conceptual design office renovation for a confidential client Within the conceptual design phase of this renovation project, I was able to contribute various programmatic layouts, exterior options, and renderings. I worked majorly within the Revit model while also learning about sustainable building design.
Programs Used: autocad & photoshop
Existing Conditions
current plan layout
level 2
level 1
lower level
area breakdown
area to be demolished
existing building area to be demolished
77,400 sqft 21,400 sqft
total building area to remain
56,000 sqft
proposed plan layout level 2 single offices double offices open offices conference rooms
30 6 22 2
total occupants
64
level 1 single offices double offices open offices conference rooms
17 5 9 2
total occupants
36
lower level
use legend lobby cafe core gym offices
objectives: net zero energy zero carbon footprint rooftop solar panels amenity spaces incl cafe & gym incorporate lake into sustainable design strategies sage glass new insulation
aerial done by co-worker
dropoff & entrance
entry space
view towards lake from stairway
view from gym space on lower level
view from the connecting bridge