Regeneration Masterplan - Connectivity

Page 1

CONNECTIVITY The key to the success of the public realm strategy is the ability to connect all of the sites together and make walking between them easier. Each key site will therefore be linked to each other enabling a flow from one space to the next. Without improved connectivity individual developments and projects will be isolated and will not complement each other. A range of types of improvements are proposed including seven amendments along Stockton Street. These include new crossings, the removal of guard rails, and revised priority junctions. These will help pedestrians cross the road but also maintain a steady flow of traffic and maintain road safety. In addition, public realm and junction improvements are also proposed to Church Street and Church Square, Victory Square/Victoria Road and York Road. These improvements, along with those proposed at the Waterfront to increase the ease with which people can move around the Masterplan Area.

NEXT STEPS CONSULTATION

1

PROVISION OF TRAFFIC SIGNALS AT THE MULTI STOREY CAR PARK ACCESS.

2

Your views are important as part of the Masterplan process. We would be grateful if you could complete a questionnaire to provide us with valuable feedback to help inform the Masterplan. You can comment on the proposals by completing a questionnaire and returning it to the Council at:

IMPROVEMENTS TO THE STOCKTON STREET/PARK ROAD TRAFFIC SIGNALS.

3

REMOVAL OF CENTRAL BARRIER ALONG LENGTH OF STOCKTON STREET AND REPLACEMENT WITH TREES OR OTHER ‘ATTRACTIVE’ FEATURES.

Regeneration Division Hartlepool Borough Council Civic Centre, Level 3 Victoria Road Hartlepool TS24 8AY

oc

St kt

You can also view the consultation material online at www.hartlepool. gov.uk/MasterplanConsultation where you can also complete the questionnaire online.

on et re

St

Please provide your feedback by 12 February 2015 to ensure that your views are fully considered. The Masterplan will be revised with the results of the public consultation before being adopted in March 2015..

7

PROVISION OF HIGH QUALITY PEDESTRIAN CROSSING ACROSS THE A689 AT VICTORIA ROAD

6

PROVISION OF FOOTWAY / CYCLEWAY ALONG STOCKTON STREET OVER THE RAIL LINE.

4

5

DELIVERABLES PROVISION OF NEW PEDESTRIAN CROSSING FACILITY BETWEEN THE HARTLEPOOL COLLEGE AND MIDDLETON GRANGE.

PROVISION OF ROUNDABOUT AT STOCKTON SREET / CLARENCE ROAD AND CHURCH STREET JUNCTION

The Masterplan will then be used to guide development in the Masterplan Area over the short, medium and long-term on a phased basis. It will also be a key document to support securing investment and supporting economic growth. The viability of the Masterplan proposals has been carefully considered as part of the process in order to demonstrate that the Masterplan is deliverable.

HARTLEPOOL REGENERATION MASTERPLAN

Help Shape Hartlepool’s Regeneration Masterplan


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.