Womensrestbuildingupgrade plans

Page 1

Sheet Index Layout ID

Layout Name

A01

Site Plan

A02

Existing & Demolition Plan

A03

Proposed Plan

A04

Floor Finishes Plan

A05

HVAC Plan

A06

Roof Plan

A07

Electrical Plan

A08

Lighting Plan

A09

Interior Elevations

A10

Interior/Section Elevations

A11

Elevations

A12

Elevations

A13

Sections

A14

Details

Alterations To The Women's Rest Building At: 201 Russell Street South, Hastings

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:


Ru ss el ll S tre et So ut h

e rn ou stb Ea st Ea et re St 2000mm high temporary site fencing is to be errected around the site to protect members of the public during demolition & construction work

on nd Ly ad Ro st Ea

N

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3 1:500

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

333m² SITE PLAN

Sheet No:

A01


Scope of Work Roof 7.02.02

LEGEND Existing walls to remain

Replace all roof claddings & flashings etc. over new Thermakraft 215 roof underlay

VERANDA PLUNKET RECEPTION

PLUNKET OFFICE

Re-pitch flat roof over the Nursery with a new gable roof to match the rest of the building

To be demolished

Re-pitch flat roof over the Baby Change Room with a new membrane roof as per the plans & specifications 2.04.02

Decor

7.02.03

Re-paint the inside of the building Re-paint the veranda barrier stucco & capping etc.

STORE 4

03 D

Re-paint the exterior timberwork of the building repairing minor defects in the stucco as part of the contract Re-paint is to include the front & rear veranda's Glazing to be re-puttied

ENTRY

PLUNKET KITCHEN 2.04.01

7.01.02

THE KATE SHEPPARD ROOM D01

PLUNKET STORE ROOM

2.01.01

Flooring Carpet & vinyl to be replaced throughout the building Decking

2.03.01 STORE 2

Deck boards to be checked rotten and or damaged boards are to be replaced to match existing

2.05.01

HALL 2.05.01

STORE 3

Insulation D02

Install Autex R1.5 under floor polyester insulation Install Autex R3.2 polyester ceiling insulation

2.01.01

7.01.02

Kitchen Cabinetry Remove all cabinetry and sink from the Garden Room

OFFICE GARDEN ROOM

Remove all cabinetry and sink from the Kate Sheppard Room and replace with the cabinetry from the old Plunket kitchen plus additional pantry units as plan

7.01.01 PANIA ROOM

STORE 1

Install new cabinetry into the old Plunket kitchen which is to become the main kitchen for the building

7.01.02

COUNSELLING ROOM

All kitchen areas will require new electrical fittings any existing fittings are to be tested to ensure compliance with NZS

TOILETS 7.02.01

VERANDA

Glazing Re-glaze the top window glass in the Pania Room with clear float glass Reception The reception is to be re-located into the old Plunket Room and Store Room by removing the internal wall from between these two rooms

PERGOLA

Heating

PERGOLA

NURSERY

2.02.02

Remove the old gas heaters from within the building Install reclaimed HVAC system as per HVAC plan Electrical Replace with Switchboard / mains cable concealed entry into the building Lighting

BABY CHANGING

Keynote Legend 2.01.01

Remove door (to be re-used) frame up & gib opening

2.02.02

Remove roof cladding & furrings to leave rafters & ceiling in place

2.03.01

Form opening for re-used door - D03

2.04.01

Form opening for double doors (D01)

2.04.02

Remove wall (non load bearing)

2.05.01

Remove doors (to be re-used)

7.01.01

Remove kitchen units, cap pipework & waste at or below floor level

7.01.02

Remove gas heater, cap pipework

7.02.01

Remove hand dryer

7.02.02

Remove vanity unit, cap pipework & waste at or below floor level

7.02.03

Re-locate kitchen cabinetry to the Kate Sheppard room

Drawn:

Rob Collins

Any electrical cables found in walls being demolished are to be brought to the attention of the contract principal

N

Date:

BD1100

Light fittings are to be upgraded as per the lighting plan

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

EXISTING & DEMOLITION PLAN

333m² Sheet No:

A02


1 A11

Keynote Legend

VERANDA

OFFICE 2

OFFICE 1

5.03.01

New half height walls

DW

New Walls

90

WALL LEGEND Existing walls to remain

5.02.04 D05

5.02.03 5.02.02 KITCHEN

5.02.06 S3 A10

3885

RECEPTION 1 D01

COUNSELLING ROOM 3

5.02.05

ENTRY

S3 A10

THE KATE SHEPPARD ROOM

R G

D02

F

D03

RECEPTION 2

New 25° gable roof over the nursery to match the cladding type of the main building

3.03.02

Re-pitch existing membrane roof with new framing and 17mm CD ply then clad with 1.5mm EPDM

3.03.03

New gable wall clad with cedar shingles to match the existing gable walls

3.03.04

Existing rainwater heads & downpipes

4.01.02

Change glazing panels at top of windows to clear float glass

5.01.01

Use H3 battens @ 450 max ctrs (over dpc) sized accordingly to cover pipework & line with 10mm gib aqualine

5.02.02

New cupboard unit (lockers)

5.02.03

New kitchen units

5.02.04

New tall units to match re-located units as closey as posible - See interior elevations

5.02.05

Kitchen units re-located from kitchen

5.02.06

New reception counter

5.02.07

Pantry cupboards

5.03.01

Re-hang door to opposite hand

7.01.01

Upgrade switchboard

3285

5.02.07 90 HALL

STORE

3.03.01

7.01.01

5.01.01 OFFICE 3 GARDEN ROOM 4.01.02

PANIA ROOM

2 A12

COUNSELLING ROOM 2

COUNSELLING ROOM 1

2 A11

TOILETS 4.01.02

VERANDA

PERGOLA

Supply and install Insulation to ceilings and underfloor Autex R1.5 under floor polyester under floor insulation Autex R3.2 polyester ceiling insulation

PERGOLA

S1 A14

6410 NURSERY

4100

S1 A14

3.03.01

3.03.03 BABY CHANGING

3.03.04 3.03.02

N S2 A13

1 A12 Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

PROPOSED PLAN

333m² Sheet No:

A03


Office 2 A: 21.59 m2 Carpet tiles

Office 1 A: 17.14 m2 Carpet tiles

Counselling Room 3 A: 7.72 m2 Carpet tiles

Reception A: 12.76 m2 Vinyl

Kitchen A: 14.72 m2 Vinyl

A: 33.37 m2 Carpet tiles

Store

A: 20.27 m2 Vinyl

A: 9.13 m2 Carpet tiles

Toilet

Hall 2 A: 10.88 m2 Vinyl

Garden Room

A: 1.94 m2 Vinyl

The Kate Sheppard Room

Hall 1

Reception 2 16 A: 12.08 m2 Carpet tiles

Entry A: 8.50 m2 Vinyl

Counselling Room 1

A: 19.39 m2 Carpet tiles

Office 3 A: 14.48 m2 Carpet tiles

Pania Room A: 32.77 m2 Carpet tiles

A: 15.90 m2 Carpet tiles

Counselling Room 2

Toilets

A: 9.09 m2 Carpet tiles

A: 14.03 m2 Vinyl

Nursery A: 23.62 m2 Carpet tiles

Baby Changing A: 5.95 m2 Carpet tiles

N

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

FINISHES PLAN

333m² Sheet No:

A04


AC2-ODU

AC2-floor console

EX

EX Hi wall

TS FH

Ø200 flexi

AC2

Mitsubishi electric floor console split MFZ-KA35 3.5KW New

AC3

Mitsubishi electric hi wall split MSZ-GE25 2.5KW New

EX

Existing split systems - Retained

FH

PDL thermostat fan heater 2KW surface wall mounted model 3304 WH with surface mount kit

TS

PDL digital timer switch model 646E7

Grilles & Diffusers A Ø200 flexi

A

Ø200 flexi

Ø200 flexi

TST

Supply diffuser Holyoake 100 l/s ECO-SA-ZOO

B

Return grille Holyoake 175 l/s EC125 RC 300x300

C

Outdoor air inlet Holyoake 75 l/s RLW-L-RC 250x200 (white)

Dampers in duct branches

B Ø250

TS FH

EX Hi wall

A

A

Ø250 solid

Ø250 solid B

EX

Daikin ducted split FDYQ100KAV1 10KW Client supplied

Heaters

A

Oven rangehood by others

AC1

TS FH

AC1 Ø300 flexi

Flexi ducting Ceiling diffuser

B Ø300 flexi

A

Ø200 flexi TS FH

Ø200 flexi TS FH

Outdoor air inlet

Ø150 flexi

Ø300 flexi

A

C

Ducted unit mounted in roof space, access to install in conjunction with construction of new roof over nursery

AC1-ODU

AC3-ODU

Hi wall AC3 Outdoor units mounted in garden on concrete pad with galvanised pipe & mesh security enclosure

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

HVAC PLAN

333m² Sheet No:

A05


15o

15o

25o

25o

o

15

4 A14

4 A14

Dektite flashing in the diamond formation over cooker hood extract

15o

S3 A10

Re-roof existing building with selected 0.55 bmt coloursteel corrugated roof cladding Roof cladding fixing pattern is: Hit 1, miss 1, hit 1, miss 2……. Thermakraft 215 self supporting roof underlay 0.55bmt coloursteel corrugated longrun roof cladding 0.55bmt flashings to valleys and ridge/hip

25o

10o

S3 A10

10o 25o

25o

25o

25o

25o

25o

25o

S1 A14

S1 o

o

25

3o

25

New 25° gable roof over the nursery to match the A14 cladding type of the main building 25x1mm tensioned roof strap bracing Roof trusses @ 900mm max ctrs over existing rafters & ceiling 70x45 H1.2 purlins - end spans 600mm max then intermediate spans 900mm max Thermakraft 215 self supporting roof underlay 0.55bmt coloursteel corrugated longrun roof cladding 0.55bmt flashings to valleys and ridge/hip New spouting & downpipes connected to existing Use existing rainwater heads & downpies from flat roof Re-pitch existing membrane roof with H3.1 framing over existing and 17mm CD ply & 1.5mm EPDM membrane

N

S2 A13 Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

ROOF PLAN

333m² Sheet No:

A06


2 0.4

2 0.4

2 0.4

2 0.4

VERANDA

OFFICE 2

OFFICE 1

0.4 2

2 0.4

0.4 2

RECEPTION 1

0.4 2

COUNSELLING ROOM 3

ENTRY

2 1.2

0.4 2

KITCHEN 2 1.

THE KATE SHEPPARD ROOM 2 1.

RECEPTION 2

HALL

STORE

2 0.4

2 0.4

OFFICE 3 Upgrade switchboard

GARDEN ROOM

PANIA ROOM COUNSELLING ROOM 2

COUNSELLING ROOM 1

TOILETS VERANDA

Data & telephone cabling is to be carried out by HDC nominated contractor who is to be informed whenever any data or telephone cabling is required to be installed, removed or altered

PERGOLA

PERGOLA

NURSERY

BABY CHANGING

N

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

ELECTRICAL PLAN

333m² Sheet No:

A07


B

B B

C

C

1.2

B

1.2

C

1.21.2

1.2

B B

B

B

B

B

B

1.2

B

B 2 1.

B B

A

A

A 1.2

1.2

1.2

B

C

A

1.2

1.2

1.2

B

1.2

C

B

C

B B

B

B

1.2

C

1.2

B Data & telephone cabling is to be carried out by HDC nominated contractor who is to be informed whenever any data or telephone cabling is required to be installd, removed or altered

Symbol

Description

B

PIR15A

B C

Description

B

C

1.2

B

B

1.2

1.2

B

1.2

B

B

B B

C

Symbol

B

B

B 1.2

Circuit wiring. Motion sensor.

PIR15A

B

Switch 2-way. Switch.

Fluorescent light T5

B

Twin 1500mm T5 luminaire

Weatherproof bulkhead

C

28w 2D 4000k

Recessed LED downlight

A

11w 3000k

Drawn:

Rob Collins

N

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

LIGHTING PLAN

333m² Sheet No:

A08


DW

3

4

Fridge

Cooker & hood

1

2

G

R F D03

1:50

Interior Elevations - Kitchen

Lockable

1:20

1

1:20

2

Lockable

Dishwasher

Lockable

1:20

3

1:20

Drawn:

Rob Collins

Lockable

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

4

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

INTERIOR ELEVATIONS

333m² Sheet No:

A09


1120 1800

1:20

Section S3

1

A03

New tall units to match re-located units as closely as possible

Re-located cabinets, benchtop & sink from kitchen

1:20 Drawn:

Rob Collins

1:50

1 Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

Interior Elevations - The Kate Sheppard Room

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

INTERIOR ELEVATIONS & SECTION

333m² Sheet No:

A10


Existing ramp access

1:100

North Elevation A03

New 3° membrane (1.5mm EPDM) roof over Baby changing room New 25° gable roof over Nursery

1:100

East Elevation A03

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

333m²

PROPOSED ELEVATIONSSheet No:

A11


New 25° gable roof over Nursery New 3° membrane (1.5mm EPDM) roof over Baby changing room

1:100

South Elevation A03

New 3° membrane (1.5mm EPDM) roof over Baby changing room New 25° gable roof over Nursery

1:100

West Elevation A03

Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

333m²

PROPOSED ELEVATIONSSheet No:

A12


0.55bmt Coloursteel corrugated roof cladding Thermakraft 215 self supporting roof underlay 0.55bmt corrugated coloursteel roof cladding Thermakraft 215 self supporting roof underlay

H3.1 molding to match existing 180x30 H3.1 barge board

H1.2 roof trusses @ 900 max ctrs by registered truss manufacturer

H3.1 tongue & groove "V" joint match boarding Louvered vent made to match the louvers on the existing gables

5 Existing roof

Block in between rafters if not done

Cedar shingles

A14

H3.1 tongue & groove "V" joint match boarding to match existing Cornice molding on top of louver to match existing

EPDM membrane

New H3.1 17mm ply fascia board

Existing rafters & ceiling with new Autex R3.2 polyester ceiling insulation Louvered vent made to match the louvers on the existing gables 100x45 H3.1 framing on edge well fixed to gable truss to give the overhang to match existing Gable truss Autex R1.5 under floor polyester insulation

Cedar shingles sized to match the existing gables fixed to the H3.1 battens with 50mm stainless steel flat head nails

20x45 H3.1 battens

1:50

Cut curved shaped pieces of 45mm H3.1 framing to match the curvature of the existing gables

Section S2 A03

NOTE:

H3.2 furring pieces @ 400 max ctrs fixed to existing substrate to form the 3° pitch New 1.5mm EPDM membrane New 17mm H3 CD ply Existing gutter formation to be stripped back to substrate & re-lined with EPDM

H3.2 furring pieces @ 400 max ctrs fixed to existing substrate to form the 3° pitch New 1.5mm EPDM membrane New 17mm H3 CD ply

Existing substrate to be checked by HDC engineer representative once existing membrane has been removed

New fascia board

Existing rafters & ceiling with new Autex R3.2 polyester ceiling insulation Existing soffit Existing stucco Existing timber window

1:10 Drawn:

Rob Collins

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

Section

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

Plan Name:

333m² Sheet No:

A13


Upper roof underlay lapped over flashing

mm 250

0.55bmt change of pitch flashing

m 130m

0.55bmt corrugated coloursteel roof cladding Thermakraft 215 self supporting roof underlay

m 10m

Soft lead edge pressed into troughs

25°

450

Hem along top edge of flashing

H3.1 tongue & groove "V" joint match boarding Reduced purlin to fit over match boarding

Quarter round continuous spouting to match existing

Roof structure

15°

1:10

H1.2 roof truss 70x45 H1.2 purlins @ 600 max ctrs to end spans then 900 ctrs to intermediate spans Solid blocking between trusses

Change of Pitch

4 Exposed 120x45 H3.2 rafter extensions lapped 450-500mm nailed with pairs of 100x3.75 galvanised hand driven nails @ 100mm ctrs to roof trusses

Existing rafters & ceiling with new Autex R3.2 polyester ceiling insulation

Thermakraft 215 self supporting roof underlay continuous over ridge Ridge flashing Soft lead edge pressed into troughs 150

450

1:10

Eaves

2 A14 0.55bmt corrugated coloursteel roof cladding

450

1:10

Thermakraft 215 self supporting roof underlay

Ridge/Hip

H1.2 roof trusses @ 900 max ctrs by registered truss manufacturer

70x45 H1.2 purlins @ 600 max ctrs to end spans then 900 ctrs to intermediate spans 0.55bmt corrugated coloursteel roof cladding H3.1 tongue & groove "V" joint match boarding

Overall valley gutter width 250mm min

Quarter round continuous spouting to match existing Exposed 120x45 H3.2 rafter extensions lapped 450-500mm nailed with pairs of 100x3.75 galvanised hand driven nails @ 100mm ctrs to roof trusses

Clearance between roofing 50mm min 80m mm in

Existing rafters & ceiling with new Autex R3.2 polyester ceiling insulation

Existing stucco

20mm min 50mm min

Existing wall framing Autex R1.5 under floor polyester insulation

Solid support for valley gutter Roof underlay continuous under gutter if copper treatments are used

1:10

Valley

5

1:50 Drawn:

Rob Collins

1 A14

in mm 80m

Date:

BD1100

25-07-2014

Scale:

1:100 @ A3

Job No:

Job Name:

Section S1

WOMENS REST BUILDING 201 RUSSELL STREET SOUTH, HASTINGS

A03

Plan Name:

SECTION & DETAILS

333m² Sheet No:

A14


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.