2023 | PORTFOLIO | HA TAN PHAT

Page 1

ARCHITECTURE PORTFOLIO

HA TAN PHAT

SELECTED WORK 2018-2023

HA TAN PHAT The CBD Premium Apartment, District 2, Thu Duc City, HCM City (+84) 937 211 196 kthatanphat@gmail.com

CURRICULUM VITAE

Oct 2020 - July 2023

Architect - NAQI & PARTNERS - 3 years

Deploying construction document - as team leader

Setup - Training Company’s Autocad Standard

Setup - Training Company’s Shop Drawing Standard

Architectural design - Techincal design

Graphic representation

3D modeling Supervisor

Feb 2019 - Oct 2019

Interior designer - Carpenter workshop - 6 month

Interior design

Product construction Supervisor

June 2018 - July 2018

Top 5 ACARA Competition 2018

Top 5 Asian Contest of Architectural Rookie’s Award

National Round

July 2017 - Aug 2017

EXPERIENCE EDUCATION

Oct 2015 - Oct 2020

AWARD

2018

COMPUTER SKILL

BIM

3D Modeling

Rendering

Adobe CC

Microsoft Office

LANGUAGES

Vietnamese

English

Workshop livability

Workshop on architecture - planning theme “Urban Story”, co-organized by UAH - Curtin University Australia.

University of Architecture Ho Chi Minh City

Bachelor of Architecture

08/2015 - 12/2020

3rd prize - Archicad BIM competition 2018

Continental Round

Idea - Archicad skill - team work

AutoCAD | Revit | Archicad

Sketchup | Rhino | Grasshopper

Lumion

Photoshop | Indesign | Premiere

Word | Excel | PowerPoint

Native language TOEIC 655

2018 2019 2021 2022 8 16 26 34 44 UNDERGRADUATE | Archicad BIM Competition | TP Bank Tower PRACTICAL PROJECT | Bo House | Titi House SKETCHES TABLE OF CONTENT

ARCHICAD BIM COMPETITION

Concept design - Design developmentBIM modeling - Shop drawing - Layout

Archicad - Rhino - Autocad - Velux - Lumion - Photoshop

Project: Archicad BIM Cometition

Term: 2018 | 3rd year

Prize: 3rd prize

Location: Binh Thanh, Ho Chi Minh City

Collaboration: Hao Nhien, Tan Cuong

The Competition’s objective is to promote practical uses of BIM through collaborative and competitive learning approach among higher education students in construction related disciplines. This aims to challenge the participant’s creativity and innovation in the design of Residential buildings with the use of BIM.

In three-stage competition (ideation, BIM model construction using Archicad, presentation) spanning over three months. I was responsible for creating the 3D BIM model, conducting self-study to learn file management, creating custom components, and establishing connections between Archicad, Rhino, and Grasshopper.

As a result, I demonstrated strong performance by achieving the highest score for the BIM model in the second round.

8
ARCHICAD BIM COMPETITION | 2018 | Undergraduate
Section Overall Desciption In charge Software
Perspective
9 Undergraduate | 2018 | ARCHICAD BIM COMPETITION
District 2 District 1 Binh Thanh District

VELUX Daylight Visualizer

This is a professional lighting simulation tool for the analysis of daylight conditions in buildings. It is intended for use in the early design phase of a building to inform architects and engineers about the impact of various design choices on daylight performance. With Daylight Visualizer you can make more informed decisions about daylight performance in your architectural design

10
ARCHICAD BIM COMPETITION | 2018 | Undergraduate
11 Undergraduate | 2018 | ARCHICAD BIM COMPETITION 1st Floor Plan
12 ARCHICAD BIM COMPETITION | 2018 | Undergraduate 2nd Floor Plan 1:100
13 Undergraduate | 2018 | ARCHICAD BIM COMPETITION 3rd Floor Plan 1:100
14 ARCHICAD BIM COMPETITION | 2018 | Undergraduate
15 Undergraduate | 2018 | ARCHICAD BIM COMPETITION

TP Bank Tower

Overall

Project: Synthesis project

Term: 2019 | 5th Year

Area: 14.000 sqm

Floor: 22

Location: District 2, Ho Chi Minh City

Instructor: Nguyen Huy Van

Software

Revit - Rhino - Autocad - Lumion - Photoshop

This project was both exciting and challenging, allowing me to gain valuable experience and learn important lessons along the way. I had to carefully consider the functionality, security, and aesthetic aspects required for a modern bank headquarters.

Desciption

The project asks students to research the office building at the headquarters of a bank. In which, the building block has function of the Bank’s office, the podium to organize the Bank’s transaction hall and some other services such as: seminars, dining, relaxation for the bank staff. Set

The working section of the Bank’s leadership is arranged to choose the location in the building.

One of the most significant aspects of this project was the opportunity to explore the intricacies of designing a tall building specifically tailored for a banking institution. I had to carefully consider the functionality, security, and aesthetic aspects required for a modern bank headquarters. I had the opportunity to work closely with my peers, exchanging ideas, seeking feedback, and refining our designs together. Overall, this project challenged me to think critically, push the boundaries of design, and integrate various aspects of architecture to create a functional and aesthetically pleasing bank headquarters. It provided me with invaluable experience in problem-solving, research, sustainable design, and collaboration.

16
TP BANK TOWER | 2019 | Undergraduate
17 Undergraduate | 2019 | TP BANK TOWER
18 TP BANK TOWER | 2019 | Undergraduate
11st Floor Plan 1:100
19 22nd Floor Plan 1:100 Undergraduate | 2019 | TP BANK TOWER
20 TP BANK TOWER | 2019 | Undergraduate A-A’ Section 1:200
21 Undergraduate | 2019 | TP BANK TOWER
22 TP BANK TOWER | 2019 | Undergraduate
B-B’ Section 1:200
23 Undergraduate | 2019 | TP BANK TOWER
West Elevation East Elevation North Elevation

Oct 2020 - June 2023

24
NAQI & PARTNERS OFFICE
25

RESIDENTIAL I BO’S HOUSE

Desciption

Function: House

Location: District 9, Ho Chi Minh City

Area: 50 m2

Year: May 2022 - now

Project lead: Nhut Nguyen

This is the project in which I primarily participated in technical aspects. It provided me with the opportunity to work closely with the construction team, structural design team, and other technical teams such as electrical, low voltage, plumbing, and security. Additionally, the client is also knowledgeable in the field of construction, which raised the standard of customer satisfaction and challenged me to deliver my work at a higher level.

Responsibilities

• Meeting with clients and stakeholders to discuss construction designs.

• Creating progress reports, time schedules, and revised budgets.

• Preparing detailed drawings.

• Directing staff in the development of project drawings, studies and budgets.

• Preparing budgets, material documents, and specification lists for client approval.

• Overseeing building contractors and construction crews.

• Visiting building worksites to ensure work is being done according to architectural plans.

• Acting as an intermediary between the client and the construction team.

• Conducting a final inspection after the project is complete.

26
Schematic Design - Construction Documents - Supervisor
BO HOUSE | 2022 | NaQi & Partners Office
27 NaQi & Partners Office | 2022 | BO HOUSE
28 BO HOUSE | 2022 | NaQi & Partners Office Bathroom section 1:25 Facade tree tub detail 1:10
29 NaQi & Partners Office | 2022 | BO HOUSE Section 1:75
30 BO HOUSE | 2022 | NaQi & Partners Office Skylight detail 1:20
31 NaQi & Partners Office | 2022 | BO HOUSE Stair detail 1:20 - 1:5
32 BO HOUSE | 2022 | NaQi & Partners Office
NOTE
33 NaQi & Partners Office | 2022 | BO HOUSE
Electrical panel installation plan
1:75

Desciption

Function: House

Location: District 10, Ho Chi Minh City

Area: 50 m2

Year: June 2021 - now

Project lead: Nhut Nguyen

This is an extremely challenging project. The design process involves handling a large volume of requirements within a limited land area, while complying with restrictive urban planning standards. The Covid-19 pandemic has disrupted the project’s timeline. The investor has made changes to the functional components and reduced the floor area according to the planning regulations. The construction had to be divided into multiple phases, and the traditional construction team has encountered numerous issues. Otherwise, i gained valuable experience and learn important lessons along the way.

Responsibilities

• Conceptual design and design development.

• Meeting with clients and stakeholders to discuss construction designs.

• Creating progress reports, time schedules, and revised budgets.

• Preparing detailed drawings.

• Directing staff in the development of project drawings, studies and budgets.

• Preparing budgets, material documents, and specification lists for client approval.

• Overseeing building contractors and construction crews.

• Visiting building worksites to ensure work is being done according to architectural plans.

• Acting as an intermediary between the client and the construction team.

• Conducting a final inspection after the project is complete.

34 RESIDENTIAL I TITI HOUSE
Schematic Design - Design Development - Construction Documents - Supervisor
TITI HOUSE | 2022 | NaQi & Partners Office
35 NaQi & Partners Office | 2021 | TITI HOUSE
36 TITI HOUSE | 2022 | NaQi & Partners Office
Skylight detail 1:20
37 NaQi & Partners Office | 2021 | TITI HOUSE Section 1:75
38 TITI HOUSE | 2022 | NaQi & Partners Office Cantilever stair detail 1:25
39 NaQi & Partners Office | 2021 | TITI HOUSE Step isolation 1:20 Finished detail 1:5
40 TITI HOUSE | 2022 | NaQi & Partners Office Facade tree tub detail 1:10
41 NaQi & Partners Office | 2021 | TITI HOUSE
42
43

SKETCHES

Box steel connection detail

Glass spandrel for curtain wall
46 Top facade detail

Chainmail tensioning system detail -KukjeGalleryK3-

47
48 Gable roof detail
49
Ha Tan Phat | (+84) 937 211 196 | kthatanphat@gmail.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.