Aerial View
Harold Hill Town Centre Regeneration Site Boundary
Introduction Welcome to our update on the regeneration of Harold Hill Town Centre, including the Farnham & Hilldene Estate, Chippenham Road, and the Abercrombie House The town centre is a key place for Harold Hill’s residents and businesses. The area needs investment to help continue to be a beacon for the neighbourhood and the whole community to continue to enjoy. Our last event presented proposals for the Family Welcome Centre, which will replace the Abercrombie House, former library, and boxing club with a new Family Welcome Centre and Health Centre. We also provided an update on proposals for the Town Centre and Chippenham Road. For this event, we are presenting more detailed design proposals for the Welcome Centre.
Your feedback We welcome your feedback on the material presented at this event. If you could complete a feedback form, it would be greatly appreciated.
March 2022
Harold Hill Town Centre Regeneration The Town Centre Vision Our vision is to create a lively, sustainable town centre to support shops, businesses, and the community. The new town centre will be a safe and accessible pedestrian environment, with places to sit, more trees, sufficient visitor parking, and a range of different restaurants, bars, and shops.
Centre
We understand that the town centre plays a big role in community life, and we aim to establish an active new shopping area and social hub to serve the community in the long-term.
s and businesses
d al
es to
king
c
d
s,
An active high street
Places to sit
Create an active high street
Places to sit
out
5at any
An evening economy
Mixture of chain and independent businesses
Mixture of chain and independent businesses
Introduce a mix of chain and independent businesses
A sketch of what the new town centre could be likeJuly 2021 July 2021
March 2022
ment and Consultations
Harold Hill Town Centre Regeneration
roduction Harold Hill Town Centre Masterplan
to the public consultation for 1 Family Centre neration of theWelcome Farnham and and Health Centre Estate. Number of dwellings: 74 (approx.) Key services:
ouncil have been consulting with • Emergency accommodation to support vulnerable bout the futurefamilies of thewith Farnham children & Hilldene e 2016. • A new Health Centre
1
• Communal courtyard m and Hilldene shopping area isserving a keyboth the Welcome Centre and Health Centre arold Hill’s residents and businesses. The Architects: Hawkins\Brown investment to help continue to make for the neighbourhood and the whole to continue to enjoy.
2
Farnham & Hilldene Estate
l have begun to explore what change the New homes: 480 (approx.) targeting 50% affordable across in the areathecould deliver and the benefits masterplan residents,New business and the wider retail space: 92,000 sqft Key community benefits:
has been designed to accessible provide an updateenvironment • Safe and pedestrian s, introduced• the architects and their initial High-quality affordable homes for the local community nd understand your priorities for with the more area.trees and green space • Improved public realm
22
• Sufficient visitor parking much in the early stages of • Range of restaurants, bars, and shops.
re still very process and need your feedback to help ed vision for the future of Farnham and tate. 3 Chippenham Road
dback
New homes: 120 (approx.) at 100% affordable and supported housing
me your feedback on the material Key community benefits: at this event.•IfNew youhigh-quality, could complete a affordable homes with Passivhaus orm, it would be greatly design and appreciated. sustainability features visit the comments board Riches and share your Brown Architects: Mikhail and Hawkins\
3
ouch
s know if you would like to be added to list.
ep up to date with how the project is
March 2022
1
Family Welcome Centre and Medical Centre
Harold Hill Town Centre Regeneration How and when? The Family Welcome Centre and Health Centre will be the first project delivered as part of the regeneration of Harold Hill Town Centre. A planning application has now been submitted, with construction works set to begin by summer next year. The opening of the centre is planned for 2024/ 25. For the Chippenham Road and Farnham and Hilldene sites, a key aim is to keep disruption to residents and business to a minimum and ensure that Harold Hill remains a thriving part of the local community throughout these changes. To allow businesses to continue to operate, the redevelopment will be phased. This means only emptying one section of the town centre at a time, demolishing it, and then building new homes and business units. We will then work with tenants in the next demolition phase to move them into the new buildings or alternative locations, before starting to demolish that phase.
Phases 1 & 2
Phase 3
Phase 4
Phase 5
Overall, we expect the full redevelopment to take around nine years from when we start in 2025. Full details of the phasing for the regeneration are outlined in the table below: Site Family Welcome Centre and Medical Centre Chippenham Road
Phase
Start Date*
1
Q1 2023
2
Q4 2023
Farnham and Hilldene
3a
Q1 2025
Farnham and Hilldene
3b
Q1 2027
Farnham and Hilldene
4a
Q1 2029
Farnham and Hilldene
4b
Q1 2031
Farnham and Hilldene
5a
Q1 2033
Farnham and Hilldene
5b
Q1 2035
Please note that all dates are indicative and subject to change.
*
March 2022
Harold Hill Town Centre Regeneration Family Welcome Centre & Health Centre: Vision Planning application submitted These proposals aim to provide much needed A planning application was submitted for services to support families in the Family Welcome Centre and Health need and the local community. Centre at the end of March. It will include vital accomodation for vulnerable families and children, and a new health centre for the wider community.
The drawings and sketches presented here are part of the submitted planning application.
It will be delivered on the site of the current Abercrombie House, former library, and boxing gym at the junction of Bridgwater Road and Hilldene Close.
Existing site
Proposed site
Artist’s impression of view from Hilldene Avenue
March 2022
gn Proposals scape Design scape Proposals
Harold Hill Town Centre Regeneration Family Welcome Centre & Health Centre: Site Plan
Health Centre andscape
BRIDGWATER ROAD
The Health Centre will be on the ground and first floors of the building and serve the entire community.
Centre entrance. We are discussing the Health Centre with sible parking. local stakeholders including the NHS Clinical nd community room Group, local GP’s and other Commissioning xits. healthcare providers. s to binThere’s and bike still a lot of work to be done before we can
confirm exactly what services the new health centre cess towill plant rooms. provide. cess points for Services that are being explored with stakeholders mergencies. and planting to providers provide include: cy for residents, • GP surgery es for playful routes • Dentist • Childrens services r low-maintenance
The Family Welcome Centre will include communal eas, featuring playful areas on the ground floor, including a reception motifs lobby to encourage and visitor breakout room, with accomodation al seating for upper floors. on the over children. pockets also Communal courtyard and car parking al elements of play 13furniture car parking spaces will be available to serve the through Welcome Centre, alongside a courtyard garden with vilion’ places space to sit and children’s play areas. n’s cycle storage akout space. exible use - with door staff breakout nned family activities st of the courtyard.
FWC RECEPTION HILLDENE CLOSE
with fruiting and Family Welcome Centre n the courtyard’s
CORE
PLAY ROOM
VISITOR BREAKOUT
CORE
HEALTH CENTRE
BUS STOP March 2022
HILLDENE AVENUE
Harold Hill Town Centre Regeneration
Copyright Hawkins\Brown Architects No implied licence exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on the site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect. To be read in conjunction with Architect's specification and other consultant information. Rev P01 P02 P03 P04 P05 P06 P07 P08 P09 P10 P11
Description For Information For Information For Information to BC For Information to BC Stage 2 Issue For Information Stage 3 Pre_Planning For Information For Information Stage 3 Design Freeze Stage 3 Issue
Date 20.04.21 14.05.21 13.08.21 03.09.21 01.10.21 18.10.21 23.11.21 13.12.21 17.12.21 14.01.22 28.01.22
Family Welcome Centre & Health Centre: Ground & First Floor
5 Design Proposals 5.4 Interior Design 5.4.5 Communal / Amenity Space
Health Centre Accommodation Schedule - Level 00
Level
L00 L00
Department Circulation/Back of House MC Medical Centre
Area 47 m² 693 m² 740 m²
Welcome Centre Accommodation Schedule - Level 00
Level
Reception - Sketch View
L00 L00 L00 L00 L00 L00
Location Plan
Department Circulation/Back of House Communal Facilities Plant Reception + Support Facilities Reception Lobby Storage
Area 278 m² 151 m² 177 m² 189 m² 75 m² 12 m² 883 m²
UP
Copyright Hawkins\Brown Architects No implied licence exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on the site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect. To be read in conjunction with Architect's specification and other consultant information.
Precedents
Rev P01 P02 P03 P04 P05 P06 P07 P08 P09 P10 P11
Description For Information For Information For Information to BC For Information to BC Stage 2 Issue For Information Stage 3 Pre_Planning For Information For Information Stage 3 Design Freeze Stage 3 Issue
Date 20.04.21 14.05.21 13.08.21 03.09.21 01.10.21 18.10.21 23.11.21 13.12.21 17.12.21 14.01.22 28.01.22
Health Centre Accommodation Schedule - Level 00 Level L00 L00
Department Circulation/Back of House MC Medical Centre
Area 47 m² 693 m² 740 m²
Welcome Centre Accommodation Schedule - Level 00 Level L00 L00 L00 L00 L00 L00
5 Design Proposals 5.4 Interior Design 5.4.5 Communal / Amenity Space
Sketch of Welcome Centre reception
Visitor Breakout - Sketch View
Department Circulation/Back of House Communal Facilities Plant Reception + Support Facilities Reception Lobby Storage
Area 278 m² 151 m² 177 m² 189 m² 75 m² 12 m² 883 m²
UP
Ground floor
Location Plan
Project
Harold Hill Family Welcome Centre
Bridgwater Rd RM3 7UA London RM3 7UA UK Drawing
Proposed Ground Floor Plan
69
Scale @ A0
Date
1 : 100
04/21/21
Drawn By
Checked By
PF
First floor
NG
Job Number
Status
Purpose of Issue
200261
S4
Stage 3 Issue Rev
Drawing No.
HHWC-HBA-01-00-DR-A-200100 11
Precedents
5 Design Proposals 5.4 Interior Design 5.4.6 Transitional Spaces
Sketch of Welcome Centre reception and support Lift Lobby - Sketch View facilities
Project
Harold Hill Family Welcome Centre
Bridgwater Rd RM3 7UA London RM3 7UA UK Drawing
Proposed Ground Floor Plan
Scale @ A0
Date
1 : 100
04/21/21
Drawn By
Checked By
PF
Upper Level Corridor - Sketch View
NG
Job Number
Status
Purpose of Issue
200261
S4
Stage 3 Issue
Drawing No.
Rev
HHWC-HBA-01-00-DR-A-200100 11
70
Family Welcome Centre Reception and support facilities
Health Centre Health Centre
Reception lobby Administration/Staff Office Visitor breakout / communal facilities Circulation / storage Temporary accomodation rooms Sketch of Welcome Centre visitor breakout March 2022
No implied li not be used of valuation. dimensions t contractor an responsibility relevant Briti Regulations omissions to read in conjunction w other consul
Harold Hill Town Centre Regeneration
Rev P01 P02 P03 P04 P05 P06 P07 P08
Family Welcome Centre & Health Centre: Second & Third Floor
5 Design Proposals 5.4 Interior Design 5.4.6 Transitional Spaces
Dining Table
Welcome Centre Accommodation Schedule - Level 02 Double Bed
Wardrobe
Dining Table
Single Bed Sofa
Double Bed
Bunk Bed
Dining Table
DN
Dining Table
Double Bed
Sofa
Dining Table
Sofa
Double Bed
Dining Table
Double Bed
Sofa
Double Bed
Single Bed
Sofa
Precedents
Double Bed
Stair Core - Sketch View
For Informa For Informa For Informa Stage 2 Iss For Informa For Informa Stage 3 De Stage 3 Iss
Dining Table
Sofa
Sofa
Area 26 m² 266 m² 13 m² 402 m² 31 m² 365 m² 36 m² 148 m² 114 m² 2 m² 1404 m²
Location Plan
Double Bed
Second floor
Double Bed
Dining Table
Dining Table
Sketch of Weclome Centre stairwell Dining Table
Sofa
Dining Table
Sofa
Sofa
Double Bed
Level L02 L02 L02 L02 L02 L02
Dwelling Type 1B 3P - Type 1 1B 3P - Type 1A 1B 3P - Type 4 (WHA) 1B 4P - Type 2 2B 4P - Type 2A 2B 5P - Type 3
Total 13 1 2 10 1 3
Grand total: 30
Third floor
72 Sofa
Double Bed
Double Bed
Double Bed
Double Bed
First Floor
Dining Table
Sofa
Sketch of Welcome Centre standard accomodation room Type 04 (Wheelchair Accessible) Dwelling - Sketch View
LocationCentre Plan Family Welcome Dining Table
Dining Table
Sofa
Dining Table
Sofa
Double Bed
Double Bed
Sofa
Bunk Bed
Single Bed
Type 02 Dwelling - Sketch View
Dining Table
Dwelling Type Schedule - Level 02
Dining Table
Sofa
Double Bed
Dining Table
Double Bed
Sofa
Dining Table
Double Bed
5 Design Proposals 5.4 Interior Design 5.4.7 Dwellings
Department Circulation Circulation/Back of House Plant Residential Rooms Type 1 Residential Rooms Type 1A Residential Rooms Type 2 Residential Rooms Type 2A Residential Rooms Type 3 Residential Rooms Type 4 (WHA) Storage
Sofa
Dining Table
5 Design Proposals 5.4 Interior Design 5.4.7 Dwellings
Level L02 L02 L02 L02 L02 L02 L02 L02 L02 L02
Temporary accomodation rooms Sofa
Double Bed
Dining Table
Sofa
Double Bed
Dining Table
Double Bed
73
Dining Table
Double Bed
Double Bed
Sofa
Sofa
Dining Table
wheelchair transfer zone 1200 x 1700
wheelchair storage zone 1100 x 1700
Sofa
Second Floor Sofa
wheelchair storage zone 1100 x 1700
Dining Table
Dining Table
Sofa
Project
Sofa
Double Bed
Dining Table
Double Bed
Sofa
Dining Table
Sofa
Double Bed
Dining Table
Double Bed
Sofa
Bunk Bed
Single Bed
Dining Table
Double Bed
wheelchair transfer zone 1200 x 1700
Harold Hi
Double Bed
Bridgwate London R UK Drawing
Proposed S
Sketch of Welcome Centre standard accomodation room with wheelchair access 1
Level 2 - General Arrangement Plan 1 : 100
March 2022
Scale @ A0
1 : 100 Drawn By
PF
Harold Hill Town Centre Regeneration Family Welcome Centre & Health Centre: Look and feel
Artist’s impression of Welcome Centre entrance
Images of similar brickwork March 2022
Harold Hill Town Centre Regeneration 5 Design Proposals 5.4 Landscape Design 5.4.4 Landscape Proposals
Family Welcome Centre & Health Centre: Communal Courtyard Courtyard View
Sketch of the courtyard garden
Artist’s impression of the courtyard garden
Sketch of the courtyard garden March 2022
Harold Hill Town Centre Regeneration Planning for the future With the recent COP26 event increasing the awareness and debate around Climate Change, we have decided to look at how our design proposals can make more of an impact. The regeneration of the Town Centre offers the opportunity to future proof the area, integrating some of the latest design ideas and technologies to make the area cleaner, greener and safer. Some of the ideas we are exploring include: • • • • • • • • •
All parking spaces future proofed as electric charging points for vehicles Car club parking spaces Extensive secure cycle parking to encourage sustainable forms of transport New planting and landscaping to help improve air quality and biodiversity Energy efficient heating and cooling to all new buildings Flood management with integrated landscape features Solar panels and renewable energy Air source heat pumps that don’t require the use of fosil fuels More recycling points
SUDS (Sustainable Urban Drainage Systems) with opportunities for play
Opportunities for flexible working
What do you think should be the sustainability priorities be for your new Town Centre?
Increase in biodiversity
Electric vehicle charging points March 2022