Bastrop Retreat

Page 1


2


Contents ADDRESSING CONCERNS THE APPROACH BUILDING SCHEMATICS INTRODUCING ENCLOSURE FACADES AND THE ENVIRONMENT WILDFIRE RESPONSE DESIGN DEVELOPMENT LIGHT AND AIR EXPLORING DETAILS FINAL DRAWINGS

(LEFT) COURTYARD DESIGN: BLURRING THE INTERIOR AND EXTERIOR ENVIRONMENT

05 11 17 23 27 35 41 51 55 71

3


The 2011 Bastrop County fi re is considered the most destructive fi re in Texas history and the third-most destructive in the nation

Over 34,000 acres were destroyed and more than 30,000 fi res were reported in Texas that year

“We are far, far from being out of fi re stress danger — this is just a pause.” -Terry Orr, Bastrop County Mayor

“The state of Texas and other areas of the Southwest are really struggling to get resources.” -Ken Pimlott, Department of Forestry and Fire Protection

4


addressing concerns introduction and initial response

5


The Retreat aims to alleviate stress and anxiety in the Bastrop community over unruly events such as recurrent wildfires. By offering medical care, fitness resources, and a relaxing spa, the Retreat provides a recovery of body, mind, and spirit, with the sense of a private escape. Integrating nature into the healing process creates a serene and supportive atmosphere to rejuvenate the Bastrop community.

6


CIRCLE D

(SITE) CAMP SWIFT MEDICAL FACILITIES CIRCLE D

SCHOOLS USED FOR SHELTER

BASTROP

(ABOVE) 2011 FIRE ORIGIN AND EXTENTS IN RELATION TO SURROUNDING NEIGHBORHOODS (RIGHT) NEARBY RESOURCES WITHIN A 1, 2, AND 3 MILE RADIUS

FITNESS CENTERS

7


HICKS LAKE

49

0’

48

47

0

0’

SITE

ESD

STA

TIO

N

51

0

2

50

FLOOD ZONE

0’

1

3

520 EXISTING SITE PLAN AND BUILDING LOCATION

VIEW 2: EXISTING SITE LOOKING NORTH VIEW 1: EXISTING SITE LOOKING EAST

8

VIEW 3: EXISTING SITE LOOKING WEST


CONGREGATION

HEALTH WAITING RECEPTION PAY WINDOW NURSE STATION STAFF LOUNGE/MEETING ROOM PUBLIC RESTROOMS (2) EXAM ROOMS (10) STAFF/PHYSICIAN OFFICES (3) PATIENT TOILETS (2) JANITORIAL SUPPLY STORAGE ARCHIVE/RECORDS MECHANICAL/ELECTRICAL DISPOSAL AREA

900 350 250 270 250 120 1,000 300 100 75 120 80 175 120

SF SF SF SF SF SF SF SF SF SF SF SF SF SF

4,110 SF

500 80 1,500 200 300 260 200

LOBBY/RECEPTION LAUNDRY FOOD COURT OFFICES LOCKER ROOM TOILETS SHOWERS

3,000 SF

RECOVERY 1,500 SF 250 SF 650 SF ---

FOOD, WATER, CLOTHING, COTS CONFERENCE ROOM COMMUNICATION/INFO CENTER LOADING DOCK ASSEMBLY (FEMA) AREA

FITNESS WEIGHT ROOM PHYSICAL THERAPY STUDIO/AEROBICS STORAGE OUTDOOR TRACK

2,500 SF 3250 600 260 175

SF SF SF SF --

4,250 SF

RELAXATION MEDITATION HYDRO MASSAGE (4) DRY MASSAGE (4) SHOWERS (4) SAUNA (2) MUD BATH (4) FACIAL ROOM (3) SALON

SF SF SF SF SF SF SF

200 560 480 400 250 560 240 240

SF SF SF SF SF SF SF SF

3,000 SF

TOTAL PROGRAM

16,750 SF

SITE VISITOR PARKING (100 SPACES) OUTDOOR SEATING RECREATION/ ASSEMBLY FEMA CAMPGROUNDS (1,000 PEOPLE) PAVILION GARDEN QUAD PLATFORM DOCK

30,000 1,500 15,000 100,000 1,200 1,000 1,000 1,200 1,500

SF SF SF SF SF SF SF SF SF

152,400 SF INITIAL PROGRAM SQUARE FOOTAGES

9


10


the approach site and the experience

SITE PARTI

(LEFT) SITE PARTI SKETCHES

11


SITE LAYOUT SKETCHES

10:00 AM SUMMER SUN STUDIES OF ORIGINAL LAYOUT

12

12:00 PM

4:00 PM


serene atmosphere

transitional zone

hectic arrival

SITE PLAN DEMONSTRATING SITE PARTI: A TRANSION THROUGH THREE ZONES

13


BUILDING PRECEDENTS

14


UNOBSTRUCTED VIEW OF NATURE

WATER INTEGRATED INTO THE BUILDING

PLACING SPACES AMONG THE TREES

15


16


building schematics

BUILDING PARTI

(LEFT) BUILDING PARTI SKETCHES

17


BUILDING LAYOUT SKETCHES

18


HEALTH WAITING RECEPTION PAY WINDOW NURSE STATION STAFF LOUNGE/MEETING ROOM PUBLIC RESTROOMS (2) EXAM ROOMS (8) STAFF/PHYSICIAN OFFICES (3) PATIENT TOILETS (2) JANITORIAL SUPPLY STORAGE ARCHIVE/RECORDS MECHANICAL/ELECTRICAL DISPOSAL AREA CAFE CONFERENCE ROOM COMMUNICATION CENTER

600 110 250 290 250 120 1,000 300 100 75 120 80 175 120 900 200 650

SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF

5,340 SF

FITNESS WEIGHT ROOM PHYSICAL THERAPY ROOM STUDIO/AEROBICS OFFICE STORAGE LOCKER ROOMS LAUNDRY

3,650 1,350 600 110 175 330 85

SF SF SF SF SF SF SF

APPROACH TO PROGRAM LAYOUT

6,300 SF

SPA MEDITATION HYDRO MASSAGE (4) DRY MASSAGE (4) SHOWERS (4) SAUNA (2) MUD BATH (4) FACIAL ROOM (3) SALON LOBBY

650 560 480 400 250 560 240 250 380

SF SF SF SF SF SF SF SF SF

3,770 SF PROGRAM LAYOUT IN SECTION FINAL BUILDING PROGRAM

19


PHYSICAL THERAPY

CAFE COURTYARD

GYM

EXAM ROOMS

INITIAL FIRST FLOOR PLAN

20


MEDITATION MUD BATH

OPEN TO BELOW STUDIO

SALON

MASSAGE

INITIAL SECOND FLOOR PLAN

21 -


CONTRAST OF HORIZONTAL AND VERTICAL ELEMENTS

22


introducing enclosure

STRUCTURAL PARTI

FACADE PARTI

23


4 3

2 1

1 CONCRETE FOUNDATION 2 STEEL COLUMNS 3 W12X22 GIRDERS 4 2X8 WOOD JOISTS 24” O.C.

STRUCTURAL AXONOMETRIC HILGHLIGHTING COLUMN AND BEAM SYSTEM

FIRST FLOOR COLUMN GRID, 10’X 20’TYPICAL BAYS

24

SECOND FLOOR COLUMN GRID, 10’X 20’TYPICAL BAYS


INITIAL ENTRY PERSPECTIVE SHOWING HORIZONTAL CLADDING AND VERTICAL ELEMENTS

25


26


facades and the environment

(LEFT) SURROUNDING GARDEN SKETCHES

27


REFLECTIVE GARDEN DESIGN

INITIAL SENSORY GARDEN DESIGN

28


INTEGRATION OF SENSORY GARDEN INTO THE HEALTH SPACES

29


PHYSICAL THERAPY

CAFE

LOBBY

OFFICES

NURSE STATION

EXAM ROOMS

FIRST FLOOR PLAN WITH SENSORY AND REFLECTIVE GARDEN

30

COURTYARD

GYM


REFLECTIVE GARDEN DOCK

REFLECTIVE GARDEN STUDY SENSORY GARDEN

CAFE EXAM ROOMS

PHYSICAL THERAPY COURTYARD

OFFICES

STUDIO LOCKER ROOMS

GYM

NURSE STATION

ZEN GARDEN

FIRST FLOOR PLAN: THREE GARDENS CONNECTES TO PROGRAM WITHIN

31


SOUTH FACADE STUDY

FRONT FACADE INTEGRATED WITH ZEN GARDEN

32


ZEN GARDEN INTERACTION WITH FRONT FACADEW

33


HICKS LAKE

DEFENSIBLE SPACE

SUMMER PREVAILING WINDS

FIRE-RESISTANT CONCRETE

BUILDING LOCATION IN COMPARISON TO SITE CONDITIONS

34


wildfire response

35


CONFERENCE

MASSAGE

MUD BATHS HYDRO MASSAGE

SALON

OPEN TO BELOW

FACIAL

CARDIO SAUNAS

SECOND FLOOR PLAN

PAVILION

RESTROOMS

CAFE

OFFICES EXAM ROOMS

STUDIO COURTYARD

PHYSICAL THERAPHY

GYM LOCKER ROOM

36

FIRST FLOOR PLAN WITH DAILY USE AXIS

NURSE STATION


FEMA HOUSING

RESPONSE AXIS

COMMON AXIS

RESTROOMS

FOOD DISTRIBUTION EXAM ROOMS

STUDIO PHYSICAL THERAPHY

NURSE STATION OFFICES

SHOWERS

ASSEMBLY SEATING

BUILDING PLAN ACCOMMODATING DISASTER RESPONSE THROUGH RESPONSE AXIS

37


BUILDING AXES

PAVILION ADAPTING FEMA HOUSING LAYOUT FOR DISASTER RESPONSE

38


PAVILION AND DISASTER HOUSING PERSPECTIVE

39


NORTH FACADE: VERTICAL WOOD SCREEN

SOUTH FACADE: RIBBED CONCRETE

EAST FACADE: HORIZONTAL WOOD SCREEN

40

EAST FACADE: CLADDING AND INTERIOR SCREEN


design development

41


1:40 SCALE SITE MODEL

42


1:40 SITE MODEL: TRANSITIONAL PATH

43


1/16”SITE MODEL: SOUTH FACADE

44


1/16”INCH SITE MODEL: NORTH FACADE

1/16TH INCH SITE MODEL: COURTYARD

45


EAST WING CORRIDOR: SUSTAINABLE STRATEGIES

46


WEST WING CORRIDOR SUSTAINABILITY STRATEGIES

47


1

Hydro

Section 10 3/4" = 1'-0"

INITIAL WALL SECTION: CONCRETE SOUTH FACADE

Mud BathElevator 183 SF Mud Bath Mud Bath Egress Showers 183 SF 183 SF 183 SF Showers 180 SF 180 SF

180 SF

SF INITIAL WALL SECTION: WOOD SCREEN Meditation ON EAST180 FACADE

Cardio 267 SF 868 SF

Sauna

48

Sauna

DN

367 SF 367 SF

1

Section 10 3/4" = 1'-0"

Hydro Hydro 183 SF

181 SF


EXAM ROOM INTERIOR

49


4:00 PM

12:00 PM

10:00 AM

SUMMER

SUN STUDIES THROUGH GYMNASIUM

50

EQUINOX

WINTER


light and air

51


SECOND FLOOR RCP: LIGHTING

FIRST FLOOR RCP: LIGHTING

52


DN

DN

SECOND FLOOR RCP: HVAC

UP

DN

DN

FIRST FLOOR RCP: HVAC

53


54


exploring details

(LEFT) FACADE AND WALL SECTION SKETCHES

55


1

2 3

7

4

5

6

8 10

9

11

12

1 FLASHING 2 EPDM 3 PLYWOOD 4 2”INSULATION 5 COMPOSITE DECKING 6 W12X24 STEEL GIRDER

7 W12X24 STEEL GIRDER

INITIAL EAST WALL ROOF DETAIL

56

8 2X4 WOOD PLANKING 9 VERTICAL STEEL ROD 10 STEEL ARM 11 12X12 STEEL COULMN 12 GLASS CURTAIN WALL


3

4

5

1

6

2

7

8

9

12

10

11

1 FLASHING 2 STEEL CAP 3 EPDM LAYER 4 INSULATION 5 METAL DECKING 6 W10X33 ROOF GIRDER

7 SEALED BASE PLATE 8 CLEAR EXTERIOR FINISH 9 2”FINISH LAYER: PRECAST CONCRETE 10 GRAVELINSULATION 11 6”STRUCTURAL LAYER: PRECAST CONCRETE INITIAL SOUTH WALL ROOF DETAIL

12 CLEAR INTERIOR FINISH

57


1

3

2

6 4

5

7 8

9 10

1 HORIZONTAL WOOD PLANK 2 STEEL RODS 3 STEEL TUBE 4 STEEL ARM 11

5 12X12 STEEL COLUMN 6 GLASS CURTAIN WALL

7 WOOD FLOORING 12

13

58

INITIAL EAST WALL GROUND DETAIL

8 CONCRETE 9 INSULATION 10 GRAVEL 11 REBAR 12 ANCHOR BOLT 13 CONCRETE FOOTING


1 3

4

2

5

6

7 8 10

9

11

14

1 CLEAR EXTERIOR FINISH 2 2”FINISH LAYER: PRECAST CONCRETE

15

3 GRAVELINSULATION 4 6”STRUCTURAL LAYER: PRECAST CONCRETE

12

16

5 CLEAR INTERIOR FINISH 6 REBAR

7 WOOD DECKING 13

INITIAL SOUTH WALL GROUND DETAIL

8 2X8 WOOD JOISTS 9 2X10 WOOD BEAM 10 INSULATION 11 GRAVEL 12 18”FOUNDATION WITH FOOTING 13 REBAR 14 WOOD PILES 15 BASE PLATE 16 CONCRETE FOOTING

59


60

SOUTH WALL SECTION PERSPECTIVE


NORTH WALL SECTION PERSPECTIVE

61


WOOD PLANK CEILING STUDY

1/2”SECTION MODEL THROUGH SPA AND PHYSICAL THERAPY

62


63


INITIAL SECTION PERSPECTIVE: EAST WALL

64


INTERIOR SCREEN STUDY

EAST WALL FACADE SKETCH

65


66

FINAL SECTION PERSPECTIVE: EAST WALL


FINAL SECTION PERSPECTIVE: EAST WALL

67


3”SCALE MODEL: ROOF DETAIL

68


69


DN

DN

70


final drawings

(LEFT) SITE PLAN

71


REFLECTION GARDEN

PAVILION

DN DN

LOBBY EXAM ROOMS DN

PHYSICAL THERAPY OFFICES DN

STUDIO

WEIGHT ROOM

ZEN GARDEN

FIRST FLOOR PLAN

72

NURSE STATION


CONFERENCE ROOM

SHOWERS

WAITING ROOM

MUD BATHS

MEDITATION

MASSAGE

FACIAL CARDIO

SALON

SECOND FLOOR PLAN

73


SECOND FLOOR RCP: STRUCTURE, HVAC, AND EGRESS

FIRST FLOOR RCP: STRUCTURE, HVAC, AND EGRESS

74


1

2

15

14

3

9

13

10

12

8

11

2x6 Southern Pine Steel Tube Backing 3 2’ Steel Arm 4 Concrete Spread Footing 5 3’ Foundation Wall 6 6” Concrete Slab 7 10x22 Floor Girder 8 2x8 Southern Pine Floor Joists 9 W8x18 Roof Girder 10 2x6 Southern Pine Roof Joists 11 Interior Wood Screen 12 Large Plane Glass 13 Metal Studs with 3” Insulation 14 Vertical Backing 15 2x6 Southern Pine Cladding 1

7

structure and enclosure

6

5 4

2

75


76

INTERIOR PERSPECTIVE OF GYMNASIUM


CARDIO MUD BATH

PHYSICAL THERAPY WEIGHT ROOM

WEST SECTION: LIGHTING STRATEGIES

building performance

52 DEGREES $6.7 MILLION --30 TONS

WEST 30 DEGREES, EAST 14 DEGREES $5.1 MILLION 5,880 SF 23 TONS

WEST 30 DEGREES, EAST 14 DEGREES $4.9 MILLION 4,198 SF 20 TONS

WEST 30 DEGREES, EAST 14 DEGREES $4.8 MILLION 3,583 SF 19 TONS

77


NORTH FACADE VIEWED FROM THE LAKE

78EAST

ELEVATION SHOWING HORIZONTAL CLADDING


COURTYARD: BLURRING THE LINES BETWEEN INTERIOR AND EXTERIOR



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.