HENRY COUNTY SPLOST IV PROJECT STATUS UPDATE Ron Burckhalter, SPLOST Capital Projects Director and Roque Romero, SPLOST Director of Transportation BOARD OF COMMISSIONERS MEETING November 1, 2016
SPLOST IV – COUNTY WIDE PROJECT UPDATE
SPLOST IV – COUNTY WIDE 911 RADIO REPLACEMENT
Budget: $6,560,000.00 Status: In Progress Contract awarded to Harris Corporation 3/15/2016 Project 20% Complete Projected Completion January 2018
SPLOST IV – COUNTY WIDE
AMBULANCES (1-Remount/1-New) Budget: $326,529.00 Status: COMPLETE (1) Ambulance Remount Cost $100,214.00 Located at F.S. #13 (1) New Ambulance Cost $226,315.00 Located at F.S. #12
Ambulance Remount
SPLOST IV – COUNTY WIDE
ANIMAL CONTROL RENOVATION Budget: $100,000.00 Status: COMPLETE Cost: $98,167.00 Renovation items included: New digital security camera system. Epoxy wall coating in kennels, puppy room, and quarantine area. Additional fencing and new automatic gate. New interior doors.
SPLOST IV – COUNTY WIDE
FIRE STATIONS CAPITAL EQUIPMENT Budget: $2,153,471.00 Status: In Progress New Equipment for (3) New Fire Stations: Fire Station #14 (Luella) Fire Station #15 (N. Mt. Carmel) Fire Station #16 (Kelleytown) (3) New Fire Trucks – Ordered; Delivery Expected December 2016 (3) New Ambulances – (1) Received; (2) In Progress
SPLOST IV – COUNTY WIDE
FIRE STATION #14 (Luella Area) Budget: $2,235,000.00 Status: In Progress Location: 1875 Hampton Locust Grove Road, Locust Grove, GA Architect: The Howell Group of Marietta, GA Contractor: Tommy Gibson Builders of Warner Robbins, GA Construction 50% Complete. Estimated Completion January 2017.
Fire Station #14
SPLOST IV – COUNTY WIDE
FIRE STATION #15 (N. Mt. Carmel Area) Budget: $2,440,000.00 Status: In Progress Location: 325 N. Mt. Carmel Road, Hampton, GA Architect: The Howell Group Contractor: Headley Construction Construction 60% Complete. Estimated Completion April 2017.
Fire Station #15
SPLOST IV – COUNTY WIDE
FIRE STATION #16 (Kelleytown Area) Budget: $2,600,000.00 Status: In Progress Location: 1575 Kelleytown Road, McDonough, GA Architect: The Howell Group Contractor: Tommy Gibson Builders Construction Notice to Proceed issued. Estimated Completion September 2017.
SPLOST IV – COUNTY WIDE
HCDOT CONSTRUCTION EQUIPMENT Budget: $450,000.00 Status: COMPLETE Purchase of 2015 ROADTEC FB-100 Heavy Duty Front Mount Broom Cost: $67,757.00 Purchase of (2) New 2017 International 7500 Dump Trucks Cost: $228,636.00 Purchase of (3) New 2016 Ford F250 Pick-Up Trucks Cost: $115,853.00
SPLOST IV – COUNTY WIDE JAIL RENOVATIONS
Budget: $1,500,000.00 Status: In Progress Pod B Renovation - COMPLETE Pod A Renovation – In Progress Renovation Items Include: New Surveillance Cameras. New Access Control System. Plumbing Renovation. Plumbing Fixture Upgrade. Epoxy Wall Coating in Shower/Toilet Area.
SPLOST IV – COUNTY WIDE NEW INTERCHANGE ON I-75
Budget: $5,500,000.00 Status: In Progress Engineers: Pond & Company Interchange Justification Report – In Progress Feasibility Study - COMPLETE
SPLOST IV – COUNTY WIDE
(30) POLICE PATROL VEHICLES Budget: $1,406,806.00 Status: COMPLETE Purchase of (30) Police Patrol Vehicles and Related Equipment Cost: $1,383,187.00
SPLOST IV – COUNTY WIDE SEWER TO AIRPORT
Budget: $2,000,000.00 Status: In Progress Design By: Henry County Water Authority HCWA Design In Progress.
SPLOST IV – COUNTY WIDE SEWER TO FAIRVIEW
Budget: 2,000,000.00 Status: In Progress Design By: Henry County Water Authority HCWA Design In Progress.
SPLOST IV – COUNTY WIDE PROJECT STATUS SUMMARY
13 of 17 County Wide Projects In Progress or COMPLETE – 76%
SPLOST IV - DISTRICT 1 PROJECT UPDATE Commissioner Bo Moss
SPLOST IV – DISTRICT 1
FIRE STATION #2 (Replacement) Budget: $2,360,000.00 Status: In Progress Location: 35 Frances Ward Drive, Locust Grove, GA Architect: The Howell Group Contractor: J.R. Bowman Construction Construction 75% Complete. Estimated Completion December 2016.
Fire Station #2
SPLOST IV – DISTRICT 1 TANGER BALL FIELDS
Budget: $550,000.00 Status: In Progress Location: 2951 Tanger Blvd., Locust Grove, GA Joint project with the City of Locust Grove Concession Bldg., Sports Lighting, Storage/Meeting Bldg., and Fencing COMPLETE. Parking Lot Design COMPLETE.
SPLOST IV - DISTRICT 1
MAJOR TRANSPORTATION (2 of 3 In Progress) McDonough Parkway (Henry Connector) Budget: $5,000,000.00 Status: Right of Way Acquisition In Progress Engineer: Heath & Lineback Engineers
SR81 Widening (Lemon to Bethany) D1 Budget: $750,000.00 (50/50 Shared Cost w/District 3) ARC Design Contribution up to $1.2M Status: Design In Progress Engineer: Moffatt & Nichol
McDonough Parkway (Henry Connector)
SPLOST IV - DISTRICT 1
INTERSECTION IMPROVEMENTS (3 of 3 In Progress or COMPLETE)
Locust Road/Jackson Street @ SR42 Status: COMPLETED by GDOT
South Bethany @ Old Jackson Budget: 1,000,000.00 Status: Final Plans In Progress Engineer: AECOM
SR81 @ Mt. Bethel/Wynn (50/50 Shared Cost w/District 3) District 1 Cost: $505,804.00 Status: COMPLETE
SPLOST IV - DISTRICT 1
DIRT ROADS (5 of 5 In Progress or COMPLETE) Harris Drive (Leguin Mill Road to South Bethany Road) Cost: $1,849,700.00 Status: COMPLETE
Lester Mill Road (Hampton L.G. to Indian Creek) Budget: $2,843,250.00 Status: Construction Bid Opened 10/18/2016 Contractor: TBD
Harris Drive
SPLOST IV - DISTRICT 1
DIRT ROADS (Continued) Peeksville Road (New Hope to Bridge) Budget: $1,200,000.00 Status: Design In Progress Engineer: Heath & Lineback
Peeksville Road (Bridge to Old Jackson) Design Only Budget: $300,000.00 Status: Design In Progress Engineer: Heath & Lineback
Weems Road (Hampton LG to End) Surface Treatment Cost: $78,243.00 Status: COMPLETE
SPLOST IV – DISTRICT 1
BRIDGE IMPROVEMENTS (5 of 5 In Progress) King Mill over Tussahaw Creek (Culvert Repair) Budget: $150,000.00 Status: Construction In Progress Contractor: Baldwin Paving
Locust Grove over Indian Creek (Bridge Repair) Budget: $75,000.00 Status: Construction In Progress Contractor: Baldwin Paving
Jackson Lake over Mackey Creek (Bridge Replacement) District 1 Budget: $456,750.00 (1/3 Cost – District 1)(2/3 Cost – District 3) Status: Construction In Progress Contractor: Georgia Bridge & Concrete
SPLOST IV – DISTRICT 1
BRIDGE IMPROVEMENTS (Continued) Old Jackson over Tussahaw Creek (Bridge Repair) Budget: $25,000.00 Status: Construction In Progress Contractor: Baldwin Paving
South Ola over Tussahaw Creek (Bridge Repair) Budget: $150,000.00 Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 1
RESURFACING, WIDENING OR SURFACE TREATMENT 13 COMPLETE Amber Court Davis Lake Road Ellistown Road Ingram’s Lane Leguin Lane Luella Road (East of SR155) Luella Road (West of SR155)
Makayla Drive McCart Road Peeksville Road Sandy Ridge Road Trestle Road Weems Road
Davis Lake Road - Surface Treatment
SPLOST IV – DISTRICT 1
PROJECT STATUS SUMMARY 2 of 3 Capital Projects In Progress – 67% 15 of 16 Transportation Projects In Progress or COMPLETE – 94% NOTE: Excludes (13) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST IV - DISTRICT 2 PROJECT UPDATE
SPLOST IV – DISTRICT 2
SENIOR/RECREATION CENTER Budget: $4,000,000.00 Status: In Progress Location: 56 McDonough Street, Hampton, GA Architect: Flynn, Finderup Architects Contractor: Meja Construction Construction 75% Complete. Estimated Completion January 2017.
Hampton Senior Center & Recreation Center
SPLOST IV – DISTRICT 2
INTERSECTION IMPROVEMENTS (5 of 6 In Progress) Industrial Parkway @ SR20 Budget: $500,000.00 (Joint Project with GDOT) Status: Right of Way Acquisition In Progress
Jodeco Road @ Blackhall Road Budget: $739,924.00 (Joint Project with GDOT) Status: Right of Way Acquisition In Progress
Mill @ SR81 Budget: $1,250,000.00 Status: Right of Way Acquisition In Progress Engineer: AECOM
SPLOST IV – DISTRICT 2
INTERSECTION IMPROVEMENTS (Continued) Mt. Carmel @ Chambers Budget: $1,000,000.00 Status: Construction Bid Opened 10/18/2016 Contractor: TBD
Simpson Mill @ Hampton-L.G. Budget: $620,000.00 Status: Preliminary Design In Progress Engineer: AECOM
Mt. Carmel @ Chambers
SPLOST IV – DISTRICT 2
DIRT ROADS (10 of 10 In Progress or COMPLETE) Amah Lee (Old SR3 to End of Pavement) Budget: $390,000.00 Status: Final Design In Progress Engineer: Wolverton & Associates
Farmer Drive (Surface Treatment) Cost: $24,988.00 Status: COMPLETE
Fields Drive (Surface Treatment) Cost: $20,686.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Floyd Road (Surface Treatment) Cost: $9,085.00 Status: COMPLETE
Jones Road (Surface Treatment) Cost: $44,776.00 Status: COMPLETE
Mt. Olive Road (Jonesboro to End of Pavement) Cost: $55,472.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Selfridge Road (Speedway Blvd. to Airport Entrance) Budget: $850,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
South Cleveland Church (New Morn to Stone Road) Budget: $862,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
South Mt. Carmel (Surface Treatment) Cost: $17,529.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Thoroughbred Drive (Greenwood Road to End of Pavement) Budget: $507,000.00 Status: Final Design In Progress Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 2
BRIDGE IMPROVEMENTS (5 of 5 In Progress) Blackhall over Rum Creek (Bridge Replacement) Budget: $300,000.00 (Joint Project with GDOT) Status: Design In Progress - GDOT
Hampton over Indian Creek (Culvert Repair) Budget: $198,281.00 Status: Construction In Progress Contractor: Baldwin Paving
Hampton over Towaliga River (Bridge Repair) Budget: $168,000.00 Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 2
BRIDGE IMPROVEMENTS (Continued) Jonesboro over Walnut Creek (Bridge Repair) Budget: $58,719.00 Status: Construction In Progress Contractor: Baldwin Paving
Old SR3 over Norfolk Southern RR (Bridge Repair) Budget: $80,000.00 Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 2
RESURFACING, WIDENING OR SURFACE TREATMENT 24 COMPLETE Arnold Road Chambers Road
Lake Talmadge Dam Lower Woolsey Road
David Road Dillion Drive Gold Leaf Drive
Manley Drive Meadow Trail Norfolk Drive
Falls Court
North Drive
SPLOST IV – DISTRICT 2
(Continued)
RESURFACING, WIDENING OR SURFACE TREATMENT Oakridge Court Oak Trail Pates Lake Court Pates Lake Cove Pates Lake Drive Pates Lake Way
Portsmouth Avenue Shoreline Way Simpson Mill Road South Drive Tidewater Avenue Water Oaks Court
Simpson Mill Resurfacing
SPLOST IV – DISTRICT 2
PROJECT STATUS SUMMARY 1 of 2 Capital Projects In Progress – 50% 20 of 23 Transportation Projects In Progress or COMPLETE – 87% NOTE: Excludes (24) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST IV - DISTRICT 3 PROJECT UPDATE Commissioner Gary Barham
SPLOST IV – DISTRICT 3
HERITAGE PARK IMPROVEMENTS Budget: $25,000.00 Status: COMPLETE Cost: $21,437.00 Improvements Included: Steps with handrails from upper parking lot to Military Museum and crosswalk. Sidewalk with handrails to Veteran’s Wall of Honor.
SPLOST IV – DISTRICT 3
JASON T. HARPER ARENA IMPROVEMENTS Budget: $1,500,000.00 Status: In Progress Architect: Southern A&E Design to Enclose the Arena - COMPLETE Permitting In Progress. Cost Estimate In Progress.
SPLOST IV – DISTRICT 3 NORTH OLA PARK
Budget: $1,500,000.00 Status: In Progress New 3-4 Year Old T-Ball Field COMPLETE Purchased BOE property behind Ola Elementary, south of the park, for park expansion Concept Design for (4) additional ball fields COMPLETE. New Parking Lot Addition In Progress Design COMPLETE. Construction In Progress. 115 Additional Spaces
SPLOST IV – DISTRICT 3
MAJOR TRANSPORTATION (2 of 2 In Progress) McDonough Parkway (SR42 to SR155)
Budget: $2,827,000.00 Status: Final Design In Progress Engineer: Kimley-Horn SR81 Widening (Lemon to Bethany) D3 Budget: $750,000.00 (50/50 Shared Cost w/District 1) ARC Design Contribution up to $1.2M Status: Concept Design In Progress Engineer: Moffatt & Nichol
McDonough Parkway (SR42 to SR155)
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (7 of 9 In Progress OR COMPLETE)
Bethany Road @ SR81 Status: Completed by GDOT
Campground Road @ SR155 Budget: $600,000.00 Status: Right of Way Acquisition In Progress Engineer: AECOM
Dailey Mill @ Jodeco Road Budget: $250,000.00 Status: Construction In Progress Contractor: CMES
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (Continued) East Lake @ SR20 District 3 Budget: $1,121,966.00 (50%/50% Shared Cost w/District 4) Status: Construction In Progress Contractor: Baldwin Paving
Jodeco Road @ Oak Grove Road Budget: $303,000.00 Status: Construction In Progress Contractor: CMES
East Lake @ SR20
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (Continued) Lake Dow/Rodgers @ Rosser Budget: $1,500,000.00 Status: Construction In Progress Contractor: Southeastern Site Development
SR81 @ Mt. Bethyl/Wynn (50/50 Shared Cost w/District 1) District 3 Cost: $506,431.00 Status: COMPLETE
SR81 @ Mt. Bethel/Wynn (D1/D3)
SPLOST IV – DISTRICT 3
DIRT ROADS (6 of 7 In Progress or COMPLETE) Butler’s Bridge Drive (Surface Treatment) Cost: $52,904.00 Status: COMPLETE
Candler Road (Surface Treatment) Cost: $31,176.00 Status: COMPLETE
East Knight Road (Surface Treatment) Cost: $30,348.00 Status: COMPLETE
SPLOST IV – DISTRICT 3
DIRT ROADS (Continued) Eskew Road (Surface Treatment) Cost: $37,419.00 Status: COMPLETE
Turner Church Road (East of Bridge to SR20) Budget: $1,802,000.00 Status: Right of Way Acquisition In Progress Engineer: Pond & Co.
Turner Circle (Surface Treatment) Cost: $26,832.00 Status: COMPLETE
SPLOST IV – DISTRICT 3
BRIDGE IMPROVEMENTS (4 of 4 In Progress) Dailey Mill over Walnut Creek (Bridge Repair) Budget: $235,103.00 Status: Construction In Progress Contractor: Baldwin Paving
Elliott over Walnut Creek Tributary (Bridge Repair) Budget: $300,000.00 (Joint Project with GDOT) Status: Design In Progress - GDOT
SPLOST IV – DISTRICT 3 BRIDGE IMPROVEMENTS (Continued) Jackson Lake over Mackey Creek (Bridge Replacement) District 3 Budget: $1,370,250.00 (2/3 Cost District 3)(1/3 Cost District 1) Status: Construction In Progress Contractor: Georgia Bridge & Concrete
Oak Grove over Walnut Creek (Bridge Repair) Budget: $403,331.00 Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 3
RESURFACING, WIDENING OR SURFACE TREATMENT 29 COMPLETE Airline Road Brookdale Court Chardonnay Oaks Drive Charming Court Clearview Circle Compton Court Country Meadows
East Lake Road (50/50 Shared w/D4) Fir Drive Foster Drive Jodeco Road (50/50 Shared w/D4) Juniper Drive Lakehaven Parkway Millbrook Way Millstone Court
East Lake Resurfacing
SPLOST IV – DISTRICT 3 (Continued) RESURFACING, WIDENING OR SURFACE TREATMENT Overlook Drive Pinecone Court Post Oak Ridge Rosser Road Rowan Drive Saxony Court Sherwood Court
Sherwood Loop Silver Tip Court Spruce Drive Whispering Pines Lane Wood Valley Drive Wynnfield Blvd. Wynnfield Way
SPLOST IV – DISTRICT 3
PROJECT STATUS SUMMARY 3 of 3 Capital Projects In Progress – 100% 19 of 22 Transportation Projects In Progress or COMPLETE – 86% NOTE: Excludes (29) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST IV - DISTRICT 4 PROJECT UPDATE Commissioner Blake Prince
SPLOST IV – DISTRICT 4 BUD KELLEY PARK
Budget: $2,750,000.00 Status: COMPLETE Location: 1605 Kelleytown Road, McDonough, GA Design/Build Firm: Sports Turf 124 Acre Passive Park 2+ Miles of Walking Trails (1) 30’x60’ Pavilion with Serving Window & Tables (2) 20’x40’ Pavilions with Picnic Tables Large Playground with Rubber Surface at ADA Areas 20’x40’ Shade Structure with (6) Fitness Elements
Bud Kelley Park
SPLOST IV – DISTRICT 4
MAJOR TRANSPORTATION (1 of 2 In Progress) Rock Quarry Road Widening Budget: $300,000.00 ARC Design Contribution up to $1.2M Status: Concept Design In Progress Engineer: Croy Engineering
SPLOST IV – DISTRICT 4
INTERSECTION IMPROVEMENTS (4 of 4 In Progress or COMPLETE)
Banks Road @ Rock Quarry Road Cost: $559,401.00 Status: COMPLETE
East Lake Road @ SR20 Budget: $1,121,566.00 (50%/50% Shared Cost w/District 3) Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 4
INTERSECTION IMPROVEMENTS (Continued) Hemphill Road @ SR138 Budget: $2,342,000.00 Status: Construction Out for Bid in November
Moseley Road @ SR138 Status: COMPLETED by GDOT
SR138 @ Hemphill Road
SPLOST IV – DISTRICT 4
DIRT ROADS (1 OF 2 IN PROGRESS) Elliott Road (East Lake Drive to Crumbley Drive) Budget: $2,272,000.00 Status: Final Design In Progress Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 4 BRIDGE IMPROVEMENTS (3 of 3 In Progress) Hemphill over James Creek (Bridge Repair) Budget: $100,000.00 Status: Construction In Progress Contractor: Baldwin Paving
Old Conyers over Big Cotton Indian Creek (Bridge Repair) Budget: $50,000.00 (50/50 Shared Cost w/District 5) Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 4 BRIDGE IMPROVEMENTS (Continued) Selfridge over Little Cotton Indian Creek (Bridge Replacement) Budget: $2,912,000.00 Status: Preliminary Design In Progress Engineer: AECOM
SPLOST IV – DISTRICT 4 RESURFACING, WIDENING OR SURFACE TREATMENT 5 IN PROGRESS Banks Road Crumbley Road Flat Rock Road Old Conyers Road Tie Street
SPLOST IV – DISTRICT 4 RESURFACING, WIDENING OR SURFACE TREATMENT 15 COMPLETE Earlygold Street East Lake Road (50/50 Shared w/D3) Elberta Street Holloway Road Jodeco Road (50/50 Shared w/D3) Kelleytown Woods Drive Kelleytown Woods Parkway Kelley Way
Maygold Street North Grove Court Pleasant Grove Circle Roseberry Road Sunhigh Street Woods Court Woods Lane
SPLOST IV – DISTRICT 4
PROJECT STATUS SUMMARY 1 of 2 Capital Projects COMPLETE – 50% 9 of 11 Transportation Projects In Progress or COMPLETE – 82% NOTE: Excludes (20) Resurfacing/Surface Treatment projects that are In Progress or COMPLETE.
SPLOST IV - DISTRICT 5 PROJECT UPDATE Commissioner Bruce Holmes
SPLOST IV – DISTRICT 5 NEW DISTRICT 5 PARK Budget: $6,850,000.00 Status: In Progress Location: 750 Fairview Road Ellenwood, GA Contractor: Sunbelt Builders Construction 90% Complete Estimated Completion November 2016 34+ Acre Community Park Event Lawn Interactive Fountain
Community Building (2) Multi-Use Sport Fields Concession/Meeting/Restroom/ Scoring Tower Building (1) 40’x60’ Pavilion w/Serving Window and Tables (2) 20’x40’ Pavilions w/Tables Walking Trails Fitness Circuit Playground
New District 5 Park
SPLOST IV – DISTRICT 5 COCHRAN PARK IMPROVEMENTS Budget: $600,000.00 Status: In Progress Location: 305 East Atlanta Road, Stockbridge, GA Improvements Include: New Sports Field Lighting. New Field Netting. New Scoreboards – COMPLETE.
SPLOST IV – DISTRICT 5
MAJOR TRANSPORTATION (2 of 3 In Progress) Anvil Block Road Widening Budget: $5,500,000.00 Status: Right of Way Acquisition In Progress Engineer: AECOM
West Village Parkway (Previously Known as West Panola) Budget: $4,238,639.00 Status: Final Design In Progress Engineer: McGee Partners
Anvil Block Road Widening
West Village Parkway (Previously West Panola)
SPLOST IV – DISTRICT 5
INTERSECTION IMPROVEMENTS (1 of 3 In Progress) East Atlanta @ Thurman & Flatrock Budget: $2,002,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 5 BRIDGE IMPROVEMENTS (2 of 2 In Progress) Old Conyers over Big Cotton Indian Creek (Bridge Repair) Budget: $50,000.00 (50/50 Shared Cost w/District 4) Status: Construction In Progress Contractor: Baldwin Paving
Stagecoach over Big Cotton Indian Creek (Bridge Repair) Budget: $25,000.00 Status: Construction In Progress Contractor: Baldwin Paving
SPLOST IV – DISTRICT 5
RESURFACING, WIDENING OR SURFACE TREATMENT 6 IN PROGRESS OR COMPLETE Awendaw Circle - COMPLETE Fairview Road – In Progress Orchard Road – In Progress Panola Road – In Progress Rex Road – In Progress Waverly Blvd. - COMPLETE
SPLOST IV – DISTRICT 5
PROJECT STATUS SUMMARY 2 of 2 Capital Projects In Progress – 100% 5 of 9 Transportation Projects In Progress – 56% NOTE: Excludes (6) Resurfacing/Surface Treatment projects that are In Progress or COMPLETE.
SPLOST IV PROJECT STATUS SUMMARY CAPITAL PROJECTS Total Projects: Projects COMPLETE: Projects In Progress:
TRANSPORTATION PROJECTS 28 6 15
75% of Capital Projects are COMPLETE or In Progress.
Total Projects: Projects COMPLETE: Projects In Progress:
82 17 53
85% of Transportation Projects are COMPLETE or In Progress. • NOTE: These numbers do not include any Resurfacing/Surface Treatment/Widening projects.