HENRY COUNTY SPLOST PROJECT STATUS UPDATE Ron Burckhalter, SPLOST Capital Projects Director and Roque Romero, SPLOST Director of Transportation BOARD OF COMMISSIONERS MEETING August 1, 2017
SPLOST IV – COUNTY WIDE PROJECT UPDATE
SPLOST IV – COUNTY WIDE 911 RADIO REPLACEMENT Budget: $7,184,000.00 Status:
In Progress
Contract awarded to Harris Corporation 3/15/2016 Project 40% Complete All radios ordered and in process of shipping. Radio/Equipment installation in progress. Microwave system installed and tested.
Estimated Completion March 2018
SPLOST IV – COUNTY WIDE AIRPORT FBO
Budget: $1,000,000.00 Status: Preliminary Design In Progress Engineer: Croy Engineering
SPLOST IV – COUNTY WIDE
AMBULANCES (1-Remount/1-New) Budget: $326,529.00 Status:
COMPLETE
(1) Ambulance Remount Cost $100,214.00 Located at F.S. #13 (1) New Ambulance Cost $226,315.00 Located at F.S. #12
SPLOST IV – COUNTY WIDE
ANIMAL CONTROL RENOVATION Budget: $100,000.00 Status:
COMPLETE
Cost: $99,689.00 Renovations included: New digital security camera system. Epoxy wall coating in kennels, puppy room, and quarantine area. Additional fencing and new automatic gate. New interior doors.
SPLOST IV – COUNTY WIDE
FIRE STATIONS CAPITAL EQUIPMENT Budget: $2,153,471.00 Status:
COMPLETE
Cost: $2,134,000.00 Equipment for (3) New Fire Stations: Fire Station #14 (Luella) New Fire Truck & Ambulance Fire Station #15 (N. Mt. Carmel) New Fire Truck & Ambulance Fire Station #16 (Kelleytown) New Fire Truck & Ambulance
SPLOST IV – COUNTY WIDE
FIRE STATION #14 (Luella Area) Budget: $2,235,000.00 Status:
In Progress
Location: 1875 Hampton Locust Grove Road, Locust Grove, GA Architect:
The Howell Group of Marietta, GA
Contractor: Tommy Gibson Builders of Warner Robbins, GA Construction 80% Complete. Estimated Completion September 2017.
SPLOST IV – COUNTY WIDE
FIRE STATION #15 (N. Mt. Carmel Area) Budget: $2,440,000.00 Status:
COMPLETE
Location: 325 N. Mt. Carmel Road, Hampton, GA Architect:
The Howell Group
Contractor: Headley Construction
SPLOST IV – COUNTY WIDE
FIRE STATION #16 (Kelleytown Area) Budget: $2,600,000.00 Status:
In Progress
Location: 1575 Kelleytown Road, McDonough, GA Architect:
The Howell Group
Contractor: Tommy Gibson Builders Construction 25% Complete. Estimated Completion February 2018.
Fire Station #16 - Kelleytown
SPLOST IV – COUNTY WIDE
HCDOT CONSTRUCTION EQUIPMENT Budget:
$450,000.00
Status:
COMPLETE
Purchase of 2015 ROADTEC FB-100 Heavy Duty Front Mount Broom Cost: $67,757.00 Purchase of (2) New 2017 International 7500 Dump Trucks Cost: $228,636.00 Purchase of (3) New 2016 Ford F250 Pick-Up Trucks Cost: $115,853.00
SPLOST IV – COUNTY WIDE JAIL RENOVATIONS Budget: $1,500,000.00 Status:
In Progress
Pod A & B Renovation - COMPLETE Pod A & B renovation items included new surveillance cameras, new access control system, plumbing renovation, plumbing fixture upgrade, and epoxy wall coating in shower/toilet area. Kitchen Renovation – In Progress. Kitchen renovation items include removing the existing floor and grout bed, replace existing sanitary sewer, replace all existing floor drains, add a new exterior door/frame, and apply epoxy floor and wall coating to entire kitchen area.
SPLOST IV – COUNTY WIDE NEW INTERCHANGE ON I-75 Budget: $5,500,000.00 Status:
In Progress
Engineers:
Pond & Company
Feasibility Study - COMPLETE Interchange Justification Report In Progress
SPLOST IV – COUNTY WIDE
(30) POLICE PATROL VEHICLES Budget: $1,406,806.00 Status:
COMPLETE
Purchase of (30) Police Patrol Vehicles and Related Equipment Cost: $1,383,187.00
SPLOST IV – COUNTY WIDE PROBATE COURT BUILDING IMPROVEMENTS Budget: $220,000.00 Status:
In Progress
Improvements Include: Courtroom Courtroom Furnishings & Equipment Security Equipment Customer Service Area Cubicles Flooring and Paint
SPLOST IV – COUNTY WIDE SEWER TO AIRPORT Budget: $2,000,000.00 Status: In Progress HCWA Design COMPLETE. Phase I Construction COMPLETE. Phase II Construction In Progress. Estimated Completion: December 2017.
SPLOST IV – COUNTY WIDE SEWER TO FAIRVIEW Budget: $2,000,000.00 Status: In Progress HCWA Design COMPLETE. Phase I Construction COMPLETE. Phase II Construction In Progress. Estimated Completion: November 2017
SPLOST IV – COUNTY WIDE
TECHNICAL COLLEGE BUILDING SPLOST Budget: $5,000,000.00 Status: In Progress Architect: Lord, Aeck and Sargent, Inc. Contractor: Parrish Construction Group Georgia State Financing & Investment Commission Project. Construction In Progress.
SPLOST IV – COUNTY WIDE PROJECT STATUS SUMMARY
16 of 17 County Wide Projects In Progress or COMPLETE
SPLOST IV - DISTRICT 1 PROJECT UPDATE Commissioner Johnny Wilson
SPLOST IV – DISTRICT 1
FIRE STATION #2 (Replacement) Budget: $2,361,600.00 Status:
COMPLETE
Cost: $2,308,534.00 Location: 35 Frances Ward Drive, Locust Grove, GA Architect:
The Howell Group
Contractor: J.R. Bowman Construction
SPLOST IV – DISTRICT 1
KITCHEN-LOCUST GROVE SENIOR/EVENT CENTER Budget: $550,000.00 Status:
In Progress
Location: 280 Mose Brown Drive, Locust Grove, GA Preliminary Design In Progress New Catered Kitchen New Full Service Kitchen
SPLOST IV – DISTRICT 1 TANGER BALL FIELDS Budget:
$550,000.00
Status:
COMPLETE
Cost: $482,507.00 Location: 2951 Tanger Blvd., Locust Grove, GA Joint project with the City of Locust Grove Concession Bldg., Sports Lighting, Storage/Meeting Bldg., Fencing, and Parking Lot Design.
SPLOST IV - DISTRICT 1
MAJOR TRANSPORTATION (2 of 3 In Progress) McDonough Parkway (Henry Connector) Budget: $5,000,000.00 Status: Right of Way Acquisition In Progress Engineer: Heath & Lineback Engineers
SR81 Widening (Lemon to Bethany) D1 Budget: $197,397.00 (50/50 Shared Cost w/District 3) ARC Design Contribution up to $1.2M Status: Design In Progress Engineer: Moffatt & Nichol
SPLOST IV - DISTRICT 1
INTERSECTION IMPROVEMENTS (3 of 3 In Progress or COMPLETE)
Locust Road/Jackson Street @ SR42 Status:
COMPLETED by GDOT
South Bethany @ Old Jackson Budget: 1,000,000.00 Status: Right of Way Acquisition In Progress Engineer: AECOM
SR81 @ Mt. Bethel/Wynn (50/50 Shared Cost w/District 3) District 1 Cost: $505,804.00 Status: COMPLETE
SPLOST IV - DISTRICT 1
DIRT ROADS (5 of 5 In Progress or COMPLETE) Harris Drive (Leguin Mill Road to South Bethany Road) Cost: $1,545,246.00 Status: COMPLETE
Lester Mill Road (Hampton L.G. to Indian Creek) Budget: $4,527,554.00 Status: Construction In Progress Contractor: Southeastern Site Development
Lester Mill Road
SPLOST IV - DISTRICT 1
DIRT ROADS (Continued) Peeksville Road (New Hope to Bridge) Budget: $1,200,000.00 Status: Right of Way Acquisition In Progress Engineer: Heath & Lineback
Peeksville Road (Bridge to Old Jackson) Design Only Budget: $126,375.00 Status: Design In Progress Engineer: Heath & Lineback
Weems Road (Hampton LG to End) Surface Treatment Cost: $76,849.00 Status: COMPLETE
SPLOST IV – DISTRICT 1
BRIDGE IMPROVEMENTS (5 of 5 COMPLETE) King Mill over Tussahaw Creek (Culvert Repair) Cost: $90,537.00 Status: COMPLETE
Locust Grove over Indian Creek (Bridge Repair) Cost: $43,433.00 Status: COMPLETE
Jackson Lake over Mackey Creek (Bridge Replacement) District 1 Cost: $381,770.00 (1/3 Cost – District 1)(2/3 Cost – District 3) Status: COMPLETE
SPLOST IV – DISTRICT 1
BRIDGE IMPROVEMENTS (Continued) Old Jackson over Tussahaw Creek (Bridge Repair) Cost: $20,959.00 Status: COMPLETE
South Ola over Tussahaw Creek (Bridge Repair) Cost: $38,030.00 Status: COMPLETE
SPLOST IV – DISTRICT 1
RESURFACING, WIDENING OR SURFACE TREATMENT 13 COMPLETE Amber Court
Makayla Drive
Davis Lake Road
McCart Road
Ellistown Road
Peeksville Road
Ingram’s Lane
Sandy Ridge Road
Leguin Lane
Trestle Road
Luella Road
(East of SR155)
Luella Road
(West of SR155)
Weems Road
SPLOST IV – DISTRICT 1
PROJECT STATUS SUMMARY 3 of 3 Capital Projects In Progress or COMPLETE 15 of 16 Transportation Projects In Progress or COMPLETE NOTE: Excludes (13) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST III – DISTRICT 1 DIRT ROADS Frog Road Budget: $2,885,726.00 Status: Construction In Progress Contractor: McCoy Grading, Inc.
SPLOST IV - DISTRICT 2 PROJECT UPDATE Commissioner Dee Clemmons
SPLOST IV – DISTRICT 2 AVALON PARK RESTROOM Budget: $50,000.00 Status: In Progress Design/Build Request for Proposals In Progress.
SPLOST IV – DISTRICT 2
SENIOR/RECREATION CENTER Budget: $4,000,000.00 Status:
COMPLETE
Location:
56 McDonough Street, Hampton, GA
Architect:
Flynn, Finderup Architects
Contractor: Meja Construction
Bear Creek Senior Activity Center and Recreation Center
SPLOST IV – DISTRICT 2
INTERSECTION IMPROVEMENTS (5 of 6 In Progress) Industrial Parkway @ SR20 (GDOT Project) Status:
GDOT Design In Progress
Jodeco Road @ Blackhall Road Budget: $803,105.00 (Joint Project with GDOT) Status: Construction Bid Opened 6/21/2017
Mill @ SR81 Budget: $1,250,000.00 Status: Right of Way Acquisition COMPLETE; Construction Bids Due 8/24/2017 Engineer: AECOM
SPLOST IV – DISTRICT 2 INTERSECTION IMPROVEMENTS (Continued) Mt. Carmel @ Chambers Budget: $1,000,000.00 Status: Construction In Progress Contractor: CMES
Simpson Mill @ Hampton-L.G. Budget: $620,000.00 Status: Preliminary Design In Progress Engineer: AECOM
Mt. Carmel @ Chambers
SPLOST IV – DISTRICT 2
DIRT ROADS (10 of 10 In Progress or COMPLETE) Amah Lee (Old SR3 to End of Pavement) Budget: $390,000.00 Status: Right of Way Acquisition In Progress Engineer: Wolverton & Associates
Farmer Drive (Surface Treatment) Cost: $24,988.00 Status: COMPLETE
Fields Drive (Surface Treatment) Cost: $20,686.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Floyd Road (Surface Treatment) Cost: $9,085.00 Status: COMPLETE
Jones Road (Surface Treatment) Cost: $44,776.00 Status: COMPLETE
Mt. Olive Road (Jonesboro to End of Pavement) Cost: $55,472.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Selfridge Road (Speedway Blvd. to Airport Entrance) Budget: $850,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
South Cleveland Church (New Morn to Stone Road) Budget: $862,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
South Mt. Carmel (Surface Treatment) Cost: $17,529.00
SPLOST IV – DISTRICT 2
DIRT ROADS (Continued) Thoroughbred Drive (Greenwood Road to End of Pavement) Budget: $507,000.00 Status: Right of Way Acquisition In Progress Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 2
BRIDGE IMPROVEMENTS (5 of 5 In Progress or COMPLETE) Blackhall over Rum Creek (Bridge Replacement) Budget: $300,000.00 (Joint Project with GDOT) Status: Right of Way Acquisition In Progress
Hampton over Indian Creek (Culvert Repair) Cost: $296,786.00 Status: COMPLETE
Hampton over Towaliga River (Bridge Repair) Cost: $52,081.00 Status: COMPLETE
SPLOST IV – DISTRICT 2
BRIDGE IMPROVEMENTS (Continued) Jonesboro over Walnut Creek (Bridge Repair) Cost: $42,830.00 Status: COMPLETE
Old SR3 over Norfolk Southern RR (Bridge Repair) Budget: $80,000.00 Status: COMPLETE Contractor: Baldwin Paving
SPLOST IV – DISTRICT 2
RESURFACING, WIDENING OR SURFACE TREATMENT 24 COMPLETE Arnold Road
Lake Talmadge Dam
Chambers Road
Lower Woolsey Road
David Road
Manley Drive
Dillion Drive
Meadow Trail
Gold Leaf Drive
Norfolk Drive
Falls Court
North Drive
SPLOST IV – DISTRICT 2
(Continued)
RESURFACING, WIDENING OR SURFACE TREATMENT
Oakridge Court
Portsmouth Avenue
Oak Trail
Shoreline Way
Pates Lake Court
Simpson Mill Road
Pates Lake Cove
South Drive
Pates Lake Drive
Tidewater Avenue
Pates Lake Way
Water Oaks Court
SPLOST IV – DISTRICT 2
PROJECT STATUS SUMMARY 2 of 2 Capital Projects In Progress or COMPLETE 20 of 23 Transportation Projects In Progress or COMPLETE NOTE: Excludes (24) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST III – DISTRICT 2
INTERSECTION IMPROVEMENTS Old Highway 3 @ SR81 Budget: $5,629,075.00 Status: Construction In Progress Contractor: CMES, Inc.
SPLOST IV - DISTRICT 3 PROJECT UPDATE Commissioner Gary Barham
SPLOST IV – DISTRICT 3
HERITAGE PARK IMPROVEMENTS Budget: $25,000.00 Status:
COMPLETE
Cost: $21,437.00 Improvements Included: Steps with handrails from upper parking lot to Military Museum and crosswalk. Sidewalk with handrails to Veteran’s Wall of Honor.
SPLOST IV – DISTRICT 3
JASON T. HARPER ARENA IMPROVEMENTS Budget: $1,500,000.00 Status:
Design COMPLETE
Architect:
Southern A&E
In process of phasing the construction.
SPLOST IV – DISTRICT 3 NORTH OLA PARK
Budget: $1,500,000.00 Status:
In Progress
Purchased property behind Ola Elementary, south of the park, for park expansion New 3-4 Year Old T-Ball Field COMPLETE. New 115 space parking lot addition COMPLETE. RFP for Design/Build for Additional Ball Fields In Progress.
SPLOST IV – DISTRICT 3
MAJOR TRANSPORTATION (2 of 2 In Progress) McDonough Parkway (SR42 to SR155) Budget: $2,827,000.00 Status: Final Design In Progress; Right of Way Acquisition Next Engineer: Kimley-Horn
SR81 Widening (Lemon to Bethany) D3 Budget: $774,009.00 (50/50 Shared Cost w/District 1) ARC Design Contribution up to $1.2M Status: Concept Design In Progress Engineer: Moffatt & Nichol
McDonough Parkway (SR42 to SR155)
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (7 of 9 In Progress OR COMPLETE)
Bethany Road @ SR81 Status: Completed by GDOT
Campground Road @ SR155 Budget: $600,000.00 Status: Right of Way Acquisition COMPLETE Engineer: AECOM
Dailey Mill @ Jodeco Road Cost: $251,260.00 Status: COMPLETE
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (Continued) East Lake @ SR20 District 3 Cost: $1,124,489.00 (50%/50% Shared Cost w/District 4) Status: COMPLETE
Jodeco Road @ Oak Grove Road Cost: $285,249.00 Status: COMPLETE
East Lake @ SR20
SPLOST IV – DISTRICT 3
INTERSECTION IMPROVEMENTS (Continued) Lake Dow/Rodgers @ Rosser Cost: $954,010.00 Status: COMPLETE
SR81 @ Mt. Bethyl/Wynn (50/50 Shared Cost w/District 1) District 3 Cost: $449,354.00 Status: COMPLETE
Lake Dow Road @ Rodgers/Rosser
SPLOST IV – DISTRICT 3
DIRT ROADS (6 of 7 In Progress or COMPLETE) Butler’s Bridge Drive (Surface Treatment) Cost: $52,904.00 Status: COMPLETE
Candler Road (Surface Treatment) Cost: $31,176.00 Status: COMPLETE
East Knight Road (Surface Treatment) Cost: $30,348.00 Status: COMPLETE
SPLOST IV – DISTRICT 3
DIRT ROADS (Continued) Eskew Road (Surface Treatment) Cost: $37,419.00 Status: COMPLETE
Turner Church Road (East of Bridge to SR20) Budget: $1,802,000.00 Status: Construction Bid Award 8/1/2017 Engineer: Pond & Co.
Turner Circle (Surface Treatment) Cost: $26,832.00 Status: COMPLETE
SPLOST IV – DISTRICT 3
BRIDGE IMPROVEMENTS (4 of 4 In Progress) Dailey Mill over Walnut Creek (Bridge Repair) Cost: $235,103.00 Status: COMPLETE
Elliott over Walnut Creek Tributary (Bridge Repair) Budget: $300,000.00 (Joint Project with GDOT) Status: GDOT Design In Progress; Right of Way Acquisition In Progress
SPLOST IV – DISTRICT 3 BRIDGE IMPROVEMENTS (Continued) Jackson Lake over Mackey Creek (Bridge Replacement) District 3 Cost: $751,777.00 (2/3 Cost District 3)(1/3 Cost District 1) Status: COMPLETE
Oak Grove over Walnut Creek (Bridge Repair) Cost: $79,611.00 Status: COMPLETE
Jackson Lake over Mackey Creek
SPLOST IV – DISTRICT 3
RESURFACING, WIDENING OR SURFACE TREATMENT 29 COMPLETE Airline Road
East Lake Road (50/50 Shared w/D4)
Brookdale Court
Fir Drive
Chardonnay Oaks Drive
Foster Drive
Charming Court
Jodeco Road (50/50 Shared w/D4)
Clearview Circle
Juniper Drive
Compton Court
Lakehaven Parkway
Country Meadows
Millbrook Way Millstone Court
SPLOST IV – DISTRICT 3 (Continued)
RESURFACING, WIDENING OR SURFACE TREATMENT Overlook Drive
Sherwood Loop
Pinecone Court
Silver Tip Court
Post Oak Ridge
Spruce Drive
Rosser Road
Whispering Pines Lane
Rowan Drive
Wood Valley Drive
Saxony Court
Wynnfield Blvd.
Sherwood Court
Wynnfield Way
SPLOST IV – DISTRICT 3
PROJECT STATUS SUMMARY 3 of 3 Capital Projects In Progress or COMPLETE 19 of 22 Transportation Projects In Progress or COMPLETE NOTE: Excludes (29) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST IV - DISTRICT 4 PROJECT UPDATE Commissioner Blake Prince
SPLOST IV – DISTRICT 4 BUD KELLEY PARK
Budget: $2,750,000.00 Status:
COMPLETE
Location: 1605 Kelleytown Road, McDonough, GA Design/Build Firm: Sports Turf 124 Acre Passive Park 2+ Miles of Walking Trails (1) 30’x60’ Pavilion with Serving Window & Tables (2) 20’x40’ Pavilions with Picnic Tables Large Playground with Rubber Surface at ADA Areas 20’x40’ Shade Structure with (6) Fitness Elements
Bud Kelley Park
SPLOST IV – DISTRICT 4 MAJOR TRANSPORTATION (1 of 2 In Progress) Rock Quarry Road Widening Budget: $418,820.00 ARC Design Contribution up to $1.2M Status: Concept Design In Progress; Waiting for GDOT Approval Engineer: Croy Engineering
SPLOST IV – DISTRICT 4
INTERSECTION IMPROVEMENTS (4 of 4 In Progress or COMPLETE)
Banks Road @ Rock Quarry Road Cost: $542,133.00 Status: COMPLETE
East Lake Road @ SR20 Cost: $1,124,618.00 (50%/50% Shared Cost w/District 3) Status: COMPLETE
SPLOST IV – DISTRICT 4
INTERSECTION IMPROVEMENTS (Continued) Hemphill Road @ SR138 Budget: $1,942,000.00 Status: Construction In Progress
Moseley Road @ SR138 Status:
COMPLETED by GDOT
SR138 @ Hemphill Road
SPLOST IV – DISTRICT 4
DIRT ROADS (1 OF 2 IN PROGRESS) Elliott Road (East Lake Road to Crumbley Road) Budget: $2,272,000.00 Status: Right of Way Acquisition COMPLETE; Construction Bid Next Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 4 BRIDGE IMPROVEMENTS (3 of 3 In Progress) Hemphill over James Creek (Bridge Repair) Cost: $42,954.00 Status: COMPLETE
Old Conyers over Big Cotton Indian Creek (Bridge Repair) Cost: $40,509.00 (50/50 Shared Cost w/District 5) Status: COMPLETE
Selfridge over Little Cotton Indian Creek (Bridge Replacement) Budget: $1,221,899.00 Status: Preliminary Design In Progress Engineer: AECOM
SPLOST IV – DISTRICT 4 RESURFACING, WIDENING OR SURFACE TREATMENT 20 COMPLETE Banks Road
Holloway Road
Old Conyers Road
Crumbley Road
Jodeco Road (Shared w/D3)
Pleasant Grove Circle
Earlygold Street
Kelleytown Woods Drive
Roseberry Road
East Lake Road (Shared w/D3)
Kelleytown Woods Parkway
Sunhigh Street
Kelley Way
Tie Street
Elberta Street
Maygold Street
Woods Court
Flat Rock Road
North Grove Court
Woods Lane
SPLOST IV – DISTRICT 4
PROJECT STATUS SUMMARY 1 of 2 Capital Projects COMPLETE 10 of 11 Transportation Projects In Progress or COMPLETE NOTE: Excludes (20) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST III – DISTRICT 3 and DISTRICT 4 MAJOR TRANSPORTATION Campground Road Ext. Budget: $12,922,095.00 Status: Construction In Progress Contractor: McCoy Grading, Inc.
Campground Road Extension
SPLOST IV - DISTRICT 5 PROJECT UPDATE Commissioner Bruce Holmes
SPLOST IV – DISTRICT 5
VILLAGE PARK at NORTH HENRY Budget: $6,850,000.00
Community Building
Status: COMPLETE
(2) Multi-Use Sport Fields
Location: 750 Fairview Road
Ellenwood, GA Architect: Breedlove Landplanning Contractor: Sunbelt Builders 34+ Acre Community Park Event Lawn Interactive Fountain
Concession/Meeting/Restroom/ Scoring Tower Building (1) 40’x60’ Pavilion w/Serving Window and Tables (2) 20’x40’ Pavilions w/Tables Walking Trails Fitness Circuit Playground
Village Park at North Henry
SPLOST IV – DISTRICT 5 COCHRAN PARK IMPROVEMENTS Budget: $600,000.00 Status: COMPLETE Cost: $517,801.00 Location: 305 East Atlanta Road, Stockbridge, GA Improvements Include: New Sports Field Lighting. New Scoreboards.
SPLOST IV – DISTRICT 5
MAJOR TRANSPORTATION (2 of 3 In Progress) Anvil Block Road Widening Budget: $7,141,000.00 Status: Construction In Progress Engineer: AECOM
West Village Parkway (Previously Known as West Panola) Budget: $4,238,639.00 Status: Final Design In Progress Engineer: McGee Partners
Anvil Block Road Widening
West Village Parkway (Previously West Panola)
SPLOST IV – DISTRICT 5
INTERSECTION IMPROVEMENTS (1 of 3 In Progress) East Atlanta @ Thurman & Flatrock Budget: $361,000.00 Status: Preliminary Design In Progress Engineer: Wolverton & Associates
SPLOST IV – DISTRICT 5
BRIDGE IMPROVEMENTS (2 of 2 COMPLETE) Old Conyers over Big Cotton Indian Creek (Bridge Repair) Cost: $40,509.00 (50/50 Shared Cost w/District 4) Status: COMPLETE
Stagecoach over Big Cotton Indian Creek (Bridge Repair) Cost: $23,533.00 Status: COMPLETE
SPLOST IV – DISTRICT 5
RESURFACING, WIDENING OR SURFACE TREATMENT 6 COMPLETE Awendaw Circle Fairview Road Orchard Road Panola Road Rex Road Waverly Blvd.
SPLOST IV – DISTRICT 5
PROJECT STATUS SUMMARY 2 of 2 Capital Projects COMPLETE 5 of 9 Transportation Projects In Progress or COMPLETE NOTE: Excludes (6) Resurfacing/Surface Treatment projects that are COMPLETE.
SPLOST IV PROJECT STATUS SUMMARY CAPITAL
TRANSPORTATION
PROJECTS
PROJECTS
Total Projects:
28
Total Projects:
82
Projects COMPLETE:
13
Projects COMPLETE:
38
Projects In Progress:
13
Projects In Progress:
31
• NOTE: These numbers do not include any Resurfacing/Surface Treatment/Widening projects.