SPLOST TRANSPORTATION PROJECT UPDATE Roque Romero, SPLOST Director of Transportation BOARD OF COMMISSIONERS MEETING March 6, 2018


SPLOST IV – COUNTY WIDE TRANSPORTATION PROJECT(S) IN PROGRESS New Interchange on I-75 Feasibility Study and Interchange Justification Report (IJR) COMPLETE and submitted to GDOT. Waiting on GDOT and FHWA to approve IJR.


COMMISSIONER JOHNNY WILSON – DISTRICT 1 TRANSPORTATION PROJECTS IN PROGRESS McDonough Parkway (Henry Connector) (Construction to be Rebid) SR81 Widening (Lemon Street to Bethany Road) (Design Only) (Joint Project w/District 3) South Bethany @ Old Jackson (Construction In Progress) Peeksville Road (New Hope to Bridge) (Right of Way Acquisition In Progress) Peeksville Road (Bridge to Old Jackson) (Design Only)


COMMISSIONER JOHNNY WILSON – DISTRICT 1 COMPLETED TRANSPORTATION PROJECTS Locust Road/Jackson Street @ SR42 SR81 @ Mt. Bethel/Wynn (Joint Project w/District 3) Harris Drive (Leguin Mill Road to South Bethany Road) Lester Mill Road (Hampton L.G. to Indian Creek) Weems Road (Hampton LG to End) (Surface Treatment) King Mill over Tussahaw Creek (Culvert Repair) Locust Grove over Indian Creek (Bridge Repair) Jackson Lake over Mackey Creek (Bridge Replacement) Old Jackson over Tussahaw Creek (Bridge Repair) South Ola over Tussahaw Creek (Bridge Repair) Frog Road (SP3)


COMMISSIONER DEE CLEMMONS – DISTRICT 2 TRANSPORTATION PROJECTS IN PROGRESS Jodeco Road @ Blackhall Road (Joint Project w/GDOT) (Construction In Progress) Mill @ SR81 (Construction In Progress)

Simpson Mill @ Hampton-L.G. (Right of Way Acquisition In Progress) Amah Lee (Old SR3 to End of Pavement) (Construction In Progress) Selfridge Road (Speedway Blvd. to Airport Entrance) (Design In Progress) South Cleveland Church (New Morn to Stone Road) (Right of Way Acquisition Next) Thoroughbred Drive (Greenwood Road to End of Pavement) (Construction In Progress) Blackhall over Rum Creek (Bridge Replacement) (Joint Project w/GDOT) (Right of Way Acquisition In Progress)


COMMISSIONER DEE CLEMMONS – DISTRICT 2 COMPLETED TRANSPORTATION PROJECTS  Industrial Parkway @ SR20 (Completed by GDOT)  Mt. Carmel @ Chambers

 Farmer Drive (Surface Treatment)  Fields Drive

(Surface Treatment)

 Floyd Road (Surface Treatment)  Jones Road (Surface Treatment)  Mt. Olive Road (Jonesboro to End of Pavement)  South Mt. Carmel (Surface Treatment)  Hampton over Indian Creek

(Culvert Repair)

 Hampton over Towaliga River (Bridge Repair)  Jonesboro over Walnut Creek (Bridge Repair)  Old SR3 over Norfolk Southern RR

(Bridge Repair)

*Old Hwy. 3 @ SR81 (SP3)


COMMISSIONER GARY BARHAM – DISTRICT 3 TRANSPORTATION PROJECTS IN PROGRESS McDonough Parkway (SR42 to SR155) (Right of Way Acquisition In Progress) SR81 Widening (Lemon Street to Bethany Road) (Design Only) (Joint Project w/District 1) Turner Church Road (East of Bridge to SR20) (Construction In Progress) Elliott over Walnut Creek Tributary (Bridge Repair)(Joint Project w/GDOT) (GDOT Design In Progress; Right of Way Acquisition In Progress)


COMMISSIONER GARY BARHAM – DISTRICT 3 TRANSPORTATION PROJECTS COMPLETED  Bethany Road @ SR81 (COMPLETED by GDOT)

 Dailey Mill @ Jodeco Road  East Lake @ SR20 (Joint Project w/District 4)  Jodeco Road @ Oak Grove Road  Lake Dow/Rodgers @ Rosser  SR81 @ Mt. Bethyl/Wynn (Shared Cost w/District 1)  Butler’s Bridge Drive (Butler’s Bridge to Honey Creek) (Surface Treatment)  Candler Road (Surface Treatment)  East Knight Road (Elliott Road to East Lake Road) (Surface Treatment)  Eskew Road (SR81 to End of Pavement) (Surface Treatment)

 Turner Circle (SR155 to Campground Road) (Surface Treatment)  Dailey Mill over Walnut Creek (Bridge Repair)  Jackson Lake over Mackey Creek (Bridge Replacement) (Joint Project w/District 1)  Oak Grove over Walnut Creek (Bridge Repair)


COMMISSIONER BLAKE PRINCE– DISTRICT 4 TRANSPORTATION PROJECTS IN PROGRESS Rock Quarry Road Widening (SR42/138 to Eagles Landing Parkway) (Concept Report COMPLETE; Waiting on GDOT Approval)

Hemphill Road @ SR138 (Construction In Progress) Elliott Road (East Lake Road to Crumbley Road) (Construction In Progress) Selfridge over Little Cotton Indian Creek (Bridge Replacement) (Design In Progress) Campground Road Extension (SP3) (Construction In Progress)


COMMISSIONER BLAKE PRINCE – DISTRICT 4 TRANSPORTATION PROJECTS COMPLETED Banks Road @ Rock Quarry Road East Lake Road @ SR20 (Joint Project w/District 3) Moseley Road @ SR138 (COMPLETED by GDOT) Hemphill over James Creek (Bridge Repair) Old Conyers over Big Cotton Indian Creek (Bridge Repair) (Joint Project w/District 5)


COMMISSIONER BRUCE HOLMES – DISTRICT 5 TRANSPORTATION PROJECTS IN PROGRESS Anvil Block Road Widening (Construction In Progress) West Village Parkway (Previously Known as West Panola) (Final Design In Progress) East Atlanta @ Thurman & Flatrock (Preliminary Design In Progress)


COMMISSIONER BRUCE HOLMES – DISTRICT 5 COMPLETED TRANSPORTATION PROJECTS Old Conyers over Big Cotton Indian Creek (Bridge Repair) (Joint Project w/District 4) Stagecoach over Big Cotton Indian Creek (Bridge Repair)