SPLOST TRANSPORTATION PROJECT UPDATE Roque Romero, SPLOST Director of Transportation BOARD OF COMMISSIONERS MEETING March 6, 2018
SPLOST IV – COUNTY WIDE TRANSPORTATION PROJECT(S) IN PROGRESS New Interchange on I-75 Feasibility Study and Interchange Justification Report (IJR) COMPLETE and submitted to GDOT. Waiting on GDOT and FHWA to approve IJR.
COMMISSIONER JOHNNY WILSON – DISTRICT 1 TRANSPORTATION PROJECTS IN PROGRESS McDonough Parkway (Henry Connector) (Construction to be Rebid) SR81 Widening (Lemon Street to Bethany Road) (Design Only) (Joint Project w/District 3) South Bethany @ Old Jackson (Construction In Progress) Peeksville Road (New Hope to Bridge) (Right of Way Acquisition In Progress) Peeksville Road (Bridge to Old Jackson) (Design Only)
COMMISSIONER JOHNNY WILSON – DISTRICT 1 COMPLETED TRANSPORTATION PROJECTS Locust Road/Jackson Street @ SR42 SR81 @ Mt. Bethel/Wynn (Joint Project w/District 3) Harris Drive (Leguin Mill Road to South Bethany Road) Lester Mill Road (Hampton L.G. to Indian Creek) Weems Road (Hampton LG to End) (Surface Treatment) King Mill over Tussahaw Creek (Culvert Repair) Locust Grove over Indian Creek (Bridge Repair) Jackson Lake over Mackey Creek (Bridge Replacement) Old Jackson over Tussahaw Creek (Bridge Repair) South Ola over Tussahaw Creek (Bridge Repair) Frog Road (SP3)
COMMISSIONER DEE CLEMMONS – DISTRICT 2 TRANSPORTATION PROJECTS IN PROGRESS Jodeco Road @ Blackhall Road (Joint Project w/GDOT) (Construction In Progress) Mill @ SR81 (Construction In Progress)
Simpson Mill @ Hampton-L.G. (Right of Way Acquisition In Progress) Amah Lee (Old SR3 to End of Pavement) (Construction In Progress) Selfridge Road (Speedway Blvd. to Airport Entrance) (Design In Progress) South Cleveland Church (New Morn to Stone Road) (Right of Way Acquisition Next) Thoroughbred Drive (Greenwood Road to End of Pavement) (Construction In Progress) Blackhall over Rum Creek (Bridge Replacement) (Joint Project w/GDOT) (Right of Way Acquisition In Progress)
COMMISSIONER DEE CLEMMONS – DISTRICT 2 COMPLETED TRANSPORTATION PROJECTS Industrial Parkway @ SR20 (Completed by GDOT) Mt. Carmel @ Chambers
Farmer Drive (Surface Treatment) Fields Drive
(Surface Treatment)
Floyd Road (Surface Treatment) Jones Road (Surface Treatment) Mt. Olive Road (Jonesboro to End of Pavement) South Mt. Carmel (Surface Treatment) Hampton over Indian Creek
(Culvert Repair)
Hampton over Towaliga River (Bridge Repair) Jonesboro over Walnut Creek (Bridge Repair) Old SR3 over Norfolk Southern RR
(Bridge Repair)
*Old Hwy. 3 @ SR81 (SP3)
COMMISSIONER GARY BARHAM – DISTRICT 3 TRANSPORTATION PROJECTS IN PROGRESS McDonough Parkway (SR42 to SR155) (Right of Way Acquisition In Progress) SR81 Widening (Lemon Street to Bethany Road) (Design Only) (Joint Project w/District 1) Turner Church Road (East of Bridge to SR20) (Construction In Progress) Elliott over Walnut Creek Tributary (Bridge Repair)(Joint Project w/GDOT) (GDOT Design In Progress; Right of Way Acquisition In Progress)
COMMISSIONER GARY BARHAM – DISTRICT 3 TRANSPORTATION PROJECTS COMPLETED Bethany Road @ SR81 (COMPLETED by GDOT)
Dailey Mill @ Jodeco Road East Lake @ SR20 (Joint Project w/District 4) Jodeco Road @ Oak Grove Road Lake Dow/Rodgers @ Rosser SR81 @ Mt. Bethyl/Wynn (Shared Cost w/District 1) Butler’s Bridge Drive (Butler’s Bridge to Honey Creek) (Surface Treatment) Candler Road (Surface Treatment) East Knight Road (Elliott Road to East Lake Road) (Surface Treatment) Eskew Road (SR81 to End of Pavement) (Surface Treatment)
Turner Circle (SR155 to Campground Road) (Surface Treatment) Dailey Mill over Walnut Creek (Bridge Repair) Jackson Lake over Mackey Creek (Bridge Replacement) (Joint Project w/District 1) Oak Grove over Walnut Creek (Bridge Repair)
COMMISSIONER BLAKE PRINCE– DISTRICT 4 TRANSPORTATION PROJECTS IN PROGRESS Rock Quarry Road Widening (SR42/138 to Eagles Landing Parkway) (Concept Report COMPLETE; Waiting on GDOT Approval)
Hemphill Road @ SR138 (Construction In Progress) Elliott Road (East Lake Road to Crumbley Road) (Construction In Progress) Selfridge over Little Cotton Indian Creek (Bridge Replacement) (Design In Progress) Campground Road Extension (SP3) (Construction In Progress)
COMMISSIONER BLAKE PRINCE – DISTRICT 4 TRANSPORTATION PROJECTS COMPLETED Banks Road @ Rock Quarry Road East Lake Road @ SR20 (Joint Project w/District 3) Moseley Road @ SR138 (COMPLETED by GDOT) Hemphill over James Creek (Bridge Repair) Old Conyers over Big Cotton Indian Creek (Bridge Repair) (Joint Project w/District 5)
COMMISSIONER BRUCE HOLMES – DISTRICT 5 TRANSPORTATION PROJECTS IN PROGRESS Anvil Block Road Widening (Construction In Progress) West Village Parkway (Previously Known as West Panola) (Final Design In Progress) East Atlanta @ Thurman & Flatrock (Preliminary Design In Progress)
COMMISSIONER BRUCE HOLMES – DISTRICT 5 COMPLETED TRANSPORTATION PROJECTS Old Conyers over Big Cotton Indian Creek (Bridge Repair) (Joint Project w/District 4) Stagecoach over Big Cotton Indian Creek (Bridge Repair)