RES I DENTI ALPROJ ECT
Ki t c he nde t a i l s
La mTua nKi e t Ma r c h2013 Phno mP e nh,Ca mbo di a
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
SPECIFIC NOTES :
SHEET INDEX SHEET #
SHEET DESCRIPTION
ISSUED DATE
0
COVER PAGE
16-06-2013
1
RESIDENTIAL FLOOR PLAN
16-06-2013
2
KITCHEN PLAN & ELEVATION
16-06-2013
3
INTERIOR WALL ELEVATION A EXTERIOR WALL ELEVATION B
16-06-2013
4
WALL SECTION
16-06-2013
5
FLOOR PLAN
16-06-2013
6
FLOORING SECTION DETAILS A
16-06-2013
7
FLOORING SECTION DETAILS B
16-06-2013
8
CABINET SECTIONS
16-06-2013
9
CABINET DETAILS A, B
16-06-2013
10
CABINET DETAIS C, D, E, F
16-06-2013 NO.
ABBREVIATIONS
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
DRAWING TITLE:
1 2
DETAIL SYMBOL
1 2
FOCUS AREA TAG
NAME: HENRY TUAN KIET LAM
A
B
SHEET
TITLE PAGE
D
INTERIOR ELEVATION
3/B
EXTERIOR ELEVATION
C
COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
UNIT GROUND FLOOR
PROJECT SUMMARY
25 LE LOI STREET, BEN NGHE WARD, 1ST DISTRICT HO CHI MINH CITY, VIETNAM
ROOM
SURFACE AREA (m2)
KITCHEN
10.3m2
Raffles International College
NORTH
DATE: 17-06-2013 SCALE: 1:1
SHEET:
0
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
1 2
A
SPECIFIC NOTES :
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
A' NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
1 1
RESIDENTIAL FLOOR PLAN SCALE
DRAWING TITLE:
RESIDENTIAL FLOOR PLAN
1:50 NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College DATE: 17-06-2013 SCALE: 1:50
SHEET:
1
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
UNDER-COUNTER DISHWASHER
DISH CABINET 1 5
E N
MEAL PREP-PAR -ATION AREA
2
COUNTER-TOP OVEN
SPECIFIC NOTES :
A
3
3/B
REFRI-GERATOR ELEVATED BAR COUNTER
1 KITCHEN PLAN 1:20 2 SCALE
2 8
EXTRACTOR HOOD INSIDE CABINET DOORS
600
455
455
DISPLAY CABINET
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
2830 700
615
615
450
890
400
1 1
450
890
2310 400
1 8
1 1
DISH RACKS NO.
450
2300
450 MICROWAVE
KITCHEN PROJECT
DRAWING TITLE:
KITCHEN PLAN & ELEVATION
SLIDING DRAWER
SINK DRAIN INSIDE CABINET DOORS
DISH WASHER
NAME: HENRY TUAN KIET LAM
880
880
OVEN
COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013
3 NORTH ELEVATION 1:20 2 SCALE
80
ASSIGNMENT NO.: 6
80
2300
ASSIGNMENT TITLE:
2 EAST ELEVATION 1:20 2 SCALE
Raffles International College DATE: 17-06-2013 SCALE: 1:20
SHEET:
2
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
1 4
1 4 SPECIFIC NOTES :
10x80 CONTINUOUS WALNUT FINISHES
WHITE WALLPAPER FINISHES ON GYPSUM PLASTER BOARD
13A-250V "TYPE A" FLAME RETARDANT ABS PLASTIC OUTLET
60X3 OAK FINISHES BASEBOARD
NO.
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
DRAWING TITLE:
INTERIOR WALL ELEVATION A EXTERIOR WALL ELEVATION B
NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013
B 3
EXTERIOR WALL ELEVATION B SCALE
1:2
A 3
INTERIOR WALL ELEVATION A SCALE
1:2
ASSIGNMENT NO.: 6
Raffles International College DATE: 17-06-2013 SCALE: 1:2
SHEET:
3
GENERAL NOTES
10
110
4 8
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
2
FLAME RETARDANT ABS PLASTIC OUTLET BOX
13A-250V "TYPE A" FLAME RETARDANT ABS PLASTIC OUTLET
10x80 CONTINUOUS WALNUT FINISHES
SPECIFIC NOTES :
PLASTIC CONDUIT
30x30 WALNUT FURRING @200 O.C. 80MM INSULATION FOAM BLANKET
WHITE WALLPAPER FINISHES
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
80x400 WALNUT STUD @250 O.C
8MM GYPSUM PLASTER BOARD 3/B
A
3
4MM GH T-03 GYPSUM BOARD
NO.
ASSIGNMENT TITLE:
60X3 OAK FINISHES BASEBOARD
KITCHEN PROJECT
DRAWING TITLE:
WALL SECTION
NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
120x30 WOOD SILL
Raffles International College
1 4
WALL SECTION SCALE
1:1
DATE: 17-06-2013 SCALE: 1:1
SHEET:
4
GENERAL NOTES The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
1 6
SPECIFIC NOTES :
127MM THICKNESS SEAMLESS BLACK ITALIAN STYLE TERRAZZO FINISHES
STANDARD "L" SHAPED DIVIDER STRIPS (HORIZONTAL)
1 7 127MM THICKNESS SEAMLESS ROUGH WHITE TERRAZZO FINISHES
1 FLOOR PLAN 1:2 5 SCALE
NO.
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
DRAWING TITLE:
FLOOR PLAN
NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College DATE: 17-06-2013 SCALE: 1:2
SHEET:
5
GENERAL NOTES
635MM UNDERBED (SAND, CEMENT, LOW SLUMP)
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
SPECIFIC NOTES :
127MM THICKNESS 1.6MM SAND DUSTING ISOLATION MEMBRANE
SEAMLESS BLACK ITALIAN STYLE TERRAZZO FINISHES
EXISTING CONCRETE SLAB
NO.
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
DRAWING TITLE:
FLOORING SECTION DETAILS A
NAME: HENRY TUAN KIET LAM
1 FLOORING SECTION DETAILS A 1:1 6 SCALE
COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College DATE: 17-06-2013 SCALE: 1:1
SHEET:
6
GENERAL NOTES
127MM THICKNESS SEAMLESS BLACK ITALIAN STYLE TERRAZZO FINISHES
635MM UNDERBED (SAND, CEMENT, LOW SLUMP)
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
SPECIFIC NOTES :
127MM THICKNESS 1.6MM SAND DUSTING ISOLATION MEMBRANE
SEAMLESS ROUGH WHITE TERRAZZO FINISHES
EXISTING CONCRETE SLAB
STANDARD "L" SHAPED DIVIDER STRIPS (HORIZONTAL)
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
0.5 MM
STANDARD "L" SHAPED DIVIDER STRIPS (DIAGONAL) NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
DRAWING TITLE:
FLOORING SECTION DETAILS B
1 FLOORING SECTION DETAILS B 1:1 7 SCALE
NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College DATE: 17-06-2013 SCALE: 1:1
SHEET:
7
GENERAL NOTES
40MM THICK HMR V313 MDF CABINET DOORS
EXHAUSTED INSIDE CABINET DOORS
425
19 MM THICK HMR V313 MDF WOOD TOP BOARD
425
UV03 HIGH GLOSS ACRYLIC LAMINATE FIN.
LK012 FROSTY WHITE FIN.
890
19 MM HMR V313 MDF TOP BOARD
420
LK012 FROSTY WHITE FIN. 40MM THICK HMR V313 MDF CABINET DOORS
CA-403002 CABINET DOORS SUSPENSION FRAMING SYSTEM
D 10
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
ZINC SU1841930 DOOR HINGE BRASS FINISHES CA-A0350 ZINC 2-STOREY DISH RACKS
20 X 80 GALAXY BLACK GRANITE BACKSPLASH SEMI-GLOSS FIN.
20 X 40 PLYWOOD CLEAT 19 MM HMR V313 MDF BOTTOM BOARD
470
12 MM HMR V313 MDF BACKING BOARD
SPECIFIC NOTES :
20 X 40 PLYWOOD CLEAT THINSET ADHESIVE
450
470
E 10
A 9
GALAXY BLACK GRANITE COUNTER TOP SEMI-GLOSS FIN. B 9
FOSHAN NANHAI ZINC SU1841930 DOOR HINGE BRASS FINISHES
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
400 MM LENGTH
40MM THICK HMR V313 MDF CABINET DOORS
C 10
40MM THICK HMR V313 MDF CABINET DOORS LK012 FROSTY WHITE FIN.
12 MM HMR V313 MDF BACKING BOARD
P&N DM211 ZINC BRASS DOOR LOADSTONE STOPPER
NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
HIGH GLOSS ACRYLIC LAMINATE UV03 BASE PANEL
DRAWING TITLE:
CABINET SECTIONS
NAME: HENRY TUAN KIET LAM
80
80
12 MM HMR V313 MDF BACKING BOARD
LK012 FROSTY WHITE FIN.
880
880
ZINC DRAWER RAIL CONCEALED SLIDES SS5502 BRASS FIN.
F 10
COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College
2 CABINET SECTION 2 1:8 8 SCALE
1 CABINET SECTION 1 1:8 8 SCALE
DATE: 17-06-2013 SCALE: 1:8
SHEET:
8
GENERAL NOTES
GRANITE COUNTERTOP SEMI-GLOSS FIN. 20MM THICK HMR V313 MDF BACKING COUNTER THINSET ADHESIVE
20 X 80 GALAXY BLACK GRANITE BACKSPLASH SEMI-GLOSS FIN.
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
SPECIFIC NOTES :
CRAFTSTONE WALL
2 8 9 20 20 X 40 MM HMR V313 MDF CLEAT
40 X 80 MM HMR V313 MDF TOP STRIP 400 MM LENGTH ZINC DRAWER RAIL CONCEALED SLIDES SS5502 BRASS FIN.
A 9
CABINET DETAILS A SCALE
1:2 COUNTERTOP SEMI-GLOSS FIN. 20MM THICK HMR V313 MDF BACKING COUNTER
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
THINSET ADHESIVE &
SCREW HARBOARD SIDING NAIL 20 X 40 HMR V313 MDF TOP STRIP
CABINET DOOR HANDLE
400 MM LENGTH
NO.
ASSIGNMENT TITLE:
ZINC DRAWER RAIL CONCEALED SLIDES SS5502 BRASS FIN.
KITCHEN PROJECT
DRAWING TITLE:
CABINET DETAILS A, B
FO SIN ALUMINIUM DAN KACA SDN. BHD. METAL L-BRACKET SHELF SUPPORT
NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College
ZINC SU1841930 DOOR HINGE BRASS FINISHES
B 9
CABINET DETAILS B
DATE: 17-06-2013
SCALE
SCALE: 1:2
1:2
SHEET:
9
GENERAL NOTES
12 MM HMR V313 MDF BACKING BOARD P&N DM211 ZINC BRASS DOOR LOADSTONE STOPPER P&N DM211 ZINC BRASS DOOR LOADSTONE STOPPER
20 X 40 PLYWOOD CLEAT
19 MM HMR V313 MDF BOTTOM BOARD HIGH GLOSS ACRYLIC LAMINATE UV03 BASE PANEL
The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all international building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards. - All dimension in millimeters
CRAFTSTONE WALL SPECIFIC NOTES :
19 MM HMR V313 MDF BOTTOM BOARD (2) 40 X 80 HMR V313 MDF SLEEPERS @ 360 O.C. (2) 40 X 80 PLYWOOD SLEEPERS @ 360 O.C.
E CABINET DETAILS E 1:2 10 SCALE
C CABINET DETAILS C 1:2 10 SCALE 19 MM THICK HMR V313 MDF WOOD TOP BOARD
1 1
1 1
DATE:
REVISIONS:
DETAIL NO. SHEET NO.
20 X 40 PLYWOOD CLEAT 12 MM HMR V313 MDF BACKING BOARD 20 X 40 PLYWOOD CLEAT 19 MM HMR V313 MDF BOTTOM BOARD
19 MM THICK HMR V313 MDF TOP BOARD
12 MM HMR V313 MDF BACKING BOARD NO.
ASSIGNMENT TITLE:
KITCHEN PROJECT
CRAFTSTONE WALL
DRAWING TITLE:
CABINET DETAILS C, D. E, F
CRAFTSTONE WALL NAME: HENRY TUAN KIET LAM COURSE: CONSTRUCTION STUDIES I TERM: MARCH 2013 ASSIGNMENT NO.: 6
Raffles International College
F CABINET DETAILS F 1:2 10 SCALE
D CABINET DETAILS D 1:2 10 SCALE
DATE: 17-06-2013 SCALE: 1:2
SHEET:
10