CULTURAL TOURIST CITY
NGOA VAN- HO THIEN LANSCAPE ARCHITECTURE
OVER VIEW OF EXISTING
• LOCATION: DONG TRIEU TOWN, QUANG NINH • PROJECT YEAR: 2018-2019 • SITE AREA: >400 HA • FUNCTION : SPIRITUAL CULTURAL TOURISM • CLIENT: TIME GARDEN • TEAM: RAYMOND ARCHITECTURAL DESIGN OFFICE THE NORTH BORDERS ON SON DONG DISTRICT AND LUC NAM DISTRICT, BAC GIANG PROVINCE. THE WEST: BORDER WITH CHI LINH CITY, HAI DUONG PROVINCE. THE SOUTH BORDERS THUY NGUYEN DISTRICT, HAI PHONG CITY AND KINH MON DISTRICT, HAI DUONG PROVINCE. THE EAST: BORDER WITH UONG BI CITY, QUANG NINH.
4 6 5
6
3
1. THE ROAD INTO THE PROJECT 2. HIGH TECHNOLOGY FARMING 3. FROM TRAI LOC LAKE TO TRAI 8
7
LOC STATION. 4. NUI DA CHONG AREA 5. ZEN RESORT 6. HO THIEN MOUNTAIN TO BAI
2 1
BANG STATION. 7. TRAI LOC LAKE 8. DONG DO LAKE
12
AREA I: RENOVATE THE ROAD INTO THE PROJECT
AREA II: HIGH TECHNOLOGY FARMING
3
AREA III: FROM TRAI LOC LAKE
5
AREA V: Z
TO TRAI LOC STATION AREA
4
AREA IV: NUI DA CHONG AREA
5
7
AREA VII: TRAI LOC LAKE
ZEN RESORT AREA
6
AREA VI: HO THIEN MOUNTAIN BAI BANG STATION
8
AREA VIII: DONG DO LAKE
1
I: RENOVATE THE ROAD INTO PROJECT Lanscape route 1: The width: 25m, 1.3km away from relic gate. Design of a Japanese cherry blossom tree line Japanese-style street lighting arrangement (5m)
Lanscape route 2: From the end of landscape 1 to An Sinh temple (1.8km) Two sides of the sidewalk planted two lines of bamboo. On the road, arrange street light equipment (1.2m)
Lanscape route 3: The next segment is 300m from An Sinh Temple. Both sides of the sidewalk planted conifer trees. Design a frangipane tree line to help separate two lanes.
Lanscape route 4: From the end point of landscape section 3 to the high technology farming (1.7km). Two sides of the sidewalk planted two lines of bamboo. On the road, there will be stone street light equipment (1.2m). Lanscape route 5: High technology farming road. Create a small park space on both sides of the sidewalk with flowers board combines grass, flowers and decorative shrubs. There will be street lights (5m) on the road and some benches for resting.
Lanscape route 1: The width: 25m, 1.3km away from relic gate. • Design of a Japanese cherry blossom tree line Japanese-style street lighting arrangement (5m) • Planting purple shrub lines on both sides of pavement and white leaf line on the median strip between the two lanes.
Lanscape route 2: From the end of landscape 1 to An Sinh temple (1.8km) • Two sides of the sidewalk planted two lines of bamboo. • On the road, arrange street light equipment (1.2m) • Planting two glands of grass to wipe the sidewalks.
Lanscape route 3: The next segment is 300m from An Sinh Temple. • Both sides of the sidewalk planted conifer trees. • Design a big tree line to help separate two lanes. • To arrange street light equipment (5m) on the road. •Plant a purple shrub line along the sidewalk and a peony line in the two-lane median strip.
Lanscape route 4: From the end point of landscape section 3 to the high technology farming (1.7km). • Two sides of the sidewalk planted two lines of bamboo. • On the road, there will be stone street light equipment (1.2m). • Planting two glands of grass to wipe the sidewalks.
Lanscape route 5: High technology farming road. • Create a small park space on both sides of the sidewalk with flowers board combines grass, flowers and decorative shrubs. • There will be street light equipment (5m) on the road and some benches for resting.
2
AREA II: HIGH TECHNOLOGY FARMING
ZONE ORIENTATION
FLOWER GARDEN
CAR PARKING
BIKE PARKING
ZONE A - TOURISM RESTAURANT
PARK BUS PARKING
ZONE
• Research area is 12ha. Stopover
BUS STOP
BUS STOP
and experience for the day. • Picnic BBQ with agriculture CAR PARKING
greenhouse and use in place
CAR PARKING
WC RESTAURANT
agriculture greenhouse. • Small farm produce market in
BBQ AREA
WATER TANK
place. • Agricultural landscape with flowers and vegetables grown with high technology. GLASS HOUSE STORAGE
AREA B - GLASS HOUSE AND Microbiological TESTING AREA • Study area 16.9ha. • High-tech flower growing area for tourism and neighborhood. • High-tech greenhouse with Japanese large frame and organic technique 4.0. • Waste treatment area and microbiological fertilizer source of agricultural village and surrounding area.
TALL FRUIT TREES
BUS PARKING
SHORT FRUIT TREES
CAR PARKING MOTORBIKE PARKING GROCERY STORE
WAREHOUSE
CONTROLLER CENTER
CAR PARKING
REPAIR AREA
RICE FIELD SOLAR PANEL
VEGETABLE AREA
BBQ AREA
AREA C - LANDSCAPE EXPERIENCE TOURIST • Study area is 7.9 ha. • High-tech flower growing area for tourism and neighborhood. • The Pony farm provides horses for horseback riding around the resort to experience. • The lotus lake is a statue of Emperor Tran Nhan Tong Buddha
FARMING CAFE SHOP
FLOWER GARDEN FLOWER GARDEN
HORSE TRACK
FLOWER GARDEN
HORSE TRACK
HORSE TRACK
LOTUS POND
AREA D - AGRICULTURAL VILLAGE MANAGEMENT AND TOURISM EXPERIENCE AREA • Research area of 12,3ha. • Hotel and accommodation, villa area experience. • Research area to test new high-tech agricultural samples. • Solar panels are arranged around rural villages to deal with natural energy.
The main ro
• Plant two
• Create a s
pavement w
flowers, shr Main road
• Plant two
• Arranging
The directio
• Planting t
• On the pa
purple tree
road goes to the Ngoa Van relic
o lines of flowering plants along the road.
small park space on both sides of the
with cockroach trees combined with grass,
rubs. leading to Ba Xa
o crocodile lines on the road side.
g wooden fence on both sides.
on to Ba Xa
two lines of Taiwan hawk tree on the road
avement, some shrubs are planted such as
es, spotted leaf trees ...
KHU A
KHU C
KHU B
KHU D
3
III: FROM TRAI LOC LAKE TO TRAI LOC STATION
AGRICULTURAL MARKET AREA PLANNING
HANDICRAFT MARKET AREA PLANNING
BUDDHIST INSTITUTE AREA PLANNING
ZEN VILLAGE AREA PLANING
HERBAL MEDICINE CENTER AREA PLANING
SQUARE AREA PLANING
4
V: NUI DA CHONG
Lanscape route 1: From Nga Van cable car to Ngoa Van pagoda (600m)
Route 1: From Nga Van cable car to Ngoa Van pagoda (600m)
Route 2: The next section from Ngoa Van pagoda to the electric car park (300m)
Route 3: 800m away from the electric car park
Route 4: From the end of section 3 (statue garden area)
Route 5: Flower valley area on Da Chong
CURRENT EXISTING FROM NGOA VAN PAGODA TO DA CHONG MOUNTAIN:
mountain.
• The trail stretching from Ngoa Van pagoda to the side of Da Chong Mountain is about 1.9 km. Scattered on the roadway there are stops to stop for beautiful views. • The two sides of the road are natural hills, some places are high cliffs on one side and cliffs overlooking the landscape below. • Ruins of Da Chong pagoda (only ruins left). • The area of Mount Da Chong is a valley area surrounded by surrounding hills and mountains. With 3 directions based on the mountain and there is a straight landscape below the Vanh Mam lake. In the middle of the valley, there is Da Chong lake.
Lanscape route 2: The next section from Ngoa Van pagoda to the electric car park (300m)
Lanscape route 3: 800m away from the electric car park
Lanscape route 4: From the end of section 3 (statue garden area)
Lanscape route 5: Flower valley area on Da Chong mountain.
5
V: ZEN RESORT ORIENTED DEVELOPMENT • The study area is about 42.7 ha • About 20 luxury resort villas on the mountainside, with swimming pool and panoramic views of the entire area.
6 BAI BANG STATION MASTER PLAN
VI: HO THIEN STATION-BAI BANG STATION
ORIENTATION FOR DEVELOPMENT • The study area is about 5.8 ha. • Construction of Bai Bang Station. • Embellish the landscape, add auxiliary point
ORIENTED FOR DEVELOPMENT • The study area is about 1.2 ha • Restoration and embellishment of the pagoda system according to the project of Dong Trieu.
ts.
HO THIEN STATION MASTER PLAN
• Build a departure station at Ho Thien mountain. • Arranging the construction site of the statue of Nhi To Phap Loa and Tam To Tran Huyen Quang. • Embellish the landscape, add auxiliary points.
7
VII: TRAI LOC LAKE
8
VIII: DONG DO LAKE
THANK YOU!