High-Profile Monthly: April 2013

Page 1

Annual focus: April, 2013

Multi-Residential / Senior Living

1

Perkins Eastman Architects

120 Kingston Street McNamara/Salvia Structural Engineer

Inside this Issue

Refining an Affordable Model for Assisted Living by Garth Johnson and Clay Benjamin Smook Stretching at the Seaport Square by Alfonso Hernandez Fast Projects- Great Delivery by Stephanie Goldberg IIDANE 2013 Sixth Annual Design Awards Multi-Residential Projects Moving Forward Precast at Home in Multi-family Projects Callahan Completes Stonebridge Project Gateway CC - Model of Urban Sustainability

April 2013

plus Healthcare, Educational, Life Science,

P.O. Box 7, Pembroke, MA 02359 Change Service Requested

Facilities, People, Calendar, and more...

www.high-profile.com Renderings courtesy Perkins Eastman


December, 2010

2

High-Profile: Annual Green Facilities Developments

2

April, 2013

GOT GREEN ? WE DO . . . and we can help you get green too !

Proud Member of the U.S. Green Building Council.

A merican Plumbing and Heating Corporation 1000 Cordwainer Drive Fire Protection Norwell, MA 02061 Phone: 781-347-9200 Fax: 781-347-9250 www.amerplumb.com

Biotech•Pharmaceutical•Medical•Educational•Sports & Entertainment•Hotels•Retail Mechanical Contractors Registration No. 8028 PLEASE RECYCLE

www.high-profile.com

Green Development News


April, 2013

3

Portwalk Residence Inn - Portsmouth, NH

Harbor Events & Conference Center - Portsmouth, NH Residence Inn - Chelsea, MA

New Hampshire Liquor & Wine Outlet - Nashua, NH

Hammondswood at Chestnut Hill - Brookline, MA

Renaissance Hotel & Spa at Patriot Place - Foxborough, MA

Brightview Senior Living Community - Billerica, MA

The Residences at Portwalk - Portsmouth, NH

Alpha Flying - Portsmouth, NH

Brightview Senior Living Community - Danvers, MA

Weston Solutions - Concord, NH

Gordon College: Chase Hall Student Residences - Wenham, MA

LGH Medical Office Building - Chelmsford, MA

Brightview Senior Living Community - Arlington, MA

Courtyard by Marriott - Keene, NH

| PROFESSIONAL | RESOURCEFUL | INDUSTRY LEADERS | FLEXIBLE | CAPABLE | EXCEPTIONAL CLIENT SERVICE & COMMITMENT

TEAM CENTRIC | PROFICIENT | EXPERIENCED | KNOWLEDGEABLE | STRONG COMMUNICATION SKILLS | LEED PROFESSIONALS |

INNOVATIVE IDEAS | CREATIVE SOLUTIONS | COST EFFECTIVE | AWARD WINNING | CLIENT FOCUSED | SUSTAINABLE DESIGN

PRO CON INC Excellence in Design Build Architecture|Engineering|PreConstruction|Construction

www.proconinc.com 603.623.8811 www.high-profile.com


April, 2013

4

Subscribe to High-Profile Monthly all year Cover Story: 120 Kingston Street ................... 26 Connecticut............................. 38 Sections: Upfront:................................... 6 Publisher’s Message..................... 8 Facilities................................. 10 IIDANE Awards........................ 12 PCINE News............................ 24 Life Sciences............................. 31 Awards................................... 34 Green..................................... 36

Education................................ 42 People.................................... 44 Calendar................................. 46

Focus: Multi-Res .............14 Phoenix Apartments................... 18 Residence at Wingate................. 19 Burlington Senior Living............. 28

www.high-profile.com E-mail news releases, advertising queries, articles, calendar listings and announcements, to: editor@high-profile.com Publishers: Spring Michael Barnes and Kathy Barnes improvements Business Development: Anastasia Barnes are in the Account Executive: Annie McEvoy ground Lucy Consultants: RAB Associates Art Direction & Design: High-Profile Monthly accepts no responsiSandra Guidetti bility for typographical errors or omissions of ads. We will reprint, without charge, that Proofing Editor: part in which the error occurs if it affects the Peggy Dostie value of the ad. Credit for errors made only for first insertion. The advertiser or agency P.O. Box 7, Pembroke, MA 02359 seeking the services of High-Profile Monthly Express Delivery: will indemnify and save harmless claims, 615 School St., Pembroke, MA 02359 lawsuits, damages or expenses, including Phone: (781) 294-4530 attorney’s fees and costs that may arise from Fax: (781) 293-5821 publication of the advertiser’s ads. E-Mail: editor@high-profile.com

ADVERTISERS INDEX A.W. Hastings....................................10 A/Z Corporation...................................4 Abbot Building..................................43 Abbott-Boyle......................................27 Alfred Benesch & Company..............42 Alleghany Contract............................35 Alpine Environmental........................31 American Plumbing & Heating Corp...................................2 APC Services of New England..........30 B. L. Makepeace................................20 Barnes Building Management............23 BL Companies....................................18 Boston Plasterers’ Cement Masons......8 Bowdoin Construction.......................38 Callahan Construction........................29 Campbell McCabe...............................6 CanAm.................................................9 Cogswell Sprinkler Company............43 Construction Journal..........................19 Copley Wolff Design Group................6 Costello Dismantling.........................14 CPI Flooring......................................30 CTA Construction Company..............11 Cutler Associates................................16 E.M. Duggen......................................26 EHK Adjorlolo & Associates.............23 Existing Conditions Survey...............17 FastFacts Fridays...............................44 Florence Electric................................40 Gencorp Insurance Group..................47 Great In Counters...............................40 Guidetti Graphics...............................31 Harry R. Feldman.................................4 Hutter Construction............................15 Hybrid Parking Garages.....................32 Ideal Concrete Block Company.........35 InnerGlass..........................................44

Ironwood Commercial Construction.. 41 J. Calnan & Associates.......................34 James W. Flett....................................44 Jewett.................................................37 Kelly’s Property Services.....................7 LAB Architects..................................32 Marr Scaffolding................................18 McNamara/Salvia........................ Cover Merrimack Valley Corporation..........39 MIIP - Mechanical Insulation Industry.........................................38 NE Moves Mortgage LLC...................7 NEBFM..............................................33 NEMCA.............................................10 North Branch......................................30 PCINE - Precast/Prestressed Concrete........................................25 Perkins Eastman........................... Cover Pro Con Incorporated...........................3 Rand Worldwide................................46 RPF Environmental Testing & Consulting.....................................41 Smook Architecture & Urban Design................................16 Structure Tone....................................13 Suffolk Construction..........................14 Superior Rail......................................27 TF Moran.............................................8 Timberline Construction......................5 Topaz Engineering Supply.................36 United Steel........................................19 Valleycrest..........................................21 Vanderweil Engineers........................11 Visconti Law......................................31 Visnick & Caufield.............................12 Wayne J. Griffin.................................22 Wessling Architects............................15

FELDMAN Professional Land Surveyors F

O C U S I N G

O

N

E

X C E L L E N C E

S

I N C E

1 9 4 6

OUR SERVICES:

OUR CLIENTS:

•• Boundary Boundary Surveys Surveys •• ALTA/ACSM ALTA/ACSM Land Land Title Title Surveys Surveys •• Topographic Topographic Site Site Surveys Surveys •• Photogrammetric Photogrammetric Mapping Mapping •• Land Land Court Court Surveys Surveys •• Construction Construction Layout Layout •• As-Built As-Built Surveys Surveys •• 3D 3DLaser LaserScanning Scanning

• • Developers Developers • • Engineering Engineering Firms Firms • • Architectural ArchitecturalFirms Firms • • Law Law Firms Firms • • General General Contractors Contractors • • Educational Educational Institutions Institutions • • Health Health Care Care Institutions Institutions • • Government Government

• Revit Modeling

Harry R. Feldman, Inc. • 112 Shawmut Avenue • Boston, MA 02118 • 617-357-9740 • www.harryrfeldman.com

www.high-profile.com


April, 2013

5

General Contracting | Construction Management | Preconstruction | Design/Build | Wireless Construction

Academic | Healthcare | Hospitality | Residential | Retail Restaurants | Supermarkets | Corporate | Data Centers | Wireless

Timberline Construction Corporation | 300 Pine Street | Canton, MA 02021 | 339.502.5000 www.timberlineconstruction.com www.high-profile.com


April, 2013

6

Boston Properties-Hines Joint Venture

BayPoint Builders New Execs

Newton, MA - BayPoint Builders announced new leadership with the addition of Mark David as president and chief executive officer. He brings 26 years of construction experience to the company. Most recently, David was the president of construction at Jones Lang LaSalle (JLL) overseeing the business nationally. He led the New England construction business as a principal at Spaulding & Slye Colliers prior to JLL’s acquisition of the firm. His leadership experience allows him to successfully set the new strategic direction of BayPoint Builders. “Mark’s experience and leadership in the construction industry will allow BayPoint Builders to build on its already strong reputation and client base and grow the company to new levels,” said Barbara Bates, director of operations at BayPoint

Rendering courtesy Pelli Clarke Pelli

Mark David Al Woods Builders. BayPoint Builders also announced that Al Woods has joined the firm as executive vice president. Woods will lead BayPoint’s effort to strengthen and grow its business. Prior to joining BayPoint, he led the strategy and business development at Jones Lang LaSalle Construction.

Purcell Joins Benesch

Chicago - Benesch has announced that Purcell Associates has become a part of Alfred Benesch & Company (Benesch), a multi-disciplined engineering and environmental services firm, headquartered in

San Francisco - Boston Properties and Hines has broken ground on the Transbay Transit Tower, a 60-story office building at Mission and First streets in San Francisco. At 1,070 feet, the tower is set to be the tallest on the West Coast and the seventh tallest in the nation, edging out New York City’s Chrysler Building. Pelli Clarke Pelli, a Connecticut-based architectural firm, designed the 1.4-million sf building. Clark Construction and Hathaway Dinwiddie will serve as general contractors. Together, the tower and the transit center form the new heart of a revitalized neighborhood.

Chicago. Combined, the firm is able to provide expanded services to clients and draw from a network of over 475 engineers, environmental scientists, and other professionals.

May Groundbreaking

Boston - Demolition is complete on the one-story warehouse behind Fenway Park to make way for the Boston Conservatory’s newest facility. A groundbreaking is expected in May for an 18,500sf building at 132 Ipswich St. that will include an

orchestra rehearsal hall, dance studios, and teaching and student spaces. Financing for the $35 million project was made possible by MassDevelopment, First Republic Bank and Zions Bank.

AIAri Appoints Robbins

Providence, RI - Vision 3 Architects announced that Christen M. Robbins has been appointed to the AIAri Board of Directors. She also serves on the Committee on the Environment. Robbins, a LEED Accredited Professional, joined Vision

3 Architects shortly after graduation as an intern architect. She is currently a member of the project teams for the addition/renovation of the Butterfield Dining Hall at the University of Rhode Island, as well as a new rehabilitation facility at Briarcliffe Gardens.

Christen Robbins

Independent ArchItecturAl hArdwAre SpecIfIcAtIonS

LEED Since 2003

BOSTON • SAN DIEGO • DOHA T: 781-899-8822

E: smessier@campbell-mccabe.com

www.campbell-mccabe.com

Independent Experts - Integrated Openings Consulting Specifications/Construction Documents

Total Openings • Architectural Door Hardware • Security Pre-schematic to Construction Administration

Serving World Class Architectural Teams Since 1866 Specifications • All Building Types • Code Compliance, Life Safety, ADA • Access Control Interface • Local, National, Global • Member: CSI, DHI, IBC, NFPA, SCUP • Certification Programs

IDENTITY DESIGNING A LANDSCAPE IS LIKE WRITING ABOUT A POWERFUL PERSONALITY AND SEARCHING FOR JUST THE RIGHT ANGLE TO MAKE THAT PERSONAL PORTRAIT COME ACROSS AS MEANINGFULLY AS POSSIBLE. – Galen Rowell

111 Huntington Ave. in Boston

www.high-profile.com

160 Boylston Street 3rd floor Boston, MA 02116 www.copley-wolff.com · 617.654.9000


April, 2013

Needham Elec. Opens 9th Branch

Nitsch Relocates

Boston Nitsch Engineering has moved into its new 18,000sf office at Two Center Plaza in Boston. Margulies Perruzzi Architects (MPA), provided site selection and interior design services for the project, which is expected to achieve LEED Gold certification. Nitsch had outgrown its previous space at 186 Lincoln Street in Boston and preferred an open, singlefloor layout to allow for greater collaboration and communication among its 80 employees. The new design enhances teamwork, allows for easy team realignments, and serves as a welcoming environment for clients, partners, and staff alike. The design strategy features two zones: 1) a public zone at the front of the suite for reception, technology-enabled conference rooms, and training spaces that

Reception area

Warren Patterson

support educational employee and client events; and 2) a private work zone with interior-placed glass-fronted offices and low-walled workstations to draw natural light deep into the space. The main training space doubles as the primary office café, melding Nitsch’s social hub with its primary training venue.

William Corso, 1963-2013

Methuen, MA - Merrimack Valley Corporation – Mechanical Contractor of Methuen announced the passing of William Corso. Corso started with the company as a service technician and worked his way up to service manager/vice president. He was instrumental in the growth and purchase of both Climate Design Systems of Haverhill and MatzRightway of Hampton Bays, N.Y.

7

Canton, MA - Needham Electric Supply has opened its ninth branch in New Hampshire. The new Hudson location, conveniently located at 13 Hampshire Drive, is a full-service branch including a 1,500sf counter and 5,000sf warehouse. Walter Mycroft, who joined Needham Electric in October 2012 and has 20+ years experience in the industry, has been named disNew Needham Electric branch in Hudson. N.H. trict manager. He will be responsible for managing Founded in 1974, Bristol County the day-to-day sales and operations as well Electrical Supply is a privately held electrias expanding the company’s footprint in cal distributor serving primarily residential southern New Hampshire. and commercial contractors in the greater With the recent acquisition of LaTaunton area. Marc Barney has been named conia Electric, a six-branch distributor in branch manager and will continue to manNew Hampshire, Needham Electric has age the day-to-day sales and operations. grown to 25 locations in Massachusetts, “We are thrilled to add our fourth New Hampshire and Vermont, and recently branch location in Southeastern Massachuannounced that it has acquired the assets setts and to welcome Marc and his team to of GTM Electric Supply of St. Albans, Vt. the Needham Electric family,” stated GregGTM will operate as Needham Electric ory Wilson, president of Needham ElecSupply. tric Supply. “We look forward to bringing GTM Electric, founded by Mark greater levels of service to our customers Bourbeau in 1991, is a privately held elecin this area and to new business opportunitrical distributor serving primarily residenties.” tial and commercial contractors in NorthIn the past four months Needham ern Vermont. Electric Supply has added nine new locaBourbeau has been named branch tions through organic growth and strategic manager and will continue to manage the acquisition including a new branch in Hudday-to-day sales and operations. son, New Hampshire and the acquisition of In addition, Needham Electric SupLaconia Electric Supply in New Hampshire ply has acquired the assets of Bristol Counwith six branches and one showroom. ty Electrical Supply located in Taunton, Mass.

cReative soLutions FoR ReaL estate Financing needs William Corso

Recently Closed Transactions

You’re The Boss!

CREATIVE SOLUTIONS FOR CREATIVE CREATIVE SOLUTIONS SOLUTIONS FOR FOR $4,854,000 Purchase Loan REAL ESTATE FINANCING NEEDS REAL REAL ESTATE ESTATE FINANCING FINANCING NEEDS NEEDS CVS

COMMERCIAL DIVISION COMMERCIAL COMMERCIAL DIVISION DIVISION

You deserve to keep your property’s interiors Haverhill, MA LocaL & RegionaL looking their very best. Which is why you should call peRmanent LoansL:Loans ppeRmanent eRmanent oans :: expeRtise: Kelly’s for top-quality interior refurbishments • Office• Buildings Office OfficeBuildings Buildings $4,000,000 Since 1994 the Commercial • Retail•Centers Retail RetailCenters Centers – all done to your exact specifications. Division has been involved in Buildings • Industrial Industrial Buildings Buildings Refinance and• Industrial Working Capital Loan Our skilled managers and craftspeople are ready for Real • Apartment Buildings arranging financing • Apartment Apartment Buildings Buildings LLocaL & R egionaL e xpeRtise : ocaL LocaL & R& egionaL RegionaL expeRtise expeRtise : :Pine Manor College - Agency & Conventional --Agency Agency && Conventional Conventional to plan and manage your project Estate right relatednow. transactions. Since the1994 Commercial Division Since the Commercial Division Since1994 1994 the Commercial Division Bridge Loans Bridge BridgeLoans Loans We’ll take care of all your painting, plastering has involved in arranging has been involved in arranging hasbeen been involved in arranging Chestnut Hill, MA financing forfor RealReal Estate financing for Real Estate financing Estate and carpentry, plus floor and wall coverings. constRuction LoansL:Loans cconstRuction onstRuction oans ::

LLC TM

Property types include: condominium construction, specialized properties. specialized specialized properties. properties. single family subdivision, office, retail, assisted living, hotel & RReLationships aRe ta het Bhe asis ReLationships Re t he Basis eLationships aRe Basis specialized properties. oo Fo usiness : : : F uR oouR FBo BuRusiness Business

Relationships Are the Basis Of Our Business:

Whether it is relationships with our capital sources or with our clients, we are constantly striving | www.Kellyspropertyservices to improve our dealings. .com

Kelly’s property services 508-958-2196

Kelly’s property services is fully licensed and insured in New england.

/ Condominiums / Condominiums • Subdivisions • Subdivisions Subdivisions / Condominiums Spec Houses Single Spec Houses • Single• Family SingleFamily Family Spec Houses

$800,000 Whether it isit relationships withwith ourwith Purchase &Loan Permanent Loans Loans Whether Whether is relationships it is relationships ourour • Construction • Construction Construction &&Permanent Permanent Loans capital or with ourwith clients, capitalsources capital sources sources or with or our our clients, clients, Medical Condominiums tax ettxempt BondsBB/onds tonds ax /ct weweareare constantly striving to to to ax ax exempt xempt /redits ax tax credits credits weconstantly are constantly striving striving improve ourour dealings. improve improve dealings. our dealings. Brookline, MA sBa LsBa oansLoans sBa oans WindW &ind soLar nergy W ind & sseoLar oLar eenergy nergy

Sid Spiegel Sid Spiegel Sid SidSpiegel Spiegel

Vice President - Commercial Division Vice President - Commercial Division Vice VicePresident President - Commercial - Commercial Division Division Phone: 781-684-5712 Phone:Phone: 781-684-5712 Phone: 781-684-5712 781-684-5712 Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com Sid.Spiegel@NEMoves.com rd Floor 52 Ave., 33rd 52Second Second Avenue, Floor, Waltham, MA 02451 52 52 Second Second Avenue, Avenue, 3rd 3rd Floor, Floor, Waltham, Waltham, MAMA 02451 02451 Waltham, MA 02451

www.high-profile.com

Tel:NY 781-878-4540 NE NY NE Tel: Tel:781-878-4540 781-878-4540 NY Proof REal EstatE JouRNal Proof Proof REal REal EstatE EstatE JouRNal JouRNal

New Proof Proof Approved Changes New New Proof Proof Proof ProofApproved Approved Changes Changes Section: fD

Size: 8x8

p 2”

ʼ

Property Services

pRopeRty stRuctuRe:

cc anan Fc inance anyany Fan inance Finance any pp RopeRty stRuctuRe : : : RopeRty pRopeRty stRuctuRe stRuctuRe

p 2”

Kelly’s Total Project services are ideal for: • Offices and meeting rooms • Hallways & lobbies • Auditoriums and atriums • Rental and condominium properties • Assisted living and nursing facilities • Educational and institutional buildings • Hotels and restaurants

• Office• Buildings Office OfficeBuildings Buildings $1,800,000 • Retail•Centers Retail RetailCenters Centers • Industrial Buildings • Industrial Industrial Buildings BuildingsLoan Refinance and Rehab • Apartment Buildings Property types include: • Apartment Apartment Buildings Buildings Property Property types types include: include: Lodging House condominium construction, singlesingle - Agency & Conventional condominium condominium construction, construction, single --Agency Agency && Conventional Conventional family subdivision, office, retail, family family subdivision, subdivision, office, office, retail, retail, MA LandBoston, cquisition /d eveLopment / construction LoansL: oansL:oans: La Land and acquisition cquisition /d /d eveLopment eveLopment / construction / construction assisted living, hotel &hotel assisted assisted living, living, hotel && related transactions. related transactions. related transactions.

p 2”

Tell us when and where and we’ll get right to work – After all, you’re the boss! any can Finance


April, 2013

8

Message from Michael Barnes, Publisher, High-Profile Monthly

Notes for Spring 2013

Apartment Rents This is our multi-residential focus, and the market is still strong. Axiometrics Inc. reports that the growth rate has slowed in 9 of the last ten months as many Metropolitan Statistical Areas (MSAs) are moderating from very strong rent growth the previous three years. Boston and San Francisco, two MSAs that consistently ranked in the top tier for revenue growth the past two years, recently dipped below the national average. Boston’s revenue growth softened during the first quarter of 2012 and has settled at a rate below 3.0%. AGC Indicators Point Upward Construction firms employed 5.78 million people in February, a gain of 48,000 from January and 140,000, or 2.5%, from a year ago. The industry unemployment rate, which is not seasonally adjusted thus is typically high in February, fell to 15.7%t last month, down from 17.1% one year ago. Prices for construction materials jumped in February, driven by extreme increases in items used in new housing and nonresidential building renovations, according to an analysis of new federal figures released today by AGC of America. Association officials said the increased materials prices are hitting contractors struggling to recover from a years-long downturn in construction demand.

Boston & Cement Masons Local 534 serving: serving: MA, MA, NH, NH, ME ME & &VT, VT, Boston Plasterers’ Plasterers’& America’s Building and Construction International America’s OldestOldest Building and Construction TradesTrades International UnionUnion Since 1864 Our trained and skilled craftsmen are just a phone call away. Since 1864 We offer responsible, highly qualified competent personnel, Ourreliable, trained and skilled craftsmen are justand a phone call away. state certified apprenticeship andhighly training program. membership. We offer reliable, responsible, qualified andOSHAcertified competent personnel, state We are and committed quality and performance. certified apprenticeship trainingtoprogram. OSHA certified membership. We and performance. Sub Contractors are committed to qualityPlasterers:

Sub A1Contractors Concrete Cutting A1 Concrete Cutting Angelini Plastering Angelini Plastering Austin Ornamental Inc. Austin Ornamental Inc. BackBay BayConcrete Concrete Back Bidgood Assoc. Bidgood Alloc. CapeCod CodPlastering Plastering Cape CavalieriConst. Const. Cavalieri CenturyDrywall Drywall Century Components ComponentSpray SprayFireproofing Fireproofing DD&&MMConcrete Concrete East EastCoast CoastFireproofing Fireproofing F.C.F. Concrete H. Carr & SonFloors G & G Plaster & EIFS Island Lath & Plaster H. Carr & Son J.R.J.Lath Construction Island & Plaster John L. Ciman & Son J.R.J. Construction J.L. L. Marshall John Ciman & Son M.L. McDonald Co. J.L. Marshall M.L. McDonald Mass AcousticsCo. Inc. Mailoux Bros.Concrete, Construction Marguerite Inc. Mecca Const. Corp. New England Decks New NewEngland EnglandDecks Finish Systems Polcari Plasterworks, Inc. Ricmor Construction, Inc. Ricmor Construction, Inc. S & F Concrete S & F Concrete StaffordConstruction Construction Stafford

www.high-profile.com

Veneer Plaster Plasterers: Venetian Polished Plaster Veneer Plaster Three coat conventional Venetian Polished PlasterPlaster Ornamental Plaster Three coat conventional Plaster Historical Restoration Ornamental Plaster & Preservation E.I.F.S. Historical Restoration & Preservation Portland E.I.F.S. Cement (Stucco) Fireproofing Portland Cement (Stucco) Fireproofing Cement Cement Masons: Masons: Flatwork Flatwork Sidewalks Sidewalks Pool Pool Decks Decks Decorative Decorative Concrete Concrete Overlays Overlays Stamped Concrete Stamped Concrete Concrete Concrete Repair Repair & & Restoration Restoration Epoxy, Seamless Epoxy, Seamless and and Composition Composition Flooring Flooring *and *and much much more* more*

More Information Please ForFor More Information Please CallCall Peter Stracuzzi, Jr. Industry Analyst Peter Stracuzzi, Jr. Industry Analyst Office: 617-825-5200 • Cell: 617-750-0896 Office: 617-825-5200 • Cell: 617-750-0896 Website: www.opcmialocal534.org Website: www.opcmialocal534.org

May Groundbreaking Demolition is complete on the onestory warehouse behind Fenway Park to make way for the Boston Conservatory’s newest facility. A groundbreaking is expected in May for an 18,500sf building at 132 Ipswich St. that will include an orchestra rehearsal hall, dance studios, and teaching and student spaces. IIDA in May In this issue of High-Profile Monthly we are announcing the winners of the annual International Interior Design Associates (IIDA) awards. If this sparks your interest you might Chester Elton want to attend its next event. IIDA Boston will host its annual Business Leader’s Breakfast May 2 at the Westin Copley in Boston. Keynote speaker Chester Elton will be speaking on Getting Your People “All IN!”: How to create a high performance culture and drive Big Results. For details visit www.iidane.org. Tsongas Awards Each May, Preservation Massachu-

setts holds an awards dinner to recognize and celebrate the efforts and accomplishments of those individuals and organizations that have made significant contributions to preserving the commonwealth’s historic resources. This year’s Tsongas Awards awards will be the beginnings of a three-year thematic program that will honor the people behind the scenes. From identifying important historic resources for restoration to breaking ground, from design and restoration work through the grand opening, the work of preservation truly takes a village, with the finished building being a collective success for its team members and the surrounding community. In 2013, the society will honor 25 firms and individuals whose “behind-thescenes” front-end work helps take a project from conceptual idea through to groundbreaking. In 2014, the society will focus on the design and restoration work that transforms these historic resources and gives them new life, and in 2015, the society will celebrate the finished projects themselves. Hospital Facilities MHA’s 7th Annual Hospital Facilities Conference will be Thursday, May 9, 9 a.m. – 2:30 p.m. at the MHA Conference Center at Executive Park, Mass. Featured presentations include: • Operational and Facility Disaster Resiliency for Hospitals Panelists: Christine Packard, Deputy Director, Emergency Management Services, Mass. Emergency Management Agency (MEMA) Peter Cusolito, CEM, CFM, Sr. Security & Emergency Preparedness Planner, VHB. Invited: Timothy McDonald, Dept. of Public Health Hospital Preparedness Coordinator and representatives from two hospitals • Case Study: Baystate Health’s Hospital of the Future Project Michael F. Moran, V.P., Facilities & Guest Services will represent Baystate Health, a 640,000sf, $296 million project that came in on time and on budget. • Innovations in Healthcare Construction, including a look at Integrated Project Delivery, presented by Sarah P. Bryant, Partner, Murtha Cullina, LLP, Loring A. Cook, III, Partner, Murtha Cullina, LLP and Andrew Quirk, RA, FHFI, Sr. VP & National Director, Healthcare Center of Excellence. In the United States, Integrated Project Delivery (IPD), which seeks to align the interests, objectives, and practices between the owner, architect, and construction manager of a construction project, got its roots in the healthcare industry. This presentation explores what IPD is and whether it is right for your audience’s next project.


April, 2013

9

Your construction site. No hassles. No worries. No surprises. Imagine that‌

At Canam, this is how we operate.

Over the last 50 years we have developed a fast, reliable construction method that adapts to all your commercial, industrial, institutional or multi-residential projects. Whether you are building structures, floors, walls or steel building envelopes, our construction solutions are simple and straightforward. So you don’t get any surprises.

1-877-499-6049 canam-construction.com

www.high-profile.com CANAM 30139_HighProfileCorpoAN_A01.indd

Paul (227) Olivier (240)


April, 2013

10

High-Profile: Facilities Development News

Coull Tops Off Office Addition

Hopkinton, MA - JM Coull, Inc. celebrated the completion of the structural steel frame of the 40,000sf office addition for PerkinElmer as part of the development of the company’s new Personalized Health Innovation Center of Excellence. The center will focus on accelerating scientific innovation to help researchers who are working to eradicate disease and extend the quality and longevity of life. A topping off ceremoFinal structural steel beam is ready for placement ny was held on site in honor of JM Coull employee Dan Mahoney, who recently underwent a bone marrow transplant. He has been a member of the JM Coull team for nearly 20 years but has 40 years of experience in the mechanical systems industry and technical systems design and construction. His expertise has been a primary factor JM Coull President Andrew Coull addresses the gatherin JM Coull’s success in the ing at the topping-off ceremony. With him are (l) Bruce advanced technology industry. Bal, executive VP, PerkinElmer, and Marc Moschella, Project manager Marc JM Coull. Moschella coordinated the Working with Gorman Richardson ceremony commemorating Lewis Architects, JM Coull recently comthe placement of the last beam in honor of pleted renovations to an existing suite Mahoney, who continues to move forward of cleanrooms and gowning room for with his battle. The beam displays an imPerkinElmer and continues to work on age of Mahoney and messages from friends renovations and other additions to the and co-workers. Hopkinton site.

ULTREX® FIBERGLASS WINDOWS AND DOORS Integrity Fiberglass Windows and Doors offers you the best low maintenance products for your multi-residential and assisted living replacement and new construction projects. Durable, sustainable with unbeatable performance... choose Integrity today.

Contact us today for a free sample of Ultrex® Fiberglass www.integritywindows.com/ultrex-fiberglass

www.high-profile.com

Jewett Renovates Marlboro Nissan Designed by Curtis

Rendering of the renovated Marlboro Nissan

Marlborough, MA - Jewett Automotive Design & Construction, a division of Raymond, N.H.-based Jewett Construction Company, Inc., has begun an extensive, five-month renovation of Marlboro Nissan in Marlborough, Mass. Designed by the Curtis Architectural Group of Newton, the renovations include demolition of the existing showroom building and construction of a new, open, twostory showroom with a second floor office mezzanine. The building frame is of structural steel with the front façade comprised of aluminum composite panels over light gauge metal framed walls, which will give it the familiar Nissan look. Side walls will be skinned with insulated metal panels, providing an attractive,

Curtis Architectural Group

cost effective wall system, and a white roofing membrane will provide heat reflection for energy savings during warmer months. The interior will be finished with ceramic tile floors, carpeting, and millwork. New lighting, as well as HVAC, fire protection, and electrical systems, are designed to create an inviting and comfortable environment for customers and employees. Siding and aluminum composite metal panels will be installed by the Jewett Metal Buildings & Steel Erectors division. The facility will be in full operation while the construction takes place, with project operations tailored to allow for minimal disruption to the client’s customers or employees.


April, 2013

11

Nadeau Awarded Nat’l Guard Projects

Camp Edwards, Massachusetts Nadeau Corporation Construction, Development, and Engineering, located in South Attleboro, has been awarded a contract by the Massachusetts National Guard as the general contractor for renovations to the bachelor officer quarters, Building 1200, at Camp Edwards. The project involves hot water improvements, HVAC upgrades, and electrical advancement along, with aesthetic amenities such as refinishing or installing new flooring, new light fixtures, new showers, kitchen cabinets, and countertops. The project involves 6,800sf worth of remodeling, which will include two new latrines, a new standing seam metal roof, expansion of a dishwashing room, and refurbishing the existing dining hall floors. New HVAC, electrical, plumbing, and structural support for an existing mezzanine will be installed as well. Some additions were also selected by the National Guard, initiating Nadeau to modify four existing coolers into one unit, replace all exterior lighting with new lighting, and replace all windows in the building. Nadeau Corporation’s project manager, David D’Angelo, will be taking on the venture for the National Guard to ensure the strict safety standards, as well as the high quality of work set by the US Army Corps of Engineers, is met.

High-Profile: Facilities Development News

Stretching at the Seaport Square

by Alfonso Hernandez Seaport Square has become one of the most sought-after development areas in and around Boston. This new and exciting neighborhood, created from 23 acres of undeveloped (and underdeveloped) land in South Boston’s Seaport District, was master planned to ofAlfonso Hernandez fer world-class office and research spaces, retail, restaurants, shops, residences, hotels, parks, and other recreational areas on Boston’s waterfront. The developers, along with city and state officials, had a vision to create a very sustainable neighborhood. To this end, during the master planning, the developers worked very closely with MEPA to create a variety of design requirements that would have to be implemented during each block development. Working in the area, there are some interesting correlations with current city and development design requirements that future development teams will need to keep in mind. For instance, because the development is located within the city of Boston, most of the properties that would be designed in this area have to meet the Stretch Energy Code and BRA Articles 37 and 80.

The development and design team have to account for optimization of Building’s Energy Performance and Greenhouse Gas Emissions, among others. We found that we exceed the city’s Stretch Energy Code and BRA Article 37 by virtue of meeting the development’s energy requirements. BRA’s Article 37 requires that new buildings be “LEED Certifiable,” a structure that is planned, designed, and constructed to achieve the level “certified” using the LEED building rating system most appropriate for the proposed project. Projects in Seaport Square required LEED Certification, therefore exceeding the city’s

covery systems on all central ventilation; energy-efficient HVAC systems, including VFD, water use reduction, lighting power density reduction, and room lighting / temperature control (for hotels), among others. The important aspect to keep in mind is that the project’s energy, energy cost, and greenhouse gas emission requirements are best fulfilled through a holistic approach to the building design. By coupling the architectural massing, envelope components, and orientation, along with the support mechanical, electrical, and plumbing system that the project code requires, goals, and operational intent can be fulfilled. The upfront planning, challenging of the design, and optimization ...the project’s energy, energy cost, and greencan bring real savings and occuhouse gas emission requirements are best pant benefits for years to come. fulfilled through a holistic approach... We are finding that, although Seaport Square development has a greater sustainable requireminimum requirements. ment than the city’s, it has become much A byproduct of the LEED require- easier to achieve many of the basic LEED ment is that the development requires and other sustainable designs on projects buildings to use 21.5% less energy than re- throughout the industry. quired to meet the state building code. This This is why we see many municiworks well, since the city of Boston has ad- palities across the Unites States adopting opted the Energy Stretch Code, which re- similar sustainable design features as part quires buildings to reduce energy by 20% of their developments. over the state’s energy code. It’s an exciting time to see our local The development and design teams neighborhood being transformed into the have often met these requirements by pro- next generation of the built-environment. viding an optimized envelop design that Alfonso Hernandez is a project manincludes high-performance glazing, walls, ager at Vanderweil Engineers, Boston. and roof assemblies in addition to heat re-

General Contracting / Construction Management / Design-Build

Great building starts here.

Capen Court, Somerville, MA Modular construction of a multi-story, 95-unit affordable living building for seniors

CTA Construction Co, Inc.

1432 Main Street Suite 204 Waltham, MA 02451 781.786.6612 www.ctaconstruction.com RESIDENTIAL

COMMERCIAL

Shire Human Genetic Therapies, Building 200 Architect: Jacobs

ACADEMIC

www.high-profile.com


April, 2013

12

High-Profile: International Interior Design Awards New England

IIDANE 2013 Interior Design Award Winners

Boston - IIDA New England announced the winners of the 2013 Interior Design Awards. Created in 2007, the event celebrates teamwork and showcases interior design projects throughout New England. This year the Design Awards received a record 63 entries. Awards were presented in 11 categories; nine professional and two student. The winning entries and their teams are: Best in Show - A Growth Equity Company. Visnick & Caulfield; Corderman & Company; Northstar Project & Real Estate Services; Wright Millwork; Communications Design Associates, Inc.; Ripman Lighting Consultants Best Office Over 80,000sf – Communispace. Spagnolo Gisness & Associates, Red Thread - Steelcase Furniture; Structure Tone; Diversified Project Management; McNamara Salvia; AHA Engineering. Best Office 30,000 - 80,000sf - A Growth Equity Company. Visnick & Caulfield; Corderman & Company; Northstar Project & Real Estate Services; Wright Millwork; Communications Design Associates, Inc.; Ripman Lighting Consultants Best Office Under 30,000sf - Markley Group, LLC. ADD Inc; R.G. Vanderweil Engineers, LLP; Commodore Builders; RedThread; Bentley Prince Street Carpet; Reflex Lighting. Best Multi-Unit Residential Design - Orchard Cove. DiMella Shaffer; Continued on next page

500 BOYLSTON STREET FLOOR 2 BOSTON, MA. 02116 T 617.457.0990

www.vca-arch.com www.high-profile.com

Best in Show - A Growth EquityCompany

Also Winner for Best Office 30,000-80,000sf Best healthcare design Amplatz Children’s Hospital

Photos courtesy Visnick & Caulfield

Robert Benson

Best multi-unit residential design Orchard Cove


April, 2013

13

High-Profile: International Interior Design Awards New England

IIDANE 2013 Interior Design Award Winners

Continued from previous page

Commodore Builders; AKF Group LLC; Collaborative Lighting, LLC. Best Private Residential Design Newton Residence. Kristen Rivoli Interior Design; LDa Architects; Macomber Carpentry & Construction; Venegas & Company. Best Research/LabDesign - Verizon Innovation Center. NELSON; John P. Moriarty & Associates; Downstream Design & Technology; WB Engineering & Consulting, PLLC; Cavanaugh Tocci Associates; Horton Lees Brogden Lighting Design . Best Hospitality/Retail Design - The Langham, Boston. CBT Architects; Columbia Construction Company; Horton Lees Brogden Lighting Design; Walter A. Furman, Co.; JAJ Co Inc. Best Healthcare Design - Amplatz Children’s Hospital, University of Minnesota | Fairview Health Services. Tsoi Kobus & Associates; HGA; Kraus-Anderson Construction Company; Meyer-Borgman & Johnson; Jacobs Engineering Group; Hedrich Blessing Photographers. Best Education Design - Slippery Rock University of Pennsylvania. Sasaki; DRS Architects; Gateway Engineers; LAM Partners, Inc.; Hammer Design Associates; CJL Engineering. Best Graduate Student Design Hisham El Bassiouni. Suffolk University Collaborative Design Center, NESAD. Best Undergraduate Student Design - Sarah Gosson. Bonobos Pop-up Shop. NESAD STI_High-Profile_Fin.pdf 1 9/27/2010 10:42:19 AM

The Langham - Champagne lounge

Richard Mandelkorn

Best hospitality/retail design - The Langham

Mike Diskin

Best Office Over 80,000sf - Communispace

617-348-2800

www.high-profile.com


April, 2013

14

High-Profile: Facilities Development News

Suffolk Tops Off Logan Project

Topping off the new rental car center

component of the project scope, which also includes a reconfigured taxi pool, roadway and intersection improvements, site access improvements, and landscaping. The individual rental car bus fleet and Massport shuttle bus fleet will be consolidated from more than 100 buses to just 28 with alternative fuel buses. The new bus fleet will help to alleviate road and curb congestion for a better customer experience, and reduce vehicle emissions to better our environment. To accommodate the project, the existing Gage Gourmet flight kitchen has been demolished and the bus/limo pool and taxi pool have been temporarily relocated to another area in the airport. Construction of ConRAC began in June 2010. Beneficial occupancy is scheduled for late 2013, while construction will be completed September 2014.

COLL ABOR ATE.

Boston - Suffolk Construction recently celebrated the topping off of the 50-acre rental car center at Boston’s Logan International Airport. Suffolk is managing construction of the Massachusetts Port Authority’s $300 million complex to consolidate Logan’s rental car facilities. The Rental Car Center project (titled the Consolidated Rental Agency Complex or ConRAC) includes construction of a four-level, 1.2 million sf precast parking garage and 112,000sf customer service building that will house all rental car companies and their vehicles serving Logan in one convenient location. Maintenance/ storage areas for rental car operations, referred to as Quick Turnaround Areas, will provide fueling, car washing, and cleaning facilities as well as vehicle storage. While the construction of these buildings is a significant undertaking, it is only a

Suffolk Construction

w

We create working environments that encourage our teams and partners to work together as one. At Suffolk, we understand that working collaboratively is the reason why we succeed…and how we build smart.

www.suffolkconstruction.com

www.high-profile.com

Marriott Inn on Schedule Pro Con Architect and CM

Needham, MA - Construction is continuing on schedule for the new 128-room Residence Inn by Marriott hotel in Needham, located at the intersection of First Avenue and B Street in the New England Business Center office park. The hotel, which is being developed by Waterford Development Corporation of Needham, is part of a redevelopment plan by Normandy Real Estate Partners that includes four new office buildings, the hotel, and two parking garages to be built in the business park over the next few years. Pro Con Inc of Manchester, N.H., is the architect and construction manager for the $13.5 million design build hospitality project, which is owned by SXC Needham Inn, LLC. “The roof is complete and the windows have been installed, making the building weather-tight,” stated the project manager for XSS Hotels LLC. “The interior framing is complete and we expect to begin sheet rocking by mid-March. We continue to be on schedule for a late July completion.” Pro Con Inc has designed the Needham Residence Inn to achieve LEED certification. The 89,740sf hotel is being built using regional and recycled materials in construction and is incorporating environmentally friendly design elements such as a white roof, over-sized windows, low-flow, water-efficient plumbing fixtures and LED lighting throughout the development.

Marriott Inn under construction The building’s first floor will house the hotel’s lobby and reception, common areas, and conference rooms. Upper floors will house guest rooms. The hotel will offer 116 urban studios, eight one-bedroom suites, and four two-bedroom suites, with a large hearth room, bar and lounge area, breakfast room, indoor pool and fitness room, two flexible space meeting rooms, business center, and guest laundry area. Plans call for the hotel to have covered parking for 22 vehicles and surface parking for 80 vehicles. The hotel, which is conveniently located off of Route 128, will serve both business and leisure travelers. The exterior design will feature precast concrete blocks, brick veneer, insulated metal paneling, and cornice molding. The hotel’s main entrance will feature a canopy with metal panels and double sliding glass doors. Construction on the site began in August 2012. The hotel is scheduled to be completed in July 2013 and plans to open in August 2013.


April, 2013

15

High-Profile: Facilities Development News

Shawmut Tops Off New School DiNisco Design Architect

Lexington, MA - Shawmut Design and Construction celebrated the recent completion of framework for the new Estabrook Elementary School in Lexington with a topping-off ceremony in March. The ceremony was attended by hundreds of students and community members from Lexington who watched as the final beam, signed by Estabrook students, was raised and locked into Students and members of the school commuplace by steelworkers. nity look on as the final beam is raised on the The Lexington Permanent Buildnew Estabrook Elementary School. ing Committee selected Shawmut to build the new 92,000sf school in the fall of 2012. DiNisco Design Partnership, the architect of record, designed the school to include speech assistance in all classrooms, high-efficiency heating and cooling systems, and exterior sunshade systems on all windows. The project is on Students wrote cards and thank you letters to track to receive LEED Silver certification. the project team that built their new school.

ACEC/MA Awards MA - On

Cambridge, March 20, the American Council of Engineering Companies of Massachusetts (ACEC/MA) announced the recipients of the 2013 Engineering Excellence Frank Monkewicz Photography Awards along with several oth- Ko Ishikura, PE; ACEC/MA president (Green International er awards. Affiliates, Inc.), Frank DePaola; PE, MassDOT highway ACEC/MA presented administrator, Dennis Baker, PE (HNTB); Para Jayasinghe, the awards in a ceremony at the deputy commissioner - Boston Public Works Dept.; Joey Royal Sonesta in Cambridge. Breton, PE (HNTB); Peter Piattoni (URS Corporation)

Market Basket Nears Completion Pro Con CM - Prellwitz/Chilinsk Architect

New Market Basket Bedford, NH – The new 78,500sf Market Basket store located at 539 Donald Street at the intersection of Route 114 in Bedford, is nearing completion. RMD Inc. of Tewksbury, Mass., is the developer for Demoulas Super Markets Inc. and the Market Basket stores. Prellwitz/Chilinski Associates Inc. of Cambridge, Mass. is the project architect, and Pro Con Inc.of Manchester, N.H., is the construction manager for the project The new store is conveniently located near the intersection of routes 101 and

114. The store will feature a Market’s Café, a Market’s Kitchen, and an in-store bakery. Oversized store-front windows allow natural light into the building and high efficiency lighting fixtures illuminate the aisles. The building’s exterior features Hardie plank siding and ground face block. This is the second Market Basket supermarket Pro Con Inc has managed for DeMoulas Super Markets. In March 2012, Pro Con Inc completed a 100,000sf Market Basket store on Elm Street in downtown Manchester, N.H.

• D/Bu • Cu M • Cu Sv • Dv Highbridge Hill Elementary School New Ipswich, NH

1

Barker Architects, Inc.

one integrated design—one beautiful result.

Wessling Architects has it all covered

How can you execute a successful building project, avoiding all the usual hassles, and fullfilling your original vision of beautiful, effective architecture? The solution is to address the entire project as one integrated design.

Call Today to Explore Concepts, Budgets & Feasibility:

Call Lars Traffie: (603) 878-2300

.HuCu. P.O. Bx 257 | 810 Tuk R | N I, NH 03071

under one roof.

This total approach enhances the design process and protects your interests not only due to efficiency, but also through comprehensive professional strong Proud designerservices, of TD Garden’s communication, and a deepernew reliance on partnering. eco — friendly roofing system.

PROFESSIONAL SERVICES

ARCHITECTURE

BUILDING RESTORATION

INTERIOR DESIGN

Presidents Place, 1250 Hancock Street, Suite 815, Quincy MA 02169 (617) 773-8150

www.wesslingarchitects.com

www.high-profile.com


April, 2013

16

High-Profile Focus: Multi-Residential/Senior Living

Refining an Affordable Model for Assisted Living

by Garth Johnson and Clay Benjamin Smook

Garth Johnson

Clay Benjamin Smook

“Affordability” is a concept often misunderstood. It requires a nuanced explanation. The most common question about assisted living cost: “What’s the cost per square foot?” The fact is, assisted living residents aren’t buying square feet – they’re buying units with services. And astute owners (and funding sources) base affordability on all-in cost – including operations in comparison to revenue. Better metrics of affordability are cost per unit – plus understanding the project’s rent target in relation to the median household income in the area. For success, this more comprehensive view of project affordability is crucial – and understanding how design and construction decisions flow from the affordability “target” is critical. Using Christopher Heights in Marlborough, Mass as our model, eight key factors were identified as essential to an affordably built project. • Understand the owners/operators model for building configuration and care. Owners Grantham Group LLC had the benefit of having built three similar facilities in Massachusetts (Attleboro, Webster and Worcester). This experience taught them the most desirable unit mix and configuration, building size, and amenities. They learned that efficient staffing, including 24-hour care, 2 hours of personal care, and a dedicated activity director – meant lower operational costs. Meal service was most efficient through the utilization of a family dining model. Through experience, they understood the necessary elements for affordability; they had their target. • Assemble the right team. The owners and their project manag-

er, Potomac Capital, enlisted the seasoned team of Cutler Associates as construction managers and SMOOK Architecture as master planners/architects. Our team approach was an open but demanding process; clear goals were set early, milestones established, and tasks assigned. The team worked strategically, developing the initial plan, attaining financing, securing permitting, finalizing working construction documents, and ultimately building the facility. Individual accountability was vital, and the mission clear: construct a cost-effective, architecturally appealing building. In-other-words, the entire team “bought into” the owner’s affordability answer. • Secure appropriate financing. Total project cost affordability must take into account both soft and hard costs, including: land acquisition, financing, design, and construction – in addition to costs associated with long-term facility operation and staffing. The Christopher Heights model utilized two low income tax funding sources: Low Income Housing Tax Credits (LIHTC) and Home Funds, and in doing so, the overall debt service on the project was reduced well below conventional financing methods. Keeping the land basis low was essential to success. Land cost must be financed through conventional means or upfront capital, as it’s not considered in the calculations for LIHTC. Finding sites in the correct demographic with favorable land acquisition costs or ground lease terms is difficult, especially in the northeast. • Use effective and strategic site planning. The land purchased for Christopher Heights was a brownfield site, and remediation was completed by the city of Marlborough prior to conveyance. The project was to be a marquee building for the Christopher Heights brand and a showcase for successful revitalization. With a slope of approximately 12 feet, the site provided a strategic master planning opportunity with the creation of a walk-out lower level. A central kitchen, mechanical and other service spaces were tucked below the building without absorbing precious ground level space. Some difficult uses bounded the site, including a run-down convenience store, a firehouse, and homes in disrepair.

• PLANNING • ARCHITECTURE • CONSTRUCTION Integrated Construction Solutions for Senior Living Worcester, MA | Tampa, FL 508.757.7500 | CutlerAssociatesInc.com

www.high-profile.com

Christopher Heights A site plan with a central courtyard as the main drop off and entry to the property was integral in mitigating the negative visual impact of the surrounding parcels. • Revisit previous success stories. The team leveraged the success of the owner’s three prior projects to streamline the design and preconstruction process of Christopher Heights. For example, mechanical, electrical, plumbing, and fire protection systems were done design-build to maximize efficiency and economy. • Strategically use private and public spaces. Another key to the Christopher Heights model was managing the gross square footage of the building without compromising unit sizes. The 83 bed facility maintains an incredibility high efficiency of 662sf per unit, versus the sector standard 750-875sf per unit. This was accomplished through the strategic use of public spaces within the building, with “country kitchens” on each floor serving alternately as family dining, gathering spaces, or entertainment venues, for example. • Design a cost effective building and skin. The structural system, comprised of tube steel columns, steel beams, and open web steel joists with composite deck, was incredibility efficient. The foundation was

designed with few jogs. Articulation of the building exterior and architectural scale was achieved through the use of cantilevered bays, trussed roof elements perched on a predominately flat roof, and the creative use of varying colors and textures of vinyl siding. • Control the costs of interior fit-out. Public areas received visual “punch” with enhanced wall, floor, and ceiling treatments. Elsewhere, efforts were made to minimize drywall soffit conditions and wall articulation. A residential heating system was also employed. • Bottom line… While the standard in assisted living at the time was between $105,000 and $125,000 per unit, Christopher House was finished at $94,000 per unit; a 10% to 25% cost savings. Affordability requires taking deliberate steps like those outlined above, to hit a price point that meets funding requirements and that makes unit prices attractive to seniors and their families. Garth Johnson, LEED-AP, HCC is VP Senior Living and Healthcare at Cutler Associates, Inc. of Worcester. Clay Benjamin Smook AIA, LEED-AP BD+C is a principal at SMOOK Architecture & Urban Design of Boston. Cutler and SMOOK also will be teaming on the new Christopher Heights Facility in Northampton.


April, 2013

17

High-Profile Focus: Multi-Residential/Senior Living

Integrated Bldrs Nears Completion J.M. Electrical Completes BHA Project O’Sullivan Architects

Cambridge, MA – Rockland-based Integrated Builders is in the final stages of constructing The Emerson Lofts, a 16 unit condominium development located at 22 Cottage Park Ave. just outside the lively Davis Square neighborhood in Somerville. The $9.5 million project is scheduled for a May 15 completion with occupancy expected for the beginning of July. Emerson Lofts is an adaptive reuse of the former J.H. Emerson Company factory (which developed and manufactured the original Iron Lung), that was built in 1909. Integrated Builders is redeveloping the new building according to LEED certification standards by incorporating top-to-bottom sustainable features, including a high-performance TPO (white) roof, energy-efficient HVAC systems, and double-hung insulated glass windows. Renovating a historical building presents a unique set of structural issues, according to Jay Dacey, president of Integrated Builders. “Anytime you take an old woodframe building and update it to conform to current codes, there are going to be lots of challenges,” he said. “We put in an elevator, upgraded the building to earthquake and seismic codes, and a lot of structural steel went in – there were some difficult aspects to this job.” Built in 1909, the structurally sound three-story brick factory building received a complete overhaul of all systems, with all new utilities and mechanical systems,

Commercial

Retail

Interior living quarters at Emerson Lofts a brand-new passenger elevator, noise and weather insulation, and all of the corridors and public spaces were made handicapaccessible. The exterior of the building will have drought-tolerant plantings and landscaping. Beneath the parking lot is a new stormwater retention system, which, along with roof drains on the building, helps minimize surface runoff into Cambridge storm drains. Bike storage for each condominium unit is provided inside the building, with 12 additional bike parking spaces outside. “It was a total top-to-bottom renovation,” said David O’Sullivan, AIA and president of O’Sullivan Architects, whose firm did the design. “We’ve got the good mix of a traditional mill building with nice wood beams and columns and exposed brick interior walls enhanced by energy-efficient systems and windows, so you’ve got the character of the building coming through – combined with the modern energy efficiency.”

Educational

Historic

Hospitality

Charlestown, MA - J.M. Electrical Company, Inc., has completed construction and project operations at the Boston Housing Authority (BHA), located at 55 Bunker Hill Street in Charlestown. The Lynnfield-based specialists installed Alerton controls, emergency lighting and wiring for new energy-efficient boilers in 24 buildings in the largest community for low- and moderate-income housing. This portion of the work was completed as part of the BHA’s $63 million energy performance contract with leading energy-efficiency and renewable energy company Ameresco, Inc. According to a recent study conducted by the Department of Housing

The new installation will reduce energy costs by 10%.

and Urban Development, public housing is, on average, less energy-efficient on a per-square-foot basis than all other US residential households. Reducing public housing energy costs by 10% could save nearly $200 million per year in operating expenses. The BHA has participated in earlier energy performance contracts that saved it more than $17 million. Those contracts allowed the BHA to fully replace the original 1938 heating system at the Mary Ellen McCormack development in South Boston, as well as upgrade heating and water systems at BHA state-funded developments throughout the city.

Healthcare

Municipal

Manufacturing

Industrial

Mixed-Use

Residential

Existing Conditions As-built Drawings 2-D/3-D 3-D Models & BIM 3D Laser Scanning Scan to BIM

Existing Conditions Surveys, Inc.

BOMA & Square Foot Calculations

Architectural Existing Conditions Documentation Boston/New England (Main Office) phone: 617.247.9161

www.existingconditions.com www.existingBIM.com

Providing Architects, Engineers, Building Owners and Real Estate Professionals with the most accurate as-built documentation and Building Information Models. We deliver drawings or models using your in-house office standard so you can begin working immediately upon delivery.

Boston

New Jersey

Albany

New York

Philadelphia

Washington D.C.

Raleigh

Durham

Chicago

Palm Beach

www.high-profile.com


April, 2013

18

High-Profile Focus: Multi-Residential/Senior Living

Allen & Major Completes Project

Arlington, MA - Allen & Major Associates, Inc. has provided land survey, civil and structural engineering, environmental consulting, and landscape architectural design services to WP East Development Enterprises LLC for the redevelopment and reuse of the former Brigham Ice Cream factory on Mill Street in Arlington. The new residential development has been aptly named Alta Brigham Square. The135,000sf development consists of a 116-unit podium-style building with 76 surface parking spaces and 89 garage-level spaces below, an adjacent one-story retail space and a direct connection to the Minuteman Bikeway. The project incorporated attractive landscape features in the courtyard and the upper retail plaza which connects to the bike path. These features include wooden pergolas, stone veneer sitting walls, unique plantings, a fire pit, a barbeque area, exterior furniture, and interesting stone paving patterns for visual effect. Environmental considerations included a planted wet water quality swale to capture and treat stormwater runoff which was specifically engineered to perform pollutant removal functions but is uniquely designed so it also becomes a landscape feature. The building structure itself consists of four stories of wood-framed construc

WinnDevelopment Opens Phoenix Apts DBVW Project Architect

Alta Brigham Square

Phoenix Apartments Providence, RI WinnDeveltion over a one-level parking area. The design was accomplished with a free standing opment, the real estate development structural steel frame and elevated concrete arm of WinnCompanies, in conjuncslab “podium,” which supports the four- tion with its nonprofit joint venture story, wood-framed residential building. partner, Omni Development CorpoStructural design services for this project ration, announced the opening of also included the retail building design and Phoenix Apartments in Providence’s analysis of the existing site retaining walls West End neighborhood. Formerly and bridge. Several site improvements to Medina Village Apartments, this the project were designed to enhance the project is an 83-unit scattered site overall character of the area surrounding affordable rental housing developthe project while providing stormwater ment that consists of 26 multifamily mitigation, including: placing utilities un- walk-up buildings spread out across View of renovated apartment interior derground, constructing additional flood five blocks. Each building has three residents will benefit for many years from storage capacity for the Mill Brook, pro- or four units with one to four bedthese new HUD Section 8 apartment.” viding improved stormwater drainage on rooms. The development team completed To maintain the HAP contract unit the parcel, reducing impervious areas on the property by 0.75 acres or a 24% reduc- significant renovations and new construc- mix, nine new buildings were constructed tion, and creating an on-site gathering node tion at Phoenix Apartments. When con- to replace the units lost to demolition. In with a kiosk and seating areas along the struction began on January 1, 2012, a ma- addition to the 26 buildings and three parkjority of the 22 existing buildings were not ing sites, the redevelopment plan at Phoebikeway for public use. habitable. Seven of the 22 buildings were nix Apartments also includes 3,148sf of demolished, and nine new buildings and nonresidential space to be used as a propthree new parking sites were constructed. erty management office, central laundry Additionally, 17 buildings underwent gut facility, and a community room. rehabilitation. Seven of these properties The project utilized green, energywere de-densified, resulting in a reduction saving building techniques, and two buildof units and/or a reduction of bedrooms. ings are part of National Grid’s Deep EnThe renovated units feature state-of-the-art ergy Retrofit program. kitchens and bathrooms, as well as ample The project’s architect, Durkee, closet and living space. Brown, Viveiros & Werenfels Architects “Along with our valued partners, we (DBVW), contractor, Pezzuco Construcare proud to be completing this most am- tion, Inc., and housing consultant, Barbara bitious urban development initiative,” said Sokoloff Associates (BSA), all played in O: 617.269.7200 Joseph Caffey, president of Omni Devel- instrumental role an bringing this project W:marrcompanies.com opment and managing partner of Phoenix to completion. WinnResidential will serve Apartments, LP. “Preserving 83 units of as the property manager for Phoenix ApartScaffold // Shoring affordable housing meets a critical need in ments, as Winn similarly does for the other our capitol city. We trust that our Phoenix properties in Omni’s portfolio.

Mast Climbing Platforms

Structural Steel Erection

CREATIVITY ▪ QUALITY ▪ EXPERTISE

Steel Fabrication and Framing Aerial Lifts / Lulls Swing Staging Bleacher / Stadium Restoration Pedestrian Protection www.high-profile.com

www.blcompanies.com | 800.301.3077 An Employee-Owned Company MA · CT · NY · NJ · OH · PA · MD


April, 2013

19

High-Profile Focus: Multi-Residential/Senior Living

Abbot Restores Apartments

Lynn, MA - Harbor Loft Apartments is an elegant eight-story brick high-rise building located at the corner of Washington and Broad Streets in downtown Lynn. When the building was converted to public housing back in the 1960s, Abbot Building Restoration Company of Boston became involved with some minor repairs at that time. Some 50 years later, Abbot has come full circle when recently contracted by the current building owner to perform maintenance on Washington Street elevation that was experiencing severe water penetration around the windows and masonry. The contract called for Abbot to cut out and repoint the masonry on the top five floors where the most severe water damage had occurred. Also, as a previous contractor has resealed the windows improperly, Abbot removed the defective sealant around multiple joints on each window – metal to masonry, metal-to-metal, and metal to glass – and removed the entire remaining residue. Abbot then resealed the affected locations with a high-grade polyurethane sealant to match the original color around the exterior of the windows. Finally, a

TAT Architects, Callahan GC

Residences at Wingate

Harbor Lofts Apartments

clear, water-repellant coating was applied to help protect the masonry surfaces. The project was performed in conjunction with architectural consultant, Brian Pfeiffer, and the Essex National Heritage Commission of Salem.

JACA on Med Model

North Quincy, MA - JACA Architects has introduced new software to its office – Med Model. Med Model is a powerful Windows based simulation tool designed for optimizing performances for healthcare systems. This software solution allows for animated visualization of clinic process and has the

Residences at Wingate Under Way

ability to import CAD files. Additionally, this software shows improvement in patient flow, facility design, logistical analysis and resource utilization. Med Model has the aptitude to test new ideas before dedicating time and capital, as well as optimizing their available resources and space capacity.

Rendering by TAT

Needham, MA - The Residences at Wingate in Needham currently are under construction. The Architectural Team, Inc. (TAT) is acting as the architect and interior designer. Callahan Construction of Bridgewater is the general contractor. The new 82,786sf “aging in place” healthcare facility will offer 91 state-of-the-art The Architectural Team apartments comprised of 42 Rendering of the dining area at Residences at Wingate assisted living units, 12 supdining rooms, bistro lounge, library, fitness portive independent living, and area, health care, spa/salon, four outdoor 37 memory care units. The new development is located on landscaped patios with dining area and fire the campus of an existing skilled nursing pit. The memory care wings will also profacility also designed by TAT, and will fea- vide a private, secured entrance, activities ture a full range of resident amenities to room, main living and dining rooms, and include an open kitchen concept with three secure outdoor area.

We deliver actionable business opportunities

Construction Journal is a trusted provider of accurate and up-to-date construction information served up in an easy-to-use project database. Track projects and companies, create up-to-the-minute project alerts, get key contacts, access project documents and plans, know project values, identify projects in conception or design, know when to bid and who the bidders are, see results and critical dates. Construction Journal is a subscription-based, construction project database backed by the industry’s best research team.

Don’t take our word for it – get a free test drive at ConstructionJournal.com and see for yourself.

www.high-profile.com


April, 2013

20

High-Profile Focus: Multi-Residential/Senior Living

Golden Pond Phase 2 Begins

Congress Companies Hosts Groundbreaking

Attending the groundbreaking (l-r): Peter Nicholson, Charlene Nicholson, William Marr, Kerry Kunst, Puja Mehta, Richard Williams, Josh Roccapriore, and Tim Kilduff. Hopkinton, MA – The Congress Companies of Peabody held a groundbreaking ceremony at the site of its latest project at Golden Pond Assisted Living Residences in Hopkinton. Golden Pond Resident Care Corp., owner of Golden Pond, co-hosted the ceremony to celebrate commencement of construction on Phase 2 of the renovation and addition project in progress at the assisted living residences. Phase 2 construction will result in a new, four-story, 36,000sf addition to the Golden Pond building, consisting of 41 assisted living beds in 30 residential units. Additionally, the existing building’s main mechanical, electrical, HVAC, plumbing, and laundry plants will be renovated and engineered to meet the require-

Under construction

ments of all new units as well as planned future expansions. All of the renovations are scheduled for completion by mid-November 2013 without disruption to current Golden Pond residents.

Community Services Project Completed George Hickey Architects

Keene, NH – Brookstone Builders, Inc. of Manchester, recently completed a new construction project for Southwestern Community Services of Keene. The scope-of-work involved the construction of an 8,400sf transitional housing facility located on six acres of land off Route 101, adjacent to the Cheshire County jail. “The Second Chance Second Chance for Success for Success” is a woodof six fully-outfitted apartments along with framed structure built on an aggregate pier foundation, and consists office space and meeting rooms. Dave Giovagnoli of Brookstone Builders was the project manager, and George Hickey Architects of Sanbornton served as the project’s architects. Southwestern Community Services is a Keene-based community services organization that has provided senior and affordable housing in the area. The project was partially financed by the New Hampshire Housing Authority. Kitchen

we are wide format.

Oce Plotwave 350

HP Designjet T2300 eMFP and ePrint & Share

Copy • Print • Color Scan System 6 “D”-size prints per minute

since 1895

Canon MFP M40 Series 22” touchscreen monitor dedicated PC , 40” color scanner ALL NEW FASTER SCANNER

B.L. MAKEPEACE www.makepeace.com • (800) 835-0194 • sales@makepeace.com

www.high-profile.com


April, 2013

21

High-Profile Focus: Multi-Residential/Senior Living

Multi Residential Projects Moving Forward

Boston - The Boston Redevelopment Authority recently approved several multiresidential projects. The board approved a project change that will add approximately 20 new units of housing to the 1282 Boylston Street project in the Fenway. The project change increases the number of residential units at the site from approximately 322 to up to 350, and increases the number of affordable units from approximately 36 to 38. The 1282 Boylston Street project, which also includes 15,000sf of ground floor retail space, is being developed by the Abbey Group. The BRA also approved housing at 37 N. Beacon Street in Allston. The $10.7 million mixed-use project includes ground-floor retail along N. Beacon Street

Rendering ADD Inc.

275 Albany Street rendering

Rendering of 1282 Boylston St.

37 N. Beacon rendering

Rendering Sebastian Mariscal

and several sustainable design elements. The new five-story building will be home to 41 units of housing with porches, including nine studios, 15 one-bedrooms, 15 twobedrooms, and two three-bedrooms. The fourth floor-units will be two stories, and the total project includes five affordable units. The project also includes 35 parking spaces with two bicycle parking spots per unit. The project’s sustainable elements include a storm water retention system, a centralized garden space, photovoltaic roof panels, and rooftop vegetable gardens. The project developer is Sebastian Mariscal of

Bruner/Cott Architects

Sebastian Mariscal Studio. The BRA Board unanimously approved the Notice of Project Change for 275 Albany Street which will bring 400 residential units to the Harrison/Albany Corridor in the South End. The $145 million project has two buildings: a 19-story building on Traveler Street with 220 residential units and an 11-story building on East Berkeley Street with 180 residential units and 2,000sf of retail. The project team includes Normandy Real Estate Partners, Gerdling Edlen, ADD Inc., and Mel Shuman Law.

Commercial • Institutional • Fine Residential • Irrigation • Stonewalls • Walkways • Terraces

Fine Residential

Princeton University Chemistry Building

Athletic Fields

The Work Force of Nature Current Landscaping Projects Include:

• Harvard Law School – Skanska • MIT Koch Center – William Berry • MGH – Building for the Third Century – Turner Construction • Temple Beth Elohim - Richard White Sons • Princeton University Chemistry – Turner Construction • Brown Creative Arts Center – Shawmut Design and Construction • Isabella Stuart Gardner Museum – Shawmut Design and Construction • Appleton Mill – CWC Builders • Russia Wharf – John Moriarty and Associates • Cambridge Rindge and Latin – Consigli Construction • Harbor Park Pavilion – Turner Construction • Dana Farber – Walsh Brothers • Dorchester Ave Improvements – McCourt Construction • Johnson and Wales University – Johnson and Wales • Linden Square Improvements – Federal Realty • Boston College Weston Jesuit Housing – Lee Kennedy Company • Logan Conrac Enabling – Suffolk Construction • IRS Modernization – Columbia Construction

ValleyCrest

Landscape Development

Telephone: 617-254-1700 • Fax: 617-254-0234 • 17 Electric Avenue, Boston, MA 02135 • www.valleycrest.com www.high-profile.com


April, 2013

22

High-Profile Focus: Multi-Residential/Senior Living

Callahan Completes Maxwell’s Green ICON Architect

Somerville, MA - Callahan, Inc. of Bridgewater recently completed construction on Maxwell’s Green in Somerville. The new 156-bed residential community features four apartment buildings, comprised of 184 units. Callahan Inc. provided construction management services for the new LEED certified project. The four buildings consist of three or four stories with a mix of studios, one-, two-, and threebedroom apartments, as well as four townhome style units. The buildings’ façades have a modern look combining masonry, composite metal paneling, metal shingles,

Dining area

Maxwell’s Green and cementitious siding. Each building has below grade parking. Maxwell’s Green features a number of amenities, including open outdoor living spaces, a lifestyle center, bicycle storage, a bike path to the Red Line-Davis Square MBTA, and electric car chargers. The two-level lifestyle center with club suite includes a chef’s kitchen, sophisticated dining, lounging and entertainment areas, network café, yoga studio, fitness center, roof deck, and theater room. The 207,722sf community is owned by Gate Residential Properties/KSS Partners, and the architect is ICON Architecture.

Micro Units in the Future?

Boston - Latest reports from Biznow indicate that Boston’s waterfront has 300 micro units planned. Boston Redevelopment Authority manager for innovation district projects Nicole Fichera says that city planners are suggesting developers build smaller apartments—350sf to 700sf—with shared amenities. First on the market is Gerding Edlen’s Factory 63 , located in the Fort Point Channel historic district of South Boston, with 38 units, including 23 micros ranging from 350sf to 500sf. After a few weeks of leasing, only three of 23 innovation units—and two of the six market-rate apartments—remain, according to Kelly Saito, Gerding Edlen president. The $193 million, 369-apartment 100 Pier 4—which includes 50 micro units—began construction in December, and they’re the first ones Hanover Group has built. Creating a layout for narrow units in a building designed for traditional apartments was a challenge according to the firm’s David Hall. The solution was interlocking L-shaped units, most of which are clustered on the first three floors around a business center and community area to foster impromptu meetings. Construction is scheduled to be complete in early 2015. ADD Inc. designed 100 Pier 4, and is doing Skanska Commercial Develop-

Nicole Fichera

Fred Kramer

David Hall

ment’s 340-apartment community at the Seaport, both with micro units. There’s extra initial cost to building this way, says Fred Kramer, the firm’s president, since there are more kitchens, bathrooms, walls, doors, plumbing, and other components. But the advantages are more units per GSF, youth appeal, the least costly market rate apartments, and Class-A amenities. Micro units also fetch higher rents psf.

Teamwork We take a collaborative approach when we take on a project. Our project managers and skilled craftspeople partner with general contractors, owners, architects, and engineers to achieve outcomes that make us all proud. We know our best work is always the result of teamwork; and we appreciate the opportunity to be part of the team. Corporate Headquarters: 116 Hopping Brook Road Holliston, MA 01746 (508) 429-8830

Sysco Boston, LLC Plympton, MA

Photo Credit: Sandy Krupa Photography

www.waynejgriffinelectric.com www.high-profile.com

Regional Offices: Charlotte, NC Raleigh, NC Duluth, GA Pelham, AL MA Lic A8999

CT Lic ELC.0123697-E1


April, 2013

23

High-Profile Focus: Multi-Residential/Senior Living

Rutherford Landing to Open in July

Rutherford Landing

Charlestown, MA - TFMoran Inc. Structural Engineers of Bedford, N.H. provided structural design for a new five-story, 99-unit, multi-family residential building with below grade parking for 138 vehicles. The 154,00sf building is located at the site of the former Charlestown Knights of Columbus at 75 West School Street in Charlestown, Mass. The apartment building is timberframed construction, with the lower level constructed of concrete and steel. In addi-

tion to the interior common space, a roof deck is planned to give tenants bonus outdoor space. TFM Structural Engineers worked with Neshamkin French Architects of Charlestown and Metric Construction Corporation of Boston on this design build project. The completion of the project is expected for summer of 2013. The project team included TFM Structural Engineers, Neshamkin French Architects, and Metric Construction.

Wise Completes Projects

Boston - Wise Construction, of Winchester, has completed work on renovated space for two Boston-area companies. At Fresenius Medical Care, Wise Construction reconfigured 200,000sf of office space, including 50 offices and multiple conference rooms. Wise also

completed an executive suite during the initial phase of the project. Germanbased Fresenius, which has its US. headquarters in Waltham, is a major provider of kidney dialysis services and renal care products. The architect for the project was ADD, Inc.

Kaplan Completes Mills Project DBVW Architect

Lawrence, MA - Built on the site of one of the first textile mills in Lawrence, the 125-year-old Washington Mills Building No. 1 was deteriorating and vacant when the Architectural Heritage Foundation and Banc of America Community Development Corporation initiated the structure’s preservation and transformation into loft-style rental apartments. Located in the city’s North Canal Historic District, the smart growth project was part of a 17-month, $43 million redevelopment that marks the single largest private investment in downtown Lawrence in decades. Kaplan Construction’s renovation and adaptive reuse of the 240,000sf structure included transforming the former industrial building into 155 luxury loft-style rental apartments that range in size from 625sf to 1,700sf. Kaplan’s extensive historic rehabilitation was instrumental in executing a design that contrasts modern interiors with original elements of the building’s historic character, including excavating original stone and brick foundation walls for use in the new building entrance, sliding metal fire doors that were preserved in place, nine-foot arched

Washington Mills Lobby

Glenn Turner

windows,14-foot-high old growth yellow pine ceilings that remain exposed, and extensive masonry restoration. The completed project is a Certified Historic Rehabilitation that conforms to the US Secretary of the Interior’s standards. It was awarded the 2008 National Preservation Honor Award from the National Trust for Historic Preservation and the Paul E. Tsongas Award from Preservation Massachusetts in 2012. The project architect was Durkee Brown Viveiros & Werenfels ( DBVW) of Providence, R.I.

Put the BARNES Advantage to work on your next project! Fedex Distribution Center

• Engineered Steel Building Systems • Steel Fabricators – Structural and Misc Iron • Metal Wall Panel Systems – Foam Insulated • Metal Standing Seam and Architectural Roofing

• Professional Steel Erectors and Installers

Atlantic Properties

• Design-Build Professionals prepared to meet with your team • Complete Steel Packages Supplied and Installed

P.O. Box 890159 | Weymouth, MA 02189 | Phone: 781-337-5277 Sales@barnesbuildings.com | www.barnesbuildings.com

www.high-profile.com


April, 2013

24

High-Profile PCINE News

B

Precast at Home in Multi-Family Projects

oston - As the housing market continues to recover, one bright spot is multi-family construction. There is growing demand for multi unit dwellings, whether apartments, hotels, or college and university housing. From smaller condo buildings and mixed use facilities to high rises and student residence halls, precast concrete has a great deal to offer for the construction and long-term performance of these structures. The nature of precast components brings a level of efficiency to the construction process. Having the panels engineered and cast off-site minimizes site disturbance and significantly decreases the amount of space needed for erection. Closely monitored and inspected plant conditions also adds a level of quality assurance not found with site-cast components. And beyond the construction phase, the performance attributes of precast concrete are uniquely suited to this building type. Hollowcore floors provide unmatched sound attenuation and also enable architects to work with long spans to create large, modular spaces. Concrete is uniquely resistant to mold and helps create excellent indoor air quality. These are just some of the reasons architects in the northeast are choosing precast concrete for their multifamily and hospitality projects. One example of precast being used for multifamily work is The Victor, which is a 12-story mixed-use project in Boston. The Victor combines 288 residential units with 17,000sf of retail and features a threelevel, 138-space above-grade parking garage. Boston architecture firm ADD, Inc., chose precast architectural panels with thin brick and textured finishes from Coreslab Structures for this project because of the cost savings, rapid construction qualities, and low maintenance the material can deliver. Precast was also selected to deliver a combination of aesthetics and constructability for the 28-story Avalon Exeter Residences at Prudential Center in Boston. The 187-unit apartment building, which began precast erection in February 2013, features an architectural precast design by Elkus Manfredi Architects in Boston. Strescon Ltd. is manufacturing and erecting the 406 architectural concrete panels that will enclose the building. Student housing is another building type ideally suited to precast concrete. Residence halls are a long-term investment for educational institutions and need to be built to last. Precast concrete offers the kind of durability and long life these structures require. In addition, the speed of construction inherent with well-

www.high-profile.com

Students are not always known for keeping quiet, but concrete floors and ceilings deliver a high level of sound attenuation that any student studying for finals will be thankful for. Anyone who has ever had to deal with the noise, vibrations, and footsteps of upstairs neighbors can appreciate the value of a concrete ceiling. Like apartment buildings and residence halls, hotels must also house a large number of people in a comfortable manner. Architects and contractors working on hotel projects face many of the same challenges and opportunities presented by multi-family projects. Things like acoustics, indoor air quality, and energy efficiency are very important in hospitality construction. Designers continue to find ways to make the most of the material attributes of precast concrete in their hotel designs. The Fenway Residence Inn by Marriott is part of an urban redevelopment initiative in the area surrounding BosThe Fenway Residence Inn by Marriott Photo: Courtesy J.P. Carrara & Sons, Inc. ton’s famed Fenway Park. The $60-million, eight-story project includes 6,000sf of ground-level retail and restaurant space, as well as 175 guest rooms. The architects at Group One Partners in Boston chose hollowcore for the job in part because using one component for floor and ceiling saves enough floor-to-floor height to allow an additional floor to be added. This project demonstrates the ways that precast can work in concert with other materials and systems to achieve design and performance goals. It uses a unique Girder-Slab System (developed by Girder-Slab Technologies of Cherry Hill, N.J.) that allows the steel frame to be erected and then precast hollowcore planks installed. The system uses a D-Beam that supports the hollowcore. Precaster J.P. Carrara & Sons manufactured the 920 precast hollowcore planks used in the hotel. The extra-wide, 8 x 8 ft. Avalon Exeter Residence Photo: Courtesy of Strescon Limited planks reduced the total number needed for the project and thought-out precast design and erection en- by Oldcastle Precast for the floors, ceilables work to take place around academic ings and roof. Long and thin hollowcore minimized seams. A finish called “carpet schedules, thereby minimizing site distur- planks allow for large, open areas free of ready” allows a direct flooring application bance on campus. supports or beams. This is perfect for large, to the hollowcore planks. Speed of erection was one of the Construction scheduling and durabil- open lounges and common rooms and also ity are important, but foremost in the minds enables some flexibility with internal wall main reasons precast was chosen for this project, and that is a common element of most architects working with student placement and design. housing is the functionality and flexibility Using precast concrete hollowcore among many precast multifamily projects. of the buildings they are designing. Col- for the floors and ceilings of a building like Precast concrete is an ideal material for leges and universities want their residence this also has many performance advan- building in tight urban areas. Construchalls to stand the test of time, but also al- tages. The inherent thermal mass of con- tion projects using precast take up very low for the ability to change and adapt the crete smoothes peak heating and cooling little space beyond the building footprint. interiors as needs change over the years. demands, which saves energy. A nonflam- When long-term performance is combined This was certainly inherent in the mable material, concrete also has obvious with fast and efficient construction, with choices made by Pawtucket, R.I.-based fire safety benefits and minimizes the need qualities like energy efficiency, indoor air Lerner Ladd + Bartels Architects when for additional fireproofing. And with more quality, fire prevention, acoustic control, they designed Hillside Hall at the Univer- emphasis being placed on indoor air qual- and durability, it’s clear why architects and sity of Rhode Island. The LEED Silver, ity, architects are also finding that precast contractors in the Northeast are choosing 120,000sf, 429-bed residence hall employs concrete provides moisture control that precast concrete. 8-inch-thick hollowcore planks supplied helps control mold and mildew.


April, 2013

25

High Performance Precast:

The Efficient, Resilient and Versatile Solution. University of Rhode Island Hillside Hall, Kingston, RI Architect: Lerner Ladd + Bartels Architects Precast: Oldcastle Precast, Inc. Precast Scope: 103,000 sf of hollowcore plank for floor/ceiling Photo: Courtesy of KBE Corporation/Photo credit: www.paulburkphotography.com

Discover High Performance Precast

The Victor, Boston, MA Architect: ADD, Inc. Precast: Coreslab Structures, (Conn) Inc. Precast Scope: 74,000 sf of architectural precast panels Photo: Courtesy of Coreslab Structures, (Conn) Inc.

The use of precast concrete in multi-residential facilities allows architects and designers to take advantage of precast concrete’s attributes. These include energy efficiency, aesthetic compatibility, economy of design, speed of construction and low maintenance. To read the complete story on either the URI Hillside Residence Hall or The Victor, visit www.pcine.org / projects .

Continuing EduCation Learn how to specify Precast Concrete systems on your next project. The Precast/Prestressed Concrete Institute is a registered provider with the American Institute of Architects continuing education system and the National Council of Examiners for Engineering and Surveying (NCEES) for professional education credit. Programs are approved for AIA/CES HSW credit and Professional Development Hours (PDH) certificates. Our programs are recognized by the State of New York and Florida.

NORTHEAST

A Chapter of of the the Precast/Prestressed ConcreteInstitute Institute Precast/Prestressed Concrete

For more information on the benefits of precast concrete or to find a precaster in your area call 888-700-5670, or visit www.pcine.org.

12551_PCINE_Hi-Profile_Multi-residential_full_page_ad_Final.indd 1

www.high-profile.com 3/15/13 11:25 AM


April, 2013

26

High-Profile Cover Story: 120 Kingston Street

B

Perkins Eastman Designs 120 Kingston

Suffolk CM, McNamara/Salvia Structural Engineer, Vanderweil MEP/FP

oston - The new state-of-the-art 26-story residential and mixed-use building located at 120 Kingston Street in downtown Boston is under construction. Perkins Eastman Architects ( PE) led the fast track design development and documentation process, and McNamara/ Salvia Inc is the structural engineer of record. RODE Architects is serving as interior architect, along with Planeta Basque Interior Design. R. G. Vanderweil Engineers is responsible for the MEP/FP design. As the concrete core and steel superstructure rises, the team continues to work closely with the development team consisting of Forest City and The Hudson Group; along with the construction management team at Suffolk Construction, to successfully bring to life the design of the 292,000sf high-rise tower. The project will be located along the Rose F. Kennedy Greenway, bordering Chinatown and the Leather District located within the highly sought after downtown Boston area. The residential portion of the building will include 240 rental units, consisting of 18 studio apartments, 175 one-bedroom units, 43 two-bedroom units, and four three-bedroom units. Those residing on the upper floors will have striking views of either the Boston Common or Waterfront, depending on which side their unit resides. In addition to the residential units, the building will also include a three-level parking garage, a retail component, gym,

Lobby

120 Kingston Street

Perkins Eastman

and restaurant. The restaurant will offer a seating area that will flow onto a large outdoor patio; adding further vibrancy and draw to this historical area of the city. Perkins Eastman worked collaboratively with the owner, developer, and construction manager to improve building efficiencies and reduce the construction budget. The team redesigned the building’s core while reducing the number of parking floors from four to three without reducing parking—allowing greater floor-to-floor heights within the same envelope. The

HVAC / Plumbing / Fire Protection

www.high-profile.com

Rendering courtesy RODE Architects

building’s skin was re-imagined to achieve greater efficiencies of the prefabricated elements and window wall systems. All of the units were redesigned to accommodate the rotation of the core, allowing the standardization of bathrooms and kitchen types within the curved triangular footprint of the building. John Pears, managing principal of Perkins Eastman Architects in Boston, also noted that, “The building fronts onto The Continued on next page


April, 2013

27

High-Profile Cover Story: 120 Kingston Street

Continued from previous page

Perkins Eastman Designs 120 Kingston

Greenway will create a back-drop to Chinatown Park, which will be integrated into the design of the outdoor public space of the site by removing the wall that currently separates the two sites. Restaurant and café tables and chairs will spill out onto a small plaza overlooking the park. The four story podium facing the park will be clad in Jet-mist granite to create the impression of mist swirling at the base, near to the water feature in the park. This notion enhances a larger-scale waterfall design concept for the Greenway façade, achieved by staggered window-wall fins terminating at varying heights on the façade, and illuminated glass fins on the podium that will ensure a rich after-dark pedestrian experience.” Pears pointed out that “PE has designed over 40,000 units of housing throughout the US and internationally over the past 30 years and built over 25,000 units. This housing and retail building is PE’s first high rise in Boston. However, the Boston office currently has over 850 rental housing units in design and under construction in projects ranging from four and five story wood-frame buildings to mid and high-rise in both steel and concrete. Many are urban and feature retail and parking podiums, and underground parking.” PE Boston also has a number of current education, healthcare, and senior living projects in design and construction. The interior design was a collaborative process with the ownership group, as-

Images courtesy of Suffolk Construction

The new 26-story residential and mixeduse building – under construction.

sociated architect RODE Architects Inc., and Planeta Basque Interior Design. An emerging design firm specializing in architecture for the urban environment, RODE is responsible for the design, layout, material concepts, and selections for the residential units and common space. As the structural engineer of record,

ing system that provided the maximum flexibility for the unit and parking level layout by eliminating all steel bracing elements and eliminating all but three interior columns. The firm strove to minimize the depth of the structural steel framing in order to work within a reduced floor to floor height and to maximize the number of framed levels within a set building height. The reduced floor to floor heights required many of the mechanical systems to Concrete core slabs in progress and stairs being pass through the structural steel load poured (from the interior of the building) carrying members. The firm worked closely with the mechanical engineer and construction manager to coordinate the mechanical systems prior to steel fabrication so that all required penetrations through the structural steel load carrying members could be fabricated prior to steel erection to provide a cost and time savings to the project. This BIM/Reuit project is on target to achieve LEED Silver and fulfill requirements of Boston’s Article 37, which requires that all large-scale Structural steel erection in progress with the projects meet USGBC’s LEED cerconcrete core in the background tification standards. The building is McNamara/Salvia Inc. (Mc/Sal) was also designed to exceed the Massatasked with working with the design team chusetts Stretch Energy code, which reand owners to create a structure that pro- quires that the building consume 20% less vided flexibility for interior programming energy than the Energy Code minimum and unit layout while remaining within the performance requirements. the target budget. 120 Kingston Street is scheduled to Mc/Sal designed a hybrid concrete open in late 2014. core shearwall with a structural steel fram-

Project Team for 120 Kingston St.

Ownership: Hudson Group North America LLC/Forest City Owner’s Agent: Rubin & Rudman LLC Architect: Perkins Eastman Architects Interior Design: RODE Architects Construction Manager: Suffolk Construction MEP/FP Engineer: R.G. Vanderweil Engineers LLC Structural Engineer: McNamara/Salvia Inc. Geotechnical Engineer: Haley & Aldrich Civil Engineer: Tetra Tech Rizzo/Daylor Consulting HVAC / Plumbing / Fire Protection: E. M. Duggan, Inc. Miscellaneous Metals

http://www.abphoto.com

Abbott-Boyle, Inc . 1 Mott Street Arlington, MA 02474 Providing quality service since 1971

Tel. 781-646-0460 Fax 781-648-0396 Cell 617-930-1298

350 West Street Box 546 | East Bridgewater, MA 02333

(P) 508-378-4025 | (F) 508-378-4050 www.superiorrail.net

www.high-profile.com


April, 2013

28

High-Profile Feature: Burlington Senior Living Community

B

Callahan Completes Stonebridge Project

urlington, MA - Callahan Construction recently completed new construction of a 94,400sf wing at the Burlington Senior Living Community in Burlington. The new wing consists of an assisted memory care community offering studio, one- and two-bedroom units comprised of 84 independent/assisted living apartments, and 26 private and semiprivate memory care apartments located in a separate and secured wing. Residents are provided a full range of amenities to include a gracious dining room, private dining rooms for family gatherings, spa, fitness center, courtyard with outdoor fireplace, sunroom, library, activity room, tavern/lounge, brain gym, and outdoor areas. Situated on nearly nine acres of undeveloped land across from Network Drive and convenient to major highways, Stonebridge at Burlington is the fifth assisted

The Architectural Team Architect

photos by Warren Jagger

Stonebridge at Burlington-Dining room living community owned and operated by Glen at Dartmouth in N. Dartmouth, BayThe Northbridge Companies. berry at Emerald Court in Tewksbury, and Sister communities are: Stafford Avita of Needham in Needham. Hill Assisted Living in Plymouth, Autumn Stonebridge at Burlington is thought-

Project Team for Stonebridge at Burlington Senior Living Community

Owner’s Rep: Waypoint Construction Consultants Architect: The Architectural Team General Contractor: Callahan, Inc. Civil Engineer: BSC Group Interior Designer: Group One Partners, Inc. Structural Engineer: LIN Associates, Inc. MEP/Fire Protection: Wozny/Barber & Associates, Inc.

Breakfast room fully designed to blend a supportive physical environment, complete with the state of the art technology, with innovative social programming. This new community is described by professionals as a “cutting edge” and “innovative” assisted living community. The building consists of three levels of wood framed construction on a slab on grade foundation. The development team includes; The Architectural Team of Chelsea, Callahan Construction, Bridgewater; Waypoint Construction Consultants, Needham; and Group One Partners, Inc., Boston. This is currently the third project that Callahan has collaborated on with Northbridge.

View of the Stonebridge at Burlington lobby

ssue Next I file Monthly ro High-P

Why keep a low profile?

May focus topics:

Civil Engineering Landscape Architecture Featuring

ACEC Engineering Excellence Awards

You are invited to participate in the May issue! News, article and advertisement reservation deadline April 19. Submit to

Does your engineering company have current projects in New England? Submit news of your most prominent project for our annual focus.

editor@high-profile.com or ads@high-profile.com

Are you active with a landscaping project? Submit details for the May focus on Landscaping.

Photo courtesy Towers|Golde’

www.high-profile.com

May will also include our regular monthly sections: • Educational Facilities • Healthcare Facility Developments • Multi Residential / Assisted Living • Green News • Life Science Facilities • Renovation and Restoration • AEC Award Winners • Connecticut Facility Developments • Upfront • People • Calendar ...and more.

For more information call 781-294-4530 Life Science Laboratory Building, UM Ameherst, MA in progress: Towers|Golde’s close collaboration with Wilson Architects and Nitsch Engineering created a site that seamlessly and sustainably integrates a 311,374 SF building into a very steep existing slope with on-grade access at multiple levels. The Construction Manager is Whiting Turner.


April, 2013

29

High-Profile Feature: Burlington Senior Living Community

CALLAHAN Preconstruction Construction Management General Contracting

Quality

Stonebridge at Burlington, Burlington, MA

and

Excellence for

Senior Living Senior Housing Multi-Family

Carriage House at Lee’s Farm, Wayland, MA (under construction)

Retail • Office • Education Commercial • Life Science Adaptive Re-Use

Callahan, Inc. 80 First Street Bridgewater, MA 02324 p: 508-279-0012 f: 508-279-0032 www.callahan-inc.com

Benchmark at Shelton, Shelton, CT (under construction)

www.high-profile.com


April, 2013

30

High-Profile Focus: Multi-Residential/Senior Living

DiGiorgio Develops Sanctuary Care $1.6 B Downtown Quincy Rebuild Sullivan CM

Essential Elements of Urban Development

Sanctuary Care at Rye - The Great Room.

Rye, N.H. - DiGiorgio Associates Inc. (DAI) partnered with Sanctuary Care to develop a one-story memory care living facility in Rye known as Sanctuary Care at Rye. Key elements of the facility are a distinctive entrance and lobby, sitting area, dining, library, and activities area. The goal of this new residence is to care for those with memory loss in a homelike environment. The single-story structure will have two residential wings attached to two activity cores. The cores will house a kitchen, dining area, activity space, and administrative offices. The residential living space will consist of 56 spacious

units, one third of which will be semi-private spaces. In the semi-private suites, the residents will share the bathroom space. Along with the development of the residential spaces within the wings, this structure will also consist of 8,900sf of community courtyard space. The total scope of the project is 36,600sf with an estimated construction cost of $7 million. Construction began in the fall of 2012 and is expected to be completed in the summer of 2013. Sullivan Construction Inc. is serving as the construction manager for this project.

APC SERVICES OF

Editor’s note: Following are excerpts from a recent Bisnow newsletter. Quincy, MA - Construction will start soon on what’s been billed as the largest urban transformation project in the country— the $1.6 billion rebuilding of downtown Quincy. Similar redevelopment efforts are under way in Boston and nationwide. Each is unique, but here are elements they share. Early on, Quincy Mutual Insurance—a company headquartered downtown for 162 years—made a $17 million pre-development investment to help launch the project. Developer Beal/Street-Works partner Ken Narva says big city makeovers need a stakeholder with the courage to get in early and the patience to hang on for the long haul. Mayor Tom Koch was a pioneering advocate, with moral and financial support. The city and state have agreed to raise $340 million, including $289 million in bonds for infrastructure: new streets, utilities, and nine garages for 5,000 cars. The city will raise 18% of the TDC, the state 3%, and the private developer 79%. The new private property will generate revenue to repay the bonds. Early in the eight-year planning phase, Narva tells us, the mayor had the courage and vision to see beyond the next election cycle. To Mayor Koch, the transformation means new jobs and revenue to fuel further growth. The developer is starting the first

building with cash. But without public underwriting, he says, it couldn’t create the appropriate environment. Quincy—birthplace of two US presidents, John Adams and John Quincy Adams—has a rich past, a solid present, and a strong credit rating. Beal/Street-Works recognized residents’ concerns over a plan to build 3.5 million sf so it acquired 39 land parcels without using eminent domain. Everyone knew what was happening from day one, says partner Richard Heapes. The plan it created calls for 1,600 housing units, 1.1 million sf of office space, and 700,000sf of retail space, including 150,000sf for food services. The spine of the New Quincy Center is Hancock Street, which leads to the T stop. Easy access to mass transit is the critical lifeline, says Narva. It places what will be new and redeveloped buildings 18 minutes from Boston and 23 minutes from Cambridge, both major employment centers. It’s surrounded by interstates 93/95, which lead to downtown Boston and many other towns. At its core, Hancock Street will be reconceived as one great boulevard from the commercial center to the T. It will feature a series of spaces filled with active uses like restaurants and shops, key public places like four-acre park and museum Adams Green, and five other outdoor public places connected by wide sidewalks.

Our mission: To provide a level of value, quality and service that is unrivaled in the construction industry.

NEW ENGLAND Pain�ng ‐ Interior, Exterior, Faux Finishes Coa�ngs ‐ Waterproong metal roofs, brick, and concrete Parking garage pain�ng and coa�ngs Abrasive blas�ng (sand, dry ice, walnut shells, black beauty) High pressure power washing Industrial cleanup Wall Coverings Plaster repair

Design by JSA, Inc.

Recently Completed Northeast Rehabilitation Hospital, Portsmouth, NH

North Branch Construction, Inc. (603) 224-3233 . FAX (603) 225-7165

www.northbranch.net

For free estimates email Tom@cpifloorcoatings.com or call 603-659-2788

APC Services of New England (Formerly Ahern Pain�ng Co) 781‐665‐5600 www.high-profile.com

781‐665‐5612 (f)

www.apcne.com

20 Beech St. Extension Newmarket, NH 03857 Phone: 603-659-2788 Fax: 603-659-2389 www.cpifloorcoatings.com Email: caprioli@cpifloorcoatings.com


April, 2013

31

High-Profile: Life Sciences Facilities

Spaceworks Completes UMass Facility

Amherst, MA - Spaceworks Architectural Interiors, a Boston-based firm providing architectural interior products, recently completed a project for the new Life Sciences facility at UMass Amherst. The project is part of a five-year capital improvements plan. Spaceworks completed more than 100 offices in two phases as part of this project.

Albert Sherman Center Features Spaceworks Products

New glass front and door design

View of interior UMass Life Sciences facility at UMass.

Glass doorway

Worcester, MA - The $400-million Albert Sherman Center expands and unifies the UMass Medical School’s Worcester campus, doubles its research capacity, and supports the school’s new learner-centered curriculum. This interdisciplinary, state-of-the-art research and education facility will foster interaction and collaboration among scientists and promote innovation and synergies across disciplines. The 480,000sf Sherman

Center, which opened in late 2012, attracts researchers, physicians, faculty, students, and industry partners, enhancing the medical school’s position as a leader in medical research and education. The project features Spaceworks Architectural Interiors’ new glass front and door designs, with enhanced acoustics, aesthetics, and functionality in the doors and hardware.

Lead Paint Abatement ◆ PCBs ◆ Mold Remediation Lead PaintAbatement Abatement ◆ PCBs ◆ Mold Remediation Lead Paint Selective Demolition Lead Paint Abatement ◆ PCBs ◆ Mold Remediation Mold Remediation PCB’s A full service law firm offering: Providing quality environmental contracting for commercial Providing quality environmental contracting for commercial Corporate & Construction Law • General & Commercial Litigation and residential clients for over 20 years. Before Providing quality environmental contracting and residential clientsAfter for over 20 years. for commerc • Mechanics’ Liens • Estate Planning & Elder Law • Construction Consulting • Personal Injury Law • Wills, Trusts & Probate • Hazardous Waste & and residential clients for over 20 years. Check our website As seen on... Environmental Law • Labor and Employment Law • Divorce & Family Law Check our website As seen on... for details. • Real Estate & Financial Transactions our we forCheck details. As seen on... 55 Dorrance Street | Providence, RI 02903 | 401-331-3800 | www.viscontilaw.com Phone: (978) 250-2740 Fax: (978) 250-0565 for detail Phone: (978) 250-2740 Fax: (978) 250-0565 21 Progress Ave, Suite #1, Chelmsford, MA 01824 Phone:Ave, (978) 250-2740 Fax:MA (978) 250-0565 21 Progress Suite #1, Chelmsford, 01824 www.alpineenvironmentalinc.com Progress Ave, Suite #1, Chelmsford, MA 01824 Guidetti Graphics Lead Paint Abatement21◆www.alpineenvironmentalinc.com PCBswww.alpineenvironmentalinc.com ◆ Mold Remediation For all your design and layout needs

G

• Periodicals • Ad Design • Logo Design • Web Site Design

Providing quality environmental contracting for commercial • Brochures and residential clients for over 20 years. Four appearances on... • Mailers Check our website • Business As Cards Check our website seen on... for • Stationery for details. details

76 S. Meadow Road, Plymouth, MA Phone: (978) 250-2740 Fax: (978) 250-0565 www.alpineenvironmentalinc.com Phone/Fax: 508-747-7754 • Cell: 508-989-1103 21 Progress Ave, Suite #1, Chelmsford, MA 01824 Phone: (877) 527-4040 • Fax: (978) 250-0565 www.alpineenvironmentalinc.com E-mail: sandra@kbguidetti.com 21 Progress Ave., Suite #1, Chelmsford, MA 01824 www.high-profile.com


April, 2013

32

High-Profile: Life Sciences Facilities

by Stephanie Goldberg In our practice speed has become part of the design process. Companies need to be up and running quickly, and once the design has begun they are looking ahead to the next steps. Clients need change even during the design process as their work figures into our more rapid paced world. Delivery schedules have Stephanie Goldberg become compressed. However, our desire to create a unique, expressive, and clear design has not changed. The challenge has become how to design and execute a project with the same quality and in a shorter amount of time. As a result, much has changed in the way we work. The traditional defined order of work; schematic design, design development followed by construction documentation has merged into a continuous flow of design, coordination, and detailing. The use of Revit has facilitated this change. Where once a design had to be set in stone prior to proceeding to final documentation, now further development of the design occurs alongside of the creation and development of details. It takes time for clients to understand the project and develop their design input. We find that we are able to keep the project moving forward, while

Fast Projects- Great Delivery

Photo Christopher Goldthwaite

View from the community space through to the conference room reflects the collaborative design process of project. William James Hall, Harvard University. allowing for shifts within the project based on client feedback. In a recent fit-out for a pharmaceutical company in Cambridge, we were able to change both details of the lobby area and alter the number of offices and types of equipment without impacting our schedule. The client was able to bring forward a required change seamlessly. We feel able to handle more nimbly our clients’ changing needs while being able to deliver on the design. Integrating engineering into Revit

is key to this faster paced project delivery. Having a single, integrated model of the design allows for the pinpointing of areas requiring coordination as well an understanding of the implication of alterations to the design. In a recent project at Harvard, working with Rist-Frost-Shumway Engineers, we have found that both the engineers and architects benefit from access to the full model. We, as architects, are able to take views and cuts through the project and see where we might find opportunities

or where we have clashes. As well, the engineers benefit through a greater understanding of design intent and are able more quickly to identify areas where we need to alter the design to accommodate ductwork or other engineering elements. Importantly, this shared model leads to fewer issues during construction as issues are worked through more thoroughly during this combined design/documentation process. There are limits to this new flow of work. Unlike a current that ebbs and flows without termination, our projects must move toward a logical conclusion, which is the building of a project on schedule and on budget. A solid program, schematic layout, and good understanding of the systems and aesthetics are key to a successful project. Establishing frequent and effective communication and trust with the client early on establishes that current of progress so needed in a fast-paced project. As a result, we are able to have a little more play, a little more fun in the design and documentation that we would normally expect given time constraints. We can try on a few ideas within the team context while moving the details and coordination forward. There is no more of that “If we only had a little more time...� as we allow ourselves the opportunities along the path to completion to make those improvements that refine and turn a project from good to great. Stephanie Goldberg, AIA, LEED AP BC+D is a principal with Lab/Life. Science. Architecture Inc.

Parking Perfected. Life. Science. Architecture. LAB is a new firm that combines the knowledge and skill of a large firm with the energy of a startup. We have 20 years of lab design experience behind us, and use technology and strategic partnerships to bring an agile, focused and responsive approach your projects. Learn about our approach at labarchitectgroup.com

www.high-profile.com

Photo Courtesy of STV

www.hybridparkinggarages.com


April, 2013

33

The 8th Annual

NEBFM’13

Boston Convention Center - Boston, MA - June 12th & 13th, 2013 NEBFM’13 will feature: • 350 exhibitors • Thousands of products & services on display • Thousands of decision makers in attendance • 30 CFM accredited individual one-hour talks covering topics including: LEED, Green, Energy, Sustainability, Building Commissioning, Facility Maintenance, Construction and Renovation Planning, Life Safety and Emergency Planning.

“Great Show! Well planned. This is the show everyone should try and get to.” Dale Desmarais - Aegis Energy Services Founder Platinum Sponsor

Co-Sponsored by: New England Real Estate Journal

For more information on exhibiting or attending Please visit: www.NEBFM.com or call Tom Thomas 1-877-770-1661 www.high-profile.com


April, 2013

34

High-Profile: Awards

United Way Awards Pro Con

Manchester, NH - Pro Con Inc was recently honored with the Granite United Way GIVE award at the agency’s annual Granite United Way Celebration. Pro Con Inc was recognized for the company’s 40 years of generosity through its workplace campaigns. “The company has always stressed the importance of giving back to our community, and the United Way provides us with the opportunity to support a wide variety of organizations in each of the communities where we work and live,” stated Sally Stebbins of Pro Con Inc. “We are honored to receive this award which represents our long standing partnership with the Granite United Way.” Pro Con Inc is a full-service archi-

l to r: Patrick Tufts, Granite United Way; Sally Stebbins, Pro Con Inc; and Governor Maggi Hassan.

tecture and construction management firm located in Manchester, NH. A leader in the industry, the award-winning company designs and builds projects throughout New England, New York, and New Jersey.

Beaudry One of Top Young Pros

Boston - Plumbers and Pipefitters Beaudry was electLocal 4 Business Manager Ray Beaudry ed as a Local 4 business is among the winners of Engineering development representaNews Record’s (ENR) Top Young Profestive in 2003 at the age sionals competition in New England. The of 25. He rose to the award celebrates the excellence of young elected position of busidesign and construction professionals in ness manager/financial the region. secretary just four years Beaudry, 35, has devoted well later in 2007, a position over half of his life to the construction he continues to hold toRay Beaudry industry launching his career in 1992 as day. He is also a trustee a student at the Bay Path Regional Vocafor the Local 4 apprentional Technical High School in Charlton. ticeship program in West Boylston. He also Following his high school graduation, he serves as president of the Worcester/Fitchcompleted Local 4’s apprenticeship pro- burg Building Trades Council. gram and has been making history as a labor leader ever since.

Elkus Manfredi Wins NAHB Gold

Wellesley, MA - The National Association of Home Builders has named Waterstone at Wellesley, a new senior living community in Wellesley, its 2013 gold award winner for Excellence in Senior Housing Design. The award was presented at the trade association’s annual national conference recently held in Las Vegas. Designed by Elkus Manfredi Architects, Waterstone is a joint venture of National Development of Newton and EPOCH Senior Living of Waltham. The Waterstone community includes 134 independent and assisted living rental apartments, a fitness center, a pool, a movie theater, five-star restaurant-style dining, designer kitchens, a riverfront walking trail, and more. In addition to the two residential buildings, the Waterstone campus includes a third building housing retail and medical office space. The design objective of the project was to offer the latest design developments specific to enriching senior living, while also raising the quality of the senior living building type to a new level of non-institutional livability, appeal, and

Waterstone at Wellesley independent architectural character. The features that secured Waterstone’s gold medal include its groundbreaking senior-living design offering private porches in each unit for access to the outdoors; an accessible riverfront walking path with raised gardens; and upscale, homelike interiors featuring New England craftsmanship; as well as its wide selection of gourmet dining options and fitness program. Elkus Manfredi was responsible for all exterior and interior architecture. Interior design was provided by Wellesley Design Associates and landscape architecture by Stantec’s Boston office.

ACEC Awards Vanderweil

Boston, MA - Vanderweil Engineers of Boston has been awarded the Gold Award from The American Council of Engineering Companies of Massachusetts (ACEC) for its engineering excellence in the completion of the Shire Human Genetic Therapies, Building 200

located in Lexington. Each year, the ACEC awards are bestowed upon those companies who have demonstrated the highest degree of merit and ingenuity within the engineering field.

Freeman French Freeman Honored

Montpelier, VT - Three projects by Vermont architectural firm Freeman French Freeman were recognized for design excellence at the biennial Vermont Public Space Awards in Montpelier. The firm was recognized for its efforts in creating a 13,500sf public garden atop the Burlington International Airport’s five-story parking garage, which was completed in partnership with the landscape architecture practice of Michael Lawrence Associates of Essex Junction. Freeman French Freeman also received awards for its landscape plan for James Jeffords Hall, a plant and soil science building on the University of Vermont

Jeffords Hall campus,nand a proposed outdoor recreation center at Norwich University in Northfield. Both projects were designed in partnership with SE Group of Burlington.

Norwich outdoor center

www.high-profile.com


April, 2013

35

High-Profile: Awards

John Tocci Wins Pioneer Award

Woburn, MA - John Tocci, chief enabling officer of Woburn-based Tocci Building Companies, won the Collaboration Academy’s Pioneer Award for leading the adoption of Integrated Project Delivery (IPD) in New England. The award, presented at the Collaboration Forum in Austin, Texas, is the only national award for IPD excellence. IPD is a contract form and delivery method that enables project stakeholders including the owner, architect, general contractor, engineering consultants, and subcontractors to work as one group to optimize results, increase value to the owner, reduce waste, and maximize efficiency through all phases of the project. IPD contractually incentivizes all parties to achieve shared objectives through shared financial risk and reward. Though IPD is becoming increasingly common practice on the West Coast, Tocci has been breaking new ground in New England, first with the 60,000sf ten-

TFMoran Named Best in N.H.

Concord, NH - TFMoran, Inc. of Bedford was honored as Best Engineering Firm in New Hampshire at the 2013 BOB (Best of Business) Award event held in March, at the Grappone Conference Center in Concord. “We are honored to receive this award,” said Robert Duval, president of TFM. “I credit our professional and dedi-

Elkus Manfredi Architects

John Tocci accepts the Pioneer Award from Collaboration Forum host Darren Smith, CIMA Strategic Services founder. ant fitout of Autodesk’s Waltham headquarters, the first IPD project in New England, and continuing with its construction of Marlborough Hospital’s new cancer pavilion, the first IPD healthcare project to be finished in the region.

cated staff of civil, structural, and traffic engineers, land surveyors, and landscape architects for the excellent service they give to our community and clients every day.” In addition to celebrating the BOB award, this year TFM is celebrating 45 years in business.

Liberty Wharf Honored

© peter vanderwarker

Liberty Wharf- “Best New Open-Air Center.” Boston - Liberty Wharf, the popular expanse of outdoor decking, a marina, and new landmark on the Boston waterfront, a new section of Boston’s famed Harborhas been honored as “Best New Open-Air walk. The site was previously occupied Center” by Retail Traffic magazine’s 2012 by Jimmy’s Harborside, a Boston restauSuperior Achievement in Design and Im- rant that was an icon since it first opened aging (SADI) awards. The magazine part- as the Liberty Cafeteria in 1924 but which nered with the American Institute of Ar- blocked public access and views to the wachitects’ Retail Entertainment Committee ter. Liberty Wharf replaces Jimmy’s with a for the award program, which is now in its new destination that has an iconic identity 23rd year. in its own right and achieves multiple imLiberty Wharf has rapidly become a portant goals for the city. busy Boston destination since its compleThe SADI jury was impressed by tion in the spring of 2011. the cohesiveness of the project, which Set over the water on a new pier spans four levels: “The team of architects spanning a historic seawall in Boston Har- at Elkus Manfredi succeeded in its design bor, Liberty Wharf is the new flagship mission of creating a ‘people place’ that home of Legal Sea Foods, in addition to connects the city.” four other restaurants, office space, a broad PAV E R S B Y I D E A L

St. Raphael Parish, Medford, MA

• Computer controlled mobile blending unit. • Solves concrete flatness and moisture issues. • Premium Calcium Aluminate formulation. • Pumps over 40,000SF in a day. • Pumps up to 50 stories high. • GreenGuard Certified. • Contributes to LEED points. • No unmixed materials EVER enter the building. • Proven system for over 10 years and millions of SF poured.

36 Holton St., Winchester, MA 01890 Contact Ryan Burke 339.227.5550 www.alleghenycontract.com | rburke@alleghenycontract.com

The Solution to Stormwater Runoff is Right Under Your Feet Aqua-Bric® and Eco-Stone® Permeable Pavement Ideal permeable pavers offer built-in technology - the pavement and base act as a stormwater treatment system that reduces or eliminates runoff to reduce pollutants and improve water quality. ■ ■ ■ ■

High-strength 9000 psi pavement ■ Easy to clean and maintain Freeze-thaw and snow-plow safe ■ Qualifies for LEED® credits ADA compliant - firm, stable, slip-resistant Cost competitive to conventional pavements Ideal Concrete Block Company, Inc. www.IdealConcreteBlock.com Serving New England Since 1923

CALL 1-800-24-IDEAL FOR A PERMEABLE LUNCH & LEARN

www.high-profile.com


April, 2013

36

High-Profile: Green Facilities Development News

School Library Earns Gold

Designed by Perry Dean Rogers, Built by Shawmut

American Window Offers Courses

Foxboro, MA - American Window Film, Inc. is prepared to present an AIA approved and accredited educational course on window films. Along with a catered lunch, a comprehensive presentation, and hands-on demonstrations, this course will provide specific technical information, window film samples, and the forms needed to apply for AIA credit. Course highlights include: Window film history, Types of film, Film applications, Understanding solar principles, UV/ fade facts, Safety and security measures, Architectural/Designer film options, Demand-side management • Demand analyzer tool, New technology, Window film specifications, LEED credit categories, Warranty information, and Surface protection.

St. George’s School Providence, RI – The Hill Library ability projects. at St. George’s School in Middletown, St. George’s undertaking of this liR.I. has earned LEED Gold certification. brary addition and renovation representBuilt by Shawmut Design and Construc- ed the first large construction project on tion and designed by Perry Dean Rogers campus in two decades. The new library Partners Architects, this 6,100sf addition includes a center for innovation, an open and 13,000sf renovation was completed floor plan library for group work, study aron an accelerated schedule and in an oc- eas, classrooms and stacks. cupied campus environment. To help get Shawmut’s previous work at St. St. George’s students involved in the con- George’s School included renovation to struction process, Shawmut teamed up the main quadrangle and a number of fastwith senior year students as they worked track summer renovations. on their own academic design and sustain-

SourceOne to Service SCEPG

Boston - SourceOne, a national consulting firm and a subsidiary of Veolia Energy North America, has been selected to perform energy advisory services for SouthCoast Electric Power Group (SCEPG), an aggregation comprised of the Cities of New Bedford, Fall River and nearly 30 private companies in the area. The SCEPG is comprised of over 800 separate accounts with an aggregate annual electricity load of roughly 150,000,000 kWh, representing an esti-

ImprovE your EffIcIEncy and your ImagE for onLy

Proudly Serving New England’s SinCe Design and Build Community 1980

Print | Copy Scan | Distribute your wide format drawings, blueprints and CAD files.

800.255.8012

www.topazeng.com sales@topazeng.com 35 Pond Park Road, Hingham, MA

www.high-profile.com

HP DesignJet T790 PS 24”

• Up to 2 “D” size prints/min • 8 GB Vitual memory • 160 GB Hard disk

HP DesignJet T2300 eMFP PS 44”

• Up to 2 “D” size prints/min • 1-CLICK Print, copy, scan • 2 paper rolls- smart switching • 32 GB Vitual memory • 160 GB Hard disk

Building and construction industries are rapidly changing in order to keep pace with consumer demands for improved energy efficiency, safety, and architectural appeal of the buildings in which they work and reside. An overall understanding of all window films is essential to remain current. Energy conservation, sustainable design and security have become integral elements of design-build and renovation projects. Given recent demands for energy efficiency and improved building safety, technical knowledge of solar performance, credible testing procedures, and specific strength and tear resistance data is essential. Please contact Peter Davey at 800274-8468 to schedule your Lunch & Learn.

HP DesignJet T1300 PS 44”

• Up to 2 “D” size prints/min • 2 paper rolls- smart switching • 32 GB Vitual memory • 160 GB Hard disk

mated annual budget of approximately $10 million. The scope of energy services provided by SourceOne will include development of pricing alternatives, contract negotiation with electricity suppliers, ongoing management of the supply relationship, and electricity market insight and forecasting. These services allow SCEPG members to have the information needed to make important electricity pricing decisions and to further reduce electricity costs

69

$

These three printers offer fantastic print Print this quality, reliability and 24” x 36” low cost of operation. > color drawing Email or call for full for only specs and details.

00* PER MoNtH!

1.7¢

PURCHASe OR leASe, CAll OR emAil FOR FOR geneROUS tRADe-in ReBAteS ASK FOR OUR CURRent PROmOtiOnAl PRiCing on all new and professionally reconditioned wide format systems! * total ink and print head cost. Media cost is additional and can vary from 2.9 cents per square foot and higher depending on media type. trade-In Rebate is based on an HP program and is subject to change without notice. trade-In Rebate is dependent on model purchased and equipment traded-in. Lease pricing listed is for HP t790 PS 24”. Lease pricing is for 60 month FMV lease. All taxes are excluded. Free delivery and installation apply to standard dock or ground-level delivery and standard installation. Call or email for complete specifications and product details. topaz is not to be held responsible for errors in content or pricing. Expires Expires 12/31/12. 3/31/13.

per sq ft*


July 27 - August 16, 2012

ISSUE April, 2013 HIGHLIGHTS

Aegis Energy Services install system in theNewsNational Arch High-Profile: Green Facilities Development 37

Meridian Capitalin MoldOLLEGE PARK, MD RPF Assists Guideline — It is common knowl- Aegis Installs CHP in the Nat’l Archives Group negotiates Northwood, NH - RPF Environ- diation in 2009, House Bill 4821, lost by edge that heat and humental, Inc. assisted the N.H. Lung As- just one vote. $25.2m in financing midity are to the Not readydetrimental to give up, the group apsociation’s Mold Task Force with the de-

C

velopment of a new mold contamination guideline, the “Standard of Care for the New Hampshire Mold Industry - A Guide for Citizens Affected by Mold and Moisture in New Hampshire Buildings.” The guideline creates a standard of care for building owners and the mold remediation industry. This is crucial considering the lack of federal and state regulations pertaining to the proper handling and cleanup of mold contamination in homes and other buildings. In 2008, a group of New Hampshire legislators, business leaders, and health administrators came together with the same concern: there are currently no laws in place to protect the citizens of N.H. when it comes to mold and poor indoor air quality. The most recent N.H. legislative effort to provide regulation of mold reme-

3A

Nave Newell Celebrates 20 Years in Business

preservation of archival docuproached the lawmakers involved, who ments. suggestedNo thatorganization the group formisamore “Mold serious about oura Task Force,” withsafeguarding the goal of creating standard ofhistorical care for therecord mold Industry. nation’s than The New Hampshire Mold Task Force The National Archives, located was formed, and the group spent the next in Washington, DC and College several months creating what is now this Park, MD. document. Maintaining steady temperaDennis N. Francoeur Jr. of RPF ture and low an humidity is a 24/7, Environmental, ABIH Certified Indus365 day a year mission the trial Hygienist, participated in for this effort Archives’ facility management, as a N.H. Mold Task Force Member. The and is aincluded costly meetings proposition. But process with various stakeholders the state and when you from are across protecting thea review of regulations and policies from original Constitution of the other states across the country. United States or the DeclaraRPF’s experiences with investigation of Independence, you take tions, solutions, and legal actions were no chances! provided to the group as the standard of Looking to cutbalancing their overall care was developed, technical energy expenses by the Naand economic drivers on30%, the topic. tional Archives of College Park, MD and Washington DC, embarked on a series of measures, including the installation of a lost some of its unique architectural treaCombined Heat and Power syssures and became deteriorated. General tem engineered, contractor for the finalmanufactured and most chaland installed bybuilding’s Aegis Energy lenging phase of the restoraServices, Inc. tion, Consigli completed the work 22 months ahead of Heat the original Combined andschedule Power and produced $2.4known million inas savings for (CHP), also cogenthe citizens of New York. eration, is the production of both electricity and heat from a SINGLE fuel source, in this case natural gas. It is a well established, proven, high-efficiency energy-saving technology. Aegis Energy Services, Inc. has been the leader in CHP for nearly 27 years with hundreds of systems located in the Northeast and Mid-Atlantic states. In 2009, The National Archives

Consigli Wins National Award

Milford, MA - Consigli Construction Co., Inc. has received the Associated General Contractors of America’s most prestigious recognition, the Alliant Build America Award for the renovation Mid of the New York Real State estateCapitol JouRnalBuilding. ’s Atlantic annual spotlight Since its construction in 1899, the New York State Capitol Building had

18-19A

SPOTLIGHT: Brokerage Directory www.marejournal.com

Mid Atlantic Real Estate Journal — July 27 - August 16, 2012 — Section B

Section B

Annual Brokerage Directory

Featuring Commercial Real Estate Brokers From The Mid Atlantic Region

Directory

Auction News/Directory ............... 4-5A Owners, Developers & Managers 7-33A Green Buildings ........................ 21-27A Calendar of Events ......................... 36A Brokerage Directory............... Section B Shopping Centers ....................... 9-24B

Upcoming Spotlight Multifamily Financing www.marejournal.com

The National Archives College Park, MD - It is common ing the installation of a combined heat and National power system (CHP) engineered, manuknowledge that heat and humidity are det- Archives installedwere by Aegis Energy rimental to the of archival installed twopreservation Aegis 75kw CHP factured, gis CHPand systems installed Services, Inc., headquartered in Holyoke, documents. No organization is more serisystems in their Washington, in the building’s main mechanious safeguarding nation’s his- Mass. DC about facility. In 2010,ourthe College cal room, located close to the boilCombined heat and power, also torical record than The National Archives, Park, Maryland site installed ers and chillers. The systems not located in Washington, D.C. and College known as cogeneration, is the production threeMd. Aegis CHP systems. Heat of only protect thefrom valuable bothhelp electricity and heat a single Park, recovered from the CHP systems archives, but also keep gas. five It is Maintaining steady temperature and fuel source, in this case naturalthe is used to re-heat ambient air to ahundred people employed there well-established, proven, high-efficiency, low humidity is a 24x7, 365-day-a-year 70 degrees F, afterfacility previously and the site’s several hundred technology. mission for the archives’ manage- energy-saving Nationalcomfortable. Archives is benefitting ment, is a costly ButF when visitors beingandcooled to proposition. 55 degrees in dailyThe reliable, high CHP sysyou protecting the original Constitution an are effort to condense out any from Intheaddition to efficiency dehumidificatems, which helped cut their high of the United States or the Declaration of moisture. tion applications such as energy this costs, reducing carIndependence, you take no chances! At College Park, the three Ae- one, while CHPsimultaneously technology is well Looking to cut its overall energy ex- bon and other greenhouse-gas emissions, penses by 30%, the National Archives of thus benefitting the D.C. metropolitan College Park, Md. and Washington D.C., area, at large. embarked on a series of measures, includ-

suite recr dorm resid ther ther wate cooli prod unit Pr syste alwa ough heat etary toric ensu will deliv savin year Th efitti effic factu Ener cut t simu and sion metr

Cooper-Horowitz arra $161.4 million in finan NEW YORK, NY — Cooper-Horowitz, Inc. recently arranged financing on the following properties: • Dunbar Apartment Portfolio: 211-227 and 231-247 West 149th Street; 210-226 and 230246 West 150th Street; 25802594 Adam Clayton Powell Jr. Blvd; 2802-2824 Frederick Douglas Blvd., New York, NY. The loan was for $20.9 million. Jayson Schwartz and Richard Horowitz represented the firm • The Bedford Portfolio: 158160 North 4th Street; 237-241 Bedford Avenue, Brooklyn, NY. Retail/Residential. The loan was for $51 million. Mark Niman, Richard Horowitz and Louis Mirando represented the firm. • 1133 Westchester Avenue, White Plains, NY. 625,000 s/f office building. The loan was for $79 million. Richard

Bedford Portfolio re Horowitz represented the firm. • 350 West Broadway, New York, NY. Retail/Condomin-

www.high-profile.com

ium mill Rich the


April, 2013

38

High-Profile: Connecticut Facilities Development News

CBC Discussion

Hoffmann Promotions

Transit-Oriented Development

Hamden CT - Hoffmann Architects of Hamden announced the promotion of Meriden, CT – CBC memtwo members of the technical staff. bers and guests gathered in the Courtenay Bauer has been promoted Augusta Curtis Cultural Center in from project coordinator to project managMarch to discuss transit-oriented er. She joined Hoffmann Architects in 2012 development opportunities along at the firm’s Arlington, Va. office. As projthe New Haven-Hartford-Springect manager, Bauer will take a lead role in field “Knowledge Corridor. ” The directing projects and communicating with location of the event was in the clients. Hayes Bauer renovated original public library in William Hayes, Assoc. AIA, has gation through design and construction. Meriden. It is a half mile from Mebeen promoted from project coordinator to l-r: John Hankins, Lawrence Kendzior, Patrick He will also be responsible for preparing riden’s train station that is poised project manager at Hoffmann’s New York McMahon, Mary Ellen Kowalewski and Sarah Lewis. evaluations of building envelope systems, for redevelopment. City office. As project manager, he will including defect surveys and third-party tor for the town of Windsor Locks, each take on greater responsibility, overseeing Sarah Lewis of Fuss & O’Neill, Inc.; Mary Ellen Kowalewski, provided individual perspectives and de- building envelope projects from investi- peer review. AICP, director of policy planning, Capitol tailing plans for the “Knowledge Corridor” Region Council of Governments; Law- development. John Hankins of Fuss & rence Kendzior, Meriden City Manager; O’Neill, Inc. moderated. On April 24 CBC’s program will and Patrick McMahon, development direclic Health Laboratory and served Hartford, CT - Diversified feature a discussion Project Management (DPM) anas its facilities director on behalf on doing business with nounced that Robert Reihl has of the state of Connecticut. the state of Connecti- joined the firm as a project exReihl has been directly cut in the wake of the ecutive and will support its life responsible for the overall manUConn Law Library sciences, public, and academic agement and completion of projState Supreme Court industry segments. ects in excess of $1 billion. He is decision exempting a LEED Accredited ProfessionReihl comes to DPM from the state from any stat- A/Z Corporation, where he held al, a Certified Healthcare Conutes of limitations and the position of senior project structor (CHC), a Certified InReihl allowing it to pursue manager, providing project mandustrial Technologist (CIT), and claims against design agement oversight on key client assign- is formally affiliated with the American and construction firms ments, including Yale University and Con- Institute of Architects (AIA), the Ameriseveral years after necticut Department of Public Works and can Society for Healthcare Engineering project completion. Construction Services. (ASHE) and has served on the US Green The program will be He also was responsible for the day-to- Building Council’s, “LEED for Labs” Ron Goodin, CBC President, welcomes everyone to the Augusta held in Hartford. day management of the state’s premiere Pub- advisory council. Curtis Cultural Center.

DPM Welcomes Reihl

PLACE YOUR MECHANICAL SYSTEMS

UNDER A MAGNIFYING GLASS TO SEE IF YOU CAN SAVE MONEY W H I L E P R O T E C T I N G T H E E N V I R O N M E N T.

We’ve been green for over 100 years!

GET A FREE 3E INSULATION ENERGY AUDIT! Let the Mechanical Insulation Industry Professionals dispatch trained insulation professionals, using thermal cameras, heat guns and computer software, to detect the insulation strengths and needs of your facility and its mechanical systems. Using the detailed data that we obtain on site, we will then assemble and provide you with a detailed assessment of your insulation.

WE MAKE IT EASY! JUST VISIT

MECHANICALINSULATORS.COM/FREE & SIGN UP FOR A FREE 3E AUDIT TODAY! S AV E E N E R G Y ! S AV E M O N E Y !

www.high-profile.com


April, 2013

39

High-Profile: Connecticut Facilities Development News

NEC CM for Mallory Ridge

KBE to Build New Housing

Mallory Ridge Bloomfield, CT - New England Con- wooded views of the beautiful landscape. struction (NEC) will serve as construction Future tenants will also enjoy optional gamanager for the Mallory Ridge 78-unit rages, in-unit laundry facilities, as well as Class A garden-style housing community lo- high-quality finishes and amenities. cated in Bloomfield. Construction is schedMartin J. Kenny, principal at Lexuled to commence in April on this $13 mil- ington Partners, LLC based in Hartford, lion multi-unit housing development. Conn., and David A. Sluter, founder of The project was designed by Barton- New England Construction and Bourne Newman Architects Partners of Norristown, Penn. and features Avenue Capital Partners, joined forces in Rendering of The Hole in the Wall Gang Camp four separate buildings with a clubhouse, 2011, beginning a successful collaborafitness center with in-ground pool, and tion on several real estate development and Ashford, CT – KBE Building of throughout the Northeast. KBE constructcommunity picnic and sundeck areas with construction projects. Farmington has been chosen to construct a ed the original 50-building camp 25 years new housing facility at The Hole in the Wall ago, and over the years has continued to Gang Camp in Ashford, Conn. construct new facilities and renovate existThe $1.5 million facility, known as ing buildings. KBE also donates time and Steve’s Station, will consist of three sepa- funds through its 50 Ways to Make a DifGlastonbury, CT - S/L/A/M and strategic plans in the Upstate New rate buildings, totaling 3,500sf of new con- ference philanthropic initiative. recently announced that Jeffrey C. York area. struction. The two-story buildings will be Last year, employees of KBE particiSpenard, AIA, EDAC has joined its Spenard previously served as a connected by one roof and will serve as pated in the bicycling event Camp Challenge Syracuse office. planner and senior architect for Beardsapartments for five doctors and their famiRide, helping to raise more than $100,000 Spenard is a design architect with ley Design Associates. Prior to that he for The Hole in the Wall Gang Camp. lies. more than 25 years of experience. He was responsible for project management This project will be constructed by Founded in 1988 by actor and huwill serve as S/L/A/M’s Syracuse, NY at C&S Companies for healthcare and KBE’s Special Projects Division, a subdimanitarian Paul Newman, The Hole in office practice leader. In this role he will research related projects. He also opened vision within KBE that provides exclusive the Wall Gang Camp provides free sumbe responsible for the development and and managed Francis Cauffman’s first resupport for construction projects valued at mer camp experiences to children with implementation of S/L/A/M’s business gional office in Syracuse for nine years. life-threatening illnesses and their families under $3 million.

Spenard Joins S/L/A/M

Northeast Studio’s Plumbing Contractor

Heating - Ventilation - Air Conditioning Sales - Service - Installation Fabrication - Design Commercial - Industrial

15 Aegean Dr., Unit #3 Methuen, MA 01844 mvalleycorp.com

497463_merrimack.indd

Tel.: (978) 689-0224 (888) 257-6876 Fax: (978) 682-3270

www.high-profile.com 1

10/13/10

12:30:53 PM


April, 2013

40

High-Profile: Connecticut Facilities Development News

Svigals Announcements

New Haven, CT - Art, architecture, and advisory firm Svigals + Partners has promoted Christopher Bockstael, AIA, to partnership, and Julia McFadden, AIA, to the ranks of the firm’s principals. Bockstael, who joined the firm in 2004 and was promoted to associate principal in 2009, is now one of the firm’s partners. He will take on an expanded role as a director of design for multiple projects. As project manager for the awardwinning New Haven headquarters of tech company Higher One, Bockstael produced a forward-thinking adaptive reuse design of the circa 1915 Winchester Arms factory. The project included the striking addition of a glass-enclosed atrium that connects

Lobby of Higher One

Robert Benson

Brockstael McFadden two of the older buildings. The result has been heralded as helping to revitalize Science Park, a part of downtown that had struggled with decline. Other projects have included the interior design and adaptive reuse to Yale New Haven Hospital’s living Well Fitness center, and currently he is engaged in the renovation and expansion of PepsiCo’s research and development laboratories in Valhalla, N.Y. McFadden, with the firm since 2008, frequently in a project management capacity, will now take the title of associate principal, taking a leading role in directing the marketing efforts firm-wide. Currently, she serves as project manager for several projects, including a renovation and addition for The Little Theatre in New Haven, a landmark facility on the National Register of Historic Places, that is currently under construction, while the new Engineering & Science University Magnet School for grades 6-12 and a new and expanded facility for the Ronald McDonald House of Connecticut – both in New Haven – are currently in the design phase.

Loomis Renovates Library

Windsor, CT - The Loomis Chaffee School, an independent secondary school in Windsor, had the opportunity to create study rooms while renovating the main level of the school’s three-story Katherine Brush Library. The concrete and waffle slab structurally framed building included a covered terrace at the main level overlooking the school’s expansive athletic fields which abut woods and the Connecticut River to Loomis Chaffee School Katherine Brush library the east. While the terrace element provisual transparency between occupants of vided the library a contained outdoor study the group study space and the main area. and unique social area, it was typically un- With flexible furniture, whiteboards, and derutilized. Enclosing the terrace allowed AV connections, the furnishings can be Loomis Chaffee the chance to repurpose reconfigured within the space to best meet the space while updating the overall main the needs of two occupants or 10. level of the library. For Loomis, this renovation and Amenta/Emma Architects was com- limited expansion project has successfully missioned by Loomis Chaffee to provide combined the traditional elements found in architectural design services for the reno- the main public area of its library (circulavation and main level expansion project. tion desk, periodicals, and reference areas) The primary program feature requested by with a variety of work and study environLoomis was the creation of multiple glass ments for its students. enclosed group study rooms located on While the debate rages on about the the former terrace. These new rooms, in impact of e-books, and libraries adapt to combination with lounge type seating ar- the digital age, the evidence is clear that lieas and traditional tables and chairs, would braries draw more people in than ever. provide students alternative environments Libraries will continue to adapt as for working individually or collaboratively. the digital age causes a continued rethinkThe new design elements utilize full height ing of space, of the role of the traditional glass interior and exterior window walls to book and of the delivery of information. preserve the essential design feature of the Libraries will also continue to be a destimain library level – the dramatic views of nation that brings together an academic the fields and woods beyond. community and promotes connection and The interior glass also promotes the collaboration through design.

Florence Electric ...The Experienced Leader ...in Green Energy Solutions From solar and wind energy to lighting retrofit and building energy saving solutions, Florence Electric is your one stop shop for design, engineering, budgeting, and installation. From schools and factories to retail stores and warehouses, there are no projects too small or too large for the management team that brings over a century of experience designing, managing, and installing its solutions. To see what Florence Electric can do for you, visit our website at www.teamfloco.com or call us at 508-823-5550

The Kaydon Group of Companies

290 Pine Street Canton, MA 02021

www.high-profile.com


April, 2013

41

High-Profile: Facilities Development News

McGowan Completes RiverStone Art

Manchester, NH - McGowan Fine Art of Concord recently completed artwork installation for RiverStone Resources LLC of Manchester. Amanda McGowan Lacasse, corporate art consultant with McGowan, coordinated the project – selecting and installing artwork for newly renovated and expanded work spaces. RiverStone’s business activities cross international boundaries and markets, and involve Nature images were chosen for the corridors, conference resolution of a wide variety rooms, and workspaces. of insurance and regulatory issues. peaceful, N.H. nature images for the corIn an effort to create a tranquil environment for RiverStone’s ridors, conference rooms, and workspaces. As a nod to the historic setting of the employees and contractors, Lacasse chose Waumbec Mills, Lacasse also highlighted Manchester history by hanging oversized historic postcards in the new break room. McGowan Fine Art has over 30 years of corporate consulting experience, and has worked with corporations and businesses of all sizes throughout New England. Oversized historic postcards in the new break room

Bond to Complete Clinic Renos

Rendering of clinical area renovation at the Jimmy Fund Clinic Boston - Bond Brothers (BOND) has begun work on a comprehensive renovation of Dana-Farber Cancer Institute’s Jimmy Fund Clinic, located in Boston’s Longwood Medical Area. The two-year renovation and expansion project will renew 19,500sf of clinic space serving pediatric cancer patients, increasing its capacity by 40%. The Jimmy Fund Clinic is widely recognized as one of the world’s premier centers for pediatric cancer research and treatment. The clinic’s multi-phased renovations will result in significant improve-

ments that will enhance pediatric cancer care for patients and families. Infusion and clinical areas will be expanded and improved to optimize flow and patient care. The waiting room will also be expanded and reconfigured to include play, quiet, and teen areas. Space adjacent to the clinic will remain occupied during construction, creating the need for strict infection control procedures. Completion of the project’s last phase scheduled for December 2014. The project is targeting LEED Ssilver accreditation.

IRONWOOD

COMMERCIAL CONSTRUCTION

Recently Completed Projects: COMMERCIAL CONSTRUCTION Anderson Window Corporate Interiors and Warehouse, Northborough, MA Historic Exterior Renovation, Gama Realty, Malden, MA Job Corps Interior Fit-out, Malden, MA

Air Quality Testing and Laboratory Analysis • Pre Reno/Demo HazMat Surveys Asbestos, Lead Paint, Mold, PCB’s • Environmental Site Assessments OSHA Compliance and Training • EPA Lead RRP Courses

Undisclosed Tenant Fit-out, Thorndike Street, Cambridge, MA BUILD VALUE, BUILD WITH IRONWOOD T (617) 334-9778 info@IronWoodDesignBuild.com

www.IronWoodDesignBuild.com www.high-profile.com


April, 2013

42

High-Profile: Educational Facilities News

Gateway CC - Model of Urban Sustainability New Haven, CT - Towers|Golde’s award-winning design for Gateway Community College is a model of effective urban landscape interventions. Simple, durable, and sustainable materials for longevity and ease of maintenance are used in an elegant, understated way to maximize their esthetic impact while providing a multi-faceted approach to representing current best practices in sustainable design. The result is a “campus” that serves to educate and delight as well as to validate the educational aspirations of both the institution and its students. This urban, brownfield project incorporates many green systems and technologies, recycled materials, community and transportation linkages, and green education commitments. It demonstrates that a natural, urbane environment can contribute to student performance, staff effectiveness, and most importantly, public perception of educational value and achievement. The 3.7 acre site is comprised of two parcels bisected by a downtown street and bordered on one side by a public parking garage. The only remnant of the original construction was the exposed shell of a below-grade service tunnel, required to remain operational throughout construction for deliveries to surrounding buildings. The new four-story, 360,000sf

Designed by Towers|Golde

The project incorporates many green systems and technologies. facility is composed of a 600-car garage and two buildings connected by a threestory high pedestrian bridge over the public way. The project incorporates a wide array of best management practices, use of local and recycled materials, community and transportation linkages, and green education commitments. Specific landscape interventions include storm water mitigation, highly programmed green spaces, and intensive green roofs for both formal and casual social interaction. The project

Detention basin is seeking LEED Gold certification. Towers|Golde composed this campus with three distinct elements: roofgardens, courtyards, and a green wall. The striking fourth floor roof garden culminates the experience of a multi-story campus atrium that slices through the core of the two buildings and leads to a distinctive, south-facing garden featuring a large ipe wood deck (approved by the fire marshal for its fire resistance) encircled by a water-efficient wildflower “meadow” with flowering trees. The garden is furnished with sculptural elements as well as seating to encourage social engagement. The rain garden in the courtyard between the building and the garage is both an artistic feature and a runoff management system; it is an educational demonstration of rain water recharge and a pocket park for casual use by students and staff. A detention basin lined with river stone is defined by granite curbing

www.high-profile.com

Site plan of Gateway Community College campus recycled from project street demolition. Surrounding the basin is a lush but waterefficient landscape of trees, shrubs, grasses, and perennial flowers, and just enough lawn to invite informal passive use. The adjacent playground serves the college’s daycare and its early childhood education programs, and was designed in close collaboration with the teaching staff. It integrates a landscaped area for quiet play and a children’s garden with more traditional play structures. Across the street, the community courtyard is an outdoor extension of a multi-purpose space available for community use. It also provides opportunities for small outdoor events, meeting breaks, and informal college socializing. Although sited at ground level, it is actually another intensive green roof garden, perched on the service tunnel roof deck. The project’s distinctive, sustainable approach is further expressed on the garage façade. One level above the street, vines are grown on a three-story trellis of biomorphic reed-like tubing, creating a dramatic vertical garden, visible across the cityscape. It announces the college and its commitment to a more sustainable future, for both its students and the planet.


April, 2013

43

High-Profile: Facilities Development News

Recent Jewett Subaru Projects

Raymond, NH - Jewett Automotive Design & Construction, a division of Raymond N.H.-based Jewett Construction Company, Inc., recently completed interior renovations at two Subaru showrooms. The four-month project at Long Subaru in Webster, Mass. involved 5,000sf of additions and upgrades to the showroom, service write up area, offices, and customer lounge. The new areas have an open and inviting feel made possible through the extensive use of exterior glass (which opens up the view while also lighting the space), ceramic tile floors, and a gas fireplace in the customer lounge. All work was performed while the dealership was in full operation – adjacent to and in areas occupied by customers and staff – requiring extensive noise and dust mitigation, as well as close coordination with dealership personnel to schedule work during off-hours and offpeak times. Work areas were concealed by walls or tempo-

New Showroom at the Renovated Long Subaru

The Renovated Ed Reilly Subaru rary barriers and clearly marked, providing a safe environment for both customers and staff. In Concord, N.H., Jewett completed interior and exterior renovations to Ed Reilly Subaru. Interior upgrades include service write-up area renovations and a refit of the showroom and customer lounge areas. Exterior renovations involved the installation of new ACM (aluminum composite material) panels and the new Subaru slate icon tower. Work also included selective demolition, new aluminum storefront doors and windows, modifications to the fire protection sprinkler system, design-build HVAC and electrical systems, and all finishes, including acoustic ceiling systems, ceramic floor tile and vinyl composite tile, carpet, and painting. Metals work was completed by Jewett Metal Buildings & Steel Erectors. Showroom and customer lounge refits were performed in two phases to ensure staff always had areas in which to meet with customers.

RODE Completes Piperi Design Teamed with designer Nicole Carroll

Boston – RODE Architects, an emerging design firm specializing in architecture for the urban environment, has completed the design of Piperi Mediterranean Grill, a new fast-casual restaurant at One Beacon Street in downtown Boston. RODE Architects teamed with interior designer Nicole Carroll on the design of the 16Photos by Andy Ryan Photography seat restaurant located on Interior view of the 16-seat restaurant the corner of Beacon and Tremont Streets. tion systems for the 1,200sf restaurant. The The project consisted of a full inte- exterior of this unique appendage to the adrior renovation, new kitchen, and ventila- jacent 37-story building remained largely as is, with the addition of new signage adorning the exposed pre-cast façade. RODE Architects coordinated the complex fit-out in a tight space tucked into the base of this busy office tower. Union Construction was the general contractor on the project, and TriMark was the kitchen consultant. CES provided project management services. The new fast-casual restaurant

77 Years And Going Strong

Fire Protection Specialists

Brick & Stone Restoration Repointing & Recaulking Concrete Repair & Protection

INDUSTRIAL • INSTITUTIONAL • RESIDENTIAL • COMMERCIAL

New Hope Baptist Church Boston, MA

Abbot has set the standard for commercial, institutional, and condominium masonry restoration throughout Eastern Massachusetts since 1936. What this means to our customers is cost-effective single source solutions, quality workmanship, and consistent service on each and every project from small to large. Now transitioning to a fourth generation, our family-oriented management team can provide the knowledge, insight, and expertise our customers demand and deserve.

How Can You Afford Not to Choose Abbot?

(508) 753-0015 22 Canterbury Street Worcester, MA 01610

617-445-0274

www.cogswellsprinkler.com

info@abbotbuilding.com

24 Hour Emergency Service 1-800-422-4971

We Install Peace of Mind 274 Summer Street Boston, MA

Like Us on Facebook www.facebook.com/abbotbuilding

www.abbotbuilding.com

28 Allerton Street, Boston, MA 02119 • HIC#166212

www.high-profile.com


April, 2013

44

Harriman Hires Five

High-Profile: People

Burt and Tang join CTA

Harriman, a fullservice architecture and engineering firm with offices in Maine and New Hampshire, announced Sharon Ames, Michael Morrissette, Benjamin Ouellette, Kelley Perreault, and Cathy StAmes reifel have joined the firm. Ames joins Harriman as a senior architect with over 18 years of experience in architecture and historic preservation. She is also a LEED Accredited Professional in building design and construction. Morrissette joins the firm as a designer in Harriman’s mechanical engineering studio. Ouellette joins the company’s electrical engineering studio as a designer. Perreault joins Harriman as an accountant. Previously she was an accountant with St. Mary’s Regional Medical

Perreault Streifel Center in Lewiston. Streifel, with over 10 years of experience, joins the firm as a lead project administrative assistant.

Boston - The Board of Directors of The Marr Companies has made four appointments within the executive management group. Robert L. Marr, chairman and CEO 10x13:1 10:11 AM Pagefor 1 28 years, has of the10/12/07 Marr Companies stepped down from his position as CEO but remains chairman of the board of directors. Following that, Daniel F. Marr III,

president and COO since 1994, has been named CEO. He is also president of Marr Scaffolding Company and Isaac Blair & Co., Inc. David B. Marr has been named president of Marr Crane & Rigging. Richard E. Burns, recently appointed vice president and COO of Daniel Marr & Son, has now been named president.

Morrissette

Ouellette

Innerglass

Tang

Burt

Both are heavily engaged in the A/E/C industry.

Cambridge, MA Gillicuddy held the role of Acentech Inc. announced director of marketing/busithat Sarah McGillicuddy has ness development manager joined the firm as director of at construction management marketing and business defirm Richard White Sons, Inc. velopment. In her new role, Prior to that she served as the she will lead the business marketing manager at Walsh development, marketing, adBrothers, Inc. vertising, and communicaShe recently was elected tions efforts of Acentech’s vice president/president-elect McGillicuddy seven vertical market teams of the Society for Marketing and three disciplines in the Professional Services (SMPS) areas of architectural acoustics, audio- Boston Chapter and will serve as the orvisual systems and information technol- ganization’s president beginning in the ogy design, and environmental noise fall of 2013. and vibration. Photo by Kate Femino of Prior to joining Acentech, Mc- K.Photographie

®

Window Systems, LLC

The Compression-Fit Advantage ns to Congratulatio of Tarlow, Rob Kerwin, Rodgers, Breed, Hart & usetts PC, Massach r of the Super Lawye 009! year; 2004-2

Our 55th year of earth moving performances. Site Development

Utility Work

Soil Remediation

Site Improvements

Earthwork

Equipment Rental

www.high-profile.com

firms.

McGillicuddy Joins Acentech

Recent Marr Appointments

Ad 55th

Waltham, MA - CTA Construction has appointed Sue Burt and Roland Tang as vice president, business development. Burt and Tang will develop the company’s sales initiatives and marketing strategies, overseeing the company’s business development efforts in three core markets: academic, residential, and commercial/retail. Prior to joining CTA Construction, Burt served as director of business development and director of marketing for architecture and engineering firms in the Boston area. Roland Tang served as director of business development for several top construction management and architecture

Maintain the charm of your existing 15 Herman Drive • windows. Simsbury, Save energy, save money, & save history!

CT 06070 860-651-3951 • Toll Free 1-800-743-6207 Fax (860) 651-4789 • www.stormwindows.com

860-651-3951 • www.stormwindows.com

Stay Connected!

In addition to High-Profile Monthly’s print publication, selected stories are posted on our blog at www.high-profile. com and included in our weekly e-newsletter, FastFacts Friday. Every issue is archived on line using flip page technology for easier viewing!

Keep up-to-date on New England’s latest A/E/C news and events! Sign up to receive FastFacts Friday. Send an e-mail to us at previews@high-profile.com with the words “add to fastfacts” in the subject line.


April, 2013

Acella Promotions

Norwell, MA. - Acella Construction announced two promotions in its project management staff. Saul Schrader, LEED AP and Ryan Klebes, LEED AP both have been promoted to the position of senior project manager. Schrader has been with the firm since 2004 and has managed numerous higher education projects. Klebes joined Acella in 2003 and has managed a wide range of healthcare, highereducation, and institutional projects.

Schrader

High-Profile: People

Klebes

Vision 3 Promotes Hauser

Providence, RI - Paul Hauser, LEED AP has been promoted by Vision 3 Architects to project manager. Upon graduating from Roger Williams University, he joined the firm as an intern architect. He is a core member of the corporate office team and is currently working on the corporate headquarters for Coastway Community Bank in Cranston, and the law offices of Edwards Wildman Palmer LLP in downtown Providence.

Hauser

Renny Schofield Joins Erland

Burlington, MA - Erland Construction announced that Renny Schofield has joined the firm as project manager. He is both a LEED Accredited Professional and ASHE Healthcare Certified. Prior to joining Erland, he worked for G. Greene Construction Company.

Schofield

For his first project at Erland, Schofield has joined the project team redeveloping Northwest Park in Burlington for Nordblom Company, that includes demolition of several buildings to make way for retail, restaurant, office, and residential space.

Save 25% - 40% with our proven the most cost effective method for advertising and promotions.

SMMA Appointments

Cambridge, MA - Symmes Maini & McKee Associates (SMMA) announced four new leadership appointments. Martine Dion, Lorraine Finnegan, and Jennifer Howe were elected principals in the firm. Steven Vincent was named a senior associate. All are LEED-accredited professionals. Dion, an 11-year veteran of SMMA, and is a licensed architect and the firm’s director of sustainable design. Finnegan, who has been with the firm for 19 years, leads the firm’s K-12 Studio, is a licensed architect.. Howe, a 13-year veteran of SMMA, leads the company’s government studio. She is a professional engineer. Vincent, who joined SMMA in 2010, is a project manager and architect in the firm’s corporate and advanced technology studio. He is a licensed architect.

Dion

Howe

Vincent

Finnegan

Schirmer Joins Vanderweil

Boston - Ernest Schirmer, support Vanderweil’s Mid-AtRCDD/NTS CTS, has joined lantic offices in New York, N.Y.; Vanderweil Engineers’ TechnolPrinceton, N.J.; and Philadelphia, ogy Design Group as a senior Penn. engineer and project manager Schirmer previously served specializing in information techas managing director of the Midnology and Integrated Intelligent Atlantic office of Acentech, Inc., Building Systems. His backand as vice president of technolground includes national and ogy consulting with the Syska international experience in teleHennessey Group. His experiSchirmer communications, data centers, ence includes technology conmultimedia, and network design sulting within the pharmaceutical, for higher education, corporate, commer- healthcare, education, research, corporate, cial, and healthcare clients. Schirmer will aviation, and hospitality markets.

Save Time - Save Money

Advertise in High-Profile Monthly every month on a tf schedule

If you are looking for repeat customers shouldn’t you repeat advertising?

Take advantage of this special offer - Save 25% to 40% every month and receive a full package of benifits with the monthly TF program. This is our most popular adveritising schedule because it’s not complicated, it saves time, it saves money and it is effective.

With our special TF offer your will receive:

More Exposure: Your ad appears each month both in print and online. Lower rate: The biggest discounts help to reduce your marketing budget for the year. A link to drive customers to your website: Your ad on line in full color., automatically links to your firm’s website and improves search engine awareness.

Focus:

Educational Facilities Developments

Agostini Builds Norwood HS

ett Park Drive, East Providence, RI 02916 1) 431-1200 Fax: (401) 431-0049

Compass Project Management CM, Ai3 Architect

conconstruction.com

Norwood, MA - Agostini Construction Company of East Providence, R.I. along with Compass Project Management, Inc. of Medfield, Mass., the owner’s project manager, teamed up with the Massachusetts School Building Authority (MSBA) and Architectural Involution (Ai3) of Wayland to successfully manage, design, and build the new Norwood High School. The new high school was the first model built under the MSBA’s Model School Program...see story on page 32. (above) athletic field (top and below) Entrance to athletic center and performing arts center.

Plus- at no additional charge add a boost for your PR: News is free and with the TF program• Your news and articles receive preferred placement • Your headlines appear on the High-Profile Monthly cover under “InsideThis Issue” • Your articles appear in the High-Profile Monthly blog • Headlines are e-blasted in FastFacts Friday

Norwood High School main entrance

Inside this Issue

September 2011

Windover Construction Completes Three School and College Projects BOND CM for UMass Fitchburg State Project Erland Tops Off New School Center with Robert Olsen + Assoc. LLD Designs, KBE Builds URI’s Hillside Residence Hall Profile: CTA Cements Place as Leading School Builder Cutler Associates’ Design Build Anna Maria College Holds Open House Oldcastle Precast Awarded Liberty Terrace Dormitory Featuring: BC Project Achieves LEED Platinum Tewksbury High School Tops Off UMass Lowell Begins Steel Erection

Library P.O. Box 7, Pembroke, MA 02359 Change Service Requested

Suffolk Construction Builds The Victor Luxury Apartments Pro Con Breaks Ground For Aviv Center for Living, KDA Architect Contracting Specialists Awarded Ground Breaking for Bristol Hotel Construction Starts on New Storrs Center Increasing Natural Gas Demand in NE by Douglas Pope MIT Sloan: Archieving Acoustical, Audiovisual, and Technological Success Colleges Carving out New Space on Existing Campuses by Julie Nugent

plus Connecticut Facilities, Heathcare, Green News, Awards, Multi Residential, Business News, People, Calendar and more...

Featuring

Life Sciences

Design and Construction

One Broadway, Cambridge, MA 02142

www.klingstubbins.com

KlingStubbins.Vanderweil Engineers Design

ARCHITECTURE

P 617.491.6450

ENGINEERING INTERIORS

Shire Human Genetic Therapies - B200

PLANNING

Lend Lease Builds

SERVICES MECHANICAL ENGINEERING ELECTRICAL ENGINEERING PLUMBING ENGINEERING POWER & UTILITIES

TRANSMISSION & DISTRIBUTION CENTRAL HEATING & COOLING SUSTAINABLE BUILDING DESIGN TECHNOLOGY INFRASTRUCTURE ENERGY ANALYSIS & MODELING BIM & IPD LEADERSHIP

BOSTON

LAS VEGAS

LOS ANGELES

NEW YORK

PHILADELPHIA

PRINCETON

vanderweil.com

SYRACUSE

Let us assign an account executive to answer questions and provide personal assistance whenever you need it.

Call 781-294-4530

2011 on

OLISpetiti ROP Com MET gn er: Desi Winn Gen Next

© HOK

WASHINGTON DC

A

s one of the world’s leading specialty biopharmaceutical companies, Shire HGT is fully focused on a single purpose: to enable people with life-altering conditions to lead better lives. In support of this mission Shire has planned, designed, and constructed a state-of-the-art campus located at the Lexington Technology Park. Groundbreaking for B200 commenced in March 2010 with occupancy taking place in October 2011. The core team includes the design team of KlingStubbins and Vanderweil Engineers and construction partner Lend Lease.....see the full story on page 38.

November 2011

Inside this Issue

Hobbs Brook Breaks Ground ISPE Boston Chapter Events AGC Build New England Awards MBC Inducts Hall of Fame Honorees Bridgewater State Opens New Wing Eckman Renovates Union Crossing Temple Renovation Phase 1 Complete Cardinal Spellman Fitness Center Opens The Albert Sherman Center Well Underway Abott Boyle Photographers 40th Anniversary Renovations at Connecticut College Science Ctr. Barnes Nears completion of new US Biological Facility New School Designed to Meet MA CHPS Standards Diversified Project Management Spotlight: InterGen Callahan Multi-Projects: Avita, Stonebridge, Autumn Glen Congress Companies Continues Bel Air Health Care Center Expect more from Test-Fits by Mark Reed Massachusetts is Leading the Next Life Sciences Revolution by Robert K. Coughlin

plus Heathcare, Institutions and Schools, Facilities News, Commercial, Green News, Awards, Associations, People, Calendar and much more...

P.O. Box 7, Pembroke, MA 02359 Change Service Requested

m (below) auditorium

45

www.high-profile.com


April, 2013

46

High-Profile: Calendar IIDA

SMPS Boston

ROC Awards 2013 June 13 Omni Parker House, 60 School Street, Boston Save the date for the most popular event of the year - SMPS Boston’s Recognizing Outstanding Communications (ROC) Awards gala! Information will be posted as it becomes available at http:// www.smpsboston.org/program/calendar.php Note: Late entry deadline - Miss the deadline for the 2013 Recognizing Outstanding Communications Awards program? SMPS has implemented a late entry date - Friday, April 26; don’t miss your chance to submit your marketing materials!

Bisnow Events

April 18 3rd Annual Boston Life Sciences Real Estate Summit Boston Marriott Long Wharf -Grand Ballroom Lobby Level 296 State St., Boston Leaders of the life sciences community discuss Boston’s life sciences real estate market. All-star panelists will review the state of the capital markets, development of new life science research facilities, and new initiatives and trends. To register or for more information: eventregistration@bisnow.com

May 2 Westin Copley, Boston IIDA Boston will host its annual Business Leader’s Breakfast. Keynote speaker Chester Elton will be speaking on Getting Your People “All IN!”: How to create a high performance culture and drive Big Results 7 am - 8 am: Registration & Networking 8 am - 10 am: Breakfast, speaker, and honoree Visit www.iidane.org

ABC

Save the date! June 20 The 2013 Annual Golf Tournament Pinehills Golf Club In Plymouth, Mass. Register by going online at www.abcma.org or by calling (781) 273-0123.

NAWIC

April 23 5:50-9:30 p.m. “Women in Media” National Association of Women in Construction Anastasia Barnes, business development manager at High-Profile Monthly, will join in a discussion on “Women in Media.” Info: http://www.nawicboston. org/events.html

yo r Pr B l M S l V d “For analyzing point cloud data in Revit, Scan to BIM is an extremely powerful tool because you get comprehensive visualization tools, a high degree of precision and ease of data management.” —Jason ellis, technology Director, truescan3D

SolutionS Beyond Software

www.high-profile.com

AGC Massachusetts

April 23 - 25 Mayflower Hotel, Washington, D.C. The AGC Federal Contractors Conference is the only national event where AGC contractors and federal agency personnel can meet in a collaborative forum to review federal construction contracting issues from around the United States. http://www.agc.org/cs/events/2013_federal_ contractors_conference

Preservation Massachusetts

May 1 Annual Awards Dinner This year’s awards will be the beginnings of a three-year thematic program that will honor the people behind the scenes, who truly make historic preservation projects happen. In 2013 we honor 25 firms and individuals whose “behind the scenes” front end work takes a project from conceptual idea through to groundbreaking. In 2014 we will focus on the design and restoration work that transforms these historic resources and gives them new life, and in 2015 we will celebrate the finished projects themselves. Visit www.preservationmass.org for more information.

MHA

May 9 - 9 a.m. – 2:30 p.m. 7th Annual Hospital Facilities Conference MHA Conference Center at Executive Park, Mass. Exhibitors: Levi+Wong Design Associates, Inc. MorrisSwitzer ~ environments for health VHB/Vanasse Hangen Brustlin, Inc. Featured Presentations: Case Study: Baystate Health’s Hospital of the Future Project Innovations in Healthcare Construction, including a look at Integrated Project Delivery. In the United States, Integrated Project Delivery (IPD), which seeks to align the interests, objectives, and practices between the owner, architect, and construction manager of a construction project, got its roots in the healthcare industry. In this presentation we will explore what IPD is. Also planned: A briefing on the recent changes to the Licensure/Review for Design/ Construction of Non-Patient areas. For information log on to http://www. mhalink.org/

5 stories 18 recessed windows of varying sizes 2 separate documents claiming to be as-builts

Scan to BiM your Problem. Solved. IMAGINiT’s Scan to BIM was the first software that allowed you to view and interact with point clouds inside of autodesk® revit®. using Scan to BiM you can interact with a point cloud in revit, assisting with automated recognition and placement of architectural and MeP elements such as walls and ducts. Get a free, 30-day trial of Scan to BiM at imaginit.com/30daytrial to learn more visit imaginit.com/scantobim or call our Boston office at 800-356-9050

Consulting | Professional serviCes | training | suPPort | software


April, 2013

47

TRUSTED CONSTRUCTION INSURANCE ADVISORS Backhoes and bulldozers. Patch trucks and pavers. We get it. Risk is inherent in your business. Whether you’re building commercial offices, constructing a bridge over water, or transporting aggregate from the plant to the field, unexpected hazards lurk. That’s why you call upon the expertise of the insurance advisors at Gencorp Construction Practice Group. Our full service industry advisors don’t just understand the construction insurance and surety business: we understand your business. This unique knowledge base allows Gencorp Construction Group to create innovative risk management and bonding solutions, and in doing so, allows you to avoid financial pitfalls by keeping your projects on track

Bob Nagel Property & Casualty

Chad Bjorklund Professional Liability Brian Rossi Surety

and on budget.

Chris Iannotti Artisan Contractors

The Trusted Advisors

Call Today: 800.232.0582

rnagel@gencorp-ins.com, x111 l brossi@gencorp-ins.com, x187 ciannotti@gencorp-ins.com, x108 l cbjorklund@gencorp-ins.com, x115

16 Main Street, East Greenwich, Rhode Island 02818 l gencorp-ins.com

www.high-profile.com


April, 2013

48

Boston Office 50 Franklin Street, Suite 203 Boston, MA 02110 T. 617.449.4000

F. 617.449.4049

New York . Charlotte . Chicago . Pittsburgh . San Francisco . Stamford . Washington DC Canada . China . Ecuador . India . UAE

B

oston - The new state-of-the-art 26-story residential and mixed-use building located at 120 Kingston Street in downtown Boston is under construction. Perkins Eastman Architects (PE) led the fast track design development and documentation process. McNamara/Salvia, Inc. is the structural engineer of record. RODE Architects is serving as interior architect, along with Planeta Basque Interior Design. R.G. Vanderweil Engineers is responsible for the MEP/FP design. The team continues to work closely with the development team consisting of Forest City - Boston and The Hudson Group; along with the construction management team at Suffolk Construction, to successfully bring to life the design of the 292,000sf high-rise...see full story page 26.

www.high-profile.com Work in progress, March 2013. Photo courtesy Suffolk Construction


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.