Hiral Ahir 2024 Portfolio

Page 1

Selected works of PROFESSIONAL + ACADEMIC architecture portfolio

Hiral Ahir

P.01) CedarBrae Blvd- Single Family Residential ...03

P.02) Bellamy Road- Single Family Residential ...05

P.03) Main Street- Laneway Suite ...08

P.04) OCVibe Urban Core- Restaurant Row- Mixed-Use Instituitional ...11

P.05) OCVibe Urban Core- Pavilion Bar Structure- Restaurant and Bar ...15

P.06) OCVibe Urban Core- Market Hall Building- Mixed-Use Commercial ...18

P.07) Chickasaw Parcel 01- High-end Single Family Residential ...21

P.08) Rockdale School- Instituitional ...24

P.09) Safdarjung Enclave- Multi Family Residential ...26

P.10) Fluer Drive + ADU - Single Family Residential and ADU ...29

P.11) Mesa Verde Drive- ADU ...33

P.12) Chickasaw Parcel 05- High-end SF Residential ...35

A.01) Design Development of atlanta library ...37

A.02) Think tank library ...41

A.03) Metro Station design and structure ...45

A.04) Thesis- Trespass - a public space ...47

2
Contents
Professional
Academic
project
project
s.no //
name // Project Type s.no //
name

P.01

Cedar Brae Boulevard

Proposed - A Single Family Residential City of Toronto, Ontario, Canada

Demolish the existing house, to propose a new single family residence on the given lot. Conceptual Massing and feasibility study based on the client’s requirement of private residence. Based on City of Toronto’s zoning regulations, client would like to apply for a variance for the front elevation of the house, extending beyond the allowable frontyard setback.

Hiral Ahir_Academic Work
Above image // Site Photograph, existing Left image //Initial Feasibility Study with estimated area calulations
4 Hiral Ahir Professional Work Above image // Initial Ground floor development and Second floor schematic planning Left image //Elevation of the Front and Side- Schematic Phase

Bellamy Road

Proposed - A Single Family Residential City of Toronto, Ontario, Canada

Demolish the existing house, to propose a new single family residence on the given lot. Involved in the Schematic Design, Zoning Permit and Building Permit phases.

Hiral Ahir Professional Work
P.02
Left image // Preliminary Material Render of the proposed design
6 Hiral Ahir Professional Work All images // Design Development set for Building Permit approval
7 Hiral Ahir Professional Work All images // Design Development set for Building Permit approval
8 Hiral Ahir Professional Work P.03 Main Street_ Laneway Above image // 3D axo nometric with the context Left image //Conceptual Massing Renders for the proposed Laneway Suite Proposed - A Laneway Suite City of Toronto, Ontario, Canada Involved in the Schematic Design, Zoning Permit and Building Permit phases.
Hiral Ahir Professional Work All images // Design Development set for Zoning Committee approval
10 Hiral Ahir Professional Work All images // Design Development set for Zoning Committee approval

OCVibe Urban Core _Restaurant Row

Proposed - A six storey mixed use building City of Anaheim, California, USA

Design Development and Construction Drawings for Restaurant Row Building, this involved, making code compliant drawings for all staircases, ensuring egress and ADA compliances are met, making key sections, plans and elevations of the main building in coordination with other consultants. Involved inmaking technical drawings and construction drawings for specific areas like Cabana over the ramp.

Hiral Ahir Professional Work
P.04
Above image // 3D view of RR with context Left image //RR Building with context render
All 3Drendersonthispageareproducedbyanexternal3dArtist

Above images // Cabana over Ramp, detail drawings and quantity table

Left images //RR Ramp and Open area Construction Drawing set

12 Hiral Ahir Professional Work

Alldetailsonthispagearedrawnbyme,inco-ordinationwith Landscape,Waterproofing,Civil,Structural,MEPconsultantsetc.

Above image // Construction Detail for Seismic Gap

Left images //Construction Detail of concrete planter walls- all configurations and transitions, refer to the plan on page above- concrete planter wall junctions shown in plan view.

13
Hiral Ahir Professional Work

Alldetailsonthispagearedrawnbyme,inco-ordinationwithcivil ,structural,MEPconsultantsetc.

Above images // Construction Detail for Top and Bottom Stair transitions.

Left images //Working Drawing of a Public Stair in accordance with ADA and Egress compliance

14 Hiral Ahir Professional Work

OCVibe Urban Core _Pavilion Bar

Proposed - A six storey mixed use building City of Anaheim, California, USA

Design Development and Construction Drawings for Restaurant Row Building, this involved, making code compliant drawings for all staircases, ensuring egress and ADA compliances are met, making key sections, plans and elevations of the main building in coordination with other consultants. Involved inmaking technical drawings and construction drawings for specific areas like Cabana over the ramp.

Hiral Ahir Professional Work
P.05
Above image // 3D view of Pavilion Bars with context Left image //Pavilion Bar schematic design with context render
All 3Drendersonthispageareproducedbyanexternal3dArtist

Alldetailsonthispagearedrawnbyme,inco-ordinationwith Landscape,Waterproofing,Civil,Structural,MEPconsultantsetc.

Above images // Elevations and Co-ordinate point system for the Design Development of Pavilion Bar Structure

Left images //Design Development - Ground floor and Roof Plan of Pavilion Bar.

16 Hiral Ahir Professional Work

Alldetailsonthispagearedrawninco-ordinationwith Landscape,Waterproofing,Civil,Structural,MEPconsultantsetc.

Above images // Detailed Drawings of different junctions of Pavilion Bar, marked on the plans and sections on the page above.

17 Hiral Ahir Professional Work

OCV!be Urban Core _Market Hall

Proposed Single Family Residence and a detached ADU with outdoor pool and spa.

Design Development and Construction Drawings for Market hall Building, this involved, making code compliant drawings for all master layout of Public Restrooms Outdoor Staircase, Interior Main Hall development- drafting key sections, plans and elevations of the main building wrt other consultants co-ordination,drafting RCP layout for all areas in co-ordination with HLB lighting, MEP, Structural consutants and Interior desigers.

Hiral Ahir Professional Work
P.06
Above image // 3D view of MH building with context Left image //3D view of MH from the main road side All 3Drendersonthispageareproducedbyanexternal3dArtist

Left images //Working Drawings of a Public Restroom in accordance with ADA compliance Alldetailsonthispagearedrawnbyme,in co-ordinationwithcivil ,structural,MEPconsultantsetc.

19 Hiral Ahir Professional Work
20 Hiral Ahir Professional Work
Left images //RCP Layout of the central main hall area of Market Hall, with detailed drawings of Cloud Shaped Ceiling

Chickasaw Parcel 01, Joshua tree, CA

Proposed Single Family Residence and a detached ADU with outdoor pool and spa.

Involved in design phase, schematic design 3d models, site visits at joshua tree for survery phase, produced 3d contour file using 2d survey analysis. Design detail and preparation of construction documents for plan check submittal set at San Bernandino County.

Hiral Ahir Professional Work
P.07
Above image // 3D schematic design development phase Left image //3D final design output of the proposed residence

5'-6-3/8"

1'-6" 8'-6"

+2771'-3-3/8" T.O.RIDGE

+2769'-6" T.O.RIDGE

+2757' F.F.E @FIRST FLOOR +2765'-0" B.O.OVERHANG

B.O.OVERHANG +2769'-6" T.O.RIDGE

+2757' F.F.E @FIRST FLOOR

T.O.RIDGE

22 Hiral Ahir Professional Work 5 A302 1 A302 1 A301 3 A301 3 A306 2 A305 1 A305 2 A306 1 A306 3 A305 4 A303 2 A303 1 A303 3 A303 8 A303 7 A303 6 A303 5 A303 2 A301 2 A302 3 A302 4 A302 2 A307 1 A307 1 A304 3 A304 2 A304 4 A304 A 1 2 3 4 5 6 B C D E F G gA gB gC gD g1 g2 m3 m2 m1 b6 b5 b4 b3 b2 b1 14'-9" 16'-1" 5'-8" 13'-10" 10'-6" 12' 15'-4" 19'-1" 7'-2" 8'-11" bD bC bB bA 9'-8" 12'-8" 8'-1" 23'-9" 25'-5" 6'-8" 21'-3" 6'-1" 12' 8'-11" 8'-1" 3'-7" 6'-2" 14' 13'-8" 6'-6" 21'-3" mC mC mA FIRST FLOOR PLAN 3/16"=1'-0" A201 SCALE: 1 3/16" 1'-0" FIRST FLOOR PLAN ENTRY HALL 101 FP-36 101.A Issue and Date Drawn By: Project No: Checked By: Scale: Sheet No: 21-04 CHICKASAW ROAD, APN 0604-051-40 CHICKASAW PARCEL 01 4875 Wiota Street Los Angeles CA 90041 p: 323 3320936 www.wyotaworkshop.com Wyota Workshop Copyright C 2021 Wyota Workshop SUBMITTAL: PLAN CHECK 09.27.2021 SM HA GENERAL NOTES KEY NOTES LEGEND FP-01 FD FLOOR DRAIN, SEE PLUMBING 1 HR. RATED WALL ASSEMBLY. PENETRATIONS TO BE SEALED. FP-02 CASEWORK FP-03 GAS RANGE WITH CEILING MOUNT HOOD FP-04 EDGE OF ROOF, BUILDING, CEILING, OR DECK ABOVE FP-05 HOSE BIB FP-06 FP-07 FP-09 42" HIGH GUARDRAIL 1/ 2" 3" STEEL VERTICAL FLAT BAR PTD, @4" O/C W/ 3/ 4" X 3" STEEL TOP AND BOTTOM BAR PTD FP-10 WOOD TRELLIS 2X8 MEMBERS (SEE PLAN FOR SPACING) FP-11 FP-12 FP-15 DIRECT VENT, SEALED COMBUSTION TYPE FIREPLACE. SEE A-009 FOR SPEC SHEET FP-16 POWER METER/ MAIN SERVICE PANEL- MIN. BUSBAR RATING OF 200 AMPS. FP-17 FP-20 FP-21 PLANTER WALL BOARD FORMED ARCHITECTURAL CONCRETE FINISH FP-22 SKYLIGHT- SEE DOOR WINDOW SCHEDULE FP-23 HVAC CONDENSER UNIT FP-24 KITCHEN HOOD VENT ON ROOF FP-25 BATHROOM OR OTHER EXHAUST VENT ON WALL FP-26 DOWNSPOUT AND GUTTER, PTD AREA DRAIN SD SMOKE DETECTOR FP-27 20 MIN. FIRE RATED DOOR, SELF-LATCHING SELF-CLOSING FP-28 FP-30 FP-34 WASHER/DRYER HOOK-UP. PROVIDE REQUIRED VENT, HOT AND COLD WATER, FLOOR DRAIN AND GFCI OUTLET FP-35 FP-37 1. ALL DIMENSIONS TO F.O.SH. OR F.O. CONC. FOR GRIDLINES AND C.L. OF STUDS AT INTERIOR WALLS AND C.L. OF DOORS & WINDOWS U.N.O. 2. REFER TO SITE PLAN AND FLOOR PLANS FOR GRADING SITE DRAINAGE. 3. REFER TO SHEET NO. A-5.01 FOR SITE DETAILS. 4. ALL ROOF RUNOFF/DOWNSPOUTS TO DRAIN TO PLANTERS FOR BIOFILTRATION. SEE FLOOR PLANS, ELEVATIONS AND SECTIONS. 5. SEE STRUCTURAL DRAWINGS FOR RETAINING WALL AND CMU WALL DETAILS. 6. PROVIDE ANT-GRAFFITI FINISH WITHIN THE FIRST 9 FEET, MEASURED FROM GRADE, AT EXTERIOR WALLS DOORS. EXCEPTION: MAINTENANCE OF BUILDING AFFIDAVIT IS RECORDED BY THE OWNER TO COVENANT. EGRESS WINDOW. MIN. 24 CLR. HT. 20" CLR. WIDTH W/ 5.7 S.F. MIN. AREA & 44" MAX. TO SILL. SEE A902 TANKLESS WATER HEATER, SURFACE MTD., SEE TITLE-24 DWGS FOR CAPACITY- OUTDOOR UNIT CM CARBON MONOXIDE ALARM WALL TYPE. SEE SHT A901 FOR WALL TYPES AREA FOR FUTURE P.V. ARRAY 2' 1'-3" C 1'-3" DASHED RECTANGLE ON PLANS INDICATES MIN. CLR. SPACE REQUIRED AT WATER CLOSET CEILING MOUNTED ENERGY STAR COMPLIANT HUMIDISTAT CONTROLLED EXHAUST FAN, CAPABLE OF 50 CFM MIN. TO TERMINATE TO OUTSIDE OF BUILDING, TYP. SEE A009 FIREPLACE FLUE CLASS 'A'/ COOL ASPHALT SHINGLES ROOFING-OWENS CORNING SUPREME IN SHASTA WHITE ICC-ES AC438. SEE A009 FOR ROOFING SPECS CLASS A BUILT UP ROOFING, SLOPE TO DRAIN @MIN 2%. 7. SEE A901 FOR FLOOR & WALL ASSEMBLIES & WATERPROOFING SCHEDULE. 8. SEE A902 FOR DOOR WINDOW SCHEDULE. 9. SEE A5.- SERIES FOR EXTERIOR DETAILS INCLUDING DECK, GUARDRAIL, SCREEN TRELLIS DETAILS FP-08 TRENCH DRAIN FP-13 ROOF DRAIN OUTLET FP-14 FP-18 FP-19 FP-29 FP-31 FP-32 FP-33 FP-36 FP-38 FP-39 FP-40 FP-42 FP-45 FP-41 FP-46 FP-47 FP-48 FP-49 FP-50 FP-51 FP-52 PROPERTY LINE GRADED DRIVEWAY GRADED YARD W/ GRAVEL FINISH GARAGE DOOR SECTIONAL, PTD 3/ 4" CORTEN STEEL PLANTER WALL SEPTIC TANK LEACH FIELD WOOD SCREEN WALL 2X6 MEMBERS @ 4" O/C W/ STEEL ANGLE SUPPORT WOOD SCREEN GATE 2X4 MEMBERS @ 4" O/C W/ STEEL ANGLE FRAME ROOF RIDGE PARAPET W/ PTD MTL FLASHING CAP DECK COATING FLOOR FINISH, SLOPED TO DRAIN 42" TALL WALL, WOOD FRAMED W/ CEMENT PLASTER FINISH (BOTH SIDES) THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACES RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS FOR FUTURE SOLAR ELECTRIC' WOOD BENCH BUILT-IN SEAT W/ 2X2 MEMBERS W/ 1/ 8" GAP AND BACK (E)JOSHUA TREE TO REMAIN NO CONSTRUCTION WITHIN 11'-0" OF TRUNK FLASHING TYP, SEE SHEET OUTDOOR KITCHEN CABINETRY SCUPPER, PTD OUTDOOR FIREPLACE ENCLOSURE W/ SMOOTH TROWEL CEMENT PLASTER FINISH PHOTOVOLTAIC PANELS. FLOOR MTD OUTLET. ROOF OVERFLOW DRAIN (COMBO UNIT) FP-43 FP-44 THE PANEL OR SUB PANEL SHALL PROVIDE CAPACITY TO INSTALL A 40 AMPERE MINIMUM DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICES. MINIMUM 1" INSIDE DIAMETER LISTED RACEWAY TO ACCOMMODATE A DEDICATED 208/ 240 VOLT BRANCH CIRCUIT FROM MAIN SERVICE OR SUBPANEL AND TERMINATE TO CHARGING SYSTEM AREA DESIGNATED FOR FUTURE P.V. ARRAY PATHWAY FOR ROUTING FROM SOLAR ZONE TO MAIN SERVICE PANEL WOOD DECK, 1X6 DECKBOARDS W/ 1/ 8" GAP OPEN TO GRADE FP-53 CONCRETE RETAINING WALL- ARCHITECTURAL BOARD FORMED FINISH FP-54 PLANTER, PROVIDE IRRIGATION AND DRAIN FP-55 LAUNDRY RM 102 POWDER RM 103 GREAT RM 104 MASTER BDRM 105 MASTER BATH+CLOSET 106 BEDRM 01 107 BATH 01 108 BEDRM 02 109 BATH 02 110 101.1 101.C 101.B 101.2 101.3 103.A 101.D 104.A 104.B 104.1 104.2 104.3 104.D 104.C 104.E 105.1 105.2 106.A 107.1 107.2 107.3 108.A 107.A 107.C 107.B 110.A 109.A 109.B 109.C 109.1 109.3 109.2 106.1 CARPORT 111 GARAGE 112 STORE RM 113 113.1 112.2 112.1 +2756.75' +2753.0' +2754.0' +2755.0' +2756.0' +2757.0' +2758.0' +2759.0' 1B 1A 2C 2D 1B 2C 2C 2D 1B 1B 2D 2B 2C 1C 2C 1A 2C 2D 2C 2C +2760.0' +2756.0' +2755.0' +2754.0' +2753.0' +2752.0' +2751.0' +2750.0' +2757.0' +2758.0' +2759.0' +2756.96' 45'-3-3/8" X 18'-1/2" 7' X 18'-4-1/8"
13'-0-3/8" X 15'-9-1/2"
X 9'-10-3/8" 13'-0-3/8" X 15'-9-1/2" 5'-6-3/8" X 9'-10-3/8" +2755' +2754.75' 20'-0-3/4" X 20'-0-3/4" 20'-5-1/4" X 18' 12'-0-3/8" X 22'-0-1/2" 8'-9-3/8" X 22'-0-1/2" +2754.75' +2754' +2753' +2756'.5" +2755' +2757' +2756.75' +2756'.5" +2757' D1 D2 D3 D4 D6 D5 D7 D8 D9 D10 D13 D11 D12 FP-48 FP-40 FP-28 FP-29 FP-20 FP-28 FP-33 FP-09 FP-53 FP-09 FP-01 FP-21 FP-54 FP-54 FP-53 FP-06 FP-55 FP-55 FP-46 FP-28 FP-28 FP-19 FP-21 FP-55 FP-55 FP-21 FP-55 FP-06 FP-27 FP-55 FP-26 TYP 1 of FP-26 TYP of 2 FP-26 TYP of SE-12 GENERAL KEY NOTES SE-01 GARAGE 1. VERIFY EXACT TO ANY WORK. 2. ALL WALL/FENCES BY ZONING ADMINISTRATION 3. SEE DOOR SE-02 CLASS SE-03 EGRESS SE-04 DOWNSPOUT, SE-05 SE-06 EXTERIOR SE-07 SE-11 SE-12 WOOD SE-13 3/ SE-14 SMOOTH SE-15 AREA SE-16 SE-17 FLASHING SE-18 PLASTER EXPANSION SE-09 WOOD SE-10 SE-21 KITCHEN SE-22 GUTTER, SE-23 SE-24 WOOD ANGLE SE-19 LINE SE-20 HOSE SE-25 42" @4" CONCRETE LINE OUTDOOR PLASTER CONCRETE CONCRETE SE-08 PLANTER WOOD ANGLE SCALE: 3 1/4" 1'-0" EAST ELEVATION +2757' F.F.E @FIRST FLOOR +2765'-0" B.O.OVERHANG +2769'-6" T.O.RIDGE +2771'-3-3/8" T.O.RIDGE +2760'-6" T.O.GAURDRAIL +2771'-3-3/8" T.O.RIDGE SE-14 SE-14 SE-14 SE-14 SE-08 SE-08 SE-13 SE-13 SE-02 SE-24 SE-23 SE-22 SE-44 SE-25 SE-22 SE-44 SE-12 ELEVATION 1/4"=1'-0" A301 SE-12 Issue and Date Drawn By: Project No: Checked By: Scale: Sheet No: 21-04 CHICKASAW ROAD, APN 0604-051-40 CHICKASAW PARCEL 01 4875 Wiota Street Los Angeles CA 90041 p: 323 3320936 www.wyotaworkshop.com Wyota Workshop Copyright 2021 Wyota Workshop SUBMITTAL: PLAN CHECK 09.27.2021 SM HA GENERAL NOTES KEY NOTES LEGEND SE-01 GARAGE DOOR (SECTIONAL), PTD 1. VERIFY EXACT LOCATION OF ALL ROOF PENETRATIONS WITH ARCHITECT PRIOR TO ANY WORK. 2. ALL WALL/FENCES IN FRONT YARD SETBACK TO BE 3'-6" MAX UNLESS APPROVED BY ZONING ADMINISTRATION DETERMINATION 3. SEE DOOR WINDOW SCHEDULE FOR SIZES OF DOORS AND WINDOWS SE-02 CLASS 'A' BUILT UP ROOFING, SLOPE TO DRAIN @MIN 2%. SE-03 EGRESS WINDOW, SEE SCHEDULE FOR MORE INFO. SE-04 DOWNSPOUT, PTD. SE-05 1 HR WALL ASSEMBLY, SEE PLANS AND SCHEDULE SE-06 EXTERIOR SOFFIT BOARD, PTD. SE-07 CASEWORK, SEE INTERIOR ELEV'S FOR MORE INFO SE-11 SE-12 WOOD TRELLIS, 2X8 MEMBERS (SEE PLAN FOR SPACING) SE-13 3/ 4" CORTEN STEEL PLANTER WALL SE-14 SMOOTH TROWEL CEMENT PLASTER, PTD. SE-15 AREA DRAIN, TYP SE-16 SE-17 FLASHING TYP, SEE SHEET SE-18 PLASTER EXPANSION JOINT, TYP. COORDINATE LOCATION OF EXPANSION JOINTS W/ ARCHITECT. SE-09 WOOD SIDING SE-10 SE-21 KITCHEN RANGE VENT, PTD. SE-22 GUTTER, PTD. SE-23 SE-24 WOOD SCREEN WALL 2X6 MEMBERS @ 4" O/C W/ STEEL ANGLE SUPPORT SE-19 LINE OF EXISTING GRADE@ SECTION LINE SE-20 HOSE BIB SE-25 EXHAUST VENT, PTD. SE-26 42" HIGH GUARDRAIL, 1/ 2" 3" STEEL VERTICAL FLAT BAR PTD, @4" O/C W/ 3/ 4" X 3" STEEL TOP AND BOTTOM BAR PTD SE-27 CONCRETE CURB. SE-28 LINE OF EXISTING GRADE@ FACE OF BUILDING FRAMELESS GLASS GUARDRAIL W/ BOTTOM SHOE SUPPORT 1" THK TEMPERED GLASS POWER METER/ MAIN SERVICE PANEL- MIN. BUSBAR RATING 200 AMPS. WOOD DECK, 1X6 DECKBOARDS W/ 1/ 8" GAP OPEN TO GRADE SE-32 SE-33 SE-34 SE-29 TANKLESS WATER HEATER, SURFACE MTD., SEE TITLE-24 DWGS FOR CAPACITY SE-30 SE-35 SE-36 SE-38 HVAC CONDENSER UNIT LOCATION FOR INVERTER AND METERING EQUIPMENT FOR SOLAR POWER PIPE COLUMN PER STRUCTURAL PTD. HR FLOOR ASSEMBLY SEPARATING GARAGE FROM DWELLING CONCRETE WALL- BOARD FORMED ARCHITECTURAL CONCRETE FINISH LIGHT FIXTURE, SEE SCHEDULE OUTDOOR KITCHEN CABINETRY SE-39 OUTDOOR FIRE FEATURE SE-40 SCUPPER, PTD SE-41 THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACES RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS FOR FUTURE SOLAR ELECTRIC' HR. RATED WALL/CEILING ASSEMBLY. PENETRATIONS TO BE SEALED. SMOOTH TROWEL CEMENT PLASTER, PTD. FOUNDATION WALL, SEE STRUCTURE PANEL FORMED- ARCHITECTURAL CONCRETE SE-43 SE-44 SE-42 OUTDOOR FIREPLACE ENCLOSURE W/ SMOOTH TROWEL CEMENT PLASTER FINISH SE-46 SE-47 SKYLIGHT, SEE DOOR/ WINDOW SCHEDULE CLASS 'A'/ COOL. ASPHALT SHINGLES ROOFING-OWENS CORNING SUPREME IN SHASTA WHITE ICC-ES AC438 CONCRETE FLATWORK ENTRY PATH STEPS, SAND FINISH TOPCAST CONCRETE FINISH SE-08 PLANTER WALL BOARD FORMED ARCHITECTURAL CONCRETE FINISH FLOOR/ROOF/WALL TYPES LINE OF PROPOSED GRADE: SEE GRADING PLANS ASPHALT SHINGLES, PER SPEC. WOOD SCREEN GATE 2X4 MEMBERS @ 4" O/C W/ STEEL ANGLE FRAME SE-31 POOL WALL W/ CONCRETE COPING AND CEMENT PLASTER EXTERIOR FINISH SE-37 WOOD BENCH BUILT-IN SEAT W/ 2X2 MEMBERS W/ 1/ 8" GAP AND BACK SE-45 SE-48 PHOTOVOLTAIC PANELS. SE-49 ROOF DRAIN OUTLET. SE-50 PLANTER, PROVIDE IRRIGATION AND DRAIN SE-51 CONCRETE RETAINING WALL- BOARD FORMED ARCHITECTURAL FINISH SCALE: 1 1/4" 1'-0" WEST ELEVATION SCALE: 2 1/4" 1'-0" SOUTH ELEVATION SCALE: 3 1/4" 1'-0" EAST ELEVATION +2757' F.F.E @FIRST FLOOR +2765'-0" B.O.OVERHANG +2769'-6" T.O.RIDGE +2771'-3-3/8" T.O.RIDGE +2760'-6" T.O.GAURDRAIL +2757' F.F.E @FIRST FLOOR +2765'-0" B.O.OVERHANG +2770'-10-5/8" T.O.RIDGE +2771'-3-3/8" T.O.RIDGE 3'-4" +2770'-10-5/8" T.O.RIDGE +2765'-0" B.O.OVERHANG +2757' F.F.E @FIRST FLOOR +2769'-6" T.O.RIDGE 3'-6" +2760'-6" T.O.GAURDRAIL SE-14 SE-14 SE-14 SE-14 SE-08 SE-08 SE-13 SE-13 SE-02 SE-24 SE-23 SE-22 SE-44 SE-25 SE-22 SE-44 SE-14 SE-14 SE-14 SE-12 SE-44 SE-22 SE-02 SE-25 SE-24 SE-23 SE-14 SE-14 SE-35 SE-35 SE-35 SE-08 SE-38 SCALE: 1 1/4" 1'-0" N-S SECTION LOOKING EAST GENERAL KEY LEGEND 1. VERIFY TO 2. ALL BY ZONING 3. SEE SCALE: 2 1/4" 1'-0" N-S SECTION LOOKING EAST SCALE:
W-E SECTION
1'-6" 4' 2' 2' 2'-6" 15'-3 4 12'-6" 8' 8'-6" 8' 8' 8' 8' MASTER BDRM 105 BEDRM 01 107 GREAT RM 104 5D 4A 5A 5A 5A 5D 5A 5A 4A 5A 5A
+2765'-0"
+2760'-6"
+2765'-0"
+2769'-6"
+2771'-3-3/8"
+2765'-0"
SE-31 SE-23 SE-34 SE-02 SE-44 SE-13 SE-25 SE-28 SE-02 SE-02 SE-34 SE-24 SE-23 SE-12 SE-35 SE-35 SE-44 SE-31 SE-24 SE-34 SE-02 SE-23 SE-44 60% slope 5 60% slope SCALE:
LEGEND SCALE: 2 1/4" 1'-0" N-S SECTION LOOKING EAST
8' MASTER
BEDRM 01 107 5D 4A 5A 5A 5A
3 1/4" 1'-0"
LOOKING NORTH
T.O.GAURDRAIL +2757' F.F.E @FIRST FLOOR
B.O.OVERHANG
T.O.RIDGE
T.O.RIDGE +2757' F.F.E @FIRST FLOOR
B.O.OVERHANG +2769'-6" T.O.RIDGE +2771'-3-3/8"
1 1/4" 1'-0" N-S SECTION LOOKING EAST
BDRM 105
SE-24 SE-34 SE-02 SE-23 SE-44

Rockdale School, Los Angeles, CA

Landscape proposal to promote shared outdoor school activities.

Scope of work: Involved in design phase, schematic design and 2d graphical representation of the proposed landscape initiatives. Compiled a design proposal presentation for the client review and documentation.

24 Hiral Ahir Professional Work Above image // Existing Concrete outdoor school area Left image //Proposed Landscaped outdoor school area
P.08

Existing permeable area: 3,454 sq.ft or 5% of total plot

Proposed permeable area: 48,017 sq.ft or 75% of total plot

All

All

25 Hiral Ahir Professional Work
top row images // Existing Concrete outdoor school area
bottom row images //Proposed Landscaped outdoor school area

P.09

Safdarjung Enclave, New Delhi, India

Multifamily 4-storey residential reinforced concrete design and build construction.

Scope of work: Involved in Elevation and facade design. Produced schematic 3d and 2d graphical representation of the proposed apartment. Compiled supplementary architectural 2d drawings as per Indian code regulations for the first construction phase.

Hiral Ahir Professional Work Above image // Proposed multifamily elevation design Left image // Proposed multifamily elevation design
ELEVATION OPTION 02

Safdarjang 2.0

B4-135 Safdarjang Enclave

Delhi 110029, India wyota workshop

www.wyotaworkshop.com tel: +01 (310) 498-8807

26, 2021

+0'-0" STREET LEVEL -10'-0" BASEMENT LEVEL 5'-0"

+9'-0"

UPPER GROUND

+0'-0"

STREET LEVEL

BASEMENT LEVEL 6'-0"

-10'-0"

Above image // Proposed multifamily basement drawing

Left image // Proposed multifamily basement design

27 Hiral Ahir Professional Work
UP
APRIL
BASEMENT PLAN SCALE: 1/8"-1'-0" 10'-9"x12'-6" 21'-9"x16'-0" 7'-9"x25'-1" 14'-0"x23'-0" POOL 11'-8"x17'-4" KITCHEN SUNKEN COURT 44 LFx8'-0"HT 9'-2"x18'-0" 7'-9"x6'-0" -18" -36" -36" -60" LIBRARY STORAGE WOODWORKING MEDIA RM YOGA STUDIO JACUZZI POOL ELEC POOL EQUIP 9'-0"x6'-0" TANK01 4'-0"x5'-0" WATER TANK02 4'-0"x5'-0" WATER TANK03 4'-0"x5'-0" WATER TANK04 4'-0"x5'-0" WATER TANK 4'-0"x5'-0" GRYWTR EQUIP 4'-0"x2'-0" GRYWTR

Above images // Proposed multifamily stilt and roof design

Left

Hiral Ahir Professional Work SAFDARJUNG 2.0 WYOTA WORKSHOP JUL 30, B4-135, SAFDARJUNG ENCLAVE, DELHI, 110029 SAFDARJUNG 2.0 WYOTA WORKSHOP ELEVATION OPTION 01 JUL 30, 2021 B4-135, SAFDARJUNG ENCLAVE, DELHI, 110029
image // Proposed multifamily elevation design

P.10

Fluer Drive, Joshua tree, CA

Single Family Residence partial demolition and remodel. Addition of a detached ADU.

Scope of work: Involved in design phase of planning an ADU and remodel design options as per building codes. Developed elevations and door window schedule package for the design proposal. Developed 3d rhino model as a part of design process and client review.

29 Hiral Ahir Professional Work Above image // Proposed SFR and ADU from 3D model view Left image // Proposed SFR and ADU from 3D model view
FLEUR DRIVE WYOTA WORKSHOP FLEUR DRIVE RENOVATION MAY 07, 2021 8429 FLEUR DRIVE, JOSHUA TREE, CA 92252 AERIAL VIEW- MAIN RESIDENCE AND ADU FLEUR DRIVE WYOTA WORKSHOP FLEUR DRIVE RENOVATION MAY 07, 2021 8429 FLEUR DRIVE, JOSHUA TREE, CA 92252 AERIAL VIEW- MAIN RESIDENCE AND ADU
30 Hiral Ahir Professional Work 5 F.O.FINISH (E) WALL 5 4 3 2 1 6 7 8 9 A F.O.FINISH (E) WALL B C D E F G F.O.FINISH (E) WALL G F.O.FINISH (N) WALL G F.O.FINISH (N) WALL G F.O.FINISH (E) WALL F.O.FINISH (N) WALL 12'-11 10'-43 " 8'-9" 40'-7" 6'-7" 5'-7 5 8 7'-0 3 8 6'-6" 5'-2" 114'-11 4 5'-10 3 4 8'-6" 8'-3" 11'-11 8 11' 11'-8 8 F.O.FINISH (E) WALL F.O.FINISH (N) WALL F.O.FINISH (E) WALL F.O.FINISH (E) WALL F.O.FINISH (E) WALL F.O.FINISH (E) WALL F.O.FINISH (N) WALL F.O.FINISH (N) WALL F.O.FINISH (E) WALL F.O.FINISH (E) WALL F.O.FINISH (N) WALL F.O.FINISH (N) WALL F.O.FINISH (E) WALL 2-E A302 2-D A302 2-B A302 1-B A301 1-A A302 1-B A302 2-F A302 2-A A302 2-C A302 1-A A301 1-C A301 1-D A301 2-D A301 2-B A301 2-C A301 2-A A301 12'-95 8 10' 35'-01 4 10'-45 8 Issue and Date Drawn By: Project No: Checked By: Scale: Sheet No: 21-03 8429 FLEUR DRIVE, JOSHUA TREE, CA 92252 FLEUR DRIVE RENOVATION 4875 Wiota Street Los Angeles CA 90041 p: 323 3320936 www.wyotaworkshop.com Wyota Workshop Copyright 2021 Wyota Workshop DESIGN 05/07/2021 DEVELOPMENT SCALE: 1 3/16" = 1'-0" FIRST FLOOR PLAN CARPORT 101 BEDRM 01 104 BEDRM 02 107 FOYER 102 BATH 02 106 GREAT RM 103 102.1 102.2 104.1 107.1 107.2 106.1 107.3 106.A 105.A 105.1 104.2 113.1 BATH 01 105 PWDR 113 BEDRM COURT NORTH COURT SOUTH COURT BEDRM 02 COURT +0'-0" DRIVEWY +3'-0" FIRST FLR +0'-0" FIRST FLR 103.1 103.2 103.3 +0'-0" FIRST FLR +0'-0" FIRST FLR EAST COURT +0'-0" FIRST FLR UP DN DN WEST COURT +3'-0" FIRST FLR ADU GREAT RM 108 BEDRM 03 109 BATH 04 111 BATH 03 110 BEDRM 04 112 108.1 108.2 108.3 112.2 109.2 112.1 109.1 111.1 110.1 112.3 108.A 111.A 110.A BEDRM 04 COURT +3'-0" FIRST FLR POOL DECK +3'-6" FIRST FLR FLOOR PLAN SM SM 3/16"=1'-0" A-201
31 Hiral Ahir Professional Work +3'-0" FINISH FLOOR +14'-2" T.O.PARAPET +3'-0" FINISH FLOOR +14'-2" T.O.PARAPET +3'-0" FINISH FLOOR +14'-2" T.O.PARAPET +3'-0" FINISH FLOOR +14'-2" T.O.PARAPET +3'-0" FINISH FLOOR +18'-1" T.O.PARAPET +3'-0" FINISH FLOOR +18'-1" T.O.PARAPET +3'-0" FINISH FLOOR +18'-1" T.O.PARAPET +18'-1" T.O.PARAPET +3'-0" FINISH FLOOR Issue and Date Drawn By: Project No: Checked By: Scale: Sheet No: 21-03 8429 FLEUR DRIVE, JOSHUA TREE, CA 92252 FLEUR DRIVE RENOVATION 4875 Wiota Street Los Angeles CA 90041 p: 323 3320936 www.wyotaworkshop.com Wyota Workshop DESIGN 05/07/2021 DEVELOPMENT SCALE: 2 3/16" = 1'-0" MAIN RESIDENCE ELEVATIONS SCALE: 1 3/16" = 1'-0" ADU ELEVATIONS A- NORTH ELEVATION C- SOUTH ELEVATION D- WEST ELEVATION B- EAST ELEVATION A-NORTH ELEVATION B-EAST ELEVATION D- WEST ELEVATION C - SOUTH ELEVATION EXTERIOR ELEVATIONS HA SM 3/16"=1'-0"
32 Hiral Ahir Professional Work +14'-2" +3'-0" +/-0.0 8'-6" +14'-2" +3'-0" +/-0.0 7'-2" 8'-4" +14'-2" +3'-0" +/-0.0 7'-2" 8'-6" 8'-4" +14'-2" +3'-0" +/-0.0 +14'-2" +3'-0" +/-0.0 8'-4" 7'-2" +14'-2" +3'-0" +/-0.0 8'-6" +3'-0" +/-0.0 +18'-1" 10'-11" 10'-11" +3'-0" +/-0.0 +18'-1" 8'-4" Issue and Date Drawn By: Project No: Checked By: Scale: Sheet No: 21-03 8429 FLEUR DRIVE, JOSHUA TREE, CA 92252 FLEUR DRIVE RENOVATION 4875 Wiota Street Los Angeles CA 90041 p: 323 3320936 www.wyotaworkshop.com Wyota Workshop DESIGN 05/07/2021 DEVELOPMENT SCALE: 2 3/16" 1'-0" MAIN RESIDENCE SECTIONS SCALE: 1 3/16" 1'-0" ADU SECTIONS SECTION A SECTION B SECTION A SECTION B SECTION D SECTION C SECTION E SECTION F BUILDING SECTIONS HA SM 3/16"=1'-0"

P.11

Mesa Verde Drive, Burbank, CA

Single Family Residence remodel and addition. Addition of a detached ADU.

Scope of work: Involved in design phase, schematic design and 2d/3d graphical representation of the proposed ADU design options as per building codes. Compiled a design proposal presentation for the client and review feedback from the Burbank planning department.

33 Hiral Ahir Professional Work
image // Proposed SFR and ADU from google view
image //Proposed SFR and ADU from 3D model view
Above
Left

Top image // Proposed SFR and ADU

Bottom image // Proposed schematic section of SFR and ADU

34 Hiral Ahir Professional Work

P.12

Chickasaw Parcel 05, Joshua tree, CA

Proposed Single Family Residence and a attached ADU with outdoor pool and spa.

Scope of work: Involved in design phase, schematic design 3d models, site visits at joshua tree for survery phase, produced 3d contour file using 2d survey analysis. Design detail and preparation of construction documents. In the process of making a plan check submittal set for San Bernandino County.

35 Hiral Ahir Professional Work
Above image // Proposed SFR and ADU from 3D model view Left image //Proposed SFR and ADU from 3D model view
36 Hiral Ahir Professional Work

A.01

Design Development of Atlanta Library

Guide / Herwig Baumgartner Scale / Library Location / Atlanta Collaborator / Yash Mehta,Richard Mapes, Julia Pike, Justine Polin, Kumaran Parthiban, Priyanka Rajani, Caleb Roberts & Irvin Shaifa

Keywords-

Tectonic Building assemblies

Facade articulation

Materials Framework

Envelope transformation

Technological associations

Enclosure

This course investigates issues related to the implementation of the design:technology, the use of materials, systems integration and the archetypal analytical strategies of force order and character.The course includes a review of basicand advanced construction methods, analysis of building codes, the design of structural and mechanical systems, environmental systems, building service systems, the development of building materials and the integration of building components and systems. The intent here is to develop a cohesive understanding of howarchitects communicate complex building systems for the built environment and to demonstrate the ability to document a comprehensive architectural project. The seminar selects a project from the Spring 2019 design studio and asks 10 students to collaborate and create a office like strategies to develope the design project for Design development

Hiral Ahir Academic Work
Left image // Night render view of the design proposed atlanta library

Steel Structure

Diagrid Primary Structure

UHP FRC Floor Panels

Diagrid Primary Structure

Steel Mullions Steel Deck

FRC louvers panels

Anodize Glass Prefab panels

Steel Mullions with Glass panels

Stainless steel Cladding and insulation

Steel Structure

Metal sheet Concrete flooring and waterproofing

Skylight

Diagrid Secondary Structure

Spacers

Girders

Primary structure fro Boxes

38 Hiral Ahir Academic Work
39 Hiral Ahir Academic Work

A.02

Think Tank Library

Design Guide / Jackilin Hah

Bloom

Scale / Library

Location / Atlanta, Geogia Collaborator / Hou Sheng Wang

Keywords-

Containers as metaphor

Precarious

Tenuous

Monolithic posture

Vaccum form technique

Interdependent spaces

Envelope tectonic

Unlike the existing Atlanta Central Library by Marcel Breuer, a singular stepped mass with its monolithic materiality, we examine tenuous agglomerations through assembly of multiple volumes to redefine a library’s monolithicposture in the city.A library is a physical container of knowledge and all the mediums in which knowledge is distributed.As these mediums transition from physical books to be taken off shelves to intangible bits to be stored and accessed remotely, the library’s role as a public asset and destination for information, will inevitably change. How do we envision an ever changing paradigm of information and its formal container?We approached the library as a cultural monolith in the city, but with precarious postures. In order to redefine library’s monolithic posture in the city, we began to organize it under its most basic metaphor as a container. We began by looking at a jumbled mass of different types of containers, like, jute bags, bath tubs, vending machines etc.We explored its various agglomerations through a collage. These groupings are examined based on their shapes and how they interact with the ground, edge and sky.

Hiral Ahir Academic Work
Left image // Section view of the library buidling proposal
42 Work
// Massing and facade tectonic evolution of the library buidling proposal
// Exploded axonometric program diagram of the library buidling proposal
43 Hiral Ahir Academic Work // Ground ffoor plan of the
buidling proposal // Fifth folorplan
the library buidling proposal
library
of

A.03

Metro Station design and structure

Design Guide / Greg Otto Scale / Infrastructure

Location / Hypothetical

Keywords-

Section active structures

Form active structures

Vector active structures

Big shed solution

Structural fundamentals

Novelty

Long span

Repetition

Load transfer

The intent of this project is to use the structural concepts studied in class and deploy these concepts to develop a long span structural solution. Understand structural fundamentals necessary to imagine and develop long span, large volume architecture. The excerise is an introduction to the structural concepts available to the designer to imagine and ultimately design long span, large volume architecture. The desire to create enclosure- space that is protected from the external environement-has continued to evolve, pressing for greater span and more imaginative solution. Scale and geomteric complexity create significant challenges unique to this sub-set of building typologies.Knowledge of the concepts, their strengths and the associated challenges in both design and construction, will enable the design decision-making process to arrive at appropriate solutions.

Hiral Ahir Academic Work
image // view of the designed metro station
Left
46 Hiral Ahir Academic Work

A.04

Tresspass- a public space

Thesis Guide / Jackilin Hah Bloom Scale / Public space

Location / Los Angeles,California

Keywords-

Unfolded elevations

Compositions

Stamping technique

Analog and digital

My project takes an existing community center located on a precarious site and proposes to convert it into a visible public space. In my project, new edges, rails, walls, and fences straddle the existing building at varying widths and thicknesses.These new wallsalso fold to the ground to form platforms for performances, seating, and landscape. It is a thesis about boundaries, walls, edges and fences and how these things can transgress their negative connotationsto become what I am proposing as a public space. What a fence essentially does is upright a boundary, defines moments of entry and exit, fall over the ground and double up layer for protection. But, In order to study the boundaries in a more positive light, I started to experiment with aggregation and composition of those. In order to explore its layered application, these diagrams were carved into rubber stamps. Through the exercise of stamping could transgress their symbolic limitations as seen in this model. Workflow between analog and digital was important This investigation usescolor and the analog stamp textures as a kind of material quality for theproject.

Hiral Ahir Academic Work
Left image // view of the proposed public space
49 Right image // 3dimensional development of the stamping exercise, color experiments // Digital and physcial stamping exercise
Hiral Ahir Academic Work Left image // Plan view of the physical model of trespass-public space // Unfolded elevation compositions as fragments of the public space
Thank you Hiral Ahir reach me at: hiralrahir@gmail.com @2024 Hiral Ahir. All rights reserved. No part of this book may be reproduced in any form without permission of the copyright owner.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.