ABPL-90118
Applied Construction Hizkia Gouw 378785 Dawei Sun 385249
Table of Content 1. Plan
Brief:
A.001 Site Plan
3
A.002 Ground Floor Plan
4
A.003 First Floor Plan
5
A.004 Second Floor Plan
6
A.005 Third Floor Plan
7
A.006 Roof Plan
8
This project promotes the concept of creating a
2. Section
Bikepark for University of Melbourne for between
A.007 Section A
10
1000 and 2000 bike.
A.008 Section B
11
Incorporated into the structure will be a new univer-
A.009 Secion C
12
sity research centre. Institute for low energy trans-
A. 010 Section D
13
port, dedicated to the development of low energy
3. Elevation
use transportation.
A.011 North Elevation
15
A.012 South Elevation
16
A.013 East Elevation
17
A.014 West Elevation
18
4. Detail A.015 Ilet Detail 1
20
A.016 Ilet Detail 2
21
A.017 Bike Park Detail
22
A.018 Suspended Ceiling Detail
23
A.019 Bondek Detail
24
A.020 Wet Area Detail
25
A.021 Stair Detail
26
5.Perspevctive
1.Plan This project promotes the concept of creating a Bikepark for University of Melbourne for between 1000 and 2000 bike. Incorporated into the structure will be a new university research centre. Institute for low energy transport, dedicated to the development of low energy use transportation.
Beaurepaire Centre
Sports Centre
Tin Alley
Baldwin Spencer Building University House
North Court
Union House
Union Lawn
N
Site Plan 01 4
Tin Ally
BikePark
C
Fire Stair
A.009
FFL 0.00
Ramp Grass Chang room/Toilet
A
Courtyard
FFL -0.05
Entrance
BIke Workshop Lift
FFL 0.00
Pavemennt
Union Road
Professor Road
A.007
Pavemennt -0.18
Chang room/Toilet
-0.18
Ramp
FFL -0.05
Grass BikePark FFL 0.00
Fire Stair
Grass
B
A.008
Grass
Grass
D
A.010
North Court
N
BikePark Fire Stair
FFL 3.50
Ramp Chang room/Toilet FFL 3.45
ILET Lift
FFL 3.50
Chang room/Toilet Ramp
FFL 3.45
BikePark FFL 3.50
Fire Stair
N
BikePark Fire Stair
FFL 7.00
Ramp
Chang room/Toilet FFL 6.95
ILET
Lift
FFL 7.00
Ramp
Chang room/Toilet FFL 6.95
BikePark FFL 7.00
Fire Stair
N
Fire Stair
BikePark FFL 10.50
Ramp
Chang room/Toilet Multi-purpose area
FFL 10.45
FFL 10.50
Lift Chang room/Toilet Ramp
FFL10.45
BikePark FFL 10.50
Fire Stair
N
Roof (colorbond Steel Roof)
Box Gutter
N
2.Section This project promotes the concept of creating a Bikepark for University of Melbourne for between 1000 and 2000 bike. Incorporated into the structure will be a new university research centre. Institute for low energy transport, dedicated to the development of low energy use transportation.
H
I
J
K
A
A.015
C
A.018
K
J
I
H
3
4
B
A.017
D
A.019
3.Elevation This project promotes the concept of creating a Bikepark for University of Melbourne for between 1000 and 2000 bike. Incorporated into the structure will be a new university research centre. Institute for low energy transport, dedicated to the development of low energy use transportation.
K
J
I
H
H
I
J
K
5
4
4.Details This project promotes the concept of creating a Bikepark for University of Melbourne for between 1000 and 2000 bike. Incorporated into the structure will be a new university research centre. Institute for low energy transport, dedicated to the development of low energy use transportation.
D
A.016
E
A.016
10
9 8 7 3
1
11
3
12
13
6
B
A.016
FFL + 0.00
5 4
Earth Level - 0.18
C
A.016
3 2 1
A
A
A
A.008
Detail A
Legends 1 2 3 4 5 6 7 8 9 10 11 12 13
1:10
Section A
Earth Concrete Strip Footing 800x300mm Waterproofing Membrane Reclaimed Timber 100x50mm Bottom Track Steel Stud Wall Thermal Insulation Cement Board Plasterboard Steel Column (I-beam 300x300mm) Sand Bed Concrete Slab 150mm Carpet Floor Covering
1:20
ILET Detail 15
1 2 3 4 5 6 7 8
Legends 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
6 4 5 3 1 16 9 10 11
7
12
17
FFL + 3.50
C
A.015 13
B
A.015
14
Reclaimed Timber 100x50mm Cement Board Waterproofing Membrane Steel Stud Wall Thermal Insulation Plasterboard Steel Column (I-beam 300x300mm) Bottom Track Carpet Floor Covering Concrete Slab 150mm Steel Beam (I-beam 300x300mm) Bondek Metal Deck Furring Channel Top Cross Rail Gypsum Board with Paint Alumunium Window Frame Sliding Window (Clear Glass (6mm) Top Track Metal Flashing Corrugated Metal Roof Steel Joist (SHS 50x50mm) Box Gutter
Detail C 1:10
15
Detail B 1:10
19 20 21 3
11
11 21 20
22
18 6 4 1 5 3 2 7
D
A.015
Detail D 1:10
E
A.015
Detail E 1:10
ILET Detail 16
1 2 3
B
4
FFL + 3.50
1 8
2 3
5
6
7
10
11
8
4
FFL + 0.00
A
Earth Level - 0.18
B 5
Detail B 1:10
7 9
B
A.010
Legends 1 2 3 4 5 6 7 8 9 10 11
Section B 1:20
A
Reclaimed Timber 100x50mm Vertical Steel Batten (C-Section 50x50mm) Steel Column (I-beam 300x300mm) Secondary Horizontal Steel Beam ( C-Section 150x72mm) Earth Sand Bed Waterprrofing Membrane Concrete Slab 150mm Concrete Strip Footing 800x300mm Bondek Metal Deck Steel Beam (I-beam 300x300mm)
Detail A 1:10
Bike Park Detail 17
1
1
2
2
3
3 4 4 8
7 5
C A.008
6
7
8
Suspended Ceiling 1:5
8
9
9
Light Fitting 1:5
Legends 1 2 3 4 5 6 7 8 9 9
Fastener Steel Angle Bracket Suspension Rod 0.6mm Suspension Clip Wall angle Trim Corner Bead Furring Channel Top Cross Rail Gypsum Board with Paint Lighting Fixture Cover
Suspended Ceiling Detail 18
2
1
D
A.010
2
3
3
Bondek Detail 1:5
1
Exploded Bondek Detail 1:5
Legends 1 Concrete Slab 150mm 2 Bondek Metal Deck 3 Steel Beam (I-beam 300x300mm)
Bondek Detail 19
9700
B C A
D
2100
Wet Areas
D
5000
2600
Section D 1:50
1:50
A
Elevation A 1:50
B
Elevation B 1:50
C
Elevation C 1:50
Wet Areas Detail 20
1
1
2 2
3 4 5
A
Stair Detail A 1:20
4
B
5
B
3
Stair Detail B 1:20
A
1
Stair Detail 1:100
6
7
8
Railing Detail 1:10
Railing Detail
Legends 1 2 3 4 5 6 7 8
Steel Pipe 38mm diameter Steel Pipe 38 mm diameter Welded and Grind Smooth Heavy Duty Step Corner Cement Mortar Insitu Concrete Steel Pipe 18mm Galvanized Screw Galvanized Steel
1:10
Stair Detail 21
5.Perspective This project promotes the concept of creating a Bikepark for University of Melbourne for between 1000 and 2000 bike. Incorporated into the structure will be a new university research centre. Institute for low energy transport, dedicated to the development of low energy use transportation.
Perspective 1 A.022
Perspective A.023
Perspective A.024
Perspective 1 A.025