![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
TIMELINE I EXPLORATION II AUTONOMOUS BUILDING III HABITAT
prehuman mission starts with landing of the first rocket in radius of 5-40 km around Marius hills pit first to exit is the rover with pre-integrated aquaponics system, deployable structure and devices for exploration followed by the lightweight crane which is going to allow objects to enter and exit the pit micro rover and drones get activated after entering the pit and start sending informations back to Earth excavation and sending of the samples about the floor consistency and possible integration after finding the suitable position for the future habitat, the aquaponics system in the rover gets activated first results of the green house and aquaponics are positive, the rover is able to deploy itself and awaits the crew preparation of the preintegrated modules on Earth with personal space design by the crew landing of the second rocket, close to the first one, with four modules and four crew members modules are being moved to the pit by NASA athlete, brought down by the lightweight crane and attached to the deployable structure crew of biologist, geologist, doctor and engineer enters the habitat by looking at the GARDEN first
![](https://assets.isu.pub/document-structure/230511150410-ab43f7743808d48b961c9fb52d278f1f/v1/6e22b0a50ae7b876f54a9eb1456d04fd.jpeg?width=720&quality=85%2C50)
Advertisement