WEEK 7

Hoi Yin Ho, 662109

Location 1! Steel

Melbourne Hospital. As traffic is always busy and a clear traffic is always needed for the active hospital, the construction of the Institute requires a lot of coordination of timing. For example, they need to get the permission for road closure for scaffolding; the transportation of building material that are huge in size must find a time when the traffic is not busy eg. midnight. !

! ! ! ! ! ! ! ! ! ! !

Concrete Glass

The Institute is in a concrete framing structure. The glass and the steel frame are suspended out of the concrete structure as the facade. The self load and other loads are transmitted through the concrete slabs and columns into the ground (load path shown by the purple arrows in the photo above). !

The Institute is located in a major intersection area, there is also a tram line on one side. The building beside is the extension building of

There is a steel framed bridge connecting the Institute and the hospital. There are probably roller joints on either side. It is built out of coated steel universal beams and has top and bottom truss. The steel are probably manufactured offsite, then bolted and welded on site. This can offer a very quick construction process as it has to be built across the road.! Both the hospital and the Institute has floors with different height. They are for certain purposes and it can be seen that ducts are built in for special equipments, the level in hospital shows truss formation which indicate that extra load will exist in that level.!

! ! ! !

! ! ! !

Hoi Yin Ho, 662109


WEEK 7

Hoi Yin Ho, 662109

Location 2!

!

This site is going to be a 14-storied apartment like Uni Lounge, meaning that the target is not for high class, the constructing material choice and quality may not be the highest.!

Photo taken by Jiawen Li!

! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!

! ! ! ! ! ! ! ! ! ! ! ! ! ! !

Photo taken by Jiawen Li!

! ! ! ! ! ! ! ! !

Photo taken by Jiawen Li!

! ! Hoi Yin Ho, 662109


WEEK 7

Location 3! Waterproofing and insulating! Sprayed with waterproof coating Platform

For vibration insulation: protecting the waterproof coating Private courtyard composed by floating platforms. They can be easily lifted up to repair the waterproof membrane. Uplifted, lower ground will be filled with soil and plants, therefore the waterproofing of the floor is very important.

!

! Stitch concrete plate connections.!

! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

Hoi Yin Ho, 662109

Hoi Yin Ho, 662109


WEEK 7

Learning Loop!

! ! !

! ! ! ! !

! ! ! ! ! !

Hoi Yin Ho, 662109

! ! ! ! ! ! ! ! Hoi Yin Ho, 662109


WEEK 7

Glossary!

! Drip! ! Vapour Barrier! ! Gutter! ! Parapet! ! Down Pipe! ! Flashing! ! Insulation! ! Sealant! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! !

Hoi Yin Ho, 662109

Hoi Yin Ho, 662109