August September Permits Plus

Page 1

August/September 2015

Permits Plus + A bi-monthly statistics and advocacy update for HBA of F-M members

FOR YOUR CALENDAR: Sept. 18 - EPA RRP Refresher

Sept. 26-27 and Oct. 3-4 - Fall Parade of Homes

Sept. 29 - Lunch Session: Manage Customer Expectations Oct. 3-4 - Remodeled Home Tour

Oct. 29 - Awards Gala & Annual meeting

QUOTABLE REGARDING JULY HOUSING STARTS

“This month’s drop in the more volatile multi-family side is a return to trend after an unusually high June,” said NAHB Chief Economist David Crowe. “While multi-family production has fully recovered from the downturn, single-family starts are improving at a slow and sometimes intermittent rate as consumer confidence gradually rebounds. Continued job and economic growth will keep single-family housing moving forward.” -David Crowe NAHB Chief Economist Aug. 18, 2015

Published six times per year in addition to the Plains Builder, Permits Plus aims to provide a concise report on building permit numbers and a timely update on Association advocacy efforts.

Minnesota

shares code update regarding bonus rooms over garages

Moorhead Building Official Jack Nyberg notified the HBA of F-M this week that the Minnesota Department of Labor & Industry has issued a “division opinion” that affects contractors building homes with bonus rooms over garages. It allows duct work to be installed in the floor ceiling assembly, without the requirement to test ductwork, if it’s located above the insulation for the building envelope and the duct is insulated to a minimum of R-8 with a vapor retarder. Nyberg noted that this has been a hotly debated issue. He learned of the opinion this week, though it was originally issued in May. See this issue’s insert to read the opinion.

Judge

clarifies order pertaining to

injunction

Oxbow

In late July, a federal judge clarified his order that had resulted in cessation of all work on Oxbow’s ring dike and homes being relocated until the Minnesota Department of Natural Resources completes a study on impacts of the F-M Diversion. His clarification means that construction on the relocation homes can move ahead. When the injunction was issued, there were eight homes under construction being allowed to continue, five homes under contract, and 25 homes in line for funding and construction, with more anticipated to follow. The cessation of work, which has dragged on since May, was causing stress and frustration for the affected homeowners, general contractors and trade contractors lined up to continue or begin work on projects.

HBA

works on issues affecting homebuilding industry

SPECIAL ASSESSMENTS - The HBA of F-M and the Fargo-Moorhead Area Association of Realtors are hosting regular meetings of a Joint Special Assessments Task Force including over 20 community members. It is a forum for attendees to express concerns and meet with local jurisdictions to ask for clarifications on special assessments. Representatives included members of the HBA of F-M and FMAAR, representatives of three financial institutions, builders and city of Fargo engineering department staff. CODE ADOPTION - The HBA’s Code Task Force has begun regular meetings to evaluate the 2015 International Codes which will be adopted by Fargo next year.

Issues update continued on back page

HBA OF F-M + 1802 32ND AVE S + FARGO ND 58103 + (701) 232-5846 + HBAFM.COM + INFO@HBAFM.COM


January through July 2015 - Dilworth, Moorhead, Fargo, West Fargo

Total Housing Permits January ‐ July 2015

Dilworth 3%

West Fargo 40%

Moorhead 21%

Total Building Permits Value

Commercial Remodel 3%

Residential Remodel 26%

Housing Starts 30%

New Commercial 14%

Fargo 36%

Multi-Family 12% Public 12%

Misc. 3%

Chart below shows permit and value growth through June versus through July. See insert for permit numbers through July compared to previous years through third quarter.

HOUSING STARTS

HOUSING VALUE

TOTAL PERMITS

TOTAL VALUE

2

City

Dilworth Moorhead Fargo West Fargo Totals Dilworth Moorhead Fargo West Fargo Totals Housing Starts Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Totals Housing Starts Multi-Family Public Miscellaneous New Commercial Residential Remodel Commercial Remodel Totals

January - June January - July 2015 2015 17 21 129 145 208 252 257 283 611 701 $4,830,850 $5,990,850 $25,494,499 $28,753,499 $43,300,625 $53,201,120 $56,001,111 $62,382,111 $129,627,085 $150,327,580 611 701 14 22 56 75 1044 1264 267 298 27 33 197 248 2216 2641 $129,627,085 $150,327,580 $37,156,720 $60,105,420 $45,632,703 $60,146,385 $14,665,241 $17,595,186 $58,253,665 $70,160,774 $121,070,391 $128,386,851 $10 091 721 $10,091,721 $14 794 622 $14,794,622 $416,497,526 $501,516,818

Difference 4 16 44 26 90 $1,160,000 $3,259,000 $9,900,495 $6,381,000 $20,700,495 90 8 19 220 31 6 51 425 $20,700,495 $22,948,700 $14,513,682 $2,929,945 $11,907,109 $7,316,460 $4 702 901 $4,702,901 $85,019,292

HBA of F-M’s monthly building permit report is prepared by Fiebiger, Swanson, West & Co.

Percentage Difference 24% 12% 21% 10% 15% 24% 13% 23% 11% 16% 15% 57% 34% 21% 12% 22% 26% 19% 16% 62% 32% 20% 20% 6% 47% 20%

Permits Plus


SEASONALLY ADJUSTED UNEMPLOYMENT RATES June 2015

May 2015

Minnesota

June 2014

SINGLE AND MULTI-FAMILY BUILDING PERMITS June 2015 Minnesota

June 2014

% change

Source: NAHB

Source: bls.gov

3.9%

3.8%

North Dakota

3.9%

9,324

North Dakota

7,272

28.2%

5,534

-45.8%

505,459

16.9%

526

18.8%

Source: NAHB

Source: bls.gov

3.1%

3.1%

United States

2.7%

2,998

United States Source: NAHB

Source: bls.gov

5.3%

5.5%

Fargo-Moorhead

6.1%

Fargo-Moorhead Source: HBA of F-M

Source: Greater Fargo-Moorhead Economic Development Corporation

2.9%

590,840

2.5%

2.8%

625

LOCAL REAL ESTATE

Source: Coldwell Banker First Realty, Barbara Grande

1st & 2nd Qtr 2015

1st & 2nd Qtr 2014

% change

$203,443

$183,900

10.6%

$359,053,525

$311,417,165

15.3%

Home prices in Fargo-Moorhead Closed MLS Volume

MORTGAGE RATES Source: Wells Fargo as of August 10

30-Year Fixed

4.125%

30-Year Fixed FHA

4.000%

5-Year ARM

3.500%

15-Year Fixed

3.375%

30-Year Jumbo

3.875%

FRAMING LUMBER PRICES Source: National Association of Home Builders

Date

Per 1,000 Board Ft.

CME Futures

July 24

$340

$270.9

July 10

$348

July 31 July 17

$332

$250.7

$344

$280.5 $288.9

WAGE GROWTH - AVERAGE ANNUAL SALARY Source: Greater Fargo-Moorhead Economic Development Corporation

June 2015

June 2014

% change

$45,968

$44,252

3.9%

$36,036

$34,632

4.1%

Cass Clay

August/September 2015

3


Home Builders Association of F-M 1802 32nd Ave. S. Fargo, N.D. 58103

Issues update continued from front page

UTILITY, TRENCHING SAFETY - Last spring, the HBA of F-M held an industry meeting with representatives from utility companies, cabling companies and excavators. A range of issues were covered including location of electric meters on homes, co-locating utility lines and excavating water and sewer lines. Since the meeting, the HBA has worked with the city of West Fargo, requesting from West Fargo’s City Commission that water and sewer pipes end 5 feet past utility easements, to allow excavators to uncover pipes without working under electrical and gas service. Extending pipes 5 feet past the easement will give excavators the ability to lower a trench-safety box over the sewer and water pipes; this enables them to excavate a smaller area than the oneto-one ratio allows, while maintaining safe working conditions. The West Fargo City Commission approved this change during its meeting June 1. As of press time, the HBA continues working to address remaining issues. OVERWIDTH PERMITTING - The HBA of F-M and truss company representatives are working with Fargo to address the city’s Overdimensional Vehicle Policy, which establishes the weight, width, length and height restrictions for vehicles operating on city streets. Truss companies fall into a niche market, where they are rarely overweight, but always require an overwidth permit. The city of Fargo requires 48 hours’ notice for each permit; although the permits rarely take this amount of time to be processed, it has become an issue for truss companies in the demanding market, where turnaround times often boil down to a few hours. The proposed solution is to switch to a yearly Overdimensional Vehicle Permit, the current practice in other areas of North Dakota, South Dakota and Minnesota.

Save

the date for

Awards Gala & Annual Meeting

featuring

NAHB CEO: Oct. 29

The HBA of F-M’s Awards Gala & Annual Meeting Oct. 29 at the Courtyard by Marriott welcomes National Association of Home Builders CEO Jerry Howard. Save the date now!

Howard will give updates from the NAHB Fall Board of Directors meeting and talk about the current state of the industry, politics in Washington, D.C. and the presidential election. He will also take questions from our members via our polling software that we’ve been using at previous meetings. This meeting is the kick-off to the Association’s 60th anniversary year in 2016. Plus, find out who will receive the HBA’s highest honors, Builder and Associate of the Year, as well as the BEAM Award and Extra Mile Award.

Permits Plus

4


Home Builders Association of Fargo Moorhead 2015 Permit Report - July January - September 2011

DILWORTH Total Housing Starts Single Family Twin Home Row / Town House Duplex Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Total

Permits

13 13 0 0 0 0 1 52 14 0 11 91

Units

0 0 0

2012 Value Permits

$2,489,667 $2,489,667 $0 $0 $0 $0 $400,000 $223,182 $429,825 $0 $51,180 $3,593,854

12 12 0 0 0 0 5 50 3 0 8 78

$12,828,213 $9,981,900 $464,000 $2,382,313 $0 $4,090,000 $3,566,725 $3,652,845 $19,195,375 $0 $161,938 $43,495,096

73 61 12 0 0 1 8 441 67 0 122 712

Units

0 0 0

2013 Value Permits

$2,605,000 $2,605,000 $0 $0 $0 $0 $2,875,000 $200,498 $310,000 $0 $17,800 $6,008,298

25 25 0 0 0 0 2 48 1 0 22 98

$11,680,000 $10,354,000 $1,326,000 $0 $0 $3,000,000 $5,798,475 $3,905,848 $19,400,549 $0 $199,650 $43,984,522

116 76 38 0 1 7 23 340 60 0 38 584

Units

0 0 0

January - July 2015

2014 Value Permits

$5,097,000 $5,097,000 $0 $0 $0 $0 $508,000 $240,538 $24,000 $0 $30,000 $5,899,538

20 18 2 0 0 1 3 32 4 0 23 83

$20,830,300 $16,137,900 $4,501,400 $0 $191,000 $18,940,000 $30,750,541 $3,728,566 $11,336,911 $0 $167,656 $85,753,974

173 113 36 6 0 3 20 363 76 0 48 683

Units

0 0 0

Value Permits

$4,775,000 $4,375,000 $400,000 $0 $0 $1,600,000 $1,198,000 $382,839 $3,040,000 $0 $596,499 $11,592,338

21 17 4 0 0 0 2 33 4 0 7 67

$32,111,639 $23,552,714 $5,318,925 $3,240,000 $0 $7,160,000 $8,226,597 $4,904,256 $14,719,600 $0 $300,180 $67,422,272

145 97 48 0 0 10 16 303 54 0 27 555

Units

0 0 0

Value

$5,990,850 $5,050,850 $940,000 $0 $0 $0 $120,000 $213,684 $605,000 $0 $15,689 $6,945,223

MOORHEAD Total Housing Starts Single Family Twin Home Row / Town House Duplex Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Total

73 50 4 5 0 2 13 420 71 0 54 633

19 0 60

0 0 60

0 2 274

24 0 86

0 0 240

$28,753,499 $20,647,499 $8,106,000 $0 $0 $20,226,880 $8,340,714 $3,043,074 $6,647,001 $0 $674,300 $67,685,468

FARGO Total Housing Starts Single Family Twin Home Row / Town House Duplex Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Total

204 172 32 4 0 11 23 878 310 19 260 1,705

$37,323,005 325 $32,000,605 242 $4,122,400 44 0 $1,200,000 39 0 $0 0 491 $27,324,900 15 $25,145,568 37 $9,372,302 909 $40,965,027 299 $19,844,810 23 $14,510,473 225 $174,486,085 1,833

$57,334,000 453 $45,749,000 351 $6,071,000 70 39 $5,514,000 32 0 $0 0 454 $34,340,797 21 $54,169,784 47 $13,042,249 854 $38,109,576 315 $10,025,417 28 $23,348,807 234 $230,370,630 1,952

$84,933,638 312 $68,646,538 255 $12,075,100 26 32 $4,212,000 31 0 $0 0 817 $57,677,999 31 $51,432,496 51 $14,324,776 815 $31,576,283 292 $14,311,084 48 $27,669,299 342 $281,925,575 1,891

$68,935,976 252 $58,991,976 173 $5,294,000 20 31 $4,650,000 59 0 $0 0 1297 $106,280,000 10 $217,913,749 43 $12,957,367 679 $93,034,353 218 $101,377,075 27 $31,350,149 187 $631,848,669 1,416

$53,201,120 $42,476,300 $3,407,490 59 $7,317,330 0 $0 450 $38,528,540 $26,587,191 $9,806,016 $54,937,753 $119,791,754 $12,162,133 $315,014,507

WEST FARGO Total Housing Starts Single Family Twin Home Row / Town House Duplex Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Total

157 103 8 16 0 4 7 210 27 8 48 461

46 0 96

$26,931,900 $20,918,500 $1,242,000 $4,771,400 $0 $5,190,000 $3,915,000 $1,977,367 $2,547,010 $12,178,925 $4,437,488 $57,177,690

322 264 30 4 0 6 32 242 40 7 59 708

$62,479,290 $55,973,290 $3,326,000 28 $3,180,000 0 $0 72 $4,500,000 $31,061,395 $2,720,755 $5,114,745 $39,359,548 $8,382,985 $153,618,718

388 318 42 5 0 11 24 220 45 4 51 743

$81,384,453 $73,005,453 $5,299,000 28 $3,080,000 0 $0 241 $16,970,000 $27,483,300 $2,712,101 $19,114,227 $1,479,600 $1,117,786 $150,261,467

435 258 100 13 0 11 31 254 47 5 55 838

$87,854,337 $64,639,337 $13,245,000 77 $9,970,000 0 $0 384 $28,100,000 $51,690,301 $4,229,206 $6,027,536 $16,387,951 $1,794,212 $196,083,543

283 185 48 18 0 2 14 249 22 6 27 603

$62,382,111 $48,151,111 $6,905,000 50 $7,326,000 0 $0 12 $1,350,000 $25,098,480 $4,532,412 $7,971,020 $8,595,097 $1,942,500 $111,871,620

$193,676,952 701 $151,559,027 472 $24,257,925 120 132 $17,860,000 77 0 $0 0 1767 $143,140,000 22 $279,028,647 75 $22,473,668 1264 $116,821,489 298 $117,765,026 33 $34,041,040 248 $906,946,822 2,641

$150,327,580 $116,325,760 $19,358,490 109 $14,643,330 0 $0 702 $60,105,420 $60,146,385 $17,595,186 $70,160,774 $128,386,851 $14,794,622 $501,516,818

TOTAL Total Housing Starts Single Family Twin Home Row / Town House Duplex Multi-Family New Commercial Residential Remodel Commercial Remodel Public Miscellaneous Total

8/4/2015

447 338 44 25 0 17 44 1560 422 27 373 2,890

$79,572,785 732 $65,390,672 579 $5,828,400 86 65 $8,353,713 43 0 $0 0 647 $36,604,900 22 $33,027,293 82 $15,225,696 1642 $63,137,237 409 $32,023,735 30 $19,161,079 414 $278,752,725 3,331

$134,098,290 982 $114,681,290 770 $10,723,000 150 67 $8,694,000 37 0 $0 1 586 $41,840,797 39 $93,904,654 96 $19,869,350 1462 $62,934,870 421 $49,384,965 32 $31,949,242 345 $433,982,168 3,377

$192,245,391 940 $162,886,891 644 $21,875,500 164 60 $7,292,000 50 2 $191,000 0 1332 $93,587,999 46 $110,174,337 105 $21,005,981 1464 $62,051,421 419 $15,790,684 53 $28,984,741 468 $523,840,554 3,495

No assurance is provided on this report. Permit information reported here may have changed. For the most current permit information, please contact the individual cities.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.