DOCUMENT TYPE:
CALCULATION REPORT DOCUMENT TITLE:
FURNACE FOUNDATION CALCULATION REPORT
4 3 2 1
-
REV.
DATE
-
-
-
PRE.
CHK.
APP.
CONTRACTOR
GEG
-
Issue For Approval
Client
Description
Purpose of Issue
PROJECT TITLE :
GOL-E-GOHAR MEGA MODULE PROJECT Client :
Contractor: MINES & METALS TECHNOLOGICAL ENGINEERING CO.
Client ‘S Project Code Main Area Code Plant Group Equipment Document Project Contractor Code Type
GEG
7
119 NAME
1003
7
FU
Serial No.
C
002
15 MMTE No.
DATE
PREPARED
GGMMCF10C4-002
CHECKED APPROVED
Eng. Discipline
SHEET
REV.
B
Contract No. : 90/1942
This document and the information disclosed are the property of MMTE and are not to be used to furnish any information for making of documents or apparatus except where approved by written agreement.
REVISION RECORD SHEET
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Note: This Table is use for External Comments.
Page:
2 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
3 of 39
Table of Contents 1.INTRODUCTION.......................................................................................................................................... 2.GENERAL VIEW......................................................................................................................................... 3.STRUCTURAL SYSTEM............................................................................................................................... 13. FOUNDATION................................................................................................................................ 7 23. SUPER STRUCTURE...................................................................................................................... 7
3.2.1 VERTICAL LOADS.....................................................................................................................7 3.2.2 LATERAL LOADS......................................................................................................................7 3.2.3 FLOORS.................................................................................................................................7 4.LOADS..................................................................................................................................................... 14. DEAD LOAD.................................................................................................................................. 8 24. SUPER DEAD LOAD...................................................................................................................... 8 34. LIVE LOAD.................................................................................................................................... 8 4. VESSELS AND EQUIPMENT LOAD................................................................................................... 8 54. SEISMIC LOAD:........................................................................................................................... 18
4.5.1 EVALUATION OF SEISMIC LOAD:...............................................................................................18 64. W IND LOAD:............................................................................................................................... 19 74. THERMAL LOAD.......................................................................................................................... 19 84. ERECTION AND MAINTENANCE LOAD............................................................................................ 19 5.LOAD COMBINATIONS.............................................................................................................................. 6.ANALYSIS............................................................................................................................................... 16. MODELING.................................................................................................................................. 23
6.1.1 FOUNDATION MODELING.......................................................................................................23 6.1.2 FOUNDATION DIMENSIONS.....................................................................................................23 26. DEFORMATIONS.......................................................................................................................... 23 36. DYNAMIC ANALYSIS..................................................................................................................... 23 7.CALCULATION REPORT............................................................................................................................ 17. SETTLEMENT AND PRESSURE ON SOIL......................................................................................... 25 27. SHEAR STRENGTH OF FOUNDATION............................................................................................. 25
7.2.1 ONE-WAY SHEAR..................................................................................................................25 7.2.2 TWO-WAY SHEAR..................................................................................................................25 37. 47. 57. 67. 7. 87.
REINFORCEMENT........................................................................................................................ 27 Anchor Bolts............................................................................................................................. 27 PEDESTALS................................................................................................................................ 30 OVERTURNING CONTROL............................................................................................................. 30 SLIDING CONTROL...................................................................................................................... 31 Column Base Design................................................................................................................ 31
7.8.1 Base Plate on Ped. 1:........................................................................................................31 7.8.2 Base Plate on Ped. 2:........................................................................................................34 7.8.3 Other Base Plates (on Ped. 3, 4 and 5):............................................................................36
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
4 of 39
1. Introduction This document is a brief calculation report for the foundation of the Furnace structure. Furnace is a 107 m high steel structure. Foundation structural system is a 3 m thick reinforced concrete mat. The top level of the foundation is 1 m under the finished ground level.
2. General View Location of structure in plant site is shown in Figure 1.
Figure 1: Location in Plant Site
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
In Figure 2 and Figure 3, three dimensional views of the structure are shown:
Figure 2: 3D View A
Page:
5 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Figure 3: 3D View B
Page:
6 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
7 of 39
In Figure 4 the foundation configuration is shown.
Figure 4 - Furnace Foundation
3. Structural System 3.1 Foundation Foundation structural system is a 3 m thick reinforced concrete mat foundation. The top level of the foundation is 1 m under the finished ground level.
3.2 Super Structure 3.2.1 VERTICAL LOADS Vertical loads are supported by Steel Frames. 3.2.2 LATERAL LOADS According to ISIRI No. 2800 Iranian code of seismic resistant design of buildings for structures with height of 70m and more, Dual system composed of special moment resisting frames and braces should be used. For this type of structural systems, behavior factor is R=9 and there are some restrictions on columns to be stronger than beams. But in this structure, at some points such as beams under the furnace equipment, this cannot be achieved. Because at that level there are heavy beams to support the furnace equipment which are much stronger than the columns. On the other hand at that level there are still other columns that satisfy the beam to column strength ratio, so even if there may hinges occur in some columns, only part of lateral stability will be lost. Knowing that the main masses are below 70m level, and the above mentioned characteristics of this structure and applying all requirements of special moment resisting frames in members and connection design (except for the above mentioned points), behavior factor will be considered R=7 instead of 9. 3.2.3 FLOORS All floors are mainly covered by 32mm grating and there is a platform covered with 8mm chequered plate at the top of elevator.
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
8 of 39
4. Loads 4.1 Dead Load Weight of structural components is included in analytical model based on specific weight of 25KN/m3 for concrete and 78.5KN/m3 for steel parts.
4.2 Super Dead Load Super dead loads are dead load of non-structural components such as following items: Grating floors: Chequered plate floors
0.55 KN/m2 0.65 KN/m2
4.3 Live Load Live loads include the followings: Main Platforms: Auxiliary Platforms: Gangways and stairs: Roof
5.0 KN/m² 5.0 KN/m² 3.5 KN/m² 1.5 KN/m²
4.4 Vessels and Equipment Load Location and amount of each vessel or equipment point loads for individual cases are tabulated in Table 1.
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
Table 1 - Vessels and Equipments
Ite m
Description
Mecha nical Weight (Ton)
Weight Of Material (Ton)
Refractory Weight (Ton)
Operation al Weight (Ton)
Elevatio n and Centre Of Gravity (mm)
13360 1
7.6
18.4
-
56
(COG)
26245 2
Product Discharge Chamber Duct
3
Product Discharge Chamber
4
Bottom Discharge Bubbler
38
-
-
38
(+100 0 COG) 21110
24
10
6
40
(COG) 21110
5
-
-
-
(COG)
26245 5
Product Cooler
75
870
48
993
(+154 6 COG)
3D Shape from Analytical Model
9 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
26245
6
86
500
-
-
7
CGS offtake
-
-
-
12
36135
8
Cooling Gas Duct
-
-
-
80
36135
9
Spring Hanger
-
-
-
13.5
37810
10
Top Gas Scrubber
(-1806 COG
37810 -
-
DATE:
1
GGMMCF10C4-002
Cooling Gas Scrubber
122
MMTE Rev .
710
(-1026 COG)
Page:
10 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
50500 11
Reduction Furnace
358
1500
516
2500
(+502 5 COG)
12
Top Gas Scrubber Duct
13
-
53
-70
60150
13
Top Gas Scrubber Ventrury
21
-
8
29
56170
14
Burden Feeder Water Tank
5
12.4
-
18
62350
Page:
11 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
15
Charge Hopper
16
Bucket Elevator
17
18
19
Bustle Gas Duct
41
Client Document NO: MMTE Document NO:
327
-
MMTE Rev .
DATE:
1
GGMMCF10C4-002
370
See Attached Drawing recieved from Mechanical Discipline.
88550
15060 21110 97210
-
-
-
94
15960
-
-
-
20.5
50500
-
-
-
8.9
61870
Page:
12 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
20
Monorail
-
-
-
3.5
25110
21
Maintenan ce Hoist (one of the three parallel monorails)
-
-
-
15
56170
22
Maintenan ce Hoist
-
-
-
10
56170
23
Shaft Furnace Hoist
-
-
-
10
10375 0
24
Elevator Hoist
-
-
-
2.5
59112
25
Elevator
-
-
-
10
-
Page:
13 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
1
-
-
-
-
Fz=18
34740
27
-
-
-
-
Fz= -16 Fx=14. 7
34740
Fz= -2 Fx= -1.2
34740
-
-
-
-
DATE:
GGMMCF10C4-002
26
28
MMTE Rev .
Page:
14 of 39
28
27
Important Note: -All equipments are assumed rigid in analytical model. -All piping loads are tabulated as below. Refer to appendices which show the location of loads. (x,y = 0,0 refers to Grids : "1,DT" and also z=0 refers to elevation +0.000.) Joint Text PS-1001 PS-1002E PS-1002F PS-1003 PS-1003A PS-1004 PS-1004A PS-1004B PS-1005 PS-1010 PS-1012 PS-1013 PS-1014 PS-1015 PS-1017 PS-1018 PS-1020 PS-1023 PS-1024 PS-1027 PS-1029 PS-1030 PS-1031B PS-1031C PS-1032 PS-1033 PS-1035
CoordSys Text GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL
CoordType Text Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian
TABLE: Joint Coordinates XorR m 12.8002 9.5 8.80103 1.5003 1.5003 4.5003 4.5003 4.5003 11.33 11.33 10.49973 10.5 10.5 17.01791 24.3917 24.39 23.5 1.5005 7.6367 10.98 -2.09 11.524 11.524 11.524 12.9001 8.03207 10.5
Y m 30.9502 32.91587 34.24189 30.9505 34.2505 30.9505 34.9455 32.5955 30.1755 32.0065 17.96218 17.81162 20.5272 21.3754 14.85 14.8501 14.95275 37.4508 39.929 40.4083 17.96656 32.5004 36.0004 30.3004 28.6504 16.50022 17.99458
Z m 50.5 37.81 37.81 26.245 26.245 32.635 32.635 32.635 50.5 50.5 70.15 76.05 76.05 79.95 34.74 50.5 76.05 8.6 14.42 44.35 26.245 60.15 60.15 60.15 65.85 26.245 50.5
F3 KN -68.67 -10.8 -78.5 -88.3 -176.6 -200 -147.15 -1.77 -5 -4.9 -13.73 -3.73 -3.92 -10.8 -26.5 -200 -210 -88.3 -32.4 -117.7 -55.9 -18.15 -21.58 -18.15 -28.45 -23.55 -5.89
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
PS-1037 PS-1038 PS-1039 PS-1047 PS-1048 PS-1051 PS-1052 PS-1056 PS-1093 PS-1094 PS-1106B PS-1106C PS-1106F PS-11072 PS-11075 PS-11080 PS-11083 PS-11084 PS-1125 PS-1126 PS-1127 PS-1155 PS-1171 PS-1186A PS-1242 PS-1246 PS-1247 PS-1248 PS-1250 PS-1252 PS-1253 PS-1254 PS-1254A PS-1255 PS-1258 PS-1259 PS-1260 PS-1266 PS-1269 PS-1272 PS-1273 PS-1281 PS-1283 PS-1287 PS-1288 PS-1289 PS-1290 PS-1306 PS-1310 PS-1319 PS-1328A PS-1329A PS-1330
Document No: Client Document NO: MMTE Document NO: GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL
Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian
MMTE Rev .
DATE:
1
GGMMCF10C4-002 20.377 24.59629 24.5748 10.49982 9.7627 4.24268 5.7767 20.60886 0.775 8.55117 10.5 10.5 10.5 26.732 11.3753 -5.064E-13 1.57843 7.65638 3.149 5.324 7.5005 13.65 17.8001 23.4998 21.2001 23 24.203 23.08783 24.4003 21.85 20.1002 24.4928 24.4928 12.2502 7.637 7.6502 7.60791 22.798 22.798 22.798 23.4997 24.7418 24.7418 12.95671 8.2213 12.934 2.4403 11.6502 1.7 23.16363 25.25 25.25 24.8401
30.8732 35.78787 41.4221 38.03396 37.8 29.50026 36.2703 35.0005 40.4083 40.46946 31.90157 32.29364 34.03929 23.0003 37.0005 28.0203 19.1503 19.1503 17.3372 17.3372 17.3372 17.3393 28.6504 38.2071 34.2504 32.7005 32.8502 32.7005 32.8005 36.8222 38.05712 37.0441 36.0301 35.5003 29.5002 27.6005 20.0005 36.0005 32.5005 34.2505 38.1292 39.9241 36.0311 15.0005 29.5005 12.5003 17.7455 32.69384 27.5503 32.7005 17.52394 22.15976 29.5003
Page: 26.245 30.85 28.745 20.11 14.96 26.245 15.06 26.245 30.85 37.81 44.35 44.35 44.35 15.06 37.81 8.6 13.36 13.36 8.6 8.6 8.6 26.245 65.85 15.06 50.5 45 44.35 44.35 30.85 50.5 50.5 44.35 44.35 50.5 32.635 36.135 36.135 26.245 26.245 26.245 29.045 28.745 37.81 34.74 36.135 34.74 32.635 50.5 32.635 44.35 20.11 20.11 20.11
15 of 39 -88.3 -9.8 -103 -5.89 -5.65 -11.77 -117.7 -29.4 -187 -20 -10.8 -3.14 -98.1 -3 -6.87 -5.89 -3.52 -3.48 -8.95 -9.4 -5.06 -5.2 -28.45 -3.92 -7.36 -11.77 -11.77 -58.9 -93.2 -13.73 -19.6 -14.7 -34.33 -11.77 -24.5 -16.68 -9.8 -9.8 -9.8 -9.8 -13.73 -31.4 -22.56 -27.6 -3.43 -25.5 -60 -5.89 -5 -5.89 -8.83 -8.92 -4.02
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
PS-1330A PS-1330B PS-1331 PS-1334 PS-1336 PS-1337 PS-1343A PS-1344 PS-1344A PS-1345 PS-1345A PS-1346 PS-1348 PS-1350 PS-1352 PS-1354 PS-1356 PS-1357 PS-1359 PS-1362A PS-1376 PS-1377 PS-1386 PS-1388 PS-1400 PS-1405 PS-1407 PS-1408 PS-1409 PS-1410 PS-1411 PS-1412A PS-1423 PS-1424 PS-1425 PS-1426 PS-1460 PS-1460A PS-1460B PS-1460C PS-1460D PS-1460E PS-1461 PS-1462 PS-1463 PS-1465 PS-1465A PS-1466 PS-1467 PS-1486 PS-1486B PS-1487 PS-1487B
Document No: Client Document NO: MMTE Document NO: GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL
Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian
MMTE Rev .
DATE:
1
GGMMCF10C4-002 25.09311 24.33011 24.8947 11.19646 12.556 7.64796 24.504 24.52421 24.325 24.596 24.504 24.306 24.316 -1.1902 17.025 12.0502 -1.2797 -1.2874 -5.124E-13 4.25 16.6502 22.23145 7.5777 7.5777 10.5 21.7002 10.5 9.12182 9.122 10.49991 10.49987 -0.0002 1.5 1.5 1.5005 5.7767 18.485 17.9 17.35 16.8 16.3 15.8 20.743 21.95005 21.95 23.17732 22.5575 23.5 21.774 15.53713 14.90366 15.5148 14.9068
29.5003 29.5003 38.66338 40.5859 36.4253 39.0003 28.5673 27.6121 28.2103 27.7262 28.5672 30.8732 30.8732 26.2901 27.1005 24.08 23.798 23.80735 32.43913 28.6003 28.2754 24.37705 39 32.08 35.86677 27.9754 33.64311 34.25035 39.0003 33.59791 35.49651 36.1001 30.9503 25.7713 22.5008 29.909 30.8003 30.8003 30.8003 30.8003 30.8003 30.8003 31.2703 33.56317 34.9002 30.4504 31.4004 36.96228 33.4364 39.87128 39.8713 39.6721 39.6721
Page: 20.11 20.11 20.11 26.245 26.245 26.245 97.21 83.35 83.35 76.05 76.05 56.17 37.81 35.495 26.245 26.245 26.245 18.36 15.06 18.36 56.17 56.17 15.06 15.06 56.17 50.5 50.5 26.245 26.245 20.11 20.11 20.11 8.6 8.6 8.6 15.06 60.15 60.15 60.15 60.15 60.15 60.15 60.15 56.17 56.17 56.17 56.17 60.15 60.15 15.06 15.06 26.245 26.245
16 of 39 -12.16 -4.02 -4.4 -26.5 -5.89 -34.33 -25.5 -0.8 -25 -35 -34.33 -35 -78.5 -450 -3.43 -4.9 -19.62 -98.1 -9.8 -9.8 -3.92 -5.89 -4.905 -4.9 -3.92 -3.92 -3.92 -8.15 -7.35 -14.7 -7.85 -5.89 -120 -30.6 -67.9 -49.05 -4.9 -8.2 -6.8 -4.42 -4.42 -4.42 -4.42 -4.905 -11.77 -8.83 -3.24 -13.25 -31.4 -3.43 -5.89 -5.89 -7.85
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
PS-1488 PS-1488B PS-1488C PS-1489B PS-1490 PS-1490B PS-1491 PS-1497 PS-1498A PS-1507 PS-1517A PS-1518A PS-1526B PS-1526C PS-1526D PS-1526E PS-1535 PS-1536 PS-1536A PS-1537 PS-1538 PS-1539 PS-1540 PS-1541 PS-1542 PS-1543 PS-1544 PS-1562 PS-1565 PS-1573 PS-1574 PS-1577 PS-1627 PS-1635 PS-1636 PS-1655 PS-1683 PS-1684 PS-1685 PS-1686 PS-1713 PS-1714
Document No: Client Document NO: MMTE Document NO: GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL GLOBAL
Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian Cartesian
MMTE Rev .
DATE:
1
GGMMCF10C4-002 15.61719 14.98751 14.41225 14.9606 15.50106 14.70194 14.80386 2.87942 9.666 14 24.23526 23.5 19.3001 19.3001 19.3001 19.3001 14.56653 12.5 10.5 10.5 10.50009 10.5 10.5 8.5003 9.375 9.33402 8.5005 3.45 15.7588 2.25 9.503 24.2028 15.1001 2.0503 3.8503 13.9002 3.9 6.884 9.338 9.3375 13.7 13.7
39.55706 39.55706 39.55706 39.85273 39.00026 39.00027 36.1504 39.0001 30.2252 0.0002 31.63564 31.81882 30.1484 29.9244 29.6744 29.5004 39.00027 28.55439 27.78918 27.72735 27.59887 27.41443 27.68986 28.93777 29.0252 29.5003 29.03819 39.0003 12.1221 25.8533 39.0003 38.1291 32.63111 19.0505 19.0505 38.05182 17.0173 17.0173 17.0173 17.3397 16.5003 12.7502
Page: 37.81 37.81 37.81 44.35 56.17 56.17 56.17 20.11 26.245 8.6 44.35 56.17 60.15 60.15 60.15 60.15 60.15 97.21 88.55 76.05 65.85 56.17 44.35 32.635 26.245 13.36 8.6 15.06 8.6 8.6 30.85 44.35 56.17 36.135 36.135 50.5 13.36 13.36001 13.36001 18.36 8.6 8.6
17 of 39 -5.89 -4.22 -3.35 -11.6 -3.14 -3.92 -5.89 -5.89 -3.92 -3.92 -3.92 -19.6 -22.95 -39.73 -29.45 -9.8 -39.25 -34.33 -18.85 -36.3 -14.7 -88.3 -11.78 -19.6 -14.7 -4.9 -5.89 -7.85 -11.77 -9 -3.63 -5.4 -8.15 -5.5 -35.3 -47 -9.8 -49 -44.65 -93.2 -3.43 -3.14
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
18 of 39
4.5 Seismic load: According to ISIRI No. 2800 Iranian code of seismic resistant design of buildings for structures with height of 70m and more, Dual system composed of special moment resisting frames and braces should be used. For this type of structural systems, behavior factor is R=9 and there are some restrictions on columns to be stronger than beams. But in this structure, at some points such as beams under the furnace equipment, this cannot be achieved. Because at that level there are heavy beams to support the furnace equipment which are much stronger than the columns. On the other hand at that level there are still other columns that satisfy the beam to column strength ratio, so even if there may hinges occur in some columns, only part of lateral stability will be lost. Knowing that the main masses are below 70m level, and the above mentioned characteristics of this structure and applying all requirements of special moment resisting frames in members and connection design (except for the above mentioned points), behavior factor will be considered R=7 instead of 9.
4.5.1
EVALUATION OF SEISMIC LOAD:
Soil Type :
II 0.1 0.5 1.5 97668 97668 1.912 Sec. 1.540 Sec. 107 m 1.2 0.05 0.05 7 7 0.30 g
To Ts S Massx = Massy = Tx dyn = Ty dyn = H= I= Ct x = Ct y = Rx= Ry= A=
3.0 2.5 2.0 1.5 1.0 0.5 0.0 B
Period (T Sec.)
X Direction T 1x= Ct x x H3/4 Static Period Multiplier (0.8 or 1) T x st T = MIN(1.25 x T x st ,T x dyn ) Bx1 Bx min=0.1 x Rx Bx Cx (Flexible)=ABI/Rx Vx=Max(V flexible , 0.7 V Fixed base )
1.663 Sec 1.0 1.663 Sec. 1.912 Sec. 1.022 0.700 1.022 0.05258 5135 KN
Y Direction 3/4
T 1y = Ct y x H Period Multiplier (0.8 or 1) T y st T = MIN(1.25 x T y st ,T y dyn ) B By min=0.1xRy By Cy (Flexible)=ABI/Ry Vy=Max(V flexible , 0.7 V Fixed base )
1.663 Sec. 1.0 1.663 Sec. 1.540 Sec. 1.181 0.700 1.181 0.06074 5932 KN
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
19 of 39
4.6 Wind Load: Wind loads are evaluated as mentioned in General Design Criteria and are applied on analytical model of the structure. INBC Part 6: V= 130 km/h q = 0.005 x V2= 0.005 x 1302 = 84.5 Kg/m2 P = Ce x C q x q Ce = According to table below Cq= As shown below
P (Kg/m2) Height
Ce
V
q
cq= 0.5
cq= 0.7
cq= 0.8
0-10
2
130
84.5
84.5
118.3
135.2
10-20
2.2
130
84.5
93.0
130.1
148.7
20-30
2.4
130
84.5
101.4
142.0
162.2
30-40
2.5
130
84.5
105.6
147.9
169.0
40-50
2.6
130
84.5
109.9
153.8
175.8
50-60
2.7
130
84.5
114.1
159.7
182.5
60-80
2.8
130
84.5
118.3
165.6
189.3
80-100
2.9
130
84.5
122.5
171.5
196.0
100-120
3
130
84.5
126.8
177.5
202.8
4.7 Thermal load Effect of +/-30 degrees Celsius change in steel parts will be taken into account.
4.8 Erection and Maintenance Load No special erection load is noted on drawings. Refractory lining is assumed to be completed gradually and in a symmetrical pattern.
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
20 of 39
5. Load Combinations In order to analyze the structural model, the following load cases are defined. Following tables describe the load cases and combination factors for design of foundation, concrete and steel parts. Table 2: Load Cases Definition Load Cases Structural Loads
Type
Description
Intermediate Load cases
Dead00
Dead
Weight of structure alone
ALLDead= Soil+Dead00+Supd100+EMDL100
Supd100
Dead
Soil
Dead
Live20
Live
SpecX* SpecY*
Weight of floors+grating+internal walls+finishing+… Weight of the soil over the foundation Live loads that contribute in Earthquake 20% Earthquake Loads in X dir: Spectrum Analysis Earthquake Loads in Y dir: Spectrum Analysis Earthquake Loads in X dir: Auto Lateral Loading Earthquake Loads in Y dir: Auto Lateral Loading
EQX
Quake
EQY
Quake
WLX
Wind
Wind Load in +X dir
WLXN
Wind
Wind Load in -X dir
WLY
Wind
Wind Load in +Y dir
WLY
Wind
Wind Load in -Y dir
TL
Therma l
-------
Main Load cases
ALLLive=Live20+ EMLL100
Fv=( 0.7AI=0.2625) x ALLDead (Seismic Vertical Effect)
FvEnv=env(Fv, FvN)
FvN= - Fv
Equipment Loads EMDL100
Dead
EMLL100
Live
EMEXLO
Quake
EMEYLO
Quake
CRV1 ~ CRV6**
Other
Equipment Dead Loads that contribute in Earthquake 100% Equipment Live loads that contribute in Earthquake100% Additional Equipment Earthquake Load in X dir Local Additional Equipment Earthquake Load in Y dir Local Vertical Crane load at different levels (including impact factor : 1.25)
CRV= ENV(CRV1 ~ CRV6)
*: This note should be taken into account that in Load Combinations The positive and negative sign of SpecX and SpecY will be considered by software SAP2000. ** In foundation analysis and design monorails loads were not considered.
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
21 of 39
Table 3: Load Combination Factors
Design Combinatio ns (for Soil Pressure Evaluation and Steel Design)
ALLDead
ALLLive
CRV
ASD1
1
1
1
ASD2
1
ASD3
0.75
0.75
0.375
ASD4
0.75
0.75
0.375
ASD5
0.75
0.75
0.375
ASD6
0.75
0.75
0.375
ASD7
0.75
ASD8
0.75
TL
WLX
WLY
WLXN
WLYN
SpecX
SpecY
FvEnv
EMEYLO
EMEXLO
0.75
0.225
0.75 0.75 0.75 0.75 0.75 0.75
ASD9
0.75
ASD10
0.75
0.75
ASD11
0.75
0.75
0.375
0.75
0.225
0.225
ASD12
0.75
0.75
0.375
0.225
0.75
0.225
ASD13
0.75
0.75
0.375
0.225
0.225
0.75
ASD14
0.75
0.75
0.225
0.225
ASD15
0.75
0.225
0.75
0.225
ASD16
0.75
0.225
0.225
0.75
0.75
ASD17-1
1
ASD17-2
0.67
0.67
0.67
0.9 0.67
0.201
0.201
ASD17-3
0.67
0.67
0.67
0.201
0.67
0.201
ASD17-4
0.67
0.67
0.67
0.201
0.201
0.67
ASD17-5
0.67
0.67
0.67
0.201
0.201
ASD17-6
0.67
0.67
0.201
0.67
0.201
0.67
0.201
0.201
0.67
ASD17-7
0.67
Design
ASD18
0.75
0.75
0.375
0.225
Combinatio ns
ASD19
0.75
0.75
0.375
0.225
0.75
-0.225
ASD20
0.75
0.75
0.375
0.225
-0.75
0.225
ASD21
0.75
0.75
0.375
0.225
-0.75
-0.225
ASD22
0.75
0.75
0.375
0.225
0.225
0.75
ASD23
0.75
0.75
0.375
0.225
0.225
-0.75
ASD24
0.75
0.75
0.375
0.225
-0.225
0.75
ASD25
0.75
0.75
0.375
0.225
-0.225
-0.75
ASD26
0.75
0.75
0.375
0.75
0.225
0.225
ASD27
0.75
0.75
0.375
0.75
0.225
-0.225
ASD28
0.75
0.75
0.375
0.75
-0.225
0.225
ASD29
0.75
0.75
0.375
0.75
-0.225
-0.225
ASD30
0.75
0.225
0.75
0.225
ASD31
0.75
0.225
0.75
-0.225
ASD32
0.75
0.225
-0.75
0.225
(for Equipment Supporting Elements Design) *
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
MMTE Rev .
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
DATE:
1
GGMMCF10C4-002
Page:
ASD33
0.75
0.225
-0.75
ASD34
0.75
0.225
0.225
0.75
ASD35
0.75
0.225
0.225
-0.75
ASD36
0.75
0.225
-0.225
0.75
ASD37
0.75
0.225
-0.225
-0.75
ASD38
0.75
0.75
0.225
0.225
ASD39
0.75
0.75
0.225
-0.225
ASD40
0.75
0.75
-0.225
0.225
0.75
-0.225
-0.225
ASD41
0.75
Design Combinatio ns
ASDF1
0.75
0.75
1.8
0.54
0.225
ASDF2
0.75
0.75
0.54
1.8
0.225
(With Over Strength Factor)
ASDF3
0.75
1.8
0.54
0.225
ASDF4
0.75
0.54
1.8
0.225
USD1
1.4
Design Combinatio ns (for Concrete Design)
Checking Combinatio ns
22 of 39
1.7
USD2
1.4
USD3
1.05
1.275
USD4
1.05
1.275
USD5
1.05
1.275
USD6
1.05
1.275
USD7
0.9
USD8
0.9
USD9
0.9
1.275 1.275 1.275 1.275 1.3 1.3 1.3
USD10
0.9
USD11
1.05
1.275
1.4025
0.4208
USD12
1.05
1.275
0.4208
1.4025
USD13
1.05
1.4025
0.4208
USD14
1.05
0.4208
1.4025
USD15
1.4
ASD USD
env(ASD1 to ASD16) env(USD1 to USD15)
1.3
-0.225
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
23 of 39
6. Analysis 6.1 Modeling According to standard No. 2800-05 3rd editions in Dual system, Flexural Frame must resist against 25% of Seismic Loads. In order for this purpose to be satisfied two Different SAP Analysis Model is prepared.
6.1.1 Foundation Modeling According to DEISIGN CRITERIA soil allowable pressure is q allowable = 2 kg/cm2 and deflection has been restricted to 10cm for Furnace Foundation. thus, in foundation analysis soil sub grade reaction is assumed Ks = 0.2 kg/m3 for reinforcement design (soft model). This note should be taken into account that Ks in margin of the foundation was doubled and in corners quadruplicated according to the Geotechnique Specification. For more information about the deflection of the foundation please refer to appendices.
6.1.2 Foundation Dimensions Based on the results from many different analyses foundation is selected as mat foundation and dimensions are as per given in Foundation drawings. Thickness of the foundation has been considered 3 m.
6.2 Deformations Height of structure H=107 m In X and Y direction: Max ∆W = (0.02x107)/(0.7x7)= 0.436 m For more information about the lateral drift refer to the appendices.
6.3 Dynamic Analysis Dynamic analysis of structure will be performed in order to evaluate the seismic effect on structural components. 90 percent of the mass in each direction should be activated. TABLE: Modal Participating Mass Ratios OutputCase StepType StepNum Period UX UY UZ SumUX SumUY Text Text Unitless Sec Unitless Unitless Unitless Unitless Unitless
MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL
Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.912 1.540 1.267 1.081 1.052 0.975 0.967 0.926 0.913 0.803 0.719 0.706 0.670 0.665
0.727 0.006 0.000 0.000 0.001 0.000 0.006 0.003 0.000 0.009 0.098 0.000 0.000 0.000
0.006 0.723 0.005 0.000 0.000 0.000 0.000 0.000 0.002 0.000 0.000 0.002 0.003 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.727 0.733 0.733 0.733 0.734 0.734 0.739 0.742 0.742 0.751 0.848 0.849 0.849 0.849
0.006 0.730 0.734 0.734 0.734 0.734 0.734 0.735 0.737 0.737 0.737 0.739 0.741 0.742
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL MODAL
Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode Mode
Document No: Client Document NO: MMTE Document NO:
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
MMTE Rev .
DATE:
1
GGMMCF10C4-002
0.652 0.644 0.601 0.595 0.578 0.576 0.560 0.558 0.551 0.542 0.519 0.511 0.496 0.492 0.489 0.488 0.484 0.483 0.475 0.475 0.473 0.471 0.469 0.466 0.457 0.455 0.447 0.444 0.442 0.440 0.433 0.431 0.425 0.424 0.416 0.412
0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.000 0.000 0.000 0.001 0.002 0.000 0.000 0.000 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.033 0.000 0.000 0.000 0.005 0.017
0.014 0.076 0.001 0.000 0.000 0.001 0.000 0.000 0.003 0.000 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.000 0.000 0.000 0.000 0.000 0.001 0.004 0.017 0.000 0.000 0.000 0.003 0.000 0.000 0.000 0.002 0.001 0.007
Page:
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.003 0.002 0.001 0.000 0.000 0.000 0.000 0.002 0.008 0.000 0.000 0.006 0.032
0.851 0.851 0.851 0.851 0.851 0.851 0.851 0.851 0.851 0.852 0.852 0.852 0.853 0.853 0.855 0.855 0.855 0.855 0.856 0.856 0.856 0.856 0.856 0.856 0.857 0.857 0.857 0.857 0.857 0.859 0.891 0.891 0.891 0.891 0.896 0.913
TABLE: Modal Load Participation Ratios OutputCase ItemType Item Static Dynamic Text Text Text Percent Percent MODAL Acceleration UX 99.846 91.307 MODAL Acceleration UY 99.461 87.462 MODAL Acceleration UZ 7.1176 5.671
As the result show, almost 90% of the mass in each direction is activated.
24 of 39
0.756 0.832 0.833 0.833 0.833 0.834 0.834 0.834 0.837 0.837 0.838 0.838 0.838 0.838 0.838 0.839 0.839 0.839 0.839 0.840 0.840 0.840 0.840 0.841 0.845 0.862 0.862 0.862 0.862 0.865 0.865 0.865 0.865 0.867 0.868 0.875
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
25 of 39
7. Calculation report 7.1 Settlement and Pressure on Soil Max soil pressure (evaluated by rigid model) = 1.45 kg/cm 2 < 2.00kg/cm2 For more information Please refer to appendices.
7.2 Shear Strength of Foundation 7.2.1 ONE-WAY SHEAR In order to check the shear strength of the foundation V12 and V13 in SAP analysis Model are checked. At first the sole capacity of the concrete part of the foundation without shear reinforcement is checked. If the existing shear exceeds the concrete capacity, the shear reinforcement is provided. Design of cross sections subject to shear shall be based on: Vn ≥ Vu where Vu is factored shear force at section considered and V n is nominal shear strength computed by:
Vn = Vc + Vs where Vc is nominal shear strength provided by concrete in accordance with:
Vc=0.85x0.53√f'c x bd = 0.85 x 0.53 x √250 x 100 x 282.5 = 201.2 Ton and Vs is nominal shear strength provided by shear reinforcement in accordance with: Vs= Avfyd ∕ s
7.2.2 TWO-WAY SHEAR For square columns, the shear stress due to ultimate loads in slabs subjected to bending in two directions is limited to: Vc=0.85 x 1.06 √f'c x b0d In order to check the punching shear a Visual Basic Program has been prepared as shown below : For example : Shear Stress = Pu / (Perimeter x d) = =3000 / (2800 x 300) = 3.57 kg/cm2 ~ 3.6 kg/cm2 Perimeter= 2 x ( a+d + b + d ) = =2 x (400 + 300 + 400 + 300 ) = 2800 cm Allowable Shear Stress = 0.85 x 1.06 x √f'c = = 0.85 x 1.06 x √250 = 14.24 kg/cm2 ~ 14.2 kg/cm2 Ratio = Shear Stress / Allowable Shear Stress = = 3.6 / 14.2 = 0.25
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No:
FURNACE FOUNDATION CALCULATION REPORT
Client Document NO: MMTE Document NO:
DATE:
1
GGMMCF10C4-002
TABLE: Element Forces - Frames Frame OutputCase CaseType Text Text Text PED1-1 ENLUSD Combination PED1-1 ENLUSD Combination PED1-2 ENLUSD Combination PED1-2 ENLUSD Combination PED1-3 ENLUSD Combination PED1-3 ENLUSD Combination PED1-4 ENLUSD Combination PED1-4 ENLUSD Combination PED1-5 ENLUSD Combination PED1-5 ENLUSD Combination PED1-6 ENLUSD Combination PED1-6 ENLUSD Combination PED2-1 ENLUSD Combination PED2-1 ENLUSD Combination PED2-2 ENLUSD Combination PED2-2 ENLUSD Combination PED2-3 ENLUSD Combination PED2-3 ENLUSD Combination PED2-4 ENLUSD Combination PED2-4 ENLUSD Combination PED2-5 ENLUSD Combination PED2-5 ENLUSD Combination
7.2.2.1Pedestal 400x400 :
MMTE Rev .
StepType Text Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
Page:
P Tonf -427.0711 -1521.6025 -419.5571 -2078.732 -531.4166 -1631.7464 -534.1137 -2162.1749 -372.2167 -1812.0328 -509.0314 -2287.3753 -470.3786 -2122.3631 -364.8197 -1757.1952 -151.5252 -1200.3368 -76.9338 -970.2937 -182.8423 -923.602
26 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
27 of 39
7.2.2.2Pedestal 350x350 :
7.3 Reinforcement According to ABA: 8-7-3-1, minimum reinforcement considering 3 m thick slab is prepared. Asmin = 0.0018x100x300 = 54 cm2/m Use : 2 T28 @ 200 (Top & Bot.) Additional Bars was provided as per shown in drawings. For more information Please refer to appendices.
7.4 Anchor Bolts For more information about the development length of the anchor bolts refer to anchor bolts drawings.
Distance ×QTY . Of anchor Bolts (each side) ¿ Distance ×QTY . Of anchor Bolts (each side) ¿ ¿ P(Tension) M2 T max= + QTY . Of anchor Bolts ¿ Please refer to table below : TABLE: Element Forces - Frames Frame
OutputCase
StepType
P
M2
M3
Capacity
Anchor Bolt
Text
Text
Text
KN
KN-m
KN-m
1170 KN
Type
PED1-1
ASDF1
Max
-3473.4
-532.02
1323.98
232
16 M100
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
PED1-1
ASDF1
Min
-10905
-1330.8
-1516.49
PED1-1
ASDF2
Max
-4457.3
-41.256
PED1-1
ASDF2
Min
-9920.7
-1821.6
PED1-1
ASDF3
Max
-1537.6
PED1-1
ASDF3
Min
-8968.8
PED1-1
ASDF4
Max
PED1-1
ASDF4
PED1-2
ASDF1
PED1-2
ASDF1
Min
PED1-2
ASDF2
Max
PED1-2
ASDF2
Min
PED1-2
ASDF3
PED1-2
ASDF3
PED1-2 PED1-2
Page: 356
16 M100
486.958
66
16 M100
-679.46
313
16 M100
-424.15
1338.7
220
16 M100
-1222.9
-1501.77
341
16 M100
-2521.5
66.6135
501.678
71
16 M100
Min
-7984.9
-1713.7
-664.741
297
16 M100
Max
-2665
-524.39
3929.77
557
16 M100
-17223
-1817.1
-67.8625
236
16 M100
-5748.8
93.4911
2791.46
361
16 M100
-14140
-2435
1070.45
438
16 M100
Max
-145.1
-400.42
3601.99
500
16 M100
Min
-14703
-1693.1
-395.646
261
16 M100
ASDF4
Max
-3228.8
217.465
2463.67
335
16 M100
ASDF4
Min
-11620
-2311
742.667
382
16 M100
PED1-3
ASDF1
Max
-4842.1
1033.6
409.695
180
16 M100
PED1-3
ASDF1
Min
-10587
228.8
-1725.77
244
16 M100
PED1-3
ASDF2
Max
-5640.4
1601.63
-103.828
213
16 M100
PED1-3
ASDF2
Min
-9788.9
-339.23
-1212.25
194
16 M100
PED1-3
ASDF3
Max
-2659
979.095
581.714
195
16 M100
PED1-3
ASDF3
Min
-8404.2
174.298
-1553.75
216
16 M100
PED1-3
ASDF4
Max
-3457.4
1547.12
68.1903
202
16 M100
PED1-3
ASDF4
Min
-7605.8
-393.73
-1040.23
179
16 M100
PED1-4
ASDF1
Max
-3815.8
2159.99
3252.38
677
16 M100
PED1-4
ASDF1
Min
-17036
363.133
202.435
71
16 M100
PED1-4
ASDF2
Max
-7087.2
2696.68
2391.88
636
16 M100
PED1-4
ASDF2
Min
-13764
-173.56
1062.93
155
16 M100
PED1-4
ASDF3
Max
-1280.2
1990.57
2948.06
617
16 M100
PED1-4
ASDF3
Min
-14500
193.719
-101.881
37
16 M100
PED1-4
ASDF4
Max
-4551.7
2527.26
2087.57
577
16 M100
PED1-4
ASDF4
Min
-11229
-342.97
758.614
138
16 M100
PED1-5
ASDF1
Max
-4498
3832.23
983.05
602
16 M100
PED1-5
ASDF1
Min
-12395
2028.19
-1801.98
479
16 M100
PED1-5
ASDF2
Max
-1538.6
4912.71
369.111
660
16 M100
PED1-5
ASDF2
Min
-15354
947.713
-1188.04
267
16 M100
PED1-5
ASDF3
Max
-2878.1
3432.98
1045.02
560
16 M100
PED1-5
ASDF3
Min
-10775
1628.94
-1740.01
421
16 M100
PED1-5
ASDF4
Max
81.314
4513.46
431.083
623
16 M100
PED1-5
ASDF4
Min
-13734
548.46
-1126.07
209
16 M100
PED1-6
ASDF1
Max
-2912.4
5059.3
3702.51
1095
16 M100
PED1-6
ASDF1
Min
-19037
1689.17
-57.3668
218
16 M100
PED1-6
ASDF2
Max
-2695
5867.12
2678.49
1068
16 M100
28 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
PED1-6
ASDF2
Min
-19254
PED1-6
ASDF3
Max
-678.67
PED1-6
ASDF3
Min
-16803
PED1-6
ASDF4
Max
-461.27
PED1-6
ASDF4
Min
-17021
PED2-1
ASDF1
Max
PED2-1
ASDF1
PED2-1
ASDF2
PED2-1
ASDF2
PED2-1
ASDF3
PED2-1
ASDF3
PED2-1 PED2-1
881.356
Page:
966.657
231
16 M100
4606.7
3365.91
997
16 M100
1236.57
-393.964
204
16 M100
5414.51
2341.89
970
16 M100
428.754
630.06
132
16 M100
-5058.4
-1881
1876.66
704
12 M100
Min
-15444
-3634.8
-395.655
553
12 M100
Max
-2589
-814.53
1260.2
417
12 M100
Min
-17914
-4701.3
220.811
643
12 M100
Max
-2949.8
-1479.9
1768.37
627
12 M100
Min
-13336
-3233.7
-503.947
530
12 M100
ASDF4
Max
-480.37
-413.43
1151.9
340
12 M100
ASDF4
Min
-15805
-4300.2
112.519
566
12 M100
PED2-2
ASDF1
Max
-3488.7
-1548.8
739.401
378
12 M100
PED2-2
ASDF1
Min
-13060
-3037.3
-912.504
608
12 M100
PED2-2
ASDF2
Max
-1560.4
-757.13
286.765
166
12 M100
PED2-2
ASDF2
Min
-14988
-3828.9
-459.868
594
12 M100
PED2-2
ASDF3
Max
-1948.9
-1241.1
759.165
345
12 M100
PED2-2
ASDF3
Min
-11520
-2729.6
-892.74
564
12 M100
PED2-2
ASDF4
Max
-20.56
-449.43
306.529
133
12 M100
PED2-2
ASDF4
Min
-13448
-3521.2
-440.104
550
12 M100
PED2-3
ASDF1
Max
61.235
-753.06
419.96
204
12 M100
PED2-3
ASDF1
Min
-10421
-1951.1
-2096.3
768
12 M100
PED2-3
ASDF2
Max
-2096.7
-160.05
-286.792
92
12 M100
PED2-3
ASDF2
Min
-8263
-2544.1
-1389.54
665
12 M100
PED2-3
ASDF3
Max
1074.9
-608.17
555.72
305
12 M100
PED2-3
ASDF3
Min
-9407.3
-1806.2
-1960.54
716
12 M100
PED2-3
ASDF4
Max
-1083.1
-15.156
-151.031
40
12 M100
PED2-3
ASDF4
Min
-7249.3
-2399.2
-1253.78
613
12 M100
PED2-4
ASDF1
Max
529.53
1153
225.937
245
12 M100
PED2-4
ASDF1
Min
-8465.2
-79.734
-2170.26
553
12 M100
PED2-4
ASDF2
Max
-1765.7
1742.91
-333.274
301
12 M100
PED2-4
ASDF2
Min
-6170
-669.65
-1611.04
486
12 M100
PED2-4
ASDF3
Max
1372.3
1074.7
401.178
349
12 M100
PED2-4
ASDF3
Min
-7622.5
-158.03
-1995.02
519
12 M100
PED2-4
ASDF4
Max
-922.95
1664.62
-158.034
248
12 M100
PED2-4
ASDF4
Min
-5327.2
-747.95
-1435.8
452
12 M100
PED2-5
ASDF1
Max
-246.11
3084.06
144.284
422
12 M100
PED2-5
ASDF1
Min
-7928.9
1119.31
-2276.1
709
12 M100
PED2-5
ASDF2
Max
-556.96
3709.92
-242.102
524
12 M100
PED2-5
ASDF2
Min
-7618.1
493.458
-1889.71
534
12 M100
PED2-5
ASDF3
Max
308.89
2833.76
307.162
457
12 M100
29 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
PED2-5
ASDF3
Min
PED2-5
ASDF4
PED2-5
ASDF4
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
-7373.9
869.008
-2113.22
637
12 M100
Max
-1.963
3459.61
-79.2241
452
12 M100
Min
-7063.1
243.152
-1726.83
462
12 M100
30 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
MMTE Rev .
Document No: Client Document NO: MMTE Document NO:
DATE:
1
GGMMCF10C4-002
Page:
31 of 39
7.5 Pedestals Reinforcement in pedestal must be design for capacity of anchor bolts For Pedestal 4000x4000 16 M100: 16x78.5 =1256 cm2 16x78.5x3500/4000 = 1100 cm2 use min 180 T28 For Pedestal 3500x3500 12 M100: 12x78.5=942cm2 12x78.5x3500/4000 = 825 cm2 use min 135 T28
7.6 Overturning control SF = Global MY(Mr-E) /Global MY(SpecX) >1.75 SF = Global MY(Mr-E) /Global MY(SpecY) >1.75 Mr-E = Dead00+Soil+Supd100+EMDL100+EMLL100+(0.2xLive20) TABLE: Base Reactions OutputCase
CaseType
StepType
GlobalFX
GlobalFY
GlobalFZ
GlobalMX
GlobalMY
Text
Text
Text
KN
KN
KN
KN-m
KN-m
SpecX
LinRespSpec
Max
4146.045
502.093
688.831
32068.9036
220804.481
SpecY
LinRespSpec
Max
507.213
4773.234
250.402
259274.094
27983.6408
Mr-E
Combination
-131.899
-4.4E-05
242098.7
-5498453.2
4101603.81
S.F. My =
18.58
( point : 32,47.6,-1)
S.F. Mx =
21.21
688.831
30898.5475
222951.825
( point : -3.5,44,-1) SpecX
LinRespSpec
Max
SpecY
LinRespSpec
Max
Mr-E
Combination
4146.045
502.093
507.213
4773.234
250.402
259070.919
29465.8234
-131.899
-4.4E-05
242098.7
-4626897.8
-4492901.7
S.F. My =
20.15
S.F. Mx =
17.86
( point : -3.5,12.5,-1) SpecX
LinRespSpec
Max
4146.045
502.093
688.831
28887.9224
222951.825
SpecY
LinRespSpec
Max
507.213
4773.234
250.402
257420.987
29465.8234
Mr-E
Combination
-131.899
-4.4E-05
242098.7
2999212.79
-4492901.7
S.F. My =
20.15
S.F. Mx =
11.65
688.831
29532.5775
221007.243
( point :29.85,9.5,-1) SpecX
LinRespSpec
Max
SpecY
LinRespSpec
Max
Mr-E
Combination
4146.045
502.093
507.213
4773.234
250.402
257275.912
28755.9863
-131.899
-4.4E-05
242098.7
3725509.03
10844053.9
S.F. My =
49.07
S.F. Mx =
14.48
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
7.7 Sliding control
7.8 Column Base Design 7.8.1 Base Plate on Ped. 1: 7.8.1.1Shear key Design:
ABA: 1-10-11: Vmax=3054 KN (Member : Ped1-6 , ASDF2)
V max = 2395 cm2 so it is used 160x35 cm2 0.85 ×0.6 × f c V max Kg = 305400/5600=54 f a= 160× 35 cm2 A sk =
I=11437 cm4
11437 =762.5 cm3 15
M=54x23x402/2=993600
f a=1303<1440
Vr =54x23x40=49680 Kg
f v=
49680 =331 <0.55xFy =1320 5× 30
DATE:
1
GGMMCF10C4-002
Assume= 0.2 " Ff = FN x = 242098 x 0.2 = 48420 KN " and " V=4773 KN " SF = 48420/ 4773 = 10.15 > 1.5 OK.
S=
MMTE Rev .
Kg =¿> ok . cm2
Kg =¿> ok . 2 cm
7.8.1.2Pressure Control under Base Plate: The maximum Pressure occurs under the PED1-2 where
P=2695 KN, M2=5867 KN-m and M3=2699 KN-m
Page:
32 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
33 of 39
in Load combination ASDF1. For pressure control under the base plate please refer to the spreadsheet as attachment. In this case :
M H =217 cm> =100 cm P 2 K 1=353 , K 2=2992 , K 3=−598551=¿ ≫Y =35.58 cm kg 4×4 kg T =133.97 Ton=¿ q max=130.38 < min 0.3 ×250 , 0.6∗250 =150 2 A cm c m2
e=
(
√
7.8.1.3Design of PL-1: Zone A Zone B Zone C
According to "Yield Line Theory" required thickness can be estimated as follow: For zone A & B:
√(
4 q max a2 (3 K −2 R) t= 1 12 + 2 K ×2400 R 1 3 R2 + × R− =0 K 4 b K= a Kg q max=130.38 2 cm
)
Zone A: a=b=57.5 cm R=0.5 t=5.47 cm Zone B: a=27.5 cm b= 59.5 cm K=2.16 R=0.665t= 3.48 cm For Zone C: a= 33 cm
√
4 qmax a2 = 4.44 cm t= 2400 ×12
Use t=7cm
)
Ok.
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT
MMTE Rev .
DATE:
1
GGMMCF10C4-002
7.8.1.4Design of PL-6:
According to "Yield Line Theory" required thickness can be estimated as follow:
t=
√
2P a 3b Fy× + c c
(
)
P=117800x1.7 Kg (Ultimate Capacity of M100) a=59.5 cm, b=37 cm, c=12.5 cm
t=
√
2 ×117800 ×1.7 =5.3 cm 59.5 3 ×37 2150 × + 12.5 59.5
(
)
a Simple edge c
b
P
Free edge
7.8.1.5Design of Stiffeners:
I=1099885 cm4 S=21000 cm3 M=130.38x98.1x0.332/2=696 KN-m
Page:
34 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT 4
Use : 5 cm THK. Plate
DATE:
1
GGMMCF10C4-002
M 696 ×10 Kg = =331 2 S 21000 cm V 130.38 × 98.1× 2× .33× 102 f v= = =¿ n× t × h 3 ×5 ×68 Kg ¿ 827 2 cm 2 2 f =√ ( 331 + 3× 827 ) =1470<0.6 ×2400=¿ Kg ¿ 1440 2 Say ok. cm f a=
MMTE Rev .
Page:
35 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
36 of 39
7.8.2 Base Plate on Ped. 2: 7.8.2.1Shear key Design:
ABA: 1-10-11: Vmax=3091 KN ( ASDF2 ON PED2-1)
V max = 2424 cm2 so it is used 1200x350 cm2 0.85 ×0.6 × f c V max Kg f a= =55.19 2 160× 35 cm A sk =
I=11437 cm4 S=
11437 =762.5 cm3 15
M=55.19x23x402/2=1015496 Vr =55.19x23x40=50775 Kg
f v=
f a=1331<1440 ok .
50775 Kg =338<0.55 × Fy=1320 2 5 × 30 cm
7.8.2.2Pressure Control under Base Plate: The maximum Pressure occurs under the PED2-5 where
P=557 KN, M2=3710 KN-m and M3=242 KN-m
in Load combination ASDF1. For pressure control under the base plate please refer to the spreadsheet as attachment. In this case :
M H =666 cm> =100 cm P 2 K 1=1698 , K 2=7216 , K 3=−1443328=¿≫Y =26.91 cm T =170.91Ton=¿≫¿
e=
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT
q max=84.62
(
√
MMTE Rev .
DATE:
1
GGMMCF10C4-002
)
kg 4×4 kg < min 0.3 ×250 , 0.6 ×250 =150 2 A cm c m2
Page:
Ok.
7.8.2.3Design of PL-1: Zone A Zone B Zone C
According to "Yield Line Theory" required thickness can be estimated as follow: For zone A & B:
√(
4 q max a2 (3 K −2 R) t= 1 12 + 2 K ×2400 R 1 3 R2 + × R− =0 K 4 b K= a Kg q max=84.62 2 cm
)
Zone A: a=b=58.5 cm R=0.5 t=4.48 cm Zone B: a=29 cm b= 58.5 cm K=2.16 R=0.652t= 2.9 cm For Zone C: a= 34 cm For Zone C:
√
4 qmax a2 = 3.68 cm t= 2400 ×12 Use t = 7cm
37 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
Document No: Client Document NO: MMTE Document NO:
FURNACE FOUNDATION CALCULATION REPORT
MMTE Rev .
DATE:
1
GGMMCF10C4-002
7.8.2.4Design of PL-6 and 7:
According to "Yield Line Theory" required thickness can be estimated as follow:
t=
√
2P a 3b Fy× + c c
(
)
P=117800x1.7 Kg (Ultimate Capacity of M100) a=59.5 cm, b=37 cm, c=12.5 cm
t=
√
2 ×117800 ×1.7 =5.32 cm 59.5 3 ×37 2150 × + 12.5 59.5
(
)
a Simple edge c
b
P
Free edge
7.8.2.5Design of Stiffeners: I=1099885 cm4 S=21000 cm3 M=84.62x98.1x0.332/2=452 KN-m 4
f a=
M 452 ×10 Kg = =215 2 S 21000 cm
Page:
38 of 39
GOL-E-GOHAR MEGA MODULE PROJECT DOCUMENT TITLE
FURNACE FOUNDATION CALCULATION REPORT
Document No: Client Document NO: MMTE Document NO:
MMTE Rev .
DATE:
1
GGMMCF10C4-002
Page:
39 of 39
2
V 84.62× 98.1× 2× .33× 10 = =¿ n× t × h 3 ×5 ×68 Kg ¿ 537 2 cm 2 2 f =√ ( 215 +3 ×537 ) =954< 0.6 ×2400=¿ Kg ¿ 1440 2 ok. cm f v=
Use : 5 cm THK. Plate
7.8.3 Other Base Plates (on Ped. 3, 4 and 5): For more information about the design of these base plates refer to spreadsheet as attachment.