Contents*
2006 - 2013
Section1* Thesis Project
Re-Nature Incubator
01
Section2* Academic Projects
Identity +Apartment in city
17
Wild Fence
22
Artisitic Concept Interpertation
24
Thershold
26
Yellow Chair Blossom
27
Section3* Job Experience
Flow into the corner
29
Appendix *
Resume
37
2009 graduation project
2008 postgraduate project
2007 workshop
2007 postgraduate project
2006 acdemic landscape project
2008 Exhibition
2013 parking structure project
Contents*
2006 - 2013
Section1* Thesis Project
Re-Nature Incubator
01
Section2* Academic Projects
Identity +Apartment in city
17
Wild Fence
22
Artisitic Concept Interpertation
24
Thershold
26
Yellow Chair Blossom
27
Section3* Job Experience
Flow into the corner
29
Appendix *
Resume
37
2009 graduation project
2008 postgraduate project
2007 workshop
2007 postgraduate project
2006 acdemic landscape project
2008 Exhibition
2013 parking structure project
Re-nature Incubator *
A Strategy against Sequelea of Urban Development
Location :Shezi Isle Taipei Advisor :Chao-Hsien,Yeh Graduation project 2009
Shezi Isle is a Re-nature Incubator, a strategy against sequelea of urban development that redeďŹ nes the boundary between Man and the nature and achieves a new dynamic equilibrium.
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
01
Re-nature Incubator *
A Strategy against Sequelea of Urban Development
Location :Shezi Isle Taipei Advisor :Chao-Hsien,Yeh Graduation project 2009
Shezi Isle is a Re-nature Incubator, a strategy against sequelea of urban development that redeďŹ nes the boundary between Man and the nature and achieves a new dynamic equilibrium.
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
01
Confluence of two major rivers, Shezi Isle has been suffering from constant flooding due to its relatively low topography and became silty, river dikes were therefore constructed and large scale development were prohibited.
The mouth of the River
northeast monsoon in winter
Chi Luang River
1940s 1960s 1970s
Shezi Isle
? NOW Future
Dan Shuei River
In 1940s Sezi Isle was the vital place where provided a vast amount of rice and vegtable for Taipei City. However as Sezi Isle is relatively low topography,it frequently has been suffering from constant flooding. In 1970s The government has prohibited any kind of constructions and it became flooding area due to prevent flooding in Taipei. Nowadays there are variety of illegal factories and uneconomic farmlands as well as lots of pumping stations in Sezi Isle. What the next step is in a strategy of deveplement in the future?
Shezi Isle is a place for storing the indispensible life “equipments” for Taipei City.
02
Thesis Project
Academic Projects
It is only in times of flooding that Shezi Isle would catch people’s attention.
Job Experience
For visitors, Shezi Isle is nothing but bicycle tracks and landscape on and beneath the river dikes.
Appendix
2006
2007
2008
The wall of the river dike imprisons the inhabitants of Shezi Isle.
2009 Re-Nature Incubator
2013
03
Confluence of two major rivers, Shezi Isle has been suffering from constant flooding due to its relatively low topography and became silty, river dikes were therefore constructed and large scale development were prohibited.
The mouth of the River
northeast monsoon in winter
Chi Luang River
1940s 1960s 1970s
Shezi Isle
? NOW Future
Dan Shuei River
In 1940s Sezi Isle was the vital place where provided a vast amount of rice and vegtable for Taipei City. However as Sezi Isle is relatively low topography,it frequently has been suffering from constant flooding. In 1970s The government has prohibited any kind of constructions and it became flooding area due to prevent flooding in Taipei. Nowadays there are variety of illegal factories and uneconomic farmlands as well as lots of pumping stations in Sezi Isle. What the next step is in a strategy of deveplement in the future?
Shezi Isle is a place for storing the indispensible life “equipments” for Taipei City.
02
Thesis Project
Academic Projects
It is only in times of flooding that Shezi Isle would catch people’s attention.
Job Experience
For visitors, Shezi Isle is nothing but bicycle tracks and landscape on and beneath the river dikes.
Appendix
2006
2007
2008
The wall of the river dike imprisons the inhabitants of Shezi Isle.
2009 Re-Nature Incubator
2013
03
?
There are variety of porblems in Shezi Isle except flooding, for instacne abundoned farmland, river pollution and Incinerator pollution. Those problems would be anaylized and sorted out the most basic fators. According to the concept of Re-nature Incubator, we can reseach and find out the best soultion to Shezi Isle.
The nature inheritance of Shezi Isle preserved thanks to its unsuitabilty of inhabitation deserves an alternative strategy distinct from that of traditional real estate development. High economic values
Low terrain flooding
Real-estate development
Chaotically sprawled farmlands and factories nowadays
months
Constructions prohibited
Strategy Infrastructure The basement of Taipei City
Intensive development
Artificial agriculture wetlands
Re-nature Incubator Green power Industry
9M
Filter for polluted river water
Now the farmlands and factories sprawled chaotically and the development seems halted in its early state of 50 years ago, forming an insulated village within Taipei city. The authority is to rise the land up to 9M to avoid flooding and to quote in real-estate investments, to raise up the values of land and quality of life of Shezi Isle. 04
Thesis Project
Academic Projects
months
Future real-estate investments of the authorities
Lymphatic system of river
In view of the existing ecosystem endangered by the development approach as mentioned above, a Re-nature Incubator is proposed with the invisible economic value of green power, as a strategy against the sequelea of urbanization to achieve the coexistence of man and Nature. Job Experience
Appendix
987
Land values and quality of life of Taipei City
Shezi Isle as flooding moderator
2006
winter
Cleansing screen of polluted air solve
northeast monsoon
Air pollution
blow
blow
River pollution
Agricultural pollution solve
blow solve
solve
months
Profit
Artificial agriculture wetlands exchange
Rain Flood period of time
Life quality
321
Profit
654
migrated population
water pollution period of time
Real-estate investments or“Re-Nature Incubator”
Problematics *
12 11 10 months
Strategy *
flow
River
flow
Flooding
solve
Flooding detention pond
solve
Rainwater detention pond
2007
2008
summer 2009 Re-Nature Incubator
2013
05
?
There are variety of porblems in Shezi Isle except flooding, for instacne abundoned farmland, river pollution and Incinerator pollution. Those problems would be anaylized and sorted out the most basic fators. According to the concept of Re-nature Incubator, we can reseach and find out the best soultion to Shezi Isle.
The nature inheritance of Shezi Isle preserved thanks to its unsuitabilty of inhabitation deserves an alternative strategy distinct from that of traditional real estate development. High economic values
Low terrain flooding
Real-estate development
Chaotically sprawled farmlands and factories nowadays
months
Constructions prohibited
Strategy Infrastructure The basement of Taipei City
Intensive development
Artificial agriculture wetlands
Re-nature Incubator Green power Industry
9M
Filter for polluted river water
Now the farmlands and factories sprawled chaotically and the development seems halted in its early state of 50 years ago, forming an insulated village within Taipei city. The authority is to rise the land up to 9M to avoid flooding and to quote in real-estate investments, to raise up the values of land and quality of life of Shezi Isle. 04
Thesis Project
Academic Projects
months
Future real-estate investments of the authorities
Lymphatic system of river
In view of the existing ecosystem endangered by the development approach as mentioned above, a Re-nature Incubator is proposed with the invisible economic value of green power, as a strategy against the sequelea of urbanization to achieve the coexistence of man and Nature. Job Experience
Appendix
987
Land values and quality of life of Taipei City
Shezi Isle as flooding moderator
2006
winter
Cleansing screen of polluted air solve
northeast monsoon
Air pollution
blow
blow
River pollution
Agricultural pollution solve
blow solve
solve
months
Profit
Artificial agriculture wetlands exchange
Rain Flood period of time
Life quality
321
Profit
654
migrated population
water pollution period of time
Real-estate investments or“Re-Nature Incubator”
Problematics *
12 11 10 months
Strategy *
flow
River
flow
Flooding
solve
Flooding detention pond
solve
Rainwater detention pond
2007
2008
summer 2009 Re-Nature Incubator
2013
05
01_ Transformation of farmlands
02_ River-pollutant-as-fuel electric generator
< Agricultural pollution
< River pollution
Artificial wetlands and Mobile artifical wetlands COD
陽極槽
oxidation Artificial wetlands collected BOD COD
Effect of artificial wetlands Physical interaction
(Sediment , filtration)
restore interaction Rainwater
BOD chemical interaction (Redox, ion-exchange)
NH-N
In the past, Shezi Isle was the granary of Taipei City, of which famlands occupies 55% of the total area which amounts to appro. 150 acres.
Nowadays, agriculture has been abandoned due to unpromising production.
farmland
transform
Man needs to coexist with the nature. But urbanization and artificialization tend to control, exploit, and reproduce the natural system.It is when these counter effects amount to threatening human existence that the boundary between man and the nature is brought to the foreground. This boundary does not necessarily mean mutual exclusion, but coexistence and mutual dependence between man and the nature. Man needs the natural environment as much as the nature needs its own cyclical domain.The boundary is rather an intermediate zone with rich gradations.
Constantly changing natural patterns of the river
biological interaction (Absorption , mineral decomposition)
TSS
< Flooding
The boundary between man and the nature
Fuel: River pollutant (BOD/COD) will be transformed into electricity. River pollutants
04_ Return land to river
The boundary of nature
9m
Dikes block the relationship between people and rivers RIVER
Re-nature
9m
Blurring of boundary to release spaces for change of the nature.
RIVER
The natural system is a dynamic process requiring sufficient time and space for change. The result is an equilibrium achieved the process of constant change.
artificial wetland
lateral erosion
Artifical filtration
Marsh purification
Artifical wetlands collect river pollutant
medial siltation
Micro power generation
Microbial fuel
Polder control
Artificial wetlands _ collection of river pollution
03_ Cleaning screen of polluted air
gather
handle
COD
76%
BOD
74%
NH-N
90%
Suspensions TSS one hectare of artificial wetland
1,000 tons of river
RIVER
77%
Venice changing patterns of natural river
< Incinerator pollution
River erosion and deposition patterns
s-type river patterns
Equidistant S-shaped water course branching system
Hexagonal land-unit system
Route of water system
RIVER
RIVER
River unit
Route of water function
River region and Rainwater region There are two region systems in Shize Isie which cater for the new relationship between land and water,such as river region and rainwater region. River unit is the place which the river flows though and River unit is the storing rainwater place.
Cleansing Screen of physical interaction: the use of water screen and devices to clean the air by keeping the pollutants.
One hectare of wetland can be injected 1,000 tons of river water, which can collect about 75% of river pollution in five days.
Mobile artificial wetlands _ lymphatic system of river Shezi Isle is constituted of mobile wetlands that can move to polluted districts to solve the problem.
Northeast monsoon in winter
river region
cleaning physical interaction
gather
SO2
Hazardous Substances
TACO3 chemisty interaction
H2O
CASO4 Productions of Artificial Wetlands
Boat that carries artificial wetlands to polluted districts.
Cleaning screen
produce Harmless substances
resident unit using collecting rainwater from summer river unit
sources of river pollution in Taipei city
rainwater region
rain unit
06
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
07
01_ Transformation of farmlands
02_ River-pollutant-as-fuel electric generator
< Agricultural pollution
< River pollution
Artificial wetlands and Mobile artifical wetlands COD
陽極槽
oxidation Artificial wetlands collected BOD COD
Effect of artificial wetlands Physical interaction
(Sediment , filtration)
restore interaction Rainwater
BOD chemical interaction (Redox, ion-exchange)
NH-N
In the past, Shezi Isle was the granary of Taipei City, of which famlands occupies 55% of the total area which amounts to appro. 150 acres.
Nowadays, agriculture has been abandoned due to unpromising production.
farmland
transform
Man needs to coexist with the nature. But urbanization and artificialization tend to control, exploit, and reproduce the natural system.It is when these counter effects amount to threatening human existence that the boundary between man and the nature is brought to the foreground. This boundary does not necessarily mean mutual exclusion, but coexistence and mutual dependence between man and the nature. Man needs the natural environment as much as the nature needs its own cyclical domain.The boundary is rather an intermediate zone with rich gradations.
Constantly changing natural patterns of the river
biological interaction (Absorption , mineral decomposition)
TSS
< Flooding
The boundary between man and the nature
Fuel: River pollutant (BOD/COD) will be transformed into electricity. River pollutants
04_ Return land to river
The boundary of nature
9m
Dikes block the relationship between people and rivers RIVER
Re-nature
9m
Blurring of boundary to release spaces for change of the nature.
RIVER
The natural system is a dynamic process requiring sufficient time and space for change. The result is an equilibrium achieved the process of constant change.
artificial wetland
lateral erosion
Artifical filtration
Marsh purification
Artifical wetlands collect river pollutant
medial siltation
Micro power generation
Microbial fuel
Polder control
Artificial wetlands _ collection of river pollution
03_ Cleaning screen of polluted air
gather
handle
COD
76%
BOD
74%
NH-N
90%
Suspensions TSS one hectare of artificial wetland
1,000 tons of river
RIVER
77%
Venice changing patterns of natural river
< Incinerator pollution
River erosion and deposition patterns
s-type river patterns
Equidistant S-shaped water course branching system
Hexagonal land-unit system
Route of water system
RIVER
RIVER
River unit
Route of water function
River region and Rainwater region There are two region systems in Shize Isie which cater for the new relationship between land and water,such as river region and rainwater region. River unit is the place which the river flows though and River unit is the storing rainwater place.
Cleansing Screen of physical interaction: the use of water screen and devices to clean the air by keeping the pollutants.
One hectare of wetland can be injected 1,000 tons of river water, which can collect about 75% of river pollution in five days.
Mobile artificial wetlands _ lymphatic system of river Shezi Isle is constituted of mobile wetlands that can move to polluted districts to solve the problem.
Northeast monsoon in winter
river region
cleaning physical interaction
gather
SO2
Hazardous Substances
TACO3 chemisty interaction
H2O
CASO4 Productions of Artificial Wetlands
Boat that carries artificial wetlands to polluted districts.
Cleaning screen
produce Harmless substances
resident unit using collecting rainwater from summer river unit
sources of river pollution in Taipei city
rainwater region
rain unit
06
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
07
Prototype Development *
A’
B’
2 3
4
01_ prototype River uint
river region
river unit
0~9m
vertical stratification
4 3
motor traffic system safe residential areas
1
+9M
rainwater retention pond factory of pollutant collection
+4M ~ 9M
pollution filtering of wetlands flooding detention pond
+0M ~ 3M
the boundary between river and land
-1M ~ 1M
A 2
-1M ~ 1M the boundary between river and land
+0M ~ 3M flooding detention pond pollution filtering of wetlands
+4M ~ 9M rainwater retention pond factory of pollutant collection
+9M safe residential areas motor traffic system
AA’ section
Prototype There are various fuctions which are situated in parts of vertical stratification in river unit. The unit will be adaptable to various situations in different time periods, such as river pollution in winter, flooding in summer, as well as rising water levels in future.
08
Thesis Project
+9M
+0M
BB’ section
Summer: flooding Academic Projects
Divisional river region plan 4.Bike traffic system 3.wetland park 2.The boundary between river and land 1.River access
Prototype is capable of solving basic problems, adaptable to context and future change.
Winter: collecting river pollution by wetlands
B
Job Experience
Future: rising water levels Appendix
River region 2006
2007
The boundary between river and land 2008
+9m bike route 2009 Re-Nature Incubator
Wetland park 2013
09
Prototype Development *
A’
B’
2 3
4
01_ prototype River uint
river region
river unit
0~9m
vertical stratification
4 3
motor traffic system safe residential areas
1
+9M
rainwater retention pond factory of pollutant collection
+4M ~ 9M
pollution filtering of wetlands flooding detention pond
+0M ~ 3M
the boundary between river and land
-1M ~ 1M
A 2
-1M ~ 1M the boundary between river and land
+0M ~ 3M flooding detention pond pollution filtering of wetlands
+4M ~ 9M rainwater retention pond factory of pollutant collection
+9M safe residential areas motor traffic system
AA’ section
Prototype There are various fuctions which are situated in parts of vertical stratification in river unit. The unit will be adaptable to various situations in different time periods, such as river pollution in winter, flooding in summer, as well as rising water levels in future.
08
Thesis Project
+9M
+0M
BB’ section
Summer: flooding Academic Projects
Divisional river region plan 4.Bike traffic system 3.wetland park 2.The boundary between river and land 1.River access
Prototype is capable of solving basic problems, adaptable to context and future change.
Winter: collecting river pollution by wetlands
B
Job Experience
Future: rising water levels Appendix
River region 2006
2007
The boundary between river and land 2008
+9m bike route 2009 Re-Nature Incubator
Wetland park 2013
09
B
02_ prototype Rainwater uint rainwater region
rainwater unit
2
0~9m vertical stratification Bike traffic system Cleaning screen of polluted air Residential areas
4
1 4 3
+9M
A’
Rainwater detention pond Factory of Energy generation from Pollutant fuel Catchwater for farming Wetlands farming areas Motor traffic system +0M
A
1 2
rainwater region
Wetlands farming areas
Wetlands farming areas 1
B’
Divisional rainwater region plan 4.Bike traffic system 3.Rainwater detention pond 2.Catchwater for farming 1.Wetlands farming areas
Rainwater detention pond
Catchwater for farming Wetlands farming areas
+9M safe residential areas
+9M bike track system +0M motor traffic system
Rainwater detention pond
Rainwater detention pond
Arrangement of rain unit
+0M Motor traffic system
+9M Bike track system
Thesis Project
Academic Projects
+0M
Catchwater for farming
Traffic system
BB’ section
AA’ section 10
+9M
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
11
B
02_ prototype Rainwater uint rainwater region
rainwater unit
2
0~9m vertical stratification Bike traffic system Cleaning screen of polluted air Residential areas
4
1 4 3
+9M
A’
Rainwater detention pond Factory of Energy generation from Pollutant fuel Catchwater for farming Wetlands farming areas Motor traffic system +0M
A
1 2
rainwater region
Wetlands farming areas
Wetlands farming areas 1
B’
Divisional rainwater region plan 4.Bike traffic system 3.Rainwater detention pond 2.Catchwater for farming 1.Wetlands farming areas
Rainwater detention pond
Catchwater for farming Wetlands farming areas
+9M safe residential areas
+9M bike track system +0M motor traffic system
Rainwater detention pond
Rainwater detention pond
Arrangement of rain unit
+0M Motor traffic system
+9M Bike track system
Thesis Project
Academic Projects
+0M
Catchwater for farming
Traffic system
BB’ section
AA’ section 10
+9M
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
11
Area develpment * The oreintation of different regions in Shezi Isle
Tillage areas Rainwater detention pond Bird-watching eco-park
River road Green power factory Mobile artificial wetlands
Silted ecological park Cleaning screen of polluted air
Cleaning screen of polluted air Pollution filtering Flooding detention Green power factory River road Green power factory Mobile artificial wetland
rainwater region river region
Tillage areas Rainwater detention pond
Flooding detention pond Green power factory Pollution filtering of wetlands
Transportation entrance
Divisional region paln * 12
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
13
Area develpment * The oreintation of different regions in Shezi Isle
Tillage areas Rainwater detention pond Bird-watching eco-park
River road Green power factory Mobile artificial wetlands
Silted ecological park Cleaning screen of polluted air
Cleaning screen of polluted air Pollution filtering Flooding detention Green power factory River road Green power factory Mobile artificial wetland
rainwater region river region
Tillage areas Rainwater detention pond
Flooding detention pond Green power factory Pollution filtering of wetlands
Transportation entrance
Divisional region paln * 12
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
13
Re-nature Incubator *
14
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
15
Re-nature Incubator *
14
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009 Re-Nature Incubator
2013
15
+ Idenity Apartment in city *
Achitecture + Apartment Location :Taichung City Advisor :Chien-Sen,Wu postgraduate project 2008
The virtical frame of apartment will be rediďŹ ne in term of the spacial relationship between inhatants and servants
16
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
17
+ Idenity Apartment in city *
Achitecture + Apartment Location :Taichung City Advisor :Chien-Sen,Wu postgraduate project 2008
The virtical frame of apartment will be rediďŹ ne in term of the spacial relationship between inhatants and servants
16
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
17
Urban context mapping * Luxury apartments
Opera theater Green belt Department store
Taichung goverment
Residential unit
Service core
Maid unit
This is a X-city project, through the observation of urban phenomana in Taichung.The “luxury apartments ” and “temporary recpetion center” is prominent for the high density of popualtion and business activity districts in recent years.The temporacy reception center where the unbuilt luxury apartments are sold to the wealthy is unique and usually catches people ‘s eyes. However the luxury apartments actually do not have a exclusive appearance as same as reception center.Nevertheless most of residential units are identical in the apartment, the more expensieve units do not possess the attracitve characteristic, when the wealthy are attracted by the reception center leading to purchasing the luxury apartments.
Programming and concept * The relationship between leaf and venation as same as inhabitant and servant.
Luxury apartements need the servant to provide severice as leaf need a venation transport nutrition. In another words, since venation lacks of leaf ,it will wither as luxury apartments do not have service system, it will be apartments. Maid unit is saperated from residential unit
Maid units are gathered together and become a residential system of servant
Luxury Apartments To redifine the spacial relationship between inhabitant and servant
Reception Center Although a apartment is virtical construction, it may provide different and unique residential units in a building. I propose the new virtical frame of residential units in term of the relationship between inhabitants and servants 18
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
19
Urban context mapping * Luxury apartments
Opera theater Green belt Department store
Taichung goverment
Residential unit
Service core
Maid unit
This is a X-city project, through the observation of urban phenomana in Taichung.The “luxury apartments ” and “temporary recpetion center” is prominent for the high density of popualtion and business activity districts in recent years.The temporacy reception center where the unbuilt luxury apartments are sold to the wealthy is unique and usually catches people ‘s eyes. However the luxury apartments actually do not have a exclusive appearance as same as reception center.Nevertheless most of residential units are identical in the apartment, the more expensieve units do not possess the attracitve characteristic, when the wealthy are attracted by the reception center leading to purchasing the luxury apartments.
Programming and concept * The relationship between leaf and venation as same as inhabitant and servant.
Luxury apartements need the servant to provide severice as leaf need a venation transport nutrition. In another words, since venation lacks of leaf ,it will wither as luxury apartments do not have service system, it will be apartments. Maid unit is saperated from residential unit
Maid units are gathered together and become a residential system of servant
Luxury Apartments To redifine the spacial relationship between inhabitant and servant
Reception Center Although a apartment is virtical construction, it may provide different and unique residential units in a building. I propose the new virtical frame of residential units in term of the relationship between inhabitants and servants 18
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
19
The Frame of Identity + House*
Luxury residential unit* Life display unit 2
Service circualtion
maid room
2
6
Servant elevator Guest elevator 6
Car elevator
7
Host elevator Residential unit
1 3
3 10
10
4
2F plan
N
2m
5m
10m
2
The construction of identity house is to privide the transit system of service. All maid rooms are assembled on the side of frame,and privided the ministration to the luxury residential unit complete the operation of identity house. When this building possesses the service privided ,all inhabitants can choose the house style by thier favor, therefore they do not live the same luxury resideintial unit as others.
2
9
Servant circulation is like leaf venation Exhibition of Luxury life is like window display
1 3
10
Ground ďŹ&#x201A;oor plan
2
3
10
4
Life display unit N
2m
8
5m
10m
2
5
1 3
3 10
10
4
1B plan
N
2m
1.Guest elevator
6.Gallery
2.Host elevator
7.Exhibition room
3.Car elevator
8.Terrace
4.Servant elevator
9.Service circulation
5.Living room
10.maid room
20
Thesis Project
5m
10m
Servant circualtion
Scenario elevation* Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
21
The Frame of Identity + House*
Luxury residential unit* Life display unit 2
Service circualtion
maid room
2
6
Servant elevator Guest elevator 6
Car elevator
7
Host elevator Residential unit
1 3
3 10
10
4
2F plan
N
2m
5m
10m
2
The construction of identity house is to privide the transit system of service. All maid rooms are assembled on the side of frame,and privided the ministration to the luxury residential unit complete the operation of identity house. When this building possesses the service privided ,all inhabitants can choose the house style by thier favor, therefore they do not live the same luxury resideintial unit as others.
2
9
Servant circulation is like leaf venation Exhibition of Luxury life is like window display
1 3
10
Ground ďŹ&#x201A;oor plan
2
3
10
4
Life display unit N
2m
8
5m
10m
2
5
1 3
3 10
10
4
1B plan
N
2m
1.Guest elevator
6.Gallery
2.Host elevator
7.Exhibition room
3.Car elevator
8.Terrace
4.Servant elevator
9.Service circulation
5.Living room
10.maid room
20
Thesis Project
5m
10m
Servant circualtion
Scenario elevation* Academic Projects
Job Experience
Appendix
2006
2007
2008 Identity + Apartment in city
2009
2013
21
Wild Fence *
Landscape + construction Location :Chiu-chiu Nature Reserve Advisor :Teng-Yao,Chang summer workshop 2007
Construction experience
2007
2011
In nature, the weathering is a process of continue keeping varying. However we discuss the wild fence how to be suitable the environment in terms of the gradual changes.
hollow brick woods
This site is in the nature reserve ,our mission in 3 weeks workshope is to build the rest platform in wild environment by handmade physical labor-contrubution. Our team, consisted of 8 working partners, faced the massive impact is whatthe of suitable construction method for the environment. However all meterial have their restricted in combing, we try to ďŹ nd a veriety of methods to assmble diďŹ&#x20AC;ernt meterials and let this contruction can be adapted to the nature reserve. In conclusion we choose the materials including hollow bricks, woods and aluminum materials to construct the wild fence.
22
Thesis Project
Academic Projects
Job Experience
Appendix
aluminum materials
Contruction in detail *
Contructing process *
2006
2007 Wild Fence
2008
2009
2013
23
Wild Fence *
Landscape + construction Location :Chiu-chiu Nature Reserve Advisor :Teng-Yao,Chang summer workshop 2007
Construction experience
2007
2011
In nature, the weathering is a process of continue keeping varying. However we discuss the wild fence how to be suitable the environment in terms of the gradual changes.
hollow brick woods
This site is in the nature reserve ,our mission in 3 weeks workshope is to build the rest platform in wild environment by handmade physical labor-contrubution. Our team, consisted of 8 working partners, faced the massive impact is whatthe of suitable construction method for the environment. However all meterial have their restricted in combing, we try to ďŹ nd a veriety of methods to assmble diďŹ&#x20AC;ernt meterials and let this contruction can be adapted to the nature reserve. In conclusion we choose the materials including hollow bricks, woods and aluminum materials to construct the wild fence.
22
Thesis Project
Academic Projects
Job Experience
Appendix
aluminum materials
Contruction in detail *
Contructing process *
2006
2007 Wild Fence
2008
2009
2013
23
Artistic concept interpertation* Crisscross between public sapce and house
Battery Park Landfill 1973 New York
Artist - MARY MISS
Type A
Prototype *
Achitecture + House Advisor :Ming-Wei,Huang postgraduate project 2007
Type B
Type C
Public path Privacy space
Type D
parallel projection
Five insubstantial billboard-like structures were placed fifty feet apart across the site.It appeared as though a column of air was being defined as it tunneled into the ground; the circles are marking out the distance to materialize the space.
perspective
Vision filter device * Public path
Transition path
1. Public path 2.Lobby 3.Living room
7 9 6
8
5
4.Dinner room 4
5.Master bedroom
3
1
6.bedroom
2
7.Study room
10
8.Guest room 9.kitchen 10.Terrace
Thesis Project
Academic Projects
1m
2m
5m
N
1F plan
1m
2m
5m
N
1B plan
1m
2m
5m
N
After the above reseach, using this concept for spatial development, then I set up the prototype including public space , transtition area and privacy space. The following stage is using the spatial concept to organise the house and considering deeply what effect is according to this spatial relationship.
The project starts from reseaching specific artist, and I figure out the properties and concepts of his works . First of all I transform this concept to the device. Then I reserch what differnt vision in term of different position of circle when we see via the vision filter devices. 24
2Fplan
Job Experience
Appendix
2006
2007 Artisitic Concept Interpertation
2008
2009
2013
25
Artistic concept interpertation* Crisscross between public sapce and house
Battery Park Landfill 1973 New York
Artist - MARY MISS
Type A
Prototype *
Achitecture + House Advisor :Ming-Wei,Huang postgraduate project 2007
Type B
Type C
Public path Privacy space
Type D
parallel projection
Five insubstantial billboard-like structures were placed fifty feet apart across the site.It appeared as though a column of air was being defined as it tunneled into the ground; the circles are marking out the distance to materialize the space.
perspective
Vision filter device * Public path
Transition path
1. Public path 2.Lobby 3.Living room
7 9 6
8
5
4.Dinner room 4
5.Master bedroom
3
1
6.bedroom
2
7.Study room
10
8.Guest room 9.kitchen 10.Terrace
Thesis Project
Academic Projects
1m
2m
5m
N
1F plan
1m
2m
5m
N
1B plan
1m
2m
5m
N
After the above reseach, using this concept for spatial development, then I set up the prototype including public space , transtition area and privacy space. The following stage is using the spatial concept to organise the house and considering deeply what effect is according to this spatial relationship.
The project starts from reseaching specific artist, and I figure out the properties and concepts of his works . First of all I transform this concept to the device. Then I reserch what differnt vision in term of different position of circle when we see via the vision filter devices. 24
2Fplan
Job Experience
Appendix
2006
2007 Artisitic Concept Interpertation
2008
2009
2013
25
Thershold *
Yellow Chair Blossom *
Landscape project Academic 2005
In the intermediary space between land and ocean
construction experience Access Grassland Windbreak forest
Bike paths Tide observation platform
Windbreak forest
This is the exhibition of Yellow Chair Blossom, through to this display to thinking all possibilty of street furniture. Then I think about the function of waste papers how to make a yellow chair. However the waste papers are squeezed and stuck into the container, and then drying it in the sun. Following this squeezed papers are assembled by hardware and acrylic board. The feeling is comfortable when sitting on this yellow chair.
divison plan C divison plan A
Exhibition + making Academic 2008
divison plan B
Thersholds are where transformation begin, where exchanges between unlikely things occur, and where identities are declared.
Making proccess *
B A
C
26
Thesis Project
Academic Projects
Job Experience
Appendix
2006 Thershold
2007
2008 Yellow Chair Blossom
2009 Re-Nature Incubator
2013 Flow into the corner
27
Thershold *
Yellow Chair Blossom *
Landscape project Academic 2005
In the intermediary space between land and ocean
construction experience Access Grassland Windbreak forest
Bike paths Tide observation platform
Windbreak forest
This is the exhibition of Yellow Chair Blossom, through to this display to thinking all possibilty of street furniture. Then I think about the function of waste papers how to make a yellow chair. However the waste papers are squeezed and stuck into the container, and then drying it in the sun. Following this squeezed papers are assembled by hardware and acrylic board. The feeling is comfortable when sitting on this yellow chair.
divison plan C divison plan A
Exhibition + making Academic 2008
divison plan B
Thersholds are where transformation begin, where exchanges between unlikely things occur, and where identities are declared.
Making proccess *
B A
C
26
Thesis Project
Academic Projects
Job Experience
Appendix
2006 Thershold
2007
2008 Yellow Chair Blossom
2009 Re-Nature Incubator
2013 Flow into the corner
27
Flow into the corner *
Achitecture + parking Location: Taipei City, Taiwan Advisor: Lican Chuan Chen Job expereince 2013
Parking structure
28
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009
2013 Flow into the corner
29
Flow into the corner *
Achitecture + parking Location: Taipei City, Taiwan Advisor: Lican Chuan Chen Job expereince 2013
Parking structure
28
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009
2013 Flow into the corner
29
Comparing parking system *
Parking system rule
The parking site is a rectangular form which is allowed setting four units of 6 meters width. In additional to this , the most parking space’s efficiency is that one parking lane can serve either sides parking space. This parking system is used three units of meters width,in others word the case adopts one lane and two line of parking sapce. On the other hand, there are a large public space left when using three unit of 6 meters width, which can offer the commercial space and friendly meeting space for the envrionment.
In Taiwan, the size parking space is stipulated 2.5m x 6m. However if the numbers of parking sapce surpasses 50 cars ,the parking lane width has to been spaned more than 6 meters.
Site Condition
Type A
International night market
Win
Type B
Type C
6M 6M 6M 6M
SITE
The site is situated in Sungshan district of Taipei City, near Chi Luang river. The current mechanical parking structure has been operated on the site in twenty years , there are lots of problems of machine have to be solved. Recently, the surrounding international night market has attracted a vast mount of foriegners, which has result in increasing of demand for parking spaces , including cars motorcycles and tourist coaches. However the older mechanical parking sructure exactly has not satified certain requriements. Nowadays there are lots of traffic jams caused by cars for waiting long time by the older machanical parking structure operating nearby the site in rush hours, espacially in weekend night. 30
Thesis Project
Academic Projects
Job Experience
Appendix
One service lane and two line of parking sapce
Two service lane and two line of parking sapce
Three service lane and two line of parking sapce
Advantage The parking site is a rectangular form which is allowed setting four units of 6 meters width.
2006
2007
A large public space left The most parking space’s efficiency One parking lane can serve either sides parking space
2008
2009
2013 Flow into the corner
31
Comparing parking system *
Parking system rule
The parking site is a rectangular form which is allowed setting four units of 6 meters width. In additional to this , the most parking space’s efficiency is that one parking lane can serve either sides parking space. This parking system is used three units of meters width,in others word the case adopts one lane and two line of parking sapce. On the other hand, there are a large public space left when using three unit of 6 meters width, which can offer the commercial space and friendly meeting space for the envrionment.
In Taiwan, the size parking space is stipulated 2.5m x 6m. However if the numbers of parking sapce surpasses 50 cars ,the parking lane width has to been spaned more than 6 meters.
Site Condition
Type A
International night market
Win
Type B
Type C
6M 6M 6M 6M
SITE
The site is situated in Sungshan district of Taipei City, near Chi Luang river. The current mechanical parking structure has been operated on the site in twenty years , there are lots of problems of machine have to be solved. Recently, the surrounding international night market has attracted a vast mount of foriegners, which has result in increasing of demand for parking spaces , including cars motorcycles and tourist coaches. However the older mechanical parking sructure exactly has not satified certain requriements. Nowadays there are lots of traffic jams caused by cars for waiting long time by the older machanical parking structure operating nearby the site in rush hours, espacially in weekend night. 30
Thesis Project
Academic Projects
Job Experience
Appendix
One service lane and two line of parking sapce
Two service lane and two line of parking sapce
Three service lane and two line of parking sapce
Advantage The parking site is a rectangular form which is allowed setting four units of 6 meters width.
2006
2007
A large public space left The most parking space’s efficiency One parking lane can serve either sides parking space
2008
2009
2013 Flow into the corner
31
Flow in the corner of the street *
Concept of development *
Structure and System *
corner plaza commercial retail Public service sapce
Aettic City guidance
Observation deck Attic sets up city observation point.
guide
and
vertical plant
Parking lane Cars entrance Motorcycle entrance
Ground floor
Second floor
Information center
Parking booth
Intelligent library
neighbourhood centre Second floor sets up neighbourhood center whcih has independent entrance and toilet.
Commercial retail
Ground floor
Entrance hall sets up information station where sevice tourists.
Cars entrance Tourist path Tourist meeting point Tourist coaches sapce
Gound floor sets up commercial retail which service tourists and neighbours as well as continue street commercial acitvities.
Tourist coaches sapce Motorcycle entrance
night market
32
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009
2013 Flow into the corner
33
Flow in the corner of the street *
Concept of development *
Structure and System *
corner plaza commercial retail Public service sapce
Aettic City guidance
Observation deck Attic sets up city observation point.
guide
and
vertical plant
Parking lane Cars entrance Motorcycle entrance
Ground floor
Second floor
Information center
Parking booth
Intelligent library
neighbourhood centre Second floor sets up neighbourhood center whcih has independent entrance and toilet.
Commercial retail
Ground floor
Entrance hall sets up information station where sevice tourists.
Cars entrance Tourist path Tourist meeting point Tourist coaches sapce
Gound floor sets up commercial retail which service tourists and neighbours as well as continue street commercial acitvities.
Tourist coaches sapce Motorcycle entrance
night market
32
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
2008
2009
2013 Flow into the corner
33
Concept of skin design *
The site is situated at the inflection of river in Sungshan district, the place is that commodities are unloaded from the ship and commercial activities are prosperous in the ealy age. Nowadays this place has been developed the international night market where attracts lots of visitors.The skin design will reflect the history of this place,and adopt the form of ripple of river as basic pattern of building sharp.
2 5
4
3
1 1
9
12
9
8 10 6
7
Ground floor plan
2F plan
N 5m
10m
20m
30m
N 5m
10m
20m
30m
view SITE 16
1
11
17
15
13
14
14
RF plan
34
Thesis Project
N 5m
1.Waiting hall
10.Parking booth
2.Meeting point
11.Parking lane
3.Commercial retail
12.parking ramp
4.Information station
13.Pavement
5.Intellignet library
14.Virtical plant
6.Car parking entrance
15.Pavement greening
7.Motorcycle parking entrance
16.Obversation deck
8.Tourist coach parking space 9.Neighbourhood center
17.City guidance
Academic Projects
10m
20m
30m
Job Experience
3F~8F plan
N 5m
10m
20m
30m
Appendix
2006
2007
2008
2009
2013 Flow into the corner
35
Concept of skin design *
The site is situated at the inflection of river in Sungshan district, the place is that commodities are unloaded from the ship and commercial activities are prosperous in the ealy age. Nowadays this place has been developed the international night market where attracts lots of visitors.The skin design will reflect the history of this place,and adopt the form of ripple of river as basic pattern of building sharp.
2 5
4
3
1 1
9
12
9
8 10 6
7
Ground floor plan
2F plan
N 5m
10m
20m
30m
N 5m
10m
20m
30m
view SITE 16
1
11
17
15
13
14
14
RF plan
34
Thesis Project
N 5m
1.Waiting hall
10.Parking booth
2.Meeting point
11.Parking lane
3.Commercial retail
12.parking ramp
4.Information station
13.Pavement
5.Intellignet library
14.Virtical plant
6.Car parking entrance
15.Pavement greening
7.Motorcycle parking entrance
16.Obversation deck
8.Tourist coach parking space 9.Neighbourhood center
17.City guidance
Academic Projects
10m
20m
30m
Job Experience
3F~8F plan
N 5m
10m
20m
30m
Appendix
2006
2007
2008
2009
2013 Flow into the corner
35
Hsin-Hao Huang
Resume*
2006 - 2013
Date of Birth:
05/02/1982
Phone number:
+886-2-29642928 /+886-933156688
Address:
5F.-1, No.3, Ln. 35, Sec. 2, Sanmin Rd., Banqiao Dist., New Taipei City 220, Taiwan R.O.C
E-mail:
hshahua@gmail.com
*Education Master degree of Architecture, Tunghai University , Taichung , Taiwan
08/2006 – 06/2010
Bachelor degree of Landscape Architecture, Tunghai University , Taichung , Taiwan
09/2001 – 06/2006
*License 02/2012
Licensed Architect in Taiwan
*Experience EDS Group Environmental Dimension Studio ,Taipei City, Taiwan - Architect Lung Wei Interior and Construction Company ,New Taipei City, Taiwan - Interior Designer
03/2012 – Present
Ministry of culture ,Taipei City, Taiwan - Substitute Service Toyo Ito Exhibition in Taipei Fine Art Museum - Volunteer staff
07/2010 – 07/2011
08/2011 – 01/2012
07/2008 – 09/2008
*Publication & Exhibition
36
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
THU ARCH Graduate Project Review 2010
06/2011
Thesis Project, Department of Architecture, Tunghai University
06/2010
Yellow Chair Blossom ,City Yeast
02/2009
Yellow Chair Blossom Exhibition ,Taipei ,Taiwan
09/2008
2008
2009
2013
37
Hsin-Hao Huang
Resume*
2006 - 2013
Date of Birth:
05/02/1982
Phone number:
+886-2-29642928 /+886-933156688
Address:
5F.-1, No.3, Ln. 35, Sec. 2, Sanmin Rd., Banqiao Dist., New Taipei City 220, Taiwan R.O.C
E-mail:
hshahua@gmail.com
*Education Master degree of Architecture, Tunghai University , Taichung , Taiwan
08/2006 – 06/2010
Bachelor degree of Landscape Architecture, Tunghai University , Taichung , Taiwan
09/2001 – 06/2006
*License 02/2012
Licensed Architect in Taiwan
*Experience EDS Group Environmental Dimension Studio ,Taipei City, Taiwan - Architect Lung Wei Interior and Construction Company ,New Taipei City, Taiwan - Interior Designer
03/2012 – Present
Ministry of culture ,Taipei City, Taiwan - Substitute Service Toyo Ito Exhibition in Taipei Fine Art Museum - Volunteer staff
07/2010 – 07/2011
08/2011 – 01/2012
07/2008 – 09/2008
*Publication & Exhibition
36
Thesis Project
Academic Projects
Job Experience
Appendix
2006
2007
THU ARCH Graduate Project Review 2010
06/2011
Thesis Project, Department of Architecture, Tunghai University
06/2010
Yellow Chair Blossom ,City Yeast
02/2009
Yellow Chair Blossom Exhibition ,Taipei ,Taiwan
09/2008
2008
2009
2013
37