Design portfolio wang

Page 1


1

|

Huang Wang

2

Contents 1. Fire Station #55

3

ASU ADE 421 Architectural III 2015 Fall Denise Bree

3. The Star Office

7

Cluster Competition 2015 Kristian Kelley

9

ASU ADE 322 Architectural II 2015 Spring Marthe Rowen

3. Desert Pool

2. Winding Square

15

ASU ADE 422 Architectural IV 2016 Spring Catherine Spellman

4. Artist Loft ASU ADE 321 Architectural I 2014 Fall Douglas McCord

13

Without knowing the rule, You cannot break the rule.


3

|

Huang Wang

4

Project 1 Phoenix Fire Station 55 Phoenix, Arizona Project goal: This project is located in North Phoenix, 36 miles to the North of downtown Phoenix. It is actually built in a barren site for the comfort of fire fighters in station 55. In response to the hot climate and mountainous surroundings, the project is created with passive designs and mountain trainings.

Dorm Patio

Process Diagrams

Programs

Team work with Miles Foster. Group role: Public part designing, Rhino & Grasshoper modeling, Diagrams, Site drawings Public vs. Private

Semi-private

Main axis

Courtyards

Tower & Memorial

Visitor Center

TRT Traning & Community Space Fire Station


5

|

Huang Wang

Site Plan

6

Training Tower Light structure

Buffering structure

Heavy structure

Tower

Keys 1. Apparatus bay 2. Storage 3. Dorms 4. Captain dorm 5. Day room 6. Dining room 7. Kitchen 8. Training tower 9. Gym 10. Office 11. Library 12. Training room 13. Community space 14. Public Kitchen

Section AA

Dorms

Section BB

Section CC

Day Room

Section DD


7

|

Huang Wang

Project 2

8

Floor Plans

Winding Square Phoenix, Arizona Project goal: This is a rarely used square in Herberger Design School at Arizona State University. It was put in derelict for years and nobody would like to take a glimpse here. So It is important to make a cosy rest zone for both students and faculty who spend long time working in design school.

9 AM

12 PM

6 PM

9 PM

2nd floor 1st floor

3 PM

Process Diagrams

Central hub

Furnitures

Connection

Extention

Covering

Studying

Sleeping

Meeting


9

|

Huang Wang

10

Writing

Project 3

Ideas Making

The Star Office Scottsdale, Arizona Project goal: This was an old building in Flagstaff, Arizona, which was originally constructed around 100 years ago. Today it still stands in the most prosperous street in downtown Flagstaff. Our goal is to transfer this unused building into an office for entrepreneurs and encourage them to share ideas and to better communicate.

Ideas Listening

Reading

Context Plan

Diagrams

Slope In the Site

Main Working Space

Stairs At the Entrance Old Building

Renovated Building

Street Elevations

North Elevation

East Elevation

Basement Working Space


11

|

Huang Wang

12

Functions

Floor Plans & Sections

Idea board at the entrance of third floor. 2nd Floor

Idea boards for working area and open to all people around. Basement

1st Floor

Meeting Room

2nd Floor 1st Floor

Idea board around people in the basement. Existing Structure

Idea Board

New Structure Section AA’

Section BB’

Basement

Working

Meeting

Rest

Utility

Entrance View


13

|

Huang Wang

14

Three Bedrooms

Project 4 Artist Loft Mesa, Arizona Project goal: The site is located in Downtown Mesa. The surrounding neighborhoods are mainly for residents. Our project is to provide quite and personal housings for artists and also able to bring more visitors to this complex to communicate with the artists about their work.

3rd Floor

Diagrams

Maxim Volume

Circulation

Functions 2nd Floor

One Bedroom Walkway

Interior

Two Bedrooms

Parking Lot

1st Floor

2nd Floor

3rd Floor

1st Floor


15

|

Huang Wang

Project 5

16

Process Diagrams

Desert Pool Tempe, Arizona Project goal: The site is located in a mountain park, called Papago in Tempe, with the Arizona Canal accross it to supply water for the entire city. Our goal is to make full use of the canal water and duct it to the public swimming pool. In this project, we decide to build a filter system on the top and pool at the bottom. The pool in the desert can be used as a new relaxing spot for people nearby.

Existing Canal

Slow-sand Filter

Duplicate

South Pavilion

Filter + Swimming Pool + Rest Area

Site Plan Rest Area

Memorial Plaza

Interior Pool

Sedimentation

Filter Diagram

Water Flow Existing Canal

1st Stage Water

Roughing Filter Intake Filter

Roughing Filter

Water Tank

2nd Stage Water Sedimentation

Slow-sand Filter

Pool

Intake Filter Wetland

Landscape Underground Aquifer

Memorial Plaza


17

|

Huang Wang

18

Function Diagram

Floor Plans & Sections

Existing canal

A

Canal Water

B

Section EE

Filter

A

Memorial Plaza Water Tank

B

Section DD Swimming Pool

C

Rest Area

D

Wetland

C D Section AA E

Existing Structure New Structure

1st Floor

E

2nd Floor

Section BB

Section CC


19

|

Huang Wang

20

Other Work - Sketches

HUANG WANG 1630 E Gaylon Dr Tempe, Arizona 85282 wanghuang950118@gmail.com 480-265-7426 EDUCATION Aizona State University, B.S. in Architectural Studies Professional Skills: AutoCad, Sketchup, Rhino, Revit / Indesign, Illustrator, Photoshop / Modeling


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.