1
|
Huang Wang
2
Contents 1. Fire Station #55
3
ASU ADE 421 Architectural III 2015 Fall Denise Bree
3. The Star Office
7
Cluster Competition 2015 Kristian Kelley
9
ASU ADE 322 Architectural II 2015 Spring Marthe Rowen
3. Desert Pool
2. Winding Square
15
ASU ADE 422 Architectural IV 2016 Spring Catherine Spellman
4. Artist Loft ASU ADE 321 Architectural I 2014 Fall Douglas McCord
13
Without knowing the rule, You cannot break the rule.
3
|
Huang Wang
4
Project 1 Phoenix Fire Station 55 Phoenix, Arizona Project goal: This project is located in North Phoenix, 36 miles to the North of downtown Phoenix. It is actually built in a barren site for the comfort of fire fighters in station 55. In response to the hot climate and mountainous surroundings, the project is created with passive designs and mountain trainings.
Dorm Patio
Process Diagrams
Programs
Team work with Miles Foster. Group role: Public part designing, Rhino & Grasshoper modeling, Diagrams, Site drawings Public vs. Private
Semi-private
Main axis
Courtyards
Tower & Memorial
Visitor Center
TRT Traning & Community Space Fire Station
5
|
Huang Wang
Site Plan
6
Training Tower Light structure
Buffering structure
Heavy structure
Tower
Keys 1. Apparatus bay 2. Storage 3. Dorms 4. Captain dorm 5. Day room 6. Dining room 7. Kitchen 8. Training tower 9. Gym 10. Office 11. Library 12. Training room 13. Community space 14. Public Kitchen
Section AA
Dorms
Section BB
Section CC
Day Room
Section DD
7
|
Huang Wang
Project 2
8
Floor Plans
Winding Square Phoenix, Arizona Project goal: This is a rarely used square in Herberger Design School at Arizona State University. It was put in derelict for years and nobody would like to take a glimpse here. So It is important to make a cosy rest zone for both students and faculty who spend long time working in design school.
9 AM
12 PM
6 PM
9 PM
2nd floor 1st floor
3 PM
Process Diagrams
Central hub
Furnitures
Connection
Extention
Covering
Studying
Sleeping
Meeting
9
|
Huang Wang
10
Writing
Project 3
Ideas Making
The Star Office Scottsdale, Arizona Project goal: This was an old building in Flagstaff, Arizona, which was originally constructed around 100 years ago. Today it still stands in the most prosperous street in downtown Flagstaff. Our goal is to transfer this unused building into an office for entrepreneurs and encourage them to share ideas and to better communicate.
Ideas Listening
Reading
Context Plan
Diagrams
Slope In the Site
Main Working Space
Stairs At the Entrance Old Building
Renovated Building
Street Elevations
North Elevation
East Elevation
Basement Working Space
11
|
Huang Wang
12
Functions
Floor Plans & Sections
Idea board at the entrance of third floor. 2nd Floor
Idea boards for working area and open to all people around. Basement
1st Floor
Meeting Room
2nd Floor 1st Floor
Idea board around people in the basement. Existing Structure
Idea Board
New Structure Section AA’
Section BB’
Basement
Working
Meeting
Rest
Utility
Entrance View
13
|
Huang Wang
14
Three Bedrooms
Project 4 Artist Loft Mesa, Arizona Project goal: The site is located in Downtown Mesa. The surrounding neighborhoods are mainly for residents. Our project is to provide quite and personal housings for artists and also able to bring more visitors to this complex to communicate with the artists about their work.
3rd Floor
Diagrams
Maxim Volume
Circulation
Functions 2nd Floor
One Bedroom Walkway
Interior
Two Bedrooms
Parking Lot
1st Floor
2nd Floor
3rd Floor
1st Floor
15
|
Huang Wang
Project 5
16
Process Diagrams
Desert Pool Tempe, Arizona Project goal: The site is located in a mountain park, called Papago in Tempe, with the Arizona Canal accross it to supply water for the entire city. Our goal is to make full use of the canal water and duct it to the public swimming pool. In this project, we decide to build a filter system on the top and pool at the bottom. The pool in the desert can be used as a new relaxing spot for people nearby.
Existing Canal
Slow-sand Filter
Duplicate
South Pavilion
Filter + Swimming Pool + Rest Area
Site Plan Rest Area
Memorial Plaza
Interior Pool
Sedimentation
Filter Diagram
Water Flow Existing Canal
1st Stage Water
Roughing Filter Intake Filter
Roughing Filter
Water Tank
2nd Stage Water Sedimentation
Slow-sand Filter
Pool
Intake Filter Wetland
Landscape Underground Aquifer
Memorial Plaza
17
|
Huang Wang
18
Function Diagram
Floor Plans & Sections
Existing canal
A
Canal Water
B
Section EE
Filter
A
Memorial Plaza Water Tank
B
Section DD Swimming Pool
C
Rest Area
D
Wetland
C D Section AA E
Existing Structure New Structure
1st Floor
E
2nd Floor
Section BB
Section CC
19
|
Huang Wang
20
Other Work - Sketches
HUANG WANG 1630 E Gaylon Dr Tempe, Arizona 85282 wanghuang950118@gmail.com 480-265-7426 EDUCATION Aizona State University, B.S. in Architectural Studies Professional Skills: AutoCad, Sketchup, Rhino, Revit / Indesign, Illustrator, Photoshop / Modeling