Portfolio 2017

Page 1

Vol. 2

Huichi Jacey Wu +1 480.265.5845 Jacey.hc.Wu@gmail.com


CYLANCE - IRVINE HEADQUARTERS Jr. Interior Designer | HKS Architects | October 2015

By coupling sophisticated math and machine learning with a unique understanding of a hacker’s mentality, Cylance provides the technology and services to be truly predictive and preventive against advanced cyber threats. Cylance’s new headquarters present an open-plan workplace with exclusive collaboration spaces. The spacial breakroom, located at the center of the space, is the hub of social activities and professional seminars.

-2-


FLOOR PLAN

CONCEP

FLOOR PLAN

-3-


ADVANTAGE SOLUTIONS - MEIJER’S TEST KITCHEN Jr. Interior Designer | HKS Architects | February 2015

DESIGN DEVELOPME

INSPIRATION

ASM has been providing clients with customized sales and marketing solutions in the grocery channel. Meijer is one of their major clients. Meijer believes that producing and preparing good food is an art form. Here at the Test Kitchen, it is also a science. Chefs and food scientists spend their days here at the Test Kitchen, using just about every kitchen gizmo and gadget imaginable to test food’s viscosity, texture, temperature and, of course, taste, to make sure the food is healthier, safer, and tastier.

DESIGN DEVELOPMENT PRESENTATION

VIEW @ TEST KITCHEN

-4-

10

DESIGN DEVELOPMENT PRESENTATION

FINISH PALETTE

1/ CARPET TILE MFR: J&J FLOORING GROUP STYLE: KINETEX / UMBRA 1819 COLOR: ECLIPSE 1766 INSTALL: ASHLAR

7/ BACKSPLASH @ LOBBY MFR: DALTILE COLLECTION: RETRO ROUNDS ITEM#: RR1111PNYRDMS1P COLOR: COBALT CIRCLE SIZE: PENNY ROUND MOSAIC

2/ LUXURY VINYL PLANK MFR: TOMKT STYLE: OZOGRIP / AVENUE STONE COLOR: IRON OXIDE TM4112 SIZE: 7.08” x 47.24” INSTALL: ASHLAR

8/ ACCENT PAINT @ ABOVE TEST KITCHEN MFR: DUNN EDWARDS COLOR: DE6370 CHARCOAL SMUDGE FINISH: EGGSHELL

3/ UPHOLSTERY OPTIONS PENDING ON FURNITURE SELECTION

9/ FIELD PAINT MFR: SHERWIN WILLIAMS COLOR: SW7007 CEILING BRIGHT WHITE FINISH: EGGSHELL

4/ PLASTIC LAMINATE AT LOWER CABINETS MFR: WILSONART COLOR: WALNUT HEIGHTS 7965K-12

10/ RUBBER BASE MFR: JOHNSONITE COLOR: 63 BURNT UMBER HEIGHT: 4” CONTINUOUS

5/ GLASS BACKSPLASH @ TEST KITCHEN VINYL GRAPHIC BY DESIGNTEX GLASS: PULP STUIDO TYPE: CLEAR LOW IRON

11/ PLASTIC LAMINATE AT UPPER CABINETS MFR: LAMIN-ART COLOR: 9201-D

6/ QUARTZ COUNTERTOP MFR: CAESARSTONE COLLECTION:CLASSICO COLOR: 2003 CONCRETE FINISH: POLISHED EDGE: EASED

|

|

8


DESIGN DEVELOPMENT PRESENTATION

OR

G.C. TO REMOVE EXISTING UPPER CABINETS. PATCH/REPAIR & PREP TO RECEIVE NEW FINISH. GLASS WHITEBOARD/PROJECTION ROUND BLUE MOSAIC BACKSPLASH. WALL MOUNTED TVTOP AT BACK WALL. COORDINATE WITH TABLE PROJECTOR (BY OTHERS) EXACT LOCATION WITH TENANT.

GRAPHIC/LOGO WALL BANNER LOCATION CHALKBOARD *ALL FURNITURE TO BE PROVIDED BY TENANT’S FURNITURE DEALER.

NEW SOLID SURFACE COUNTERTOPS & RE-FINISH PLASTIC LAMINATE FRONTS TO MATCH TEST KITCHEN

GLASS WHITEBOARD/PROJECTION WITH CEILING MOUNTED PROJECTOR (BY OTHERS) FLOOR CORE FOR POWER. G.C. TO COORDINATE EXACT LOCATION WITH TENANT & FURNITURE DEALER. CARPET TILES AT CONFERENCE & OFFICE. ASHLAR INSTALLED. NEW ALUMINUM FRAMED SYSTEM WITH BUTT JOINT GLASS & WOOD DOOR.

DEMO CARTS

LUXURY VINYL PLANKS THROUGHOUT. INSTALL PARALLEL TO MAIN LOBBY WALL.

G.C. TO REMOVE EXISTING UPPER CABINETS. PATCH/REPAIR & PREP TO RECEIVE NEW FINISH. ROUND BLUE MOSAIC BACKSPLASH. WALL MOUNTED TV AT BACK WALL. COORDINATE EXACT LOCATION WITH TENANT.

OGO WALL

CATION

RD

NEW SOLID SURFACE COUNTERTOPS & RE-FINISH PLASTIC LAMINATE FRONTS TO MATCH TEST KITCHEN

VIDED BY TENANT’S

-5-

|


Jr. Interior Designer | HKS Architects | January 2016

ME WE US

LEGEND:

EXPERIAN - COSTA MESA HEADQUARTERS

US: 26%

The concept is to categorize the workplace interactions into three levels: Me, We, and Us. “Me” space shows an open plan and is located along with the perimeter of the building to provide maximum sunlight exposure. To accommodate various working styles, the key is to select modular system furniture. “We” space is mostly used for scheduled meetings. Accommodating technology is a high priority to facilitate increasing remote conferences. “Us” space serves as a hub of spontaneous interactions. The design focus is to provide a cozy atmosphere allowing staff to refresh and recharge. Workplace Trend PAST

Scoping

VISIONING

We: 40%

Us:20%

EXPERIANS WORKPLACE OF THE FUTURE -6-

LEGEND: ME WE US

ME: 50%

Me: 40%

WE: 24%

Us:9%

EXPERIAN

We: 27%

TODAY

EXPERIANS WORKPLACE OF THE FUTURE

Me: 64%


INSPIRATION

-7-


KAISER PERMANENTE ADMIN & EMPLOYEE HEALTH SERVICE Staff Designer | Lionakis | October 2016 - present

This project is inspired by the local citrus industry and incorporates abstract yet contextual elements into the design of the space. The corridors in the center of the space symbolize the Magnolia Avenue. A street witnesses the evolution of the local community and is still the hub of social activities. Therefore, the shared spaces are located alongside of the corridors on the floor plan. In addition, this project follows Kaiser’s My Workplace program, which promotes employees health through providing ergonomic, flexible, and comfortable work environments.

Paint

Restroom

Casework

Carpet & Rubber Sheet Flooring Interior Finishes -8-


Kit of Parts

-9-


PACIFIC TRAILS MIDDLE SCHOOL - BLDG C Staff Designer | Lionakis | October 2016 - Present

Building C will be the newest middle school building in the San Dieguito Union High School District. The building is designed to accommodate approximately1000 students and functions as a community hub through shared-use facilities on the campus. There will be science classrooms and maker labs for STEM program to add to the capacity for the whole Pacific Trails campus. The interior finishes palette aims to promote interactive learning and provides a healthy environment for both students and teachers. This concept is represented in the installation of tackable surfaces, movable whiteboards, and sustainable finishes.

- 10 -


1" 0 1/4" 1/2" 1" IF THIS SHEET IS NOT IF 30"x42", THIS SHEET IT IS AIS REDUCED NOT 30"x42", PRINT IT IS - SCALE A REDUCED ACCORDINGLY PRINT - SCALE ACCORDINGLY

0 1/4" 1/2" 2"

1

Paint

2

3

PP

PH

STAIR C102

CLASSROOM

D

C101

C108

C107

GIRLS

BOYS

C110

C111

GIRLS

BOYS

C110

C111

PP

LOBBY

CLASSROOM

PREP

C106

PH

4

PP

CLASSROOM

CLASSROOM

C113

C114

CLASSROOM

CLASSROOM

C113

C114

PH

STAIR

UP

LOBBY

CLASSROOM

C105

D

PH

UP

CLASSROOM

PREP

C106

C102

PP

LOBBY

COPY / STAFF

TOILET

C109

C112

COPY / STAFF

TOILET

C109

C112

C101

C108

C107

PH

PH

PH

1 HR RATED CORRIDOR

UP

LOBBY

C103

UP

C105

PH

CORRIDOR

C103

STAIR

C129

C128

PREP

C127

CORRIDOR STAFF WOMEN

CUSTODIAN

C128

C126

STORAGE

C124

CLASSROOM C125

C104

C121

CLASSROOM C123

ELEV MECH RM

C119

CLASSROOM

CLASSROOM

C118

C117

CLASSROOM

CLASSROOM

C118

C117

C129

STAFF MENS

C124

CLASSROOM

FIRE RISER

ELEC STORAGE C122

PREP

C127 C125

C116

FAB LAB/MULTI PURPOSE

C121

CLASSROOM

FIRE RISER C116

FAB LAB/MULTI PURPOSE

C120

ELEV

C115

PH

PH

STAFF MENS

C115

PH

1 HR RATED ELEV MECH RM CORRIDOR C120

ELEV

C104

STAFF WOMEN

STAIR PH

C119

C123

CUSTODIAN C126

C

ELEC C122

Casework

1

C

BLDG C - OVERALL FIRST FLOOR PLAN SCALE 3/32" = 1'-0"

FirstBLDG Floor C - OVERALL FIRST FLOOR PLAN 1

SCALE 3/32" = 1'-0"

STAIR CLASSROOM

CLASSROOM

CLASSROOM

C206

C207

C208

C201

STAIRDN OPEN TO BELOW

CLASSROOM

CLASSROOM

CLASSROOM

C206

C207

C208

C201

1

BLDG C - LEVEL 2 - Corridor - North Pt1 SCALE 1/4" = 1'-0"

P3

C205

C224

CLASSROOM

CLASSROOM

C222

C221

C220

C212

C209

C210

CLASSROOM

CLASSROOM

C211

C212

1 HR RATED CORRIDOR

4

5 PH

A-521 CLASSROOM

1. P3

C129

1 CLASSROOM

CLASSROOM

C216

C215

C220

COMPUTER LAB

1

2

18

1

CMU VENEER

8.

WHERE WI NUMBERS ARE INDICATED CONTRACTOR SHALL REFER TO CUSTOM FABRICAT CASEW DESCRIBED IN DRAWINGS AND SPECIFICATIONS.

9.

ALL EXPOSED STEEL COLUMNS, BEAMS & BRACE FRAMES IN 1 HOUR RATED CORRIDOR SHALL BE PAINTED P3.

14. ALL TACK PANELS TO FACE CORRIDOR. CEILING

6

13

A-521

P3

2" MARBLE THRESHOLD WITH EASED EDGE

TYP

DOOR SHOWN IN CLOSED POSITION. TRANSITION SHALL OCCUR AT CENTERLINE OF DOOR / OPENING, WHERE IT OCCURS.

A-521

FRY REGLET DRMPET-375

EXPANSION JOIN CONT. SEALANT COLOR TO MATCH GROUT

2 MAX

D

18

A-521

A-521

18

18

A-521

A-521

CERAMIC FLOOR TILE, SEE FINISH SCHEDULE

7' 2" FROM FINISH FLOOR

SHEET KEYNOTES

1

TACK BOARD SURFACE WHERE OCCURS, SEE ELEVATIONS

CONCRETE FLOOR,

18SEE FINISH SCHEDULE

A-521

1 1/4" TYP

3

9

A-522

IMPACT RESISTANT GYP. BOARD TYPICAL PAINTED.

3' FROM FINISH FLOOR (MATCH ADJ. 2 REGULAR CURTAIN WINDOW)?

GYP. BOARD PAINTED.

FRY REGLET DRMPET-375

CL

Typical Corridor BLDG C - LEVEL 2 - Corridor - North Pt2

A

G

1 HOUR ASSEMBLY

CT7

18

G

4

CHECK INSTALLATION PATTERN

B1

A

13. SEE SHEET A-631 FOR WINDOW SCHEDULE AND DIAGRAM.

BLDG C - OVERALL SECOND FLOOR PLAN

A-521

KEY PLAN

12. CLASSROOM FABRIC WRAPPED TACK PANELS TO BE +/- 1/2" THICK. REFER TO DETAIL 14/

SCALE 3/32" = 1'-0"

2

SEE SHEET A-561 FOR TYPICAL CASEWORK ANCHORAGE.

11. CLASSROOM FABRIC WRAPPED ACOUSTIC PANELS TO BE +/- 1/2" THICK. REFER TO DETA

3

BLDG C - OVERALL SECOND FLOOR PLAN

SCALE 3/32" = 1'-0"

SEE FINISH SCHEDULE & LEGEND FOR CASEWORK TYPES.

5.

10. ALL 5' 0" TALL MARKERBOARDS TO BE PROJECTION GRADE.

A-522

2

4.

ALL CASEWORK SHELVING SHALL BE ADJUSTABLE, UNO. CLASSROOM C214 7. PROVIDE LOCKS IN ALL CASEWORK. ALL LOCKS SHALL HAVE INDIVIDUAL KEYS AND MAST ALL LOCKS.

3

2

CONTRACTOR TO PROVIDE BACKING AS REQUIRED, SEE STRUCTURAL DRAWINGS FOR CLASSROOM TYPICAL BACKING DETAILS.

6.

1

C218

REFER TO FINISH LEGEND AND SCHEDULE ON SHEET A-641 FOR FURTHER INFORMATION

C214

C217

A-521

C223

Second Floor

C213

KEY PLAN

C215

IDF COMPUTER LAB 18 C218

CUSTODIAN

A

DN

PH BLDG C WALL ELEMENTSSTAIR 2. COORDINATE WITH FLOOR PATTERN. ALIGN COLOR CHANGESCH W IN THE FLOOR DN COLOR. REFERC213 TO FLOOR FINISH PLAN SHEET C.AF-111 THROUGH C.AF-112B.

3.

CLASSROOM

CLASSROOM 2 C216

ELEV

CLASSROOM

C221

C222

STAIR

GENERAL NOTES

C217

C219

18 CLASSROOM

A

BOYS

1 HR RATED CORRIDORIDF P3 C203

STAFF / COPY

C204

C223

C224

1

2

CLASSROOM CORRIDOR CUSTODIAN

C225

STAFF MENS

C129

C219

STAFF MENS

STAFF WOMEN

GIRLS

ELEV

A-521 STAFF / COPY

P3

C204

2"

D

Carpet, Tile, Rubber Sheet Flooring Interior Finishes

C225

TYP

13

A-521

CORRIDOR REVEAL DN

CLASSROOM

C211

1"

18 A-521

STAIR

CLASSROOM

C203

0 1/4" 1/2"

ALIGN TYP.

DN

OPEN TO BELOW DN

6 STAFF WOMEN

IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT - SCALE ACCORDINGLY

P3

1/17/2017 10:42:10 PM 1/17/2017 10:42:10C:\Users\Nathan.Dea\Documents\015512_BIM_INC1_MASTER_R16_CENTRAL_nathan.dea.rvt PM C:\Users\Nathan.Dea\Documents\015512_BIM_INC1_MASTER_R16_CENTRAL_nathan.dea.rvt

1"

P3

C205

C210

1/2" MAX

2"

3 STAIR

0 1/4" 1/2"

FLOOR TRANSITION CERAMIC TILE TO CONCRETE

ACM_09300_004A 140925. Q1

6" = 1'-0"

IMPACT RESISTANT 5/8" GYP.

13

TACK BOARD CORRIDOR 3" = 1'-0"

Q1

WALL TYPE PER PLAN ALUM J CHANNEL

SCALE 1/4" = 1'-0"

DOOR SHOWN IN CLOSED POSITION. TRANSITION SHALL OCCUR AT CENTERLINE OF DOOR / OPENING, WHERE IT OCCURS.

C FRY REGLET DRMPET-375

RUBBER TRANSITION STRIP. MFR: JONHSONITE MODEL: CRS-28-A COLOR: 28 MEDIUM GREY

CONCRETE FLOOR, SEE FINISH SCHEDULE

#12x2" FH SDST @ 16" O.C. TOP & BOT (ATTACH TO STUDS)

ELEVATION LEGEND

5/8" GYP. BOARD

1/2" THICK FABRIC-WRAPPED TACK BOARD PANEL

TG

FULLY TEMPERED SAFETY GLASS WALL AS SCHEDULED

- 11 -

C 2 TAPE AND JOINT

1

MAX

/2" MAX

IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT - SCALE ACCORDINGLY

2

BOYS

C209

OPEN TO BELOW

B

1

GIRLS OPEN TO BELOW

B

CARPET CONC. TOPPING

SP10, FABRIC WRAPPED TACKABLE WALL PANELS

TACK BOARD WHERE OCCURS, SEE ELEVATIONS

1


Vol. 2

Huichi Jacey Wu +1 480.265.5845 Jacey.hc.Wu@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.