Design Studio 5

Page 1




























REAR PERSPECTIVE


GROUND FLOOR PLAN NTS






TECHNICAL REPORT

UNIT A SENTUL DEPOT INTEGRATED DESIGN

DESIGN STATEMENT LIGHTING VENTILATION WATER SUPPLY WATER LAYOUT SEWERAGE SEWER LAYOUT


UNIT A SENTUL DEPOT DESIGN STATEMENT TRANSITIONING FROM THE EXISITING BUILDING TO THE NEW ADDITION SPACES AND PROVIDE DIFFERENT PROGRAMS TO BENEFIT THE USERS . SPORT AND RECREATIONAL PROGRAMS ARE INTRODUCED BOTH IN THE OLD AND NEW BUILDING.


LIGHTING STUDY T8 Linear Fluorescent Light

MATERIALS

25 - 32 watt

Glass curtain wall allows daylighting

20,000 life hours

enters into the interior space.

type 1

type 2

THERMAL ZONNING

NATURAL LIGHTING

MARTIAL ARTS CENTER

MARTIAL ARTS CENTER

NATURAL LIGHTING RETAILS

SUNLIGHT

Calculation for natural lighting required: total floor areax10%

OPENING PROVIDED

=136m2 x 10%

COMPLY TO UBBL 1984,

=13.6m2

CLAUSE 39-NATURAL LIGHTING MINIMUM

THERMAL ZONNING RETAILS

MAXIMUM ILLUMINATION

Calculation for natural lighting required:

MINIMUM ILLUMINATION

total floor areax10%

Calculation of nos of lighting: Dimension of space Total Floor Area

Natural lighting provided: REQUIREMENT OF 10% FOR =total area of opening

DAYLIGHTING.

DIRECT SUNLIGHT

SUNLIGHT

Type of Lighting

=198m2 x 10% =19.8m2

type 2length=7 width=4

Natural lighting provided:

4(5x4m)+2(7x4)=80+56

=total area of opening

=136

=24m2>19.8m2

T8 Linear fluorescent lamp

complied to ubbl clause 39

MINIMUM ILLUMINATION

OPENING PROVIDED COMPLY TO UBBL 1984, CLAUSE 39-NATURAL

type 1length=5 width=4

MAXIMUM ILLUMINATION

LIGHTING MINIMUM REQUIREMENT OF 10% FOR DAYLIGHTING.

Calculation of nos of lighting:

Dimension of space

length=18 width=11

Total Floor Area

198sqm

Type of Lighting

T8 Linear fluorescent lamp

Number of Lamps in each 9 luminaire,n

=60m2>13.6m2

Number of Lamps in each 9

Height of lighting fixture 2800

complied to ubbl clause 39

luminaire,n

Height of working plane 4.8

Conclusion 29 nos of fluorescent tube light is required to achieve the standard requirements of illuminance recommeded by M51525 Spacing between luminaires assume max spacing between luminaires to height ratio for fluorescent tube light=1.5 maximum spacing between luminaires s max=1.5xHm=1.5x2.2=3.3 no of row fixtures required along with width of room=4/3.3 =1.21, 1 row no of fixtures required in each row =total fixtures/ no of row =29/1 29nos

Height of lighting fixture Height of luminaire Height of working plane

2800

K=(LxW)/ (Hm(L+W)

Assumption of reflectance K=1.93 value,% Ceiling=70,wall=50,floor=20 Utilization factor, UF

luminaire and working

0.8

Height between luminaire 3-0.8=2.2 and working plane,Hm Room index,K

Height between

3

k=1.93 uf=0.62

Assumption for

MF=0.8

maintenance factor, MF

Taken E=300

Standard illuminance,E

N=EA/(F x n x UFx MF)

Number of luminairess

N=(300x136)/2800x1x0.62

needed,N

x0.8) N=40800/1388.8 =29.38

0.7 4.8-0.7= 4.1

plane,Hm Conclusion 42 nos of fluorescent tube light is required to achieve the standard requirements of illuminance recommeded by M51525 Spacing between luminaires

Room index,K

K=(LxW)/ (Hm(L+W) K=1.67

Assumption of

Ceiling=70,wall=50,

reflectance value,%

floor=20

Utilization factor, UF

k=1.67 uf=0.62

assume max spacing between luminaires to height ratio for fluorescent tube light=1.5 maximum spacing between luminaires s max=1.5xHm=1.5x4.1=6.15 no of row fixtures required along with width of room=11/4.1 =2.68, 2 row no of fixtures required in each row =total fixtures/ no of row =42/2 21nos

Assumption for

MF=0.8

maintenance factor, MF Taken E=300 Standard illuminance,E

N=EA/(F x n x UFx MF)

Number of luminairess

N=(300x198)/2800x1x0.62

needed,N

x0.8) N=59400/1388.8 =42.7


VENTILATION STUDY LEGEND OPENING HIGH TEMPERATURE MODERATE TEMPERATURE COLD TEMPERATURE

THERMAL ZONNING

NATURAL VENTILATION

MARTIAL ARTS CENTER

MARTIAL ARTS CENTER

NATURAL VENTILATION RETAILS

THERMAL ZONNING RETAILS

Calculation for natural lighting required:

Calculation for natural lighting required:

total floor areax10%

OPENING PROVIDED COMPLY TO UBBL 1984,

total floor areax10%

OPENING PROVIDED COMPLY TO UBBL 1984,

=136m2 x 10%

CLAUSE 39-NATURAL VENTILATION MINIMUM

=198m2 x 10%

CLAUSE 39-NATURAL VENTILATION MINIMUM

=13.6m2

REQUIREMENT OF 5% FOR VENTILATION.

=19.8m2

REQUIREMENT OF 5% FOR VENTILATION.

Natural lighting provided:

Natural lighting provided:

=total area of opening

AIR CHANGES PER HOUR

=total area of opening

AIR CHANGES PER HOUR

=60m2

CFM=(10/HR X 408m3)/60minutes

=24m2

CFM=(10/HR X 950m3)/60minutes

=(10/HR X14408.4) /60

=(10/HR X 33548.9) /60

=144084/60

=335489/60

=2401.4

=5591.4

CFM TO TONS

CFM TO TONS

1 TON OF COOLING =400CFM

1 TON OF COOLING =400CFM

1 TON OF COOLING =12000 BTU/HR

1 TON OF COOLING =12000 BTU/HR

1 BTU/HR =0.00039 HP/HR

1 BTU/HR =0.00039 HP/HR

2401/400CFM

5591/400CFM

=6 TONS

=13.9 TONS

6 TONS X 12000BTU/HR =72000 BTU 72000X0.00039 HP/hr = 28.08 HP 72000>30000BTU 72000/30000 =2.4 =3UNITS

FFR-C/ FCQ-KA Series Product Range: R410A Inverter Single Split Capacity Range: 1.0 – 6.0 hp Refrigerant: R410A

14 TONS X 12000BTU/HR =168000 BTU 168000 X0.00039 HP/hr = 65.52 HP 168000>30000BTU 168000/30000 =5.6 =6UNITS

MATERIALS VINYL FLOORING Vinyl flooring can be safely used

with

underfloor

heating. Vinyl heats up and cools down quickly. Vinyl floors are subject to a top

floor

temperature

restriction, usually 80.6°F (27°C), limiting the heat output


WATER SUPPLY SYSTEM GROUND FLOOR PLAN

FIRST FLOOR PLAN

M

M

LEGEND DIRECT WATER COLD WATER CISTERN WATER FROM COLD WATER CISTERN

M

WATER MAIN


WATER SUPPLY SYSTEM

75MM DIAMETER PVC CLASS 7 DIRECT WATER PIPE

COLD WATER CISTERN

ROOF LEVEL FEMALE TOILET

MALE TOILET

36MM DIAMETER PVC CLASS 7 PIPE

FIRST FLOOR LEVEL 36MM DIAMETER PVC CLASS 7 PIPE

FEMALE TOILET 12MM DIAMTER PVC PIPE

MALE TOILET

CAFE KITCHEN

75MM DIAMETER PVC CLASS 7 DIRECT WATER PIPE

GROUND FLOOR LEVEL

INCOMING MAIN


SEWERAGE SYSTEM GROUND FLOOR PLAN

DISCHARGE

TO

THE

MAIN SEWER DISCHARGE

NEARER

FIRST FLOOR PLAN

M2

100MM DIAMETER PVC SOIL AND VENT PIPE

EXISTING

MANHOLE

DISCHARGE DIRECTION

M1

KITCHEN

LEGEND DIRECT DISCHARGE DISCHARGE TO FLOOR TRAP



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.