SCHEMATIC LANDSCAPE PROPOSAL
ORIENT CEMENT, DEVPUR
PHASE ONE REVISION A NOVEMBER 2012
iammies Landscapes Landscape + Architecture www.iammies.in
Detail Landscape Design - Phase one
Orient cement, Devpur
1 2 7500MM
4
WIDE
10000MM
SERVICE
ROAD
ROAD
3 5
BSNL TOWER
POLICE STATION
STAFF MESS GUEST HOUSE
RAILWAY QTRS
'J' TYPE 'E' TYPE QTRS.
LEGEND
SCHOOL
SITE PLAN COLONY CIVIL OFFICE
1 Entrance Mountain 2 Truck parking 3 Factory Entrance
D - TYPE DOUBLE STORY PLAY GROUND
4 Factory gateway
6 Executive Housing
LIBRARY
5 Residential Medians FUNCTION HALL
'C' TYPE QTRS.
SHUTTLE COURT
6
November 2012
Orient cement, Devpur
1 ENTRANCE MOUNTAIN
Detail Landscape Design - Phase one
November 2012
Detail Landscape Design - Phase one
2 TRUCK PARKING
November 2012
Orient cement, Devpur
Orient cement, Devpur
Detail Landscape Design - Phase one
1930
2 TRUCK PARKING
P.B +600
P.B +600
1000
20940
P.B +600
T/S ± 00.00
9210
11500
P.B +600
42060
3490
00
10000 2000 3000
41870
20940 20940
T/S ± 00.00
10000
3000
3000
F.S+200
69530
P.B +600
T/S ± 00.00
18300 T/S ± 00.00
20950
14100
2100
10000
87700
1900
16570
2000 P.B +600
97020
F.S+200
2000
10000
6990
T/S +500
450
3000
2900
E ROAD
M WID
7500M
P.B +600
57430
8980
AD
ICE RO
M SERV
10000M
P.B +600
F.S +200
F.S+200
3000
P.B +600
2100
10000
P.B +600
3000
98500
F.S -250
2000
10000
F.S+200
P.B +300
F.S+200
2900
3000
2000 9000
P.B +300
T/S +750
67220
P.B +100
F.S+200
1190
3570
14940
2200
T/S ± 00.00
21640
4080
4500
12490
12490
3000
1500 T/S ± 00.00
T/S ± 00.00
6480
1500
1500
12490
T/S ± 00.00
18620
24770
P.B +600
30360
10000
2150
T/S +750
10000
T/S ± 00.00
3280
4500
10470
17450
10000
1500
3490
P.B +300
P.B +300
P.B +850
20950
31400
34890
41870
45360
T/S ± 00.00 T/S ± 00.00
16250
T/W +850
R30
P.B +600
14920
20700
24240
P.B +600
9950 T/S +500
6990
1900 450 4640
11840
152580
T/S ± 00.00
89530
P.B +100
32270
2400
T/S ± 00.00
14920
F.S +150
2200
SLOPE
E
OP
18820 P.B +100
1800
8000
144300
1500
7320 1800
P.B +850 8000
T/S +750
T/C +200
F.S -250 1500
P.B +100
500
16570 7370
3340 T.W +350 T.C +200
T.W ± 00.00
P.B +750
1770
1700
1720
2320
4080
3120
1500 1500
3500
P.B +100
1500
F.S +200 1500
T/C +200
2750 1800
500
T/C +200
T/R ± 00.00 4250
2000
T.W -150 8820
6720
9220
SCALE 1:500
F.S F.G PB T/C T.S T.ST T/W B.O.P -
FINISHED SURFACE FINISHED GRADE PLANTING BED TOP OF CURB TOP OF SEAT TOP OF STRUCTURE TOP OF WALL BOTTOM OF POOL
5000
8000
8000
P.B +100
2000 1500
1800
P.B +100
510
T/W +850
T/C +200
1750
SL
SCALE 1:200
TRUCK PARKING AT ENTRANCE
1:500 30-10-2012
121030 PHASE ONE PLAN
November 2012
Detail Landscape Design - Phase one
3 FACTORY ENTRANCE
November 2012
Orient cement, Devpur
Orient cement, Devpur
Detail Landscape Design - Phase one
3 FACTORY ENTRANCE
1720
2320
T.W -150
1750
4080
4080
3120
2200
24240
3570
F.S +150
1190
3570
2200
20700
T/S ± 00.00 11840
1200 9000
70100
F.S +150
32270
T/S ± 00.00
2400
1390
T/S ± 00.00
F.S +150
5780 42
00
40
T.S +600
00
2200
F.S +150
97120
E
OP
SL
T/S ± 00.00
95520
2200
SLOPE
T.S +600
P.B +100
P.B +100
0
200 F.S +150
T/C +200
T/W +450
T/S ± 00.00
625
P.B +100
P.B +100
0
F.S +150
T/C +200
P.B +100 T/C +200
F.S +150 100 70
T/C +200
T/W +600
00
T/C +200
T/W +1200
T/W +750
30
112
P.B +100
280
P.B +100
T.S +600 F.S +150
P.B +100
T.S +600
T/C +200
200 0
T/C +200
0 200
F.S +150
P.B +100
B.W +600
T/C +200
T/C +200 P.B +100 F.S +150
T/W +900 143
T/W +750
T/W +600
T/C +200
T/C +200 P.B +100
P.B +100
2000
0
944
2000
90
60
156
T/C +200
P.B +100
T/C +200
P.B +100
0
600
P.B +100
T/C +200
F.S F.G PB T/C T.S T.ST T/W B.O.P -
FINISHED SURFACE FINISHED GRADE PLANTING BED TOP OF CURB TOP OF SEAT TOP OF STRUCTURE TOP OF WALL BOTTOM OF POOL
FACTORY ENTRANCE LANDSCAPE INCLUDING EXISTING CYCLE PARKING
1:200
10-11-2012
121110 Phase One Plan
November 2012
A
Detail Landscape Design - Phase one
4 FACTORY GATEWAY
November 2012
Orient cement, Devpur
Orient cement, Devpur
4 FACTORY GATEWAY
Detail Landscape Design - Phase one
November 2012
Detail Landscape Design - Phase one
4 FACTORY GATEWAY
November 2012
Orient cement, Devpur
Orient cement, Devpur
5 RESIDENTIAL MEDIANS
Detail Landscape Design - Phase one
November 2012
Detail Landscape Design - Phase one
Orient cement, Devpur
4000
5 RESIDENTIAL MEDIANS
1840
2400
7500
4000
2400
7500
6000
SLOPE 1:10
F.S +300
4000
12000
P.B +350
F.G +250
7500MM WIDE ROAD
T/C +200
4000
SLOPE 1:10
T/C +200 FS +200 F.G +650
T/W +200
P.B +700
T/W +600
FS +200
T/C +200
T/W +600
F.G +650
KOREAN CARPET GRASS 12 SQ.M / 130 SFT.
4000
KOREAN CARPET GRASS 12 SQ.M / 130 SFT. ST.AUGUSTINEGRASS/ SHADE GRASS 32 SQ.M / 345 SFT.
7500MM WIDE ROAD
4000
ST.AUGUSTINE GRASS/ SHADE GRASS 104 SQ.M / 1120 SFT.
50MM THICK STONE KERBING
KOREAN CARPET GRASS 13 SQ.M / 140 SFT.
200MM THICK C.C KERBING
ST.AUGUSTINE GRASS/ SHADE GRASS 35 SQ.M / 380 SFT.
4000
12000
ST.AUGUSTINEGRASS/ SHADE GRASS 65 SQ.M / 670 SFT.
50MM THICK STONE BAND
F.S F.G PB T/C T.S T.ST T/W B.O.P -
FINISHED SURFACE FINISHED GRADE PLANTING BED TOP OF CURB TOP OF SEAT TOP OF STRUCTURE TOP OF WALL BOTTOM OF POOL
MEDIANS AT RESIDENTIAL SPINE
30-10-2012 121030 PHASE ONE PLAN
November 2012
1:50
A
Orient cement, Devpur
Detail Landscape Design - Phase one
November 2012