portfolio
ida basic
content
CURRICULUM VITAE BACHELOR STUDIO WORKS (ARCHITECTURE) Second Semester Third Semester Fourth Semester Fifth Semester Sixth Semester MASTER STUDIO WORKS (URBAN DESIGN) First Semester Second Semester
IDA BASIC 448 Central Park West Apt 1E New York 10025 NY +1 (917) 755 9313 ibasic@me.com PERSONAL INFORMATION 01/29/1981 in Gradacac (Bosnia and Herzegovina) Citizen of Switzerland
EDUCATION 1986-92 1992-97 1997-01 2003-04 2005-06 2008-11 2011-12
Primary school in Bosnia and Herzegovina Secondary school in Allschwil (CH) High school in Basel (CH) ETH Z端rich (CH) Internship at Herzog & De Meuron in Basel (CH) Bachelors degree in architecture at ZHAW in Winterthur (CH) Masters degree in urban planning at CCNY in New York (USA)
EMPLOYMENT HISTORY 2001-03 2003-10 2005-06 2006-11 2008-11 2008-08
United Banks of Switzerland in Basel (CH) Adecco Hotel & Event Herzog & De Meuron in Basel (CH) Musical Theatre Basel (CH) Good News Productions in Z端rich (CH) Danfoss AG Heating in Frenkendorf (CH)
LANGUAGES Bosnian (native language) German / Swiss German (secon native language) English French Italian INTERESTS Architecture Art & Design Traveling Movies Photography
curriculum vitae
architecture 3rd Semester ZHAW
In our third semester in Winterthur we were supposed to design a one family house with a separate guest house in Malans (Graubünden) and use the materials from the area. The topography was very steep and it made the design of the house complicated which led to the placement of the cellar on the street level and the main entrance to the house on the first floor with two outside seating places and all semi-private rooms like living room, kitchen and tv-room. Two outside seating areas and an atelier with a small guest house are at the same niveau. On the second floor we find the master bedroom with a balcony, the children’s bedrooms and a library with connection to a loggia which overviews the village of Malans. 95400910237
Baholz
95400910271
Baholz
104-A
104A
104A-A
104
Bannholzweg
264
120
120A
95400910228
117A
117A-A
110A-A
95400910270
110A
Scadenaweg 105-A
95400910227
105
Luggagasse
108-B
116A
95400910269
108A
118-B
N
106
95400910251
115
119-A
107
Bovelweg
sse Luggaga
119-B
108
119
95400911008
110-A
118
Scadena 165-A
95400910277
95400910250
127
110
111-A
165
115A
128A
95400911007 95400911007
128
129
130-A
131
111
164
163
130
132
117
166
117-A
116
133
114
166-A
133A
112
Alt Tobel
95400910225
95400910275
141
167
160A
Schermengasse
113
161
95400910249
134-A
160
167-A
95400910274
136
95400910273
136A
160-A
135
168
135-A
134
Mostgasse
160B
se
95400910224
138-A
169
Mostgas
171-E
95400911006
154
137A
154A
159
138
Nuttgasse
170
156A
158
154-A
139
95400910290
156
134A
157
e
137
Nuttgass
Turnhalle
150-A
171
139-A
152
95400910223
95400910248
143-A
153
156-A
139-B
95400910289
143
153C-A
151-A
151
153C
172-A
140B
152-A
174
175
Frassa
Beeligasse sse Gazienzenga
se 172
Beeligas 142
140A
146
95400910288
149-A
147
140
173 177
173-A
Rathaus
95400910287
149
95400910222 176
145-A
95400910247
150
Schulhaus
95400910246
145
75
Weiss-Kreuz
178
148
492
491
179-A
95400910245
95400910291
181
180-C
95400910252
180-B
Dorfplatz
180A
496
74
179
180
149B
183
68-B
49D
493
asse 494
Sterneng
495
95400911056
Sternengasse 69-D 184
95400911057
asse Heereng 68
95400910221
Kronengasse
185
202-A
201
Ochsen 202
202-D
95400910327
200-A
200
95400910328
69-B
191B
95400911076
199
191A
195
191
196
193
191C
194
69-A
Tobelgasse
Krone
193a
69
204
197-A
192
95400910220
95400911075
95400910329
203
Goldgasse
71-A
e Goldgass
205
197
95400911077
203-A
194B-A
95400911063
70
194B
70A
Rüfegasse
208
Löwengasse
95400910219
207-A
61A
207
206
206A
212
212-A
208A
61
62
206-B
211
Ägyptengasse 210
447
209
Postplatz
212A
95400911078
Situation Malans
211-B
62B
60A
Post
209-C
62A
214
59B-A
architecture 118-B
3rd Semester ZHAW
Cross Section
118
118-B
95400911007 95400911007
130-A
Longitudinal Section 131
130
132
Lower Level
Elevation East
118
Elevation North
Elevation South
95400911007 95400911007
130-A
131
130
132
Ground Floor
Elevation West
architecture 4th Semester ZHAW
After a seminar in Venice, Italy and a visit in Chioggia (a former fisherman’s island which is now abandoned) the exercise of this semester was to build a new small self sustainable village with a promenade and a crust towards Venice. In groups of four we had to organize and design our lots with a common green area for our residents. Italy’s famous arcades and terracotta colors inspired the design of the building. The wet underground and the humid climate didn’t allow us to build cellars which lead to small private compartments on the ground floor and a party room with a covered seating area near the water. The floors one and three are identical as are the floors two and four. The fifth floor is a luxury floor with only two big apartments and a roof top terrace for all residents.
N
Ground Floor
architecture 4th Semester ZHAW
Floors 2 & 4
Floor 5 Elevation East
Floors 1 & 3
Cross Section
architecture 5th Semester ZHAW
Located in the city of St. Gallen where the famous fair of OLMA takes place we had to design a new exhibition center with a congress center on the upper floor and a restaurant. A separate office building which is connected to the exhibition center and inhouses offices had to be attached to the main building. For the first time we had to plan the whole supporting framework and the building services like heating, cooling and cross ventilation. The warehouses are locadet on the lower levels as is the parking garage which is connected to the already existing garage from another hall. The visual difference between the main exhibition center (concrete) and the office building (wood paneling) was chosen to differentiate the two.
±0.00
Temporäres Messelager 200 m2
HALLE 3.1
HALLE 2.1
HALLE 3.0
HALLE 2.0
±0.00
Messehalle 1650 m2
±0.00 ±0.00
Entrée 850 m2
Entrée 250 m2
±0.00
Temporäres Gastrolager 95 m2 ±0.00
HALLE 1.1
±0.00
Restaurant 660 m2 168 Sitzplätze
Küche 150 m2
HALLE 1.0
F9 AUSSENHALLE
LUFTRAUM
Tor / Induktionsschlaufe B. = 6.75m
8 ARENA
HALLE 9.1.2
HALLE 9.1 667.10müM
P 8/9
Ground Floor
Haustechnik 1330 m2
architecture
Lager 1330 m2
-4.50
-9.00
5th Semester ZHAW
Lager 730 m2
Lager 730 m2
-9.00
-4.50
Lager 1285 m2
Gastrovorbereitung 1285 m2
-9.00
-4.50
Parkgarage (Anbau) 1285 m2 78 neue Parkplätze 2 Invaliden- Parkplätze -4.50
öffnung bei Erweiterung 6.00 x 2.10
öffnung bei Erweiterung 6.00 x 2.10
Warehouse Level -2
Parkzone 2. Ebene - 3.10
Haustechnik Parkhaus 225 m2
Garage Level -1
Situation St. Gallen
Detailschnitt 1-20
Lounge Sitzungsräume 380 m2 +4.00
Zwischengeschoss 250 m2 +4.00
Sitzungsräume 265 m2 +4.00
Office Floor and Support Structure
Anlieferung +6.30
Kongresshalle 2600 m2 +8.00
Empfangsraum Kongress 750 m2 +8.00
Empfangsraum Kongress 635 m2 +8.00
Büro 535 m2 +8.00
Detailed Section Office Building
Congress Center
architecture 6th Semester ZHAW
Our Bachelorproject was again located in the city of St. Gallen in Switzerland near the OLMA exhibition area. We had to design a community center with a public swimming pool, a fitness center and a restaurant with an open public area in front complementary to the new sports hall across the street. The lot was triangular which made it very hard to design a building which would fit fluently and inhouse an olimpic swimming pool and two children’s pools. To solve the supporting framework and the building services was a big part of the excercise. My design- a snake-like building which is different on the ground floor and on the upper floor- tries to fit into the lot and to use as much of it as possible but also it tries to open towards the new sports hall and the elementary school.
Sauna Herren Toiletten Herren Toiletten Damen Sauna Damen
Duschraum Herren
Duschraum Damen
Sole-Becken 1.7 m Tiefe 35 ° warm
NichtschwimmerBecken 1,25 m Tiefe
Schwimmer-Becken 25 m Länge 14 m Breite 5 Bahnen
Eingangshalle
Dachaufba
Restaurant
Begehbare Natursteinp Auflast (Kie Abichtung Wärmedäm Betondecke
Wandaufba
Küche
Aussensch Wärmedäm Inneschale (Element b Thermoele
Bodenaufb
Belag nach Trennlage Schwimme Trennlage P Wärmedäm Trttschalldä Betondecke
gedeckter Aussensitzplatz
N
Fenster: Alufenster Rahmenve
Ground Floor Public Swimming Pool and Restaurant
architecture
Haustechnikzentrale 1 Sanitär
Toilette Herren
6th Semester ZHAW
Toilette Damen
Ticketkontrolle/ Kassen
Garderobe Damen Garderobe Herren
Duschen Herren
Haustechnikzentrale 2 Heizung
Duschen Damen
Haustechnikzentrale 2 Lüftung
Kursraum
Garderobe Damen
Toilette Herren
Toilette Damen
Garderobe Herren Ticketkontrolle/ Kassen Garderobe Damen
Garderobe Herren
Physiotherapie
Duschen Herren
Fitness Duschen Damen
Kursraum
Garderobe Damen
Garderobe Herren
Physiotherapie
Upper Floor Fitness Center
Fitness
Building Service Plans
Elevations
Longitudinal Section
Cross Section
au:
er PlattenbelagB. platten) es, Geröll) ca. 8cm
mmschicht ca. 25-30cm e ca. 30cm
au:
hale Sichtbeton 18cm mmung 20cm e Beton 22cm bei Bodenübergängen ement zur Dämmung)
bau:
h Wahl: Platten, Parkett....
ender UB PE-Folie mmung 8cm ämmung 2cm e 25cm (UG 30cm)
Fertigprodukt erkleidung Innen aus Metall
Detailed Section
Framework
urban design
1st Semester CCNY
Parting between urban and natural spaces, places of consumption, life and production is increasingly problematic for territory planning. The idea of local food production began to be important when the big cities started to explode. Regional production of food could solve a lot of problems. It could be a way to educate and employ homeless people and to inform children about food and the diet they should consume to prevent obesity and health issues. Introducing domestic animals into the neighborhood could also be a way of recreation or solve a lot of other problems. Hens could produce eggs, goats could give milk and cheese amd clear the weeds, horses can be used for recreation and fishes could be cultivated in fish ponds and sold with the vegetables on the local farmers markets.
Seward Park
Urban Map
urban design
1st Semester CCNY
Williamsburg Bridge Vertical Garden Scheme Vertical Garden Housing Section
Areal Birds View
Vertical Garden Housing Floor Plans
urban design
2nd Semester CCNY
Istanbul with its 14 million people (official number) faces a very big challenge where to house new residents which are coming to this very important node city constantly from all party of Turkey. Due to last earth quake in november 2011, the question has been raised whether it is safe for people who house in informal settlements in the center city to stay there. The goal of IMP (Istanbul Metropolitan Planning Office) is to rehouse 1-4 million people in the following years and release the tension that has been existing in Istanbul‘s center.
3'457.26 m2
2'821'368.93 m2
6.98 %
13.96 % 9.89 % 4.94 %
Yeni Sehir - The New City Istanbul
The goal of our project was to create a new city which is self- governed and doesn‘t depend on the main city. Eventhough the idea was to produce enough work places we, connected the transportation systems to Istanbul‘s existing train, bus, ferry and highway systems. The 4 big lakes on our site are reservoirs to catch water because Istanbul has been facing water shortages over the past years. We also wanted to preserve as much of the existing natural forests and agro-forests and add more agricultural land to this problematic site due to exploitations from coal mining.
urban design
2nd Semester CCNY
Religious Institutions 6.98 %
13.96 %
Health Institutions 9.89 % 4.94 %
Cultural Institutions
Commercial Institutions
Use Diagram
Educational Institutions
Istanbuls Regional Plan and Built Up Area
CATCHMENT RESERVOIR 1'400'000 m2 8'400'000 m3
6.98 %
13.96 % 9.89
WIND-SOLAR ENERGY PRODUCTION 808'000 m2
% 4.94 % 513'896.47 m2
FOG CATCHMENT IN THE FOREST 1'200'000 m2
Fog Catchment 9
8
7
6
5
4
3
2
1
11
10
14
13
12
14
13
12
11
10
9
8
7
6
5
4
3
2
1
32.0
3
4
5
6
7
8
9
10
11
12
1
2
9
8
7
6
5
4
3
2
1
11
10
14
13
11
10
12
13
3
2
1
9
8
7
6
5
4
11
10
14
13
12
14
13
12
11
10
9
8
7
6
5
4
3
2
1
12
9
8
7
6
5
4
3
2
1
11
10
14
13
14
13
12
11
10
9
8
7
6
5
4
3
2
1
12
9
1
8
14
7
13
6
12
5
11
4
10
3
9
2
8
11
7
10
6
14
5
13
4
12
3
2
1
FRAME
6
5
4
3
2
1
14
13
12
11
10
9
8
7
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7 8 7
6
5
4
3
2
1
9
8
11
10
14
13
12
9 10 11 12 13 14 1 14
13
2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 1
9
14
13
12
11
10
9
8
7
6
5
4
3
2
1
2
10
3
11
4
12
5
13
6
14
7 8
4 5 6 7
14
9
8
7
6
5
4
3
2
11
10
14
1
3
11 13
13
2
10 12
12
1
9
8 9 10 11 9
8
7
6
5
4
3
2
1
11
10
14
13
12
12 13 14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 1
3
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
11
10
12
11
13
12
14
13 9
8
7
6
5
4
3
2
1
14
14 1 2 3 4 5 6 7 8 9 10 11 12
1
13
2
14
3 4 5 6 7 8 9 10 11 12 13
14.0
6
5
4
3
2
1
9
8
7
11
10
14
13
12
14 1 2 3 4 5 6 7 8 9 10 11 9
8
7
6
5
4
3
2
1
11
10
14
13
13
12
12 14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
NYLON MESH 0.3 X 0.3 m 200 Dollar/ mesh
14 13 12 11 10 9 8 7 6 5 4 14
13
12
11
10
9
8
7
6
5
4
3
2
1
3 2 1
2
1
14
13
12
11
10
9
8
7
6
5
4
3
14 13 12 11 10 9 8 7 6 5 14
13
12
11
10
9
8
7
6
5
4
3
2
1
4 3 2 1 1 2 3 4 5 6 14
13
12
11
10
9
8
7
6
5
4
3
2
1
7
9
8
7
6
5
4
3
2
1
11
10
9
14
13
12
8
20.00
10 11 12 13 14 1
1
2
2
3
3
4
4
5
5
6
6
7
7
6
5
4
3
2
1
9
8
11
10
14
13
12
9
8
7
6
5
4
3
2
1
11
10
8
14
13
8
12
7
9
9
10
10
11
11
12
12 14
13
13
12
11
10
9
8
7
6
5
4
3
2
1
13 14
14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 13 12 11 10 1
9
2 4
9
8
7
6
5
4
3
2
1
11
10
14
13
3
12
8 7 6
5
5
6
4
7
3
8
2
9
1
10 11 12 13 14 9
8
7
6
5
4
3
2
1
10
11
14
13
12
6
5
4
3
2
1
14
13
12
11
10
9
8
7
1 2 3 4 9
8
7
6
5
4
3
2
1
11
10
12
6
14
13
5 7 8 9 10 11
14
12
13
13
12
14
11 10 9
1
8
2
7
3
6
4
5
5
4
6
3
7
2
8
1
9
14
10
13
12
11
10
9
8
7
6
5
4
3
2
1
11 12 13 14 1 2 3 4 14
13
12
11
10
9
8
7
6
5
4
3
2
5
1
CATCHMENT GUTTER
6 7 8 9 10 11 12 13 14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 13 12 11 10 9 8 7 6 5 4 3 2 1
9
8
7
6
5
4
3
2
1
11
10
14
13
12
14
13
12
11
10
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
11
10
14
13
12
14
13
12
11
10
9
8
7
6
5
4
3
2
1
CATCHMENT TANK 100 l
1 2 3 4 5 6 7 8 9 10 11
1
12
2
13
3
14
4 5 6 7 8 9 10 11 12 13 14 5
4
3
2
1
14
13
12
11
10
9
8
7
6
14 13 12 11 10 9 8
14
7
13
6
12
5
11
4
10
3
9 8
2
7
1
6 5 4 3 2 14
1
13 12 11 10
1
9
2
8
3
7
4
6
5
5
6
4
7
3
8
2
9
1
10 11 12 13 14 14 13 12 11 10 9 8 14
13
12
11
10
9
8
7
6
5
4
3
2
1
7 6 5 4 3 2
9
8
7
6
5
4
3
2
1
11
10
14
13
12
1
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7 8 9 10 1
11
2
12
3
13
4
14
5 1
6
2
7
3
8
4
9
5
10
6
11
7
12
8
13
9
14
10 11 12 13 14 14 13 12 11 10 9 8 7 6 1
5
2
4
3
3
4
2
5
1
6 7 8 9 10 11 12 13 14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7
14
8
13
9
12
10
11
11
10
12
9
13 9
8
7
6
5
4
3
2
1
11
10
14
14
13
12
8 7 6 5 1
4
2
3
3
2
4
1
5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
6.98 %
14 13 12 11 10 9 8 7 6 5 4 3 2 1
1 2 3 4 5 6 7
13.96 %
8 9 10 11 12 13 14 14 13 12 11 10 1
9 8
1
7
2
6
3
5
4
4
5
3
6
2
7
1
8
2 3 4 5 6 7 8 9 10
9
11
10
12
11
13
12
14
13 14 14 13 12 11 10 14
13
12
11
10
9
8
7
6
5
4
3
2
1
9 8 7 6 5 4 3 2 1
14
9
8
7
6
5
4
3
2
1
11
10
14
13
12
13
1
12
2
11
3
10
4
9
5
8
6
7
7
6
8
5
9
4
10
3
11
2
12
1
13 14
14 13 12 11
5
6
7
6
5
4
3
2
9
8
1
5
11
4
10
3
14
2
13
1
12
10 9 8 7 6
4
7
3
8
2
9
14
13
12
11
10
9
8
7
6
5
4
3
2
1
1
10
14
13
12
11
10
9
8
7
6
5
4
3
2
1
11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 13 12 11
9
8
7
6
5
4
3
2
1
11
10
14
13
12
10 9 8 7 1
6
2
5
3
4
4
3
5
2
6
1
7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9
1
10
2
11
3
12
4
13
5
14
6 7 8 9 14
13
12
11
10
9
8
7
6
5
4
3
2
1
10 11 12 13 9
8
7
6
5
4
3
2
1
14
13
12
11
10
14
13
12
11
10
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
11
10
14
13
12
% 4.94 %
0
10
30
60
9
8
7
6
5
4
3
2
1
11
10
12
14 4
3
2
1
13
12
11
10
9
8
7
6
5
14 14
13
12
11
10
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
11
14
13
12
10
9
8
7
6
5
4
3
2
1
11
10
14
13
12
9.89
1:1000$Zoom$in
13
14 9
8
7
6
5
4
3
2
1
11
10
14
13
12
14 13 12 11 10 9 8 7 6 5 4 3 2 1
Fog catchment is an innovative way to provide more water in countries with water deficiencies. This idea was introduced by the Canadian volonteer organization Fog Quest which operates since 1987. ďżź The idea is to buy very inexpensive meshes which are made from recycled nylon from all over the world and spann it into a frame with a gutter and either spann the whole construction between trees or put it like a sign in an area known for a lot of foggy days. The fog is being caught in the mesh and the fresh water drops down the mesh to the catchment gutter which is connected with a catchment tank. Each mesh can catch around 200 liters of water on a foggy day.