SKØNHED ER CIVILISATIONENS HØJDEPUNKT!
1
2
DESIGN FOR DISASSEMBLY – TECTONIC POTENTIAL TECTONIC MOTIF, definition: ‘Actions’ of construction (e.g. 'hanging’)
’ALPHABET’ OF TECTONIC MOTIFS
HANGING HOOKING PITCHING OVERLAPPING CLAMPING SLITTING GROOVING BENDING
PLUGGING CONSOLING FLUTING STACKING SLIDING LIFTING RESTING
PROTRUDING
SPANNING SPLITTING
3
4
5
6
7
8
9
case Kvistgaard
10
11
12
13
14
15
16
WALL
SHIELDING
FACADE
FURNITURE
Experiment process: • Finding and salvaging dismantled components • Designing prototypes • Constructing prototypes at workshop • Evaluation
17
Process: Processes are mapped in flow charts with data input for LCA evaluation
LCA evaluation: Comparing repurposing with alternative scenario where new components are used.
18
LCA evaluation EXAMPLE 1 (SUCCESS): STEEL SPIRAL DUCTS REPURPOSED AS FACADE CLADDING
LCA evaluation EXAMPLE 2 (FAILURE): CONCRETE SLABS REPURPOSED AS WALL BRICKS
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
vandkunsten.com
60