commARCH - June 2017

Page 55

PROJECT

exteriors

Historic Re-Roof Is A Modern Marvel

Entire building enclosed in massive scaffold with giant tarpaulin as the existing roof was removed.

C

ompletion of the re-roofing project at the historic Christ

tions were undertaken but none contributed significantly to the his-

Church Cathedral in Vancouver, British Columbia,

toric structure’s long-term sustainability.

marked the culmination of a massive four-phase, 22-year

In 1995, a formal plan was undertaken to make the cathedral

renovation plan. The cathedral—built originally in 1894—was the first

structurally sound and to meet the area’s seismic stabilization re-

church in Vancouver and began its service to the community with

quirements. Aesthetic and acoustical upgrades, along with basic

a cedar-shake roof. Over the years, various additions and modifica-

functional improvements, were also included in the multi-phase commercialarchitecturemagazine.com

Completion of the re-roof project at the historic Christ Church Cathedral in Vancouver, British Columbia, marks the culmination of a massive four-phase, 22-year renovation plan.

JUNE 2017

COMMERCI A L A RCHI T EC T URE

55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.