o achieve global competitiveness through operational excellence in today’s demand driven environment, the TPM launch ceremony took place on 31 October 2013 at LCPL Plant Site. Over two hundred LCPL employees attended the event. The ceremony started with a recitation from the Holy Quran followed by a welcome speech by Mr. Qamar Alam. In his address Mr. Qamar Alam remarked that TPM does not provide a quick or easy solutions. It usually requires changes in employee’s attitude and values which take time. He further added that TPM was a company-wide approach

towards achieving a standard of performance in manufacturing, in terms of the overall effectiveness of equipment, machines and processes, which is truly world class. Mr. Asif Saad launched TPM by unveiling the TPM logo, after which the video screens on the main stage started displaying an introductory TPM video showing basics of TPM and TPM implementation protocol at LCPL. The video was followed by two more motivational videos on team work. There was also a video message by Mr. Kim, Chairman Lotte Chemicals. Recalling the remarkable success after

TPM implementation at Lotte Chemical’s Ulsan Plant, he expressed his hope that TPM implementation at LCPL will also be a great success in terms of plant productivity, its availability, its efficiencies and skill development of all the employees. Mr. Kim expressed his appreciation for LCPL employees for their past performances and possessing a willingness to accept new challenges. He wished LCPL a great success and assured his full cooperation for achieving accelerated, focused, and sustainable results by TPM implementation. At the TPM launch ceremony, Mr. Asif Saad also addressed the employees continued on next page

Cover story

OVERHAULs

CSR

TPM Launch Ceremony

01

HSES 11 Million Man-hours without LTC

04

Safety & Security of Sealed Radioactive Sources

23

Third Fire & Safety Award

10

05

Achievement of Zero Injury Target

06

Keeping Pace With Technology

09

03

In this Issue

World Environment Day

20

Donation for Baluchistan Earthquake

21

Free Eye Camp at Ghaghar Pattak

22

RECRUITMENT & Training Initiatives

VISIT Ambassador of Korea Visits LCPL

OH 2013 - Achievements and Phenomenal Performance

Young Engineer’s Forum

CTA Dryer Replacement and Internal Repairs

12

Commissioning of New UPS CR

13

Increased Self-Reliance for Piping Analysis

14

26

ENGAGEMENT Tape Ball Night Cricket Tournament

03

City Office First Anniversary

18

Musical Evening 2013

17


Annual 2013 – Editorial

2

Editorial

r e s u lt s

T

Year End Results

he much awaited newsletter for 2013 is finally here. The year where our achievements speak for themselves is a testament of the hard work and effort by all employees. The timely completion of overhaul 2013 with zero injury earlier in the year was just one of the highlights of this year. The Introduction of TPM (Total Productive Management) is another step towards achieving excellence through employee engagement. The gradual implementation of this methodology will no doubt bring the best out of us all. Our efforts were also recognized by other independent bodies as our Company was awarded with fire & safety award, CSR Business Excellence award, Environmental Excellence Award and best learning organization award. These awards clearly outline the high standard we maintain at our Company. Our CSR efforts continued throughout the year. Following our support to victims of natural disasters that had hit Pakistan in earlier years, Our Company did not shy away from supporting fellow countrymen when earth quake hit the province of Baluchistan in 2013. Our support for Family educational services (FESF), Karachi United Federation, WWF and AKU continued as per norm. While 2013 had been a challenging year, we did celebrate our hard work with Musical evening and other social activities at the plant site which provided us an opportunity to spend some leisure time with our fellow employees. Lastly, on behalf of the editorial team, I apologize for the delayed publication of this newsletter. However with your continued support, we will be publishing the newsletter every quarter from this year again. Having said this, I would once again like to thank you for your support and encouragement shown towards “Life @ Lotte Chemical Pakistan” and hope you continue sharing your success and achievement with us. – Zain Talpur

a

Editor Zain Talpur

(Amounts in Rs ‘000)

by Faisal Abid

Lotte Chemical Pakistan Ltd 2013

2012

Consolidated 2013

(Re-stated) Revenue

2012 (Re-stated)

57,069,684

52,823,257

57,069,684

52,823,257

(57,780,354)

(53,035,075)

(56,920,556)

(52,614,280)

Gross (loss) / profit

(710,670)

(211,818)

149,128

208,977

Distribution and selling expenses

(120,104)

(132,191)

(120,104)

(132,191)

Administration expenses

(329,043)

(303,595)

(331,932)

(303,595)

Other expenses

(31,567)

(22,346)

(93,816)

(46,500)

Other income

970,053

573,985

180,340

361,856

Finance costs

(126,835)

(146,054)

(83,664)

(146,054)

Loss before taxation

(348,166)

(242,019)

(300,048)

(57,507)

Taxation

(197,936)

61,095

(197,936)

61,095

(Loss) / profit after taxation

(546,102)

(180,924)

(497,984)

3,588

(0.36)

(0.12)

(0.33)

0.0024

Cost of sales

(Loss) / Earnings per share - basic and diluted (Rupees)

C OVER S TORY

TPM Launch Ceremony continued from page 1 by emphasizing that the inception of TPM is destined to actualize collaboration between different functions by an amalgamation of team-working, continuous improvement, and good working practices. Mr. Asif Saad insisted that TPM is initiated as a “top down” exercise, but only implement-

Contributors Arif Raza Aali Muazzam Abdul Shaafi Shaikh Ahmed A. Abedi Asad Hayat Asadullah Chughtai Ayesha Moin Faisal Abid Fahad Hassan Faiza Owais Farhad Jamil Hassan Ayaz Muhammad Sajid Khan

ed successfully via “bottom-up” participation. In this direction, he highlighted that TPM implementation can considerably contribute towards improvement in organizational behavior in the manufacturing business transcending world class competitiveness.

Muhammad Waqas Raja Waheedullah Khan Rizwan Ahmed Sajid Shafique Shuaib Iqbal Sumayya Waheed Syed Hameed Hussain Shah Taha Iqbal Talha Mustafa Tariq Mehdi Waqas Sheryar Zahid Shah Zia Ur Rehman

a

Design & Layout iMedia Life @ Lotte is compiled and edited by staff at Lotte PPTA. If you would like to contribute to the articles and events covered here, please contact the editorial board. www.lotte-ppta.com


VI S IT S

His Excellency, Ambassador of the Republic of Korea visits LCPL Site H

is Excellency Mr. Jong Hwan Song, PhD, Ambassador of The Republic of South Korea, visited the Lotte Chemical Pakistan Ltd plant site on 27 September 2013. He was accompanied by Mr. Lee Chang-hee, Consul General, Embassy of Korea,

and Karachi. The honorable guests were greeted at site by Mr. Asif Saad and his management team. After a detailed presentation on plant operations the guests were taken on a plant tour. At the culmination of the tour, the

a

3

Annual 2013 – visits

by Asad Ullah Chughtai

honorable guest also planted a sapling of a SAPOTA (Chikoo) tree to mark the visit. Mr. Jong Hwan Song was highly impressed by the professional efficacy of the LCPL management team and the HSE / housekeeping standards being followed and maintained.

Engagement

Tape Ball Night Cricket Tournament O

n 30 August 2013 a friendly Night Cricket Tournament was organized by the Lotte Sports and Recreation Committee at Little Master Hanif Muhammad Cricket ground, Bahadurabad. All the participants from different departments were grouped into three teams, Lotte Lions, Lotte Eagles & Lotte Dolphins. Each team played two matches of eight overs and best two team played the final. After playing the two matches, each team won one match and lost one match. The final was played by Lotte Eagles and Lotte

By Zahid Shah

Dolphin on the basis of run rate. Lotte Dolphin claimed the trophy after defeating

Lotte Eagles in the final. Prizes were distributed by Syed continued on page 16


HSES

LCPL Employees Achieve 11 Million Man-hours Without Lost Time Case L

Annual 2013 – overhauls & INITIATIVEs

4

otte Chemical Pakistan achieved the milestone of 11 Million Man-hours for its employees, without any Lost Time Case (LTC) on August 06, 2013. Mr.. Asif Saad (Chief Executive) congratulated the LCPL team & appreciated the efforts of all employees in achieving this world-class standard due to their continued commitment, positive attitude, adherence to safety rules and responsible approach towards HSE. Mr.. Qamar H Manzoor (Director Manufacturing) appreciated the exceptional safety record set by LCPL team with continuous efforts to this cause as

this could not have been possible without great team work and responsibility shown by all employees. Mr.. Harris stressed on continued efforts in making LCPL a safe working place for employees, contractors and visitors and raise HSE performance to the next level of excellence. The continued success of HSE Management system and its implementation is an indication of LCPL team’s dedication which ardently work at levels ensuring the safe system of work performance. Strong focus of the Management on Health, Safety and Environment de-

fines our standards and success criteria. This remarkable achievement is a confirmation of the effectiveness of our HSE Management systems (OSHAS 18001 and ISO 14001) and our team’s commitment By Shuaib towards safety. Iqbal As a reward for adherence towards safe work practices, LCPL employees were awarded shopping coupons. LCPL Management is proud of this achievement and hope to build on this excellent performance.

a

overhauls

Administration role in Plant Overhaul 2013

A

munication, meals, refreshment, camp residents, taking care of arrival departure and stay of overseas vendors. Administration’s representatives provided their support round the clock. by Hameed A detailed sumHussain Shah mary is appended as below.

s planned, the plant was shut down as planned from 24 January 2013 to 14 February 2013 for extensive repairs and maintenance of all process plant equipments Lotte Chemical Pakistan’s Administration department played a vital role during the shutdown which involved arrangement of transport, com-

Transport provided

Meals served

Tea served

Breakfast served

Refreshment served

Expats entertained

Stayed in Camp

7,370

7,701

57,477

4,292

17,633

24

1,896

a

Paraxylene Storage Tank Repairs – A Hazard Averted

P

araxylene is the principal raw material of the PTA manufacturing process and is stored in an aboveground storage tank at plant site. Paraxylene is an extremely combustible liquid and adequate containment is essential for plant safety. A serious safety threat was posed when planned inspection revealed flaws which had developed on the storage tank’s roof due to localized corrosion. The inspection team developed a comprehensive Inspection & Repair plan which was vetted by a certified authority. continued on page 7

by Abdul Shaafi Shaikh


OVER H AUL S

Achievements / Phenomenal Performance OH-2013 – In view of Production Department

ordering of misc. items (Job isolation tags, Job identification tags, decontamination tags, safety equipment tags, hoses, chains, locks, jigs & fixtures) ,shutdown /start-up bar charts, major jobs / equipments handover timelines, dispensations, shift rotas, decontamination bay location & its operation, training of new PTW / Hot permit issuers . Awareness sessions were arranged at Plant site for shift teams for refresher of PTW system and last overhaul safety statistics .Production department overhaul coordinator and

Generation Plant. Total numbers of vessel entries at OX, Pure and Utilities Plants were 34, 14 and 08 respectively. Plant was de-classified after 44 hours of shutdown that was another milestone, previously 48 hours were required for de-classification. In this overhaul, a new concept of ‘Area Block’ as an initiative was introduced that helped in reducing a number of slip plates for vessel entries, resulting in reduced cost, manpower resource and early handover of equipments. OX and Pure Plants were decon-

taminated in a skillful and professional manner; no surprises or upsets have been seen during jobs and equipments handover. Almost every vessel was found to be neat, clean and free of chemical smell and leftover powder lumps. Major jobs at OX Plant included TA Dryer repair, PAC rotor replacement / overhauling, PAC electronic Protonic auto control system changeover with Siemens SCAUT system, inspection / deblocking of vent header. While at Pure, PTA Dryer inspection, reactor catalyst replacement activity, Preheaters HP jetting. Similarly at Utilities, Paraxylene tank roof and internal repair, cooling tower basin cleaning, Boilers A/B inspection. Another major job included the migration project of DCS system. New DCS commissioned in this overhaul 2013 and all logistics of the plant was verified by team. By using the new DCS, the Plant was started safely in time without delays. All activities related with safe and efficient shutdown / start-up were carried out as per bar charts. No mis-operation and no equipment failure have been observed during these activities. It was a landmark achievement attributed to great teamwork and hard work.

a

Innovation, Professionalism and Teamwork

D

flow Acetic Acid cooling). uring overhaul 2013 it was found that Dehydration (DH) Subsequent to the initiative by technical team, a task Column bottom cooler tubes were leaking and cooler team was formed to install this was not useable anymore. Plant canretrofit exchanger on new locanot be operated without cooling DH tion with new pipeline. This job column bottom stream and hence it was professionally executed was critical to have some solution. at very fast pace by project & Since no spare cooler or tube bundle workshop team enabling was available and manufacturing of plant start up with this exnew cooler and transportation on changer within overhaul site was almost 6 month task , it was by Waqas time line. therefore a serious threat of proSheryar Excellent initiative, long plant outage. professional and team To address the issue a used gas work skills of technical/ / steam heater was identified and project /workshop team made through design checks on Aspen it possible to avert a prolonged software declared suitable after plant outage. minor modifications for this criti- Team: Waqas Sheryar & Sarang Abdullah (Technical), cal duty (high temperature and high Saeed Ahmed (Projects), Saeed (Workshop)

a

5

Annual 2013 –overhauls & INITIATIVEs

T

senior managers conducted the seshe plant was shutdown on 23 Jansion. uary and started after 21 days on In this overhaul, 1401 total jobs 14 February, (including LWRs / EWRs and Co-Gen.) The Production department’s were attended which is a record numachievements related to overhaul ber of jobs executed. Out of total jobs, planning, execution and completion 728 jobs were executed by mainteof tasks, these were appreciable and nance, 364 jobs by Instruments, 289 noteworthy. jobs by Electrical, 5 Mod. Jobs by ProjThe targets of overhaul (safe and ect and 15 jobs by misc. disciplines. zero injury, completion within preThe 631 jobs were attended on defined time period and within preOxidation (Mech. = 434, Instr. = 159, estimated cost) were successfully Elect. = 35, Project = 3 ), similarly 333 achieved. jobs on Purification (Mech. = 205, InGood planning includes nominastr. = 86, Elect. = 37, Project = 2, Misc. tions of area to shift teams, organi= 3), 309 jobs on Utilities Plant zation chart, development of job (Mech. = 64, Instr. =50, Elect. = list, isolation plans, safe job 183, Misc.= 15) and 128 jobs handover / takeover proceby Muhammad (Mech. = 25, Instr. =69, Elect.= dures, major job reviews, slip Sajid Khan 34) were attended at the Coplate registers, rescue plans,


overhauls

Achievement of Zero Injury Target in Overhaul-2013 L

Annual 2013 – overhauls & INITIATIVEs

6

otte Chemical Pakistan achieved Zero Injury Target during Overhaul 2013. This achievement is the result of continued focus and commitment to all safety aspects by LCPL staff, SUSA auditors, HSE & Technical Training Team, Area Managers and contractor’s safety teams. The HSE & Technical Training team Lead by Mr.. Shabbir K Hussain contributed their best to achieve the milestone. The remarkable safety performance resulted in achieving 0.503 million safe working man-hours while executing well over 1400 jobs. The site safety induction was arranged by the HSE& Technical Training department. 10 special sessions were also arranged at the Descon Camp and by Shuaib at TTC to facilitate the Overhaul team. Emergency Iqbal Response, Process Support Services & High Pressure water jetting supervision was provided through Emergency Response Team (ERT). Learning Events & Areas of Improvements were highlighted through daily safety publications. The SUSA Audit program was also implemented. 24 SUSA auditors involved in auditing of different plant areas on daily basis and highlighted the areas of improvements accordingly. Best SUSA auditors evaluation was carried out based on quality audits and prizes were awarded to the following winners.

»» Rehan Siraj, Plant Manager- Utilities »» Sohail Abbas, Plant Manager- Purification »» Muhammad Zain Siddique, AM Maintenance- Utilities

a

Utilities Plant OH-2013 Achievements Extraordinary Performance

Purification Plant – OH-2013 Achievements Phenomenal Performance

A

Z

s a part of preventive maintenance of the plant, a premeditated overhaul was executed in January 2013. Dedicated teamwork along with complete safety compliance from all sections of manufacturing function was evident as every major maintenance job was addressed and executed well within time; consequently escalating overall efficiency of the plant. All team members, employees and contractors performed respective tasks with a professional attitude in attaining the foremost objective of ZERO injury. by Sajid Shafique Prior to handing over equipments and vessels, complete de-contamination and isolation followed standard operating procedures to avoid any hazard. Paraxylene tank inspection and overhauling was carried out productively and essential repairs were carried out well within time. Though tough, but in action with engineering, cooling tower sump was methodically cleaned; also damaged meshes were refurbished and reinstalled. Boiler’s internals and continued on the next page

ero injury during overhaul 2013 denotes a commitment towards HSE. To keep the reliability of plant, a major planned overhaul 2013 was executed during which all major maintenance jobs were addressed and all proposed modifications were implemented well within time; thus increasing overall efficiency of the plant. The whole team conducted their duties in a safe and professional manner and achieved their zero injury goal. All vessels were by Asad Hayat completely de-contaminated prior to handover of the equipment and many lumps were removed from the vessel with solid team effort. Catalyst replacement activity completed well before time. New DCS commissioned in this overhaul 2013 and all logics of purification plant verified.

a


OVER H AUL S

OVERHAUL 2013 – A Success Story E

successfully executing to date highest pack of all planned inspection activities ever quantum of work for an Overhaul is to be carried out during Overhaul and a commendable effort. Extensive plan- taking inspection services from a single contractor to improve management ning went into successful execution and operations. Rigorous prepaof Overhaul 2013 with initiaratory area visits were carried tives such as a development of out with area teams to by Abdul Shaafi Shaikh clearly understand scope of work. In order to carry out inspection activities in a seamless manner a system of control sheets was reintroduced and for the first time all inspection activities were stewarded through it. Several Major jobs were also supported by the Inspections during this Overhaul, such as CTA Dryer and Paraxylene storage tank repairs. Inspection of CRU and Co-Gen plant equipment was also carried out for the first time to gather base line data.

a

spection team new in his role, safely and

a detailed pictorial work-

Utilities Plant - OH-2013 Achievements Extraordinary Performance

Paraxylene Storage Tank Repairs – A Hazard Averted

continued from the previous page

continued from page 4

furnace were completely inspected with support of technical and NALCO expert. Following commissioning of new DCS, all logics were carefully verified and tested. Zero injury in execution of all jobs regardless major or minor, dictates self commitment of all personnel of Lotte chemical Pakistan toward HSE. As evident from overhaul 2013, LCPL HSE policies have once again proved to be helpful.

The tank was inspected internally and externally using advanced nondestructive testing techniques, such as a remote-controlled UTCrawler to assess the health of the tank’s shell, and Magnetic Flux Leakage and Vacuum Box Testing to inspect the bottom. An improved paint system was also identified through an International leading

a

Manufacturer in corrosion protection coatings and successfully applied to enhance the integrity of this tank in the future. The teamwork by the Inspection, Maintenance & Workshop teams is a true testament of excellent inter-departmental co-ordination in Manufacturing team.

a

7

Annual 2013 – overhauls & INITIATIVEs

ach Overhaul brings its own set of challenges and it is by successful execution of all objectives that a team shows its true potential. Overhaul 2013 was no different as it had its own set of challenges. With each member of In-


i n i t i at i v e s

PAC Control Modernization Project

D

Annual 2013 – overhauls & INITIATIVEs

8

uring the overhaul of 2013, PAC the new panel to its location with a tight control modernization project was squeeze thru an opening created in the implemented during which old Siemens wall of the PAC local control room. Pre commissioning work was comcontrol panel with Protonic controller and other hardware was replaced with pleted in the agreed time frame during new Siemens SCAUT panel that was which 56 multi core cables connected to equipped with Siemens PLC S7-400H. the old panel were marked and removed SCAUT (Siemens Compressor Automa- and after installing the new SCAUT pantion) which is the latest of the Siemens el all cables were re-connected as per new wiring diagram and 145 input and compressor control system. Project was a challenge to the Lotte output loops were tested. All of these Instrumentation team as the estimated activities were done with Lotte own time of completion suggested by Sie- resource before the arrival of Siemens mens was around 30 days, but after re- engineer at site. Further activities were viewing our in house resources and their done in supervision of Siemens engineer during which all Controller actions capabilities it was decided to take were tested and PAC protection ownership of execution of bulk systems comprising of Bentley of pre commissioning work by Hassan Ayaz

before the arrival of Siemens engineer, thus with this proposal Siemens agreed to reduce the time of commissioning to 17 days. The challenge began with the removal of all fields wiring from the old panel and shifting it out and bringing in

Nevada vibration system, over speed protection system and other trip initiators were tested before handing over the machine to the operational team for normal operation. The new SCAUT control system has an added advantage over the old Pro-

We do it with Precision

D

1-401 is oxidation 1st crystallizer where HP solvent is sprayed in its vapor line to knock down any escaping solids. This solvent is sprayed in the vapor line through an isolation valve which is connected with upstream header directly. On 12 April 2013, acetic acid leakage started from this valve ‘s body which was timely picked up by area operator during his routine field visit. As there was no isolation available on upstream and downstream high pressure circuits, plant shut down was required to replace the valve. Uncontrolled leakage from this valve could also have lead to a toxic release at plant. After detailed

analysis and hazards review, a solution came out which resulted in replacement of this valve without shutting down the plant. This not only saved production loss but a toxic Reby Aali lease condiMauzzam tion was also averted. Well done Production team !

a

tonic control system in many ways as it is more user friendly for the operational team, as well trouble shooting of its hardware and control system has also become simpler. Now there is facility to views current trends of different controllers and viewing and logging alarms to perform corrective actions, while for the Instrumentation maintenance team there are Soft by-pass options for some of the trip initiators useful for online maintenance. The SCAUT system has the option to connect remotely to the on line diagnostic centre in Siemens Germany via DSL phone line who can analyse our system and provide help to trouble shoot any control and hardware related issue. The SCAUT system has its benefits and will prove to deliver a more reliable PAC operation both in terms of operation and maintenance. Good support was provide by the workshop team for rigging jobs and civil work, IT department and production team simultaneously good efforts and workmanship was put in by Mohammed Khaliq, Mashood Adil, Hassan Ayaz, Syed Mahmood Ali and well supported by Hassan Shahid, Amir Azam and Irfan Ahmed.

a


INITIATIVE S

Keeping Pace with Technology for Better Process Control D

a solution which would provide the most feasible way of smooth hardware and software transformation, and that too, in minimum plant outage. Hence, after much techno-commercial evaluation, DeltaV from Emerson Process Management was finalized. Engineering of the system, followed by extensive Factory Acceptance Test by LCPL Instrumentation and Production teams was completed at Emerson Singapore. The commissioning scope of the

large scale and short time span is indeed a praiseworthy achievement. The LCPL Instrumentation team performed extraordinarily well in the leadership of Amir Azam and Irfan Ahmed. In the forefront of various installation & commissioning activities was Asif Farooqi, supported by a diligent team of technicians and apprentices. Umair Aleem, Hassaan Ayaz and Abdullah Bin Azhar also provided support and helped rectify post-commissioning issues. Valuable inputs were shared by all Production team members at one point or the other. The migraby Hassan tion to DeltaV Ayaz DCS has given us a major leap ahead in the ever advancing automation technologies of today. In addition to the core advantages like availability of spares and technical support from vendor, we are also benefitting from the perks that come along with the latest architecture of DCS in terms of software and hardware. Troubleshooting instrument loops and online tracing of control logics have become more intuitive. Moreover, advanced features of the new 3,000 instrument loops after being DCS include auto tuning of PID loops, transferred to new DCS cabinets. The remote HART calibration of transmitInstrument team worked in coordina- ters, user friendly trends on operator tion with vendor team to achieve this workstations, system-generated emails milestone in record time. Issues were to concerned managers and web-based rectified on the spot and after critical pages for worldwide viewing of critical trip testing and verification of interlocks data. After the completion of DCS miin coordination with Production team, gration project, OEM is providing reguthe PTA plant was started up on new lar technical support on issues that arise DCS, marking the completion of Over- as the system matures. Hopefully, these minor bumps will be straightened out haul 2013. Technology transition on such a soon. project which required down time was planned in Overhaul 2013. Pre-overhaul preparations included installation of DCS cabinets in Rack Room, Core Outstation & Non-core Outstation. These cabinets house DCS controllers, I/O cards, servers, network switches and related hardware. Fiber optic cable was laid for interconnection of DCS equipment at various locations. During the overhaul, configuration of new operator workstations and servers was carried out along with OEM engineers. The most tedious job was to test and commission around

a

9

Annual 2013 – overhauls & INITIATIVEs

istributed Control System (DCS) of the plant plays the most critical role in controlling the manufacturing process. It serves as the bridge between plant operations team and the equipment to be controlled. During the recent overhaul of plant, DCS has undergone a major upgrade from Emerson PROVOX to Emerson DeltaV 11.3 system. This migration project mainly focused on addressing the issue of technology obsolescence which was directly affecting the reliability of the system. The initial and most crucial challenge in this project was to opt for such


i n i t i at i v e s

Innovation Saves the Day H

urdles come, crossed and forgotten but the spirit and strategies used are always remembered. LP steam is supplied to oxidation CTA drier through two flexible hoses. On 19 April 2013, steam leakage from one of the flexibles were reported. This situation posed a threat of catastrophic failure of the flexible which

Annual 2013 – overhauls & INITIATIVEs

10

could have initiated a plant shut and safe algorithm for isolation and down for replacement job. The chal- execution of the job. The team met the challenge and saved a sure lenge was to isolate the steam, production loss. stop the drier for 35 – 40 mins It is evident that stratewithout plant shut down. by Aali gy, decision, teamwork and Production team along Mauzzam excellence can altogether with their engineering colleagues worked out the problem and planned a smart

become miraculous

a

Distribution Transformers: A Retrofit Challenge

T

ransformers play a vital role in the overall electrical network at plant. Stepping down voltage levels to supply power to industrial drives and maintaining that level are two most significant roles. Understandably, these units also require appropriate maintenance regimes which include periodic testing, general maintenance and refurbishment if need be. Plant overhauls and short shut downs give our electrical team the window to work on these transformers which are otherwise in service throughout the year. This past overhaul the electrical team, consisting of Talha Mustafa, Kamran Khan, Niaz Ahmed, Kashif Nadeem and HFC technicians, worked on maintenance and replacement of transformers at plant. Some transformers were sent to Siemens for refurbishment while some others were replaced with already refurbished spare transformers. The cor-

respondence with Siemens transformers refurbishment team was also done very well with lead times of half of what it normally is. Electrical testing of all 22 distribution transformers was also carried out by Siemens engineers with necessary support provided by our team. The activity was spread throughout the overhaul. It was planned very effectively by the electrical planning team and followed even better by the execution team with no lags encountered in the electrical outage plan. A few unplanned issues were however encountered during the replacement job but were handled adeptly by the Electrical team. On such problem that was frequently encountered was the mechanical interchangeability of different transformers. The positioning of holes, gland plates, busbars and sizing of terminal boxes were different and it was a challenge to make adjustments and modifications in a limited frame of time.

PAC Motor – Level 2 Inspection

P

of PAC motor, which is rocess Air Comdue after every 20,000 pressor Motor is By Sumayya equivalent run hours, one of the most critiWaheed during the overhaul cal motors installed 2013. The presently inat the plant. To ensure stalled motor was commishealthy and reliable operation of this motor, a proper sioned in OH-and this inspecpreventive and inspection re- tion was critical as it was the gime is prescribed by the ven- first time the new PAC motor dor. These PMs require special was inspected. Moreover, the tools and test equipments and outage of PAC motor is not posare performed by trained per- sible during normal plant operation, implying that missing sonnel sent by the OEM. Field Service Engineer from this opportunity of inspection ABB Switzerland, Mr. Matth- would have deferred the job till ias Ebner along with E&I staff the next overhaul. carried out Level 2 inspection

a

By Talha Mustafa

a

HSES

Achievement of Third Fire & Safety Award

L

CPL received a third Fire & Safety ExcelBy Shuaib lence Award from the National Forum for Iqbal Environment & Health (NFEH) & Fire Protection Agency Pakistan (FPAP) at Marriot Hotel Karachi on December 17, 2013. Dr. Sikander Mandhro, (Minister Environment, Govt. of Sindh) was the Chief Guest while Mr.. Sajjad Saleem Hotiana (Chief Secretary Sindh) & Mr.. Tariq Moeen (Secretary General, FPAP) were the guests of honor. Mr.. Shabbir K. Hussain (HSE & Business Development Manager) received the award on behalf of LCPL. The Fire Safety Award is an acknowledgement of the implementation of excellent control measures & maintenance of the fire safety management system to handle major emergencies like Fire & Toxic release at LCPL.

a


INITIATIVE S

Taking the Initiative!

P

L

LANT OUTAGE! a scary thought when targeting high production level’s to meet business demands. A scenario developed on one of the blind flange installed at Hp steam circuit. High pressure steam at 309 ºC and 98–bar pressure was observed to be gushing out of the flange. The leakage had an increasing trend and the rate was increasing with every passing hour, if not contained it had the potential to force steam isolation and consequently lead to plant shut down. By Fahad Hassan Accessing the hazards involved and the criticality of job; plan was devised. The plan involved injection of a specialized sealing compound having temperature hardening properties directly into the flange through the use of state of the art technology. A specialized clamp was fabricated in-house to facilitate injection and to serve as a holding medium for injection compound. The plan was successfully implemented and the dedication and commitment of the team resulted in sealing the joint completely.

a

otte Chemical Pakistan has always believed that a plant working at maximum efficiency is the key to successful business. This is why millions of rupees are spent every year to not only maintain equipment but to also improve it in any way possible. However, it is also possible to solve issues with just determination and initiative. The mechanical maintenance team of the purification plant, led by Asim-urRehman and assisted by Nadeem Mehdi, Kamran Khursheed and their team, were faced with a similar problem not long ago. The paddle thrower of the Container Back Fill Unit had been having issues with leakage of burnt packing residue into the product. The contaminated product was not at par with the quality expected from Lotte Chemical Pakistan. As the current paddle thrower was now obsolete, spare parts or service were no longer readily available. Modified paddle throwers however, were available in good condition. The quoted price for one of these paddle throwers was Rs. 18 million. However the maintenance team was insistent that a solution could be found that would not only save the company a lot of money but also leave the company more self reliant. Using the plans of the modified paddle throwers, an in-house solution was found in form of Brass Labyrinth Seals, which replaced half of By Taha Iqbal the packing, stopping the leakage. The paddle thrower has been operating problem free since it was commissioned. Such initiatives are what the engineering department must continue strive for.

a

HSES

INITIATIVEs

First Surveillance Audit of ISO 14001 & OHSAS 18001 Certification

Site Development Program – Green Area Near Workshop

I

t is announced with great pleasure that LCPL was recommended for continued registration to OHSAS 18001 and ISO 14001 after a successful Surveillance Audit on 11-13 March 2013. No nonconformance was reported in any of LCPL systems. The Audit was carried out by an external certification body, United Registrar of System (URS).

a

by Tariq Mehdi

L

CPL management took an initiative for Site Development and implementation of the Go Green concept in year 2011. In continuation of this program, a

green area has been developed near Engineering Workshop with various trees and flowers. Moreover, a pond and a cage was also developed for fishes and birds.

a

11

Annual 2013 – overhauls & INITIATIVEs

Leakage through Steam Header


INITIATIVE S

CTA Dryer Tyre Replacement & Internal Repairs

R

Annual 2013 – overhauls & INITIATIVEs

12

ecent plant overhaul was packed with new challenges and the opportunities to prove team’s worth, with CTA dryer tyre replacement and internal repairs works on top of the list. Tyre replacement, an activity which had never been dealt by the LCPL team, was of critical nature as the reliability of dryer and productivity of plant depended on it. Considering the challenge a dedicated team was commissioned to plan and execute this activity with primary focus on safe and successful completion of the job. Numerous preprational activities were undertaken including development of dummy rollers to facilitate internal repairs and dryer rotation without its tyre, which happens to be main load bearing. These activities involved prolong crane operation with simultaneous repair works of welding both internal and on dryer shell. The entire activity needed close coordination between numerous interfaces to ensure smooth maintenance without delay on any front. Through dedicated team effort, entire job including internal repairs and tyre replacement was completed within the defined time line and without any compromise on quality.

By Fahad Hassan

a

Reverse Engineering R

everse engineering has become a very useful for engineers. This was why the purification plant maintenance team decided to develop an alternate source for Sundyne pump spare parts, using a credible supplier in South Korea. As the equipment in question was critical to the operation of the plant it was necessary that a comprehensive technical evaluation be carried out to ensure that there was no compromise in quality. The company selected for this task was Samjeong Turbine. Samjeong is a highly reputed company with a rich history in reverse engineering. The inducer, impeller, high and low speed shafts of gearbox and journal bearings of idler and driven shafts were sent to South Korea so that Samjeong could start the reverse engineering process.. Any part to be reverse engineered was inspected By Fahad closely; drawings were produced, verified and corHassan rected if necessary. All the materials used in the production of these parts were investigated and verified. The Purchase department also played an extremely important part during the import and export phases of the process. When produced, the quoted price for the reverse engineered parts was a fraction of the price of that of the OEM parts, resulting in almost 80% savings. The ordered parts have since been used in the refurbishment of a Sundyne pump which has been operating at maximum efficiency. This has prompted further dealings with Samjeong Turbine. As the prices for original spare parts go up, it has become necessary to turn to reverse engineering. The Engineering and Commercial teams should be credited for this remarkable cost saving initiative.

a

Team Work – a Success Story

C

hallenging the status quo should be the mean for any organization that wants to excel. An organization must not underestimate the power of a team under difficult circumstances; it’s the combined effort of teams that generates the results beyond one’s imagination. Challenging a decade-long practice and providing a better alternative with additional savings, operational, maintenance, effluent handling and treatment ease would not have been possible without the collective relentless efforts put in by the team from the Operations & Technical departments. In order to reduce variable cost, a combined initiative was taken by techBy Waqas nical and operations team to replace Shehryar the candles washing media from Acetic Acid to Hot Flush Water for PTA Mother Liquor Filter (M1-1603). The change is expected to reduce the cost associated with maintenance, filter elements changeover, inspection, and will also help in increasing equipment availability. Improvements were made possible by ulitilizing the provision available in design rather than going for huge capital investments. The initiative was first employed as a controlled trial. Successful implementation of the trial since June2013 is an exemplary achievement as no other PTA plant is utilizing this methodology.

a


INITIATIVE S

Commissioning of new UPS CR Adapting to new Technology to Enhance Reliability the prompt and timely completion of the extensive works. This UPS is one of its kinds and none of the UPSs installed at the plant are similar to it in operation and performance. This system employees the philosophy of redundancy & parallel operation; and thus ensures uninterrupted operation of critical equipments. A small training session for the team was also carried out so that the electrical team becomes accus-

tomed to this new technology. With the commissioning of this new UPS the idea of adapting to new technology to guarantee reliability of critical equipments has been practically implemented in the system by electrical section.

a

Against All Odds

P

This new development had the potential of seriously hamrocess Air Compressor (C1-113) and Expander (C1-155) pering overhaul time line as all the pre-overhaul are critical equipments for operation of plant and preparations were compromised. require major maintenance due to continuous The maintenance team however, rose operation. During recent plant overhaul, up the challenge and devised an alterthe team was faced with a surprising nate execution plan with all critisituation when crack was observed cal resources deputed round the on the rear shroud of 5th stage imclock along with a vigilant monipeller. toring team to ensure quick deciMaintenance team while asBy Fahad Hassan sion making. Entire machine was sessing the situation came to the dismantled and assembled again conclusion that since PAC is dywithin the defined time line while namically balance machine thereensuring quality of workmanship fore only 5th stage pinion assembly and yet again proving that this team cannot be replaced or else there will can achieve great height. be a persistent threat of machine failure during routine plant operations.

a

13

Annual 2013 – overhauls & INITIATIVEs

U

PS CR is one of the most critical struction of temporary walls, relocation electrical equipments installed of lighting JBs and scaffoldings. The commissioning of this new UPS at the plant. It provides uninterrupted power to the plant’s Distributed Control was carried out during Overhaul – 2013 System (DCS), Emergency Shutdown in the presence of Gutor Field Service (ESD) System, MIS and core plant field Engineer, Mr. Richard Borja. Some of the instrumentation. The DCS provides con- jobs, including phase wise shifting of the trol of plant parameters to the board- new UPS to the site and cable laying etc, men for smooth plant operation; while were carried out prior to the overhaul to ESD is installed to ensure safe plant save up on time during the overhaul. The shutdown in case of emergency. Thus whole job was executed with remarkthe criticality of UPS CR cannot be undermined and it’s ever reliable operation has to be ensured. The already installed UPS was old and moving towards obsolescence; also it had only single uninterrupted power source. Electrical team, adapting to the new technology, initiated the procurement of a new UPS with redundant supplies, and modified design. The new UPS employees active load sharing, which means two independent UPSs share load equally, ensuring both smooth plant operation and safe plant shutdown in case By Sumayya of emergency.Since this type of Waheed UPS was being installed for the first time at Lotte Chemical plant, the work was comprehensively planned well before the commissioning. To cater to the space constraint in the UPS room, a modification was carried able pace and efficiency due to excellent out by electrical team on the new UPS. planning and teamwork. The efforts of A 400 mm cubical was removed and its Mr. Muhamad Waqas, Ms Sumayyah internal components were relocated. Waheed and Mr. Imranullah Khan and This modification, an initiative taken by his team, especially Muhammad AfElectrical team, has prevented break- zal, during the planning and execution ing of walls of OCRB for its rigging, con- phases are commendable in ensuring


INITIATIVE S

Increased Self-reliance for Piping Analysis

D

esign conformance of Industrial piping systems and their analysis requires stringent compliance to International standards and codes. Piping flexibility analysis software is an essential design tool in this respect. CAESAR II is a state of the art piping flexibility analysis software being used by the LCPL

Design team in ensuring code compliance. The available version, i.e. CAESAR II 4.0, was procured in 2003, but numerous updations in codes & standards had rendered most of its tools and features inapplicable. As a result of excellent team work between the Inspections, IT & Com-

Annual 2013 – overhauls & INITIATIVEs

14

mercial teams, an upgradation initiative of available software to latest version was undertaken to ensure all current code compliance cases are met during analysis. Moreover this was done at half the price of a new one through identification and application of a license up gradation plan by the LCPL Inspection and Registry team. The new By Abdul Shaafi Shaikh version 6.10 of CAESAR II has cutting-edge graphics rendering capabilities, advanced analysis options, and is compliant with the latest engineering codes and standards. This initiative has further enforced LPCL team’s design capabilities and will result in significant savings as flexibility analysis services from external contractors shall no longer be required.

a

Left: Caesar II 6.10 (2013). Right: Caesar II 4.0 (1997)

TPM AWARENESS SESSIONS – A Step Towards a New Approach T otal Productive Management (TPM) is a Plant improvement methodology, which enables continuous and rapid improvement through use of employee involvement, employee empowerment, and closed-loop measurement of results. It is an approach that seeks to achieve zero breakdowns, zero defects and zero accidents at work place.” The introduction of TPM at LCPL is designed to improve collaboration between various manufacturing departments by amalgamation of team work, continuous improvement and good working practices.TPM continues to improve organization’s efficiencies within business units through more employee engagement and exceptional commitment from every individual.

In this regard the Sustainability department took an initiative to arrange TPM Awareness Sessions for the employees working at the Plant site. Two Awareness Sessions were arranged alternatively, the first was arranged at the Arabian Sea Country Club on 29 August 2013, in which about 103 Employees participated & showed their interest towards this new approach. The Second Awareness Session was arranged at the Recreation Hall, Plant Site on 16 September 2013, which engage 55 Employees. In these sessions the employees were made aware of 5S Activity, Total Productive Management and TPM Reward & Suggestion System. Active discussions held after the session proved its success in all aspects.

a


INITIATIVE S

Protection Relays Upgradation Project T

“3-phase overcurrent plus earth fault along with the support of Muhammad Waqas and Imranullah Khan completed with instantaneous elements” the activity successfully within the with a compatible MiCOM planned time frame. In this way, the P122 protection relay. By Muhammad protection system is upgraded to The activity was conWaqas

tracted out to Schneider Electric Pakistan Limited, who replaced and then tested the relays. The Schneider team

current technology ensuring reliability and system improvement.

a

Emergency Generators: Load Sharing Issue Resolution

A

15

Annual 2013 – overhauls & INITIATIVEs

he protection relays installed at the 11kV SWBD01 were in service since plant commissioning. With the passage of time and upgradation in technology, these relays had become obsolete. The spares and technical backup support had also depleted considerably during the past few years. The relays manufacturer had recommended new MiCOM protection relays as a replacement to the installed relays. Therefore, a phase-wise plan was developed for the replacement of protection relays. Phase 1 and majority of Phase 2 relays were successfully migrated in the previous overhauls. The replacement of protection relays at 11kV SWBD01 was successfully carried out during this overhaul, which included replacement of the existing protection relays MCGG 82 i.e.

The generators were behaving abnormally for about six months before the plant overhaul; the engines were overspeeding on start-up and then tripping on over frequency. Also, load sharing behaviour between the generators was abnormal. The probable cause was the Load Sharing Modules (LSMs) on the EDGs and BLG. Therefore, in the presence of service engineer from Woodward International Singapore; calibration of LSMs was performed to achieve the required behaviour. Although it was difficult to get load for the generators since the plant overhaul was in full swing, with most of the drives de-energized. However, with full support from operations team the minimum requirement of 50% load was eventually met. Calibration for all modules was done repeatedly after testing them on-load and then tweaking the settings to accomplish desired results. Undoubtedly, dedicated efforts and round the clock working of Electrical team consisted of MuBy Shuaib Iqbal hammad Waqas, Abid Qayyum and Muhammad Sohaib Iqbal along with the vendor engineer resulted in the diagnosis and the rectification of the issues that were interrupting the normal operation of EDGs and BLG.

vailability of emergency generators in case of partial or complete power outage is very essential for plant operation as these supply power to critical power load. Taking the opportunity of Overhaul 2013, electrical maintenance team responded brilliantly to the expectations of business, resulted in successful rectification of over-speeding and tripping issues of EDGs and BLG.

a


Engagement

Tape Ball Night Cricket Tournament continued from page 3 Qamar Alam (President of Lotte Sports and Recreation Committee) for Man of the Match, Best Bowler, Best Batsman, runner-ups, and winning team trophies. The event was enjoyed by all the participating employees

16

and their families. These sort of events help promote healthy activities among employees. Such activities teaches team work and leadership to employees in a pleasant and informal environment.

a


Engagement

Musical Evening 2013 I n the LCPL tradition of holding gettogethers for all employees, the Sports and Recreation Club organized an Annual Musical Function, held at the PAF Convention Centre on 7 June 2013. An audience of around 600 people including LCPL employees, sponsors and honorable guests gathered at the venue to enjoy an evening of family entertainment. The event was started off with a dinner which included a variety of appetizing cuisine. The event started with the National Anthem on the guitar by Train-

ee Engineer, followed by the spectacular famous luminaries of the country whose performance of LCPL local talent. Short memorable performances left the audiskits presented by trainee engineers ence thoroughly entertained. It was truly a night to remember. A highlighting the life at LCPL. Gifts and prizes were also distrib- special thanks to Mr. Asif Saad, Mr. Huuted through lucky draw to employees. mair Ijaz for preparing special slideshow Bumper prize draw was conducted by that was presented during the event. respectable CEO Mr. Asif Saad. Later We are also thankful to the commercial team for their dedicated efforts. he appreciated the efforts of Sports In the end, thanks to all memand Recreation Club members for bers of SRC as successful event organizing such an outstanding organization is always the ulticommunity event. The event By Faiza Owais mate result of teamwork. was graced by the presence of

a

17


ENGAGEMENT

City Office First Anniversary

Annual 2013 – ENGAGEMENT

18

L

otte Chemical Pakistan’s city office completed its first year anniversary. Celebrating the occasion, a cake cutting ceremony was held.

By Asad Ullah Chughtai

a

Wage Settlement 2013-2014 with CBA

I

ndustrial Relations section has always strived to take on new challenges and initiatives. In Q1 – 2013, IR section successfully negotiated with CBA Team and timely signed-off of the Wage settlement agreement.

During this negotiation, CBA and Management team both played a key role in timely signing of the agreement.

a

CBA Team: »» Furqan Ahmed Qureshi, General Secretary »» Tamia Rizwan, President »» Asim Naveed , Joint Secretary »» Adnan Yousuf, Finance Secretary »» Management Team: »» Aali Muazzam, Plant Manager »» Kamran Saeed Khan, Maintenance Manager »» Shahzad Ibrahim Ansari, Senior Shift Manager »» Kashif Majeed, Accounts Manager »» Rizwan Ahmed, Assistant Manager IR »» Zia ur Rahman, IR Officer »» Arif Raza, Manager HR & Training

HSES

Safety Slogans Competition

T

he HSE & Technical Training department organized a safety slogan competition with the Overhaul Team. Outstanding participation was observed in the competition from Lotte Chemical Pakistan Ltd. employees, including trainee engineers, apprentices and contractors. A total of 147 safety slogans were received showing the commitment to a safe system of work practices and provided guidelines on behavior based safety at LCPL. All safety slogans were thoroughly reviewed by a designated committee and the following winners were finalized.

»» Muhammad Tariq Patel (Senior MeBy Shuaib chanical Technician) Iqbal »» Saeed Ahmed (Project Engineering Manager) »» Yawar Ali Khan (Electrical Technician) »» Haroon Ur Rashid Khan (Administration Officer-1) The awarded slogans were also published through safety banners and displayed at prominent locations at the plant site during overhaul.

a


ENGAGEMENT

Eid Milan Party H

R & Administration Department has been traditionally organizing Eid Milan get-togethers annually. As per ritual, This event was celebrated again by the employees of Lotte Chemical Pakistan, held on 19 August 2013 at the plant site.

Mr.. Raja Waheedullah Khan and his team members welcomed guests at the main canteen.

a

By S. Hameed Hussain Shah

Mango Party

H

R & Admin Function of LCPL has always been a step ahead in arranging extracurricular activities for its staff. A mango party was arranged. The main objective of the event was to provide opportunity for staff to interact with each other. Different types of mangoes were served. Moreover the event was followed up by juice drinking competition, mango cutting completion, quiz competition and winners received gifts from senior management.

a

Iftar & Dinner Party

H

R & Admin Function arranged Iftar party with Shift Staff on 25 July 2013, which was attended by available shift staff along with HR & Admin staff. The event was held at the Control Room at the Plant. Employees present participated in Islamic quiz competition and winners received gifts from the management. Iftar dinner was also served, which was well received by all.

a

Annual 2013 – ENGAGEMENT

19


CSR

World Environment Day T

he theme for this year’s World Environment Day celebrations was Think-Eat-Save. Think-Eat-Save is an anti-food waste and food loss campaign that encourages you to reduce your food print. According to the UN Food and Agriculture Organization (FAO), every year 1.3 billion tons of food is wasted. This is equivalent to the same amount produced in the whole of sub-Saharan Africa. The IR Department organized World Environment Day on 6 June 2013. Employees of LCPL celebrated this day with great enthusiasm and spirit. More than 60 employees from different departments volunteered for beach cleaning activity at PQA, the spirit of love for the Environment was quite evident during entire event.

Annual 2013 – CSR

20

By Zia ur Rehman

a

World Environment Day is an annual event which began in 1972 and aimed at being the biggest and most widely celebrated global day for positive environmental action. World Environment Day activities take place all year round and climax on 5 June every year.


CSR

Earth Day O

n April 22, 2013, more than one billion people around the world took part in the 43rd anniversary of Earth Day. LCPL‘s staff participated to celebrate Earth Day with Great Spirit and enthusiasm and planted new plants / trees at our site / city office. More than 100 volunteers from plant and city ofBy Raja Waheed Ullah fice participated and planted Khan & Rizwan Ahmed around 130 new plants.

Annual 2013 – CSR

21

a

Impact of Plants on the Environment and Our Health

Donation for Earthquake Victims of Baluchistan

A

A

brief session was organized at city office on “ Impact of Plants on Environment and Our Health”. This session was facilitated by Ms Rahat Haq, an expert on the subject. The speaker was introduced to audience by Mr.. Asif Saad. Ms Rahat later shared a brief but interesting history of efforts made by business to improve flora and fauna at site and the continuous commitment of the management to safeguard it. This was

fter being struck by two earthquakes of 7.7 and 7.2 magnitudes in Awaran and Kech districts of Balochistan, Pakistan, Massive losses and damages were reported. Many people lost their levies in these earthquakes and number of people were injured. As the disaster began unfolding Lotte Chemical Pakistan decided to contribute for earthquake victims. The Company made generous donation in form of food hampers and warm clothing, Reaching out to 1000’s of families affected by the Earthquake A small ceremony was held on Friday, 11 October 2013 at PMDA office in Karachi. The Company representative handed over relief goods to the Director General, PDMA for earthquake victims.

a

By Asad Ullah Chughtai followed by an explanation on importance and impact of plants on our environments / health. Ms Rahat also shared with audience, the availability of several health plants in the markets. The session was attended by large number of staff, who showed keen interest in the subject, some inquisitive questions were also asked at the end. To generate further interest, refreshment made from home grown vegetables / fruits / health plants were also served, which were liked by all due to their unique taste.

a

By Zia ur Rehman


CSR

Free Eye Medical Camp at Ghaghar Pattak A

free Eye Medical camp at Ghaghar Pattak was setup on this free eye camp. A professional medical team of Layton Rahmatulla Be30 October 2013 to provide free Eye Screening nevolent Trust (LRBT) joined us at the camp. A number check up to the people of neighboring community. of locals had visited the camp and had their eyes tested. The underprivileged of the area lacked access to baBy Zia ur sic medical facilities which prompted LCPL to set up Rehman

a

Annual 2013 – CSR

22


Recruitment & Training

Learn the Art of Presentation S

yed Sajjad Ahmed, Assistant Manager Contracts Administration, Planning and Mechanical Reliability, he has a passion to develop himself and others. Hence, he conducted several short training sessions in the organization for

colleagues. This time he taught a short in improving skills to present. At the end of the training, employees shared training session on Learn the Art of their feedback. Presentation. This training was focused on ideas that can help drastically By Arif Raza

a

Annual 2013 – RECRUITMENT & TRAINING

23

HSES

Learning & Socialising IEEEP Multi Topic Symposium By Farhad

Jamil s the world turns into a global village, connecting with people and getting to know the newest technology has become essential to progress. Electrical team got this very opportunity by attending the 28th IEEEP Multi topic International symposium held at Pearl Continental Hotel Karachi on 20 & 21 March, 2013. The training was attended by Mr.. Abdus Samad, Mr.. Muhammad Waqas, Mr.. Sohaib Iqbal, Ms Sumayyah Waheed and Farhad Jamil. The symposium covered a multitude of topics ranging from renewable energy to LED lighting to thermographic techniques, presented by some of the veteran authors. Apart from technical learning, the symposium provided an excellent networking opportunity. It was attended by delegates from various enterprises / establishments and provided a fairly good chance to communicate with people from different fields and areas of the industry. Such trainings are very helpful in discussion of new ideas and ventures and help in improving the already employed setup and systems.

A

a

Safety & Security of Sealed Radioactive Sources used in Industrial Applications

I

n coordination with Pakistan Nuclear Regulatory Authority (PNRA), The LCPL HSE & Technical Training team organized two training days on ‘Safety & Security of Sealed Radioactive Sources used in industrial applications’ at the plant on November 05-06, 2013. The initiative was taken by HSE team to promote the awareness level of ‘Radiation Safety’ at the LCPL plant. Mr.. Tariq Mehdi (RPO) welcomed the PNRA trainers team and emphasized the importance of radiation safety during opening remarks of the session. The following detailed topics were covered in the course. »» Regulatory requirements and role of PNRA. »» General radiation safety requirements »» Radiation incidents and case histories By Shuaib Iqbal »» Emergency response and preparedness »» Radiation monitoring devises »» Security of sealed radioactive sources. Special thanks to Mr.. Khalid Hussain (Director RNSD-III, PNRA) for coordination in organizing the event. Mr.. Tariq N. Virk (Engineering Manager) acknowledged the efforts of PNRA & LCPL HSE & Technical Training team in promoting the culture of such comprehensive training. Certificates were awarded to all training participants.

a


Recruitment & Training

Recruitment of Trainee Engineers

F

Annual 2013 – RECRUITMENT & TRAINING

24

or many years, we have provided opportunities to fresh engineering graduates to enable them to gain professional and personal development. The engineering graduates join the organization under company’s Trainee Engineer scheme, which provides them extensive practical exposure at our Plant near Port Qasim. After completion of this extensive and rigorous training program, the trainee engineers, subject to vacancies and good performance, are absorbed within the organization. We organized road shows at the following Engineering Universities and tested 1125 fresh engineers for Trainee Engineer jobs: »» Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Swabi »» NED University of Engineering & Technology, Karachi »» Dawood College of Engineering & Technology, Karachi »» National University of Science & Technology, Islamabad »» Pakistan Navy Engineering College, Karachi »» University of Engineering & Technology, Lahore

By Arif Raza »» Punjab University, Lahore After completion of written tests stage, the successful engineers appeared for interviews. Later 23 engineers were offered Trainee Engineer jobs.

a

Refresher Trainings on Permit to Work System

Training Needs Analysis Meetings

P

T

ermit to work generally known as PTW, is a mandatory requirement to carry out work on LCPL site. It is a key tool not only to control the work but reduce associated risks to avoid any injuries. Therefore training on PTW system is organized from time to time to raise awareness and knowledge level of all employees and contractors. In overhaul 2013, refresher sessions for both PTW issuers and Acceptors were organized by Technical Training Center where these refreshers were conducted by Engineering and Production team members. By Ahmed A. Abedi

NA meetings had been arranged in the organization to identify the knowledge, skills, behaviors and attitudes required to meet the business objective. In these meetings, current level of knowledge, skills, behaviors and attitudes were assessed for each individual.

a

a

Six Sigma Orientation by Asif Zaheer

M

r.. Asif Zaheer, Material Planning Manager conducted a 2 hour training session on Six Sigma Orientation. Mr.. Asif has attended this training from National Productivity Organization (NPO) and shared his learning with colleagues.

a

By Arif Raza


Recruitment & Training

Training on Maximize Your Potential by Mr.. Saadi Insha

L

CPL’s training on maximising the potential of employees falls under the category of personal development programs. The purpose is to enrich the individual at a personal level, detect and strengthen the skills and capacities the individual already possesses and teach new skills so that these can be put into practice afterwards By Arif Raza in both the daily and professional

a

Trainee Engineers Joining

W

ith a view of providing talented individuals a frame work through which they acquire technical knowledge and experience to become success professional individuals in future, 13 Trainee Engineers were hired on 1 July 2013 from different universities. TTC organized 4 weeks orientation program for the new trainees. The purpose of this orientation program was to provide them basic overview of plant technology, HSE systems and familiarize them with Company’s policies. Initially general awareness was given about all the departments. In the end they enjoyed lunch in the Company’s Mess.

a

Solution to the crossword on page 28

Internships @ Lotte

I

nternship is a mandatory part of education in most of the universities. Hence, corporate sector is bridging this need of students to meet this requirement. Every year, we absorb healthy number of students as Interns in the company mainly from engineering discipline. This gives on-the-job training to students, which helps them to learn from practical environment. Generally, the internship works as an exchange of services for experience between the student and his or her employer.

a

Integrated Management Systems Training

L

CPL earned its internationally recognized certification of OHSAS-18001 and ISO-14001 in MAY’2012. Training programs are held on yearly basis to integrate these management systems into our culture for achieving significant tangible results in terms of employee safety and environmental management systems. Awareness Training on ISO 14001 (Environmental Management systems) and OHSAS 18001 (Occupational health and safety management systems) was held on 11 September 2013 by United Registrar of System (URS). Such trainings are considered one of the essential ingredient for retaining highest standards in Health, Safety and environmental performance and maintaining exceptional safety reBy Ahmed cords. Ali Abedi Main topics covered in course were »» ISO 14001 – Environmental Management Systems - workshop »» OHSAS 18001 Occupational Health and Safety - principles

a

Annual 2013 – RECRUITMENT & TRAINING

lives.

25

28

DOWN 1 calico. 2 ferret. 3 tactless. 4 damsel. 5 suburban. 6 detector. 8 stock exchange. 14 our. 16 cleanser. 17 obedient. 18 motivate. 19 ewe. 21 insert. 23 mildly. 24 listen. ACROSS 7 Rabelais. 9 abused. 10 tom. 11 libretto. 12 soused. 13 soothe. 15 kilobyte. 16 cross-examiner. 20 feverish. 22 timely. 25 undies. 26 novelist. 27 erg. 28 Lerner. 29 extolled.

29 27

25

26

20

21 16

13

22

17

23

18

14

19

15

11

12 10

78

9 12

34

24

56


Recruitment & Training

Young Engineer’s Forum O

Annual 2013 – RECRUITMENT & TRAINING

26

n 25 May 2013, all young engineers of Lotte Chemical gathered at Marriott hotel with company’s senior management. Employees from various departments came across with everyone including all Functional Heads and Chief Executive, Mr.. Asif Saad. This was an opportunity for everyone to talk about themselves, how they become part of Lotte Chemical Pakistan, where they stand at life, where they want to be in life, etc. Mr.. Asif Saad also shared his career pathway with employees and how he reached at the Chief Executive level from a Management Trainee. All participants shared their views very openly and talked with each other freely. This was the great opportunity for young engineers to share and learn from each other successes. Later, lunch was served followed by lucky draw of two Apple iPad’s which were won by Mr.. Asim ur Rehman and Mr.. By Arif Raza Zia Abbas Naqvi. Employees appreciated this initiative and requested to continue this practice in future.

a

Welcome Aboard!

W

e heartily extend a very warm welcome to managers as part of the LCPL family and wish them an enjoyable and productive stay with the Company.

Muhammad Tariq Nazir, DAE (Mechanical Technology), Govt. College of Technology, Multan, joined as Sub Engineer Mechanical – II, with effect from 1 April 2013

Usman Ali, BSc (Chemical Engineering), Punjab University, Lahore, joined as Shift Manager, with effect from 16 May 2013

Shuaib Iqbal, ME (Environmental), NED University of Engineering & Technology, Karachi, joined as Assistant Manager HSE with effect from 1 June 2013

Celestia Anil Henry, BA, St. Joseph Govt. College for Women, Karachi, joined as Secretary with effect from 1 June 2013

Syed Raza Anis, BE (Electrical Engineering), NED University of Engineering & Technology, Karachi, joined as Assistant Manager Electrical Reliability with effect from 3 June 2013

Zaeem Bin Babar, MSc (Chemical Engineering), American University of Sharjah, joined as Process Support Manager (Pure), with effect from 1 July 2013

Muhammad Rehan Shami, BSc (Chemical Engineering), University of Engineering & Technology, Lahore joined as Trainee Engineer, with effect from 1 July 2013

Aamir Ayub, BE (Mechanical Engineering), College of Electrical & Mechanical Engineering (NUST), Islamabad, joined as Trainee Engineer, with effect from 1 July 2013

Muhammad Azam, BE (Mechanical Engineering), NED University of Engineering & Technology, Karachi, joined as Trainee Engineer, with effect from 1 July 2013

Muhammad Shahid, BSc (Chemical Engineering), University of the Punjab, Lahore, joined as Trainee Engineer, with effect from 1 July 2013

Muhammad Owais Mehmood, BE (Electronics Engineering), Pakistan Navy Engineering College (NUST), Karachi, joined as Trainee Engineer, with effect from 8 July 2013

Ahmed Mehmood Khan Babar, BS (Mechanical Engineering), Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, joined as Trainee Engineer with effect from 22 July 2013

Mubeen Mukhtar, BE (Chemical Engineering), National University of Sciences & Technology, Islamabad, joined as Trainee Engineer, with effect from 22 July 2013.

Ambreen Malik, MA (Political Sciences), University of Karachi, joined as Executive Assistant, with effect from 1 October 2013

Qadeer Ahmed, BSc (Chemical Engineering), University of the Punjab, Lahore, joined as Trainee Engineer, with effect from 1 November 2013

Jahanzaib Ali, BSc (Chemical Engineering), University of the Punjab, Lahore, joined as Trainee Engineer, with effect from 1 November 2013

Muhammad Taimoor Aijaz, BE (Chemical Engineering), NED University of Engineering & Technology, Karachi, joined as Trainee Engineer, with effect from 1 November 2013

Ghulam Mustafa, BSc (Chemical Engineering), University of Engineering & Technology, Lahore, joined as Trainee Engineer, with effect from 1 November 2013


Recruitment & Training

pprentices training Program at LCPL helps apprentices to acquire new technical skills, increase their contribution to any organization they work at and also to build their confidence to carry out the work assigned to them. As a part of company’s efforts to develop skilled individuals from grass root level, every year LCPL organizes a structured apprenticeship training program for 03 months in line with GOP rules and

By Ahmed Ali Abedi

regulations at Technical Training Centre (TTC). This year 18 apprentices joined LCPL on 1st August’13. In order provide technical knowledge to new apprentices, individuals from the plant site were requested to give classroom training to apprentices by teaching them and sharing their own experiences. To make the training program effective APIs written in Urdu

were given along with the videos to ensure complete understanding of basic working principles. Apprentices were also trained on specific equipments along with detailed knowledge of the processes related to occupational health and safety. Training was completed on 25th October 2013 after proper validations, and then all apprentices were handed over to their respective departments.

a

Long Service Awards

C

ongratulations to recipients of Long Service Awards and wishing them a long prosperous association with the Company.

a

Ashiq Ali Financial Controller, completed 25 years of service in May 2013

Tariq Mahmood IT Manager, completed 15 years of service in February 2013

Amir Anwer Systems Analyst, completed 15 years of service in September 2013

Khalil Ahmed Asst. Engineer Electrical (Purification), completed 15 years of service in March 2013

Owais Ahmed Hashmi Assistant Manager Salaries, completed 15 years of service in November-2013

Liaqat Khan Senior Asst Engineer Process (Ox), completed 15 years of service in November-2013

Azam Khan Lodhi Administration Officer, completed 15 years of service in March 2013

Sadiq Ali Senior Asst Lab Officer, completed 15 years of service in October 2013

Niaz Ahmad Rajpoot Shift Electrical Sub Engineer - I, completed 15 years of service in August-2013

Adil Ahmed Sheikh Assistant Lab Officer, completed 15 years of service in October 2013

Puran Lal Hatwal Administration Officer-I, completed 15 years of service in June 2013

Gohar Rehman Sub Engineer Mechanical - I (CoGen), completed 10 years of service in February 2013

Faizanul Haque Sub Engineer Process-I, completed 10 years of service in March 2013

Arshad Iqbal Khan Sub Engineer Process - II, completed 15 years of service on 13 December 2013

Welcome Aboard! continued from the previous page Arslan Tahir, BSc (Chemical Engineering), University of Engineering & Technology, Lahore, joined as Trainee Engineer, with effect from 1 November 2013

Muhammad Farhan Sagheer, BSc (Chemical Engineering), University of Engineering & Technology, Lahore, joined as Trainee Engineer, with effect from 1 November 2013

Waqas Hameed, BSc (Chemical Engineering), University of Engineering & Technology, Lahore, joined as Trainee Engineer, with effect from 1 November 2013

Syed Mujahid Hussain Shah, DAE (Welding & Sheet Metal Technology), Swedish Pakistani Institute of Technology, Gujrat, joined as Junior Engineer Inspection, with effect from 6 November 2013

Umair Aleem, BE (Electronics Engineering), NED University of Engineering & Technology, Karachi, joined as Asst Manager Reliability Instrumentation with effect from 1 December 2013

27

Annual 2013 – RECRUITMENT & TRAINING

Apprentices Joining A


‫بلوچستان کے زلزلہ کے متاثرین کے لیے امداد‬

‫ ضیاالرحامن‬:‫از‬

‫بلوچستان پاکستان میں آواران اور کیچ کے اضالع گرم کپڑوں کے صورت میں زلزلے سے متاثر ہزاروں‬ ‫ کی شدت کے دو زلزلے آنے کے خاندانوں کے لیے بھاری مقدار میں امداد فراہم‬۷‫۔‬۲ ‫ اور‬۷‫۔‬۷ ‫میں‬ ‫بعد بھاری نقصانات کی اطالعات ملی ہیں۔ ان کی۔‬ ‫زلزلوں میں لوگوں کی ایک کثیر تعداد جان بحق ہو‬ ‫اس سلسلے میں پی ڈی ایم اے آفس کراچی‬ ‫گئی ہے اور بہت سے لوگ زخمی ہوئے ہیں۔‬ ‫ کو ایک مخترص سی تقریب‬3102 ‫ اکتوبر‬11 ‫میں‬ ‫اس تباہی کو دیکھتے ہوئے لوٹ کیمیکل پاکستان منعقد کی گئی۔ کمپنی کے منائیندے نے زلزلے کے‬ ‫نے زلزلے کے متاثرین کے لیے امداد فراہم کرنے متاثرین کے لیے امدادی سامان پی ڈی ایم اے کے‬ a ‫کا فیصلہ کیا۔ کمپنی نے خوراک کے پیکٹوں اور ڈائرکٹر جرنل صاحب کے حوالے کیا۔‬

28

Annual 2013 – Leisure

Leisure 12

34

56

78

9 10

11

12

13

14

16

15

17

20

18

21

25

22

19

23

24

26 27

28

29

Cryptic Crossword ACROSS 7 French writer shows real bias unfortunately (8) 9 Insulted a British and American journalist (6) 10 He’s found among entomologists (3) 11 See about unusually bitter book (8) 12 Thus employed drunk (6) 13 So old article offers comfort (6) 15 Some memory of what cobra has, you say? (8) 16 In court, one questions angry inspector (5-8) 20 Fellow always is hot, running high temperature (8) 22 Chap, see, is punctual (6) 25 Pants and comes back to life? (6) 26 Isn’t love misrepresented by ths writer? (8) 27 Some work is therefore cut short (3) 28 Lyricist is a beginner, it’s said (6) 29 Former partner rang and praised highly (8) Answers on page 25

Challenging Sudoku! DOWN 1 Caught a straying coil of cloth (6) 2 Type of polecat is a diligent searcher (6) 3 Time to perform more infrequently? That’s unsubtle! (8) 4 Young girl soundly curses English student (6) 5 Vehicle picked up Pope in the outskirts of town (8) 6 Could be protected first off with smoke sensor? (8) 8 Trite conversation where brokers work (5,8) 14 Old, old city belonging to us (3) 16 Daily gets hold of second detergent perhaps (8) 17 Compliant with order to somehow end it (8) 18 Give incentive to team playing around four (8) 19 Ultimately people follow like sheep (3) 21 Put in stern, I work (6) 23 Slightly miffed at first by ruined idyll (6) 24 Taking part, journalist endeavours to pay attention (6)

Symbols to use: 123456789

Cryptograms Cryptograms are simple-substitution ciphers where every letter of the alphabet has been switched. Your task is to use pattern recognition and your grammar and vocabulary abilities to decipher the hidden quotes. Hint: start with the 1, 2 and 3 letter words, and remember that the most common letters in the English language are E-T-A-I-O-N, in roughly that order. Good luck!

JYK MFBK TE SD KGHI HM JYK MCOFJSO SD T GT WNNO. V YKPKGKB KGHI VHPM , HJ HM SPIC RC EKDTNIJ RC JYK OSBTI DTHINBK SD JYSMK V YS KGTEK JYK DT WJ JY TJ JYKBK W TP RK PS WSOFBSOHMK SP RTMHW FBHPWHFIKM . – Ayn Rand


‫‪ LCPL‬کے مالزمین نے کوئی وقت ضائع کیے بغیر ایک کروڑ‬ ‫دس الکھ مین آورز (‪ )man hours‬کا ہدف مکمل کر لیا‬ ‫‪29‬‬

‫ایچ ایس ای مینجمنٹ سسٹم کی مستقل کامیابی اور اس کا اطالق ایل سی‬ ‫لوٹ کیمیکل پاکستان نے بغیر کسی السٹ ٹائم کیس (ایل ٹی سی) کے ایک‬ ‫پی ایل کی ٹیم کی لگن کا مظہر ہے جنہوں نے جذبے سے محنت کر کے‬ ‫کروڑ دس الکھ مین آورز کا ہدف ‪ 6‬اگست ‪ ۲۰۱۳‬کو مکمل کر لیا۔‬ ‫کام کرنے کے ایک محفوظ نظام کو یقینی بنایا۔ انتظامیہ کی صحت‪ ،‬سالمتی‬ ‫اور ماحول پر بہت زیادہ توجہ ہامرے معیارات اور کامیابی کے معیارات کی‬ ‫جناب آصف سعد (چیف ایگزیکٹو) نے ایل سی پی ایل کی ٹیم کو مبارکباد‬ ‫داللت کرنی ہے۔ یہ غیر معمولی کامیابی ہامرے ایچ ایس ای مینجمنٹ‬ ‫پیش کی اور متام مالزمین کو ان کے مسلسل عزم‪ ،‬مثبت رویے‪ ،‬حفاظتی‬ ‫سسٹمز (‪ OSHAS 18001‬اور ‪ )ISO 14001‬کے مؤثر ہونے اور ہامری‬ ‫قواعد و ضوابط کی پابندی اور ایچ ایس ای کے متعلق ذمہ دارانہ رویہ‬ ‫از‪ :‬شعیب اقبال ٹیم کی سالمتی کے عزم کی تصدیق کرتی ہے۔‬ ‫رکھنے کی وجہ سے یہ عاملی معیار کا ہدف حاصل کرنے پر رساہا۔‬ ‫جناب قمر ایچ منظور (ڈائرکٹر مینوفیکچرنگ) نے ایل سی پی ایل کی‬ ‫ٹیم کو مسلسل جدوجہد سے حفاظت اور سالمتی کا بہرتین ریکارڈ قائم‬ ‫کرنے پر ان کی تعریف کی کیونکہ ایسا ہونا شاندار ٹیم ورک اور متام مالزمیں‬ ‫کی طرف سے کیے گئے ذمہ داری کے مظاہرے کے بغیر ممکن نہ تھا۔ مسٹر‬ ‫حارث نے ایل سی پی ایل کو مالزمین‪ ،‬ٹھیکیداران اور وزیٹرز کے لیے ایک‬ ‫محفوظ جگہ بنانے اور ایچ ایس ای کی کارکردگی کو بہرتی کی اس سے اگلی‬ ‫سطح پر پہنچانے کے لیے مسلسل جد و جہد پر زور دیا۔‬

‫محفوظ طریقہ کار کی پابندی کرنے پر ایل سی پی ایل کے مالزمین کو‬ ‫خریداری کے کوپنز سے نوزا گیا۔‬ ‫ایل سی پی ایل کی انتظامیہ اس کامیابی پر فخر محسوس کرتی ہے اور اس‬ ‫غیرمعمولی کارکردگی میں مزید بہرتی النے کی توقع رکھتی ہے۔‬

‫‪a‬‬

‫افطار اور ڈنر پارٹی‬ ‫ایچ آر اینڈ ایڈمن فنکشن نے ‪ ۲۵‬جوالئی ‪ ۲۰۱۳‬کو شفٹ سٹاف کے لیے‬ ‫ایک افطار پارٹی کا انتظام کیا جس میں موقع پر موجود شفٹ سٹاف کے‬ ‫لوگ اور ایچ آر اینڈ ایڈمن کے عملے نے رشکت کی۔‬ ‫تقریب کا آغاز چھ پج کر تیس منٹ پر پالنٹ کے کنٹرول روم میں ہوا۔‬ ‫وہاں پر موجود مالزمین نے اسالمی معلومات کے مقابلے میں رشکت کی اور‬ ‫جیتنے والوں کو انتظامیہ کی طرف سے تحائف دیے گئے۔ اس کے بعد لذیز‬ ‫افطاری اور ڈنر کا دور چال جس کی سب نے بہت تعریف کی۔ یہ پروقار‬ ‫تقریب سب کی دعاؤں کے ساتھ اختتام کو پہنچی۔ ‪a‬‬

‫دعوت آم (مینگو پارٹی)‬

‫از‪ :‬حمید‬ ‫حسین شاہ‬

‫ایل سی پی ایل کا ایچ آر اور ایڈمن فنکشن کا شعبہ اپنے عملے کے لیے‬ ‫غیر نصابی رسگرمیاں فراہم کرنے میں ہمیشہ پیش پیش رہتا ہے۔ ‪ ۵‬جوالئی‬ ‫‪ ۲۰۱۳‬کو ایک مینگو پارٹی کا اہتامم کیا گیا۔ متام مالزمین نے موسم گرما کا‬ ‫استقبال کیا اور پھلوں کے بادشاہ یعنی آم سے لطف اندوز ہوئے۔‬ ‫اس تقریب کا بنیادی مقصد عملے کو ایک دورسے کے ساتھ گھلنے ملنے‬ ‫کا موقع فراہم کرنا تھا۔ اس میں مختلف قسم کے آموں کا بندوبست کیا‬ ‫گیا تھا۔ مزید براں تقریب کے بعد جوس پینے‪ ،‬آم کاٹنے اور سواالت کے‬ ‫مقابلے منعقد کیے گئے اور جیتنے والوں کو سینیرئ مینیجمنٹ کی طرف‬ ‫سے تحائف دیے گئے۔ یہ ایک بہت ہی زبردست دن تھا اور انتظامیہ نے‬ ‫مالزمین کے ساتھ مل کر بہت اچھا وقت گزارا۔ ‪a‬‬

‫عید ملن پارٹی‬

‫ایچ آر اور ایڈمنسٹریشن ڈپارٹمنٹ روایتی طور‬ ‫پر ہر سال عید ملن پارٹی منعقد کرتا ہے۔ رواج‬ ‫کے مطابق اس سال بھی لوٹ کیمیکل پاکستان‬ ‫کے مالزمین نے ‪ ۱۹‬اگست ‪ ۲۰۱۳‬کو پالنٹ کی‬ ‫حدود میں ہونے والی یہ تقریب منائی۔ اس‬ ‫تقریب کے مہامن خصوصی ایل سی پی ایل کے‬

‫چیف ایگزیکٹو جناب آصف سعد تھے۔‬ ‫جناب راجا وحید اللہ اور ان کی ٹیم کے ارکان‬ ‫نے مہامن خصوصی اور دورسے مہامنوں کا‬ ‫مین کینٹین میں استقبال کیا۔ متام مالزمین نے‬ ‫ایک دورسے کو عید مبارک کہی۔ ایک شاندار‬ ‫بوفے لنچ کا بندوبست کیا گیا تھا جس سے‬ ‫سب ہی لوگ لطف اندوز ہوئے۔‬

‫‪a‬‬


‫سی بی اے کے ساتھ ‪ 2014-2013‬کے لیے معاوضے کا تصفیہ‬ ‫(ویجسیٹلمنٹ)‬ ‫صنعتی تعلقات کے شعبے (انڈسٹریل ریلیشنز‬ ‫سیکشن) نے نئے چیلنجز اور نئے اقدامات سے‬ ‫عہدہ برا ہونے کی ہمیشہ بھرپور کوشش کی ہے۔‬ ‫‪ ۲۰۱۳‬کی پہلی سہ ماہی میں آئی آر کے شعبے نے‬

‫سی بی اے کی ٹیم کے ساتھ کامیابی سے گفت و‬ ‫شنید کر کے ویج سیٹلمنٹ کے معاہدے پر بروقت‬ ‫دستخط کر دیے ہیں۔‬

‫اس ب��ات چیت کے دوران سی بی اے اور‬ ‫انتظامیہ کی ٹیم دونوں نے معاہدے پر بروقت‬ ‫دستخط کرنے میں بہت اہم کردار ادا کیا ہے۔‬ ‫سی بی اے ٹیم‪:‬‬ ‫• فرقان احمد قریشی‪ ،‬جرنل سیکرٹری‬ ‫• تامیا رضوان‪ ،‬پریزیڈنٹ‬ ‫• عاصم نوید‪ ،‬جوائنٹ سیکرٹری‬ ‫• عدنان یوسف‪ ،‬فنانس سیکرٹری‬ ‫مینیجمنٹ ٹیم‪:‬‬ ‫•‬ ‫•‬ ‫•‬ ‫•‬ ‫•‬ ‫•‬ ‫•‬

‫عالی معظم‪ ،‬پالنٹ مینیجر‬ ‫کامران سعید خان‪ ،‬مینٹیننس مینیجر‬ ‫شہزاد ابراہیم انصاری‪ ،‬سینیرئ شفٹ مینیجر‬ ‫کاشف مجید‪ ،‬اکاؤنٹس مینیجر‬ ‫رضوان احمد‪ ،‬اسسٹنٹ مینیجر آئی آر‬ ‫ضیا الرحامن‪ ،‬آئی آر آفیرس‬ ‫عارف رضا‪ ،‬مینیجر ایچ آر اینڈ ٹریننگ‬

‫‪a‬‬

‫ٹی پی ایم سے آگاہی کی نشستیں (ٹی پی ایم اویرنیس سیشنز)‬ ‫– ایک نئے رویے کی طرف ایک قدم‬ ‫ٹوٹل پروڈکٹو مینیجمنٹ (ٹی پی ایم) پالنٹ میں بہرتی النے کا ایک طریقہ‬ ‫کار ہے جس سے مالزمین کی شمولیت‪ ،‬مالزمین کو اختیارات دینے اور نتائج‬ ‫کی جانچ کے لیے کلوزڈ لوپ (‪ )pool desolc‬کے استعامل سے مسلسل اور‬ ‫تیز رفتاری سے بہرتی آتی ہے۔ اس طریقہ کار کا ہدف کام کی جگہ پر تعطل‬ ‫(بریک ڈاؤن)‪ ،‬خرابی‪ ،‬اور حادثات سے مکمل چھٹکارا ہے۔‬ ‫ایل سی پی ایل میں ٹی پی ایم کے آغاز کا مقصد ٹیم ورک‪ ،‬مستقل بہرتی اور‬ ‫کام کرنے کے بہرت طریقہ ہائے کار کے امتزاج سے مینوفیکچرنگ کے مختلف‬ ‫شعبوں کے درمیان ہم آہنگی اور تعاون کو بہرت بنانا ہے۔ ٹی پی ایم کے ذریعے‬ ‫کاروباری یونٹوں کے اندر مالزمین کی طرف سے مزید شمولیت اور ہر فرد‬ ‫کی طرف سے بہرتین عزم کے ساتھ ادارے کی استطاعت میں مسلسل اضافہ‬ ‫ہوتا ہے۔‬

‫اس سلسلے میں سسٹینیبلٹی ڈپارٹمنٹ نے ٹی پی ایم کے اطالق کے لیے‬ ‫پالنٹ میں کام کرنے والے مالزمین کے لیے ٹی پی ایم سے آگاہی کی نشستوں‬ ‫کا بندوبست کرنے میں پہال قدم اٹھایا۔ اس سلسلے میں دو اویرنیس سیشنز‬ ‫منعقد کیے گئے۔ پہال سیشن عریبین سی کنٹری کلب میں ‪ 92‬اگست ‪ 3102‬کو‬ ‫ہوا جس میں تقریباً ‪ 301‬مالزمین نے رشکت کی اور اس نئے طریقہ کار میں‬ ‫دلچسپی کا اظہار کیا۔ جو لوگ پہلے سیشن میں شامل نہیں ہو سکے تھے ان‬ ‫کے لیے پالنٹ کے ریکری ایشن ہال میں ‪ 61‬ستمرب ‪ 3102‬کو دورسے سیشن‬ ‫کا بندوبست کیا گیا جس میں ‪ 55‬مالزمین شامل ہوئے۔ ان سیشنز میں ‪S5‬‬ ‫ایکٹیوٹی‪ ،‬ٹوٹل پروڈکٹو مینجمنٹ اور ٹی پی ایم ریوارڈ اینڈ سجیشن سسٹم‬ ‫کے متعلق معلومات فراہم کی گئیں۔‬ ‫سیشن کے بعد ہونے والے مباحثے سے اسے کے متام پہلوؤں کی کامیابی کا‬ ‫اظہار ہوا۔ ‪a‬‬

‫‪30‬‬


‫ٹی پی ایم کی افتتاحی تقریب‬ ‫پھلے صفحہ سے جاری‬

‫‪31‬‬

‫کرنے ہوئے امید ظاہر کی کہ ایل سی پی ایل میں‬ ‫ٹی پی ایم کا اطالق پالنٹ کی پیداواری صالحییت‪،‬‬ ‫اس کی دستیابی‪ ،‬اس کی استعداد اور متام مالزمین‬ ‫کی مہارت کو بہرت کرنے کے لحاظ سے ایک بہت‬ ‫بڑی کامیابی ہو گی۔مسٹر کم نے ایل سی پی ایل‬ ‫کے مالزمین کی گزشتہ کارکردگی اور نئے چیلنجوں‬ ‫کو قبول کرنے پر ان کی آمادگی کے لیے ان کو خراج‬ ‫تحسین پیش کیا۔ انہوں نے ایل سی پی ایل کی‬ ‫کامیابی کے لیے نیک خواہشات کا اظہار کیا اور‬

‫ٹی پی ایم کے اطالق کے ذریعے زود رفتار‪ ،‬مرکوز‪،‬‬ ‫اور پائیدار نتائج حاصل کرنے کے سلسلے میں اپنے‬ ‫مکمل تعاون کا یقین دالیا۔‬ ‫ٹی پی ایم کی افتتاحی تقریب کے موقع پر ایل سی‬ ‫پی ایل کے چیف ایگزیکٹو جناب آصف سعد نے‬ ‫مالزمیں سے خطاب کرتے ہوئے اس بات پر بھی زور‬ ‫دیا کیا کہ ٹی پی ایم کے آغاز کے بعد ٹیم ورکنگ‪،‬‬ ‫مسلسل بہرتی اور کام کرنے کے بہرت طریق کار کے‬ ‫امتزاج سے مختلف شعبوں کے درمیان ہم آہنگی‬

‫یقیناً وجود میں آئے گی۔ جناب آصف سعد نے اس‬ ‫بات پر زور دیا کہ اگرچہ ٹی پی ایم کا آغاز ایک‬ ‫“اوپر سے نیچے” (ٹاپ ڈاؤن) طریقے سے کیا جاتا‬ ‫ہے لیکن اس کا کامیابی سے اطالق رصف “نیچے‬ ‫سے اوپر” (باٹم اپ) والے طریقے سے ہی ہو سکتا‬ ‫ہے۔ اس ضمن میں انہوں نے واضح کیا کہ ٹی پی‬ ‫ایم کا اطالق عاملی معیار کی مسابقت میں کامل‬ ‫حاصل کرنے والے مینوفیکچرنگ کے کاروبار میں‬ ‫ادارے کے رویے میں بہرتی النے میں خاصی حد‬ ‫تک مددگار ثابت ہو گا۔‬

‫‪a‬‬

‫‪Annual 2013 – Urdu‬‬

‫گھاگھر پھاٹک میں آنکھوں کا مفت میڈیکل کیمپ‬ ‫گھاگھر پھاٹک میں ‪ ۳۰‬اکتوبر ‪ ۲۰۱۳‬کو قرب وجوار طبی سہولتیں میرس نہ ہونے کی وجہ سے لوٹ‬ ‫کے لوگوں کو آنکھوں کے مفت معائینے کی سہولت کیمیکل پاکستان نے یہ مفت آئی کیمپ لگایا تھا۔‬ ‫فراہم کرنے کے لیے آنکھوں کا مفت میڈیکل کیمپ‬ ‫لگایا گیا۔ یہاں رہنے والے غریب لوگوں کو بنیادی لیٹن رحمت اللہ فالحی ٹرسٹ (ایل آر بی ٹی) کی‬

‫از‪ :‬ضیاالرحامن‬

‫ایک پیشہ ور میٹیکل ٹیم اس موقع پر کیمپ میں‬ ‫ہامرے ساتھ موجود تھی۔ بہت سارے مقامی‬ ‫رہائشیوں نے کیمپ میں آ کر اپنی آنکھوں کا‬ ‫معائینہ کروایا۔ ‪a‬‬


‫‪Life @ Lotte Chemical is a corporate newsletter intended‬‬ ‫‪for employees and partners of Lotte Chemical Pakistan‬‬

‫‪2013‬‬

‫کور سٹوری‬

‫ٹی پی ایم کی افتتاحی تقریب‬ ‫از‪ :‬عائشہ معین‬

‫آج کل کے رضورت کے مطابق چلنے والے ماحول‬ ‫میں اپنے کام کے طریقے میں بہرتی ال کر عاملی‬ ‫مسابقت میں شامل ہونے کی کوشش میں ‪۳۱‬‬ ‫اکتوبر ‪ ۲۰۱۳‬کو ایل پی سی ایل (‪ )LCPL‬کے‬ ‫پالنٹ کے مقام پر ٹی پی ایم کی افتتاحی تقریب‬ ‫منعقد کی گئی۔ اس موقع پر ایل سی پی ایل کے‬ ‫چیف ایگزیکٹو جناب آصف سعد نے بطور مہامن‬ ‫خصوصی شامل ہو کر تقریب کو عزت بخشی؛‬ ‫جناب یون شاؤ ہانگ‪ ،‬جناب مل‪ ،‬جناب محمد وسیم‬ ‫اور جناب قمر حارث منظور اس تقریب کے خاص‬ ‫مہامن تھے۔ اس تقریب میں ایل سی پی ایل کے دو‬ ‫سو سے زیادہ مالزمین نے رشکت کی۔‬ ‫تقریب کا آغاز قرآن پاک کی تالوت سے ہوا جس کے‬

‫ٹی پی ایم کی افتتاحی تقریب‬

‫‪۳۲‬‬

‫سی بی اے کے ساتھ ‪ 2014-2013‬کے لیے‬ ‫معاوضے کا تصفیہ (ویج سیٹلمنٹ)‬

‫‪۳۰‬‬

‫ٹی پی ایم سے آگاہی کی نشستیں (ٹی پی‬ ‫ایم اویرنیس سیشنز) – ایک نئے رویے کی‬ ‫طرف ایک قدم‬

‫‪۳۰‬‬

‫بعد جناب قمر عامل نے استقبالیہ پیش‬ ‫کیا۔ اپنے خطاب میں جناب قمر عامل نے‬ ‫اس چیز کی طرف توجہ دالئی کہ ٹی پی ایم‬ ‫کوئی فوری اور آسان حل فراہم نہیں کرتا۔ عموماً‬ ‫اس کے لیے مالزمین کے رویے اور اقدار میں تبدیلی‬ ‫کی رضورت ہوتی ہے جس میں وقت لگتا ہے۔‬ ‫انہوں نے مزید کہا کہ ٹی پی ایم سے مراد پوری‬ ‫کمپنی میں بحثییت مجموعی سازوسامان‪ ،‬مشینوں‬ ‫اور طریقہ کار کو حقیقتاً عاملی معیار کے مطابق‬ ‫مؤثر بنا کر مینوفیکچرنگ کی کارکردگی میں اعلٰی‬ ‫معیار کے حصول کا رویہ اپنانا ہے۔‬ ‫ایل سی پی ایل کے چیف ایگزیکٹو جناب آصف‬ ‫سعد نے ٹی پی ایم کے لوگو کی نقاب کشائی کر‬

‫‪ LCPL‬کے مالزمین نے کوئی وقت ضائع‬ ‫کیے بغیر ایک کروڑ دس الکھ مین آورز‬ ‫(‪ )man hours‬کا ہدف مکمل کر لیا‬ ‫گھاگھر پھاٹک میں آنکھوں کا مفت میڈیکل‬ ‫کیمپ‬

‫‪۲۹‬‬

‫‪۳۱‬‬

‫کے ٹی پی ایم کا افتتاح کیا جس کے بعد‬ ‫مین سٹیج پر موجود ویڈیو سکرین پر ٹی پی‬ ‫ایم کے متعلق ایک تعارفی ویڈیو چلنا رشوع ہو‬ ‫گئی جس میں ٹی پی ایم اور ایل سی پی ایل میں‬ ‫ٹی پی ایم کے اطالق کے طریق کار کے متعلق‬ ‫بنیادی باتوں کا احاطہ کیا گیا تھا۔ اس ویڈیو کے‬ ‫بعد ٹیم ورک کے متعلق دو ترغیبی ویڈیوز دکھائی‬ ‫گئیں۔‬ ‫لوٹ گروپ آف کیمیکلز کے چیرئمین مسٹر کم کی‬ ‫طرف سے ایک ویڈیو پیغام بھی دکھایا گیا۔ انہوں‬ ‫نے لوٹ کیمیکلز کے السن والے پالنٹس پر ٹی پی‬ ‫ایم کے الگو ہونے کے بعد بے مثال کامیابی کا ذکر‬ ‫اگلے صفحہ پرجاری‬

‫افطار اور ڈنر پارٹی‬

‫‪۲۹‬‬

‫دعوت آم (مینگو پارٹی)‬

‫‪۲۹‬‬

‫عید ملن پارٹی‬

‫‪۲۹‬‬

‫اِس اِشو میں‪...‬‬

‫بلوچستان کے زلزلہ کے متاثرین کے لیے‬ ‫امداد‬

‫‪۲۸‬‬


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.