BETTER BUILT STRONGER BUILT PANEL BUILT
Indoff
Indoff has partnered with Greenville Mechanical to provide a high-quality turnkey solution for isolation structures to be used as a buffer to prevent the spread of current or new viruses, and any other unknown pandemics in the future. This structure is a quick, effective, and easy way to immediately offer safe testing and treatment. This modular structure will be assembled on a concrete pad. Walls are class “A” rated for a 90-mph wind load, a 3” thick wall, and 26-gage galvanized stucco embossed steel pre-painted white (other colors available upon request). The inside facing has 1/8" Fiberglass Re-enforced Plastic (FRP), finished in white and laminated to the core. (See attached literature for further details). The building will have a clean room gasketed drop ceiling with LED lights, and a modular plug and play-wall outlets. No field wiring required. The structure will utilize clean-room technology, including positive or negative pressure, hepa filters, and technology such as bipolar ionization and ultra-low energy plasma technology for the removal of VOC’s, bacteria, viruses, mold, and any particulates. Meets 1,000, 10,000 and 100,000 clean room classifications. The building utilizes modular construction, which enhances build time and can ship from the manufacturer in 4 weeks, with 2 weeks for installation onsite. In addition to a new isolation building, we also offer isolation partitions and complete isolation rooms in existing spaces. A 20’ x 20’ building (other sizes available) will ship complete with the following specifications: • PE stamped drawings • 8’-high clean room drop ceiling • Electrical to include 120/1ph outlets on 4’ nominal centers, light switch, LED lights and breaker box, all with modular plug and play wiring. No additional field wiring required for the building itself. • Additional wiring included for clean room technology. • Windows and door as specified by customer • Building can be added onto to meet size requirements. • Sprinklers and exit signage not included. Indoff suggests customers use sprinkler contractor that handles their existing facility.
brian.galloway@indoff.com • 828-778-6004 • www.indoff.com