Portfolio 2017 [ENG]

Page 1

INES SEBASTIAN UGARTECHE // PORTFOLIO 2017


INÉS SEBASTIÁN UGARTECHE + (00) (34) 685 77 21 53 , Spain // + (351) 925 775 939, Portugal isebastianugarteche@gmail.com Architect since 2015, I have always moved around different areas working around the concept of city, participation and perception; learning about how urban development affects our life. The knowlegde got in internation contexts and volunteering has given to me a wide point of view and maked me resourceful to new situations. I´m an adaptative and dynamic person, looking for a opportunity to keep on learning and developing my skills.


CV

Academic training 2015 Master + bachelor of architecture, Higher Technical School of Architecture of Valencia, (UPV) - 2013 Faculty of architecture and urbanism of São Paulo, Brasil (USP) 2007 Bachelor´s degree, B. V. M. Irlandesas Shool (Honours)

Professional experience Architect in ATELIERMOB, architecture office (Lisbon, Portugal; 18 months)

2016-2017

- Graphic and conceptual development of architectural projects - Design of documents for the project “ANDA LISBOA” coordinated by Lisboa´s town hall. - Mapping and analysis of the informal settlement “Terras da Costa” and “Flecheiro” for the elaboration of an alternative plan for rehousing - Workshop with children around architecture and urbanism - Remodeling of dwellings 2017

Workshop ‘Reco+Nature’, International Festival of Art and Construction, Portugal

2015

Architect + Education. ONG S. San Viator + Collège Inmaculée Conception (Haití, 3 months)

- Monitoring of the construction´s works of the kindergarden 2013

Intership in GOMA OFICINA, architecture office (São Paulo, Brasil; 4 months)

- Graphic and conceptual development of architectural projects 2011-Nw.

Active member of the architectural collective ARQUITECTURA SE MUEVE

2008-2016.

Languages

Professional experience in other areas (temporal works)

• Spanish: Native language • English: Advanced level writing + speaking. Certificate in Advanced English (C1) • Portuguese: Advanced level wwriting + speaking. (DIPLE B2) • French: Medium level writing + speaking. (DELF B1)

Informatical skills

Mecanography Paquete Office Wordpress

Complementary training

AutoCad 2d/3d Indesign CS6 Photoshop CS6

SketchUp Revit Architrave

• “Energetic certification of buildings”, CDE • “Communication and social design”, Diseño Social EN+ • “Building with earth. Rammed earth and adobe” workshop, (UPV) • ”Technologies for human development”, CFP (UPV) •Landscape management and planning, subject framed within the movement for a Free and University Collaborative including mapping and fieldwork with associations and residents of the district (USP) •”Planning in special areas: Favelas and cortiços” (USP) • Workshop “Analogical smart cities & analogical smart architecture”, PKMN (USP)

Works selected • “Urbanism and Landscape: The Puig of Santamaría”, course works 2012- 2013. UPV editorial • “Living the border” exposition of course works seleted in Bordeaux (UVP/EHU + ENSAP)

Other skills Hardworking // Strong work ethic // Excellent team works + Adaptability skills // Driving license //

Volunteer experiences • Oxfam Intermón permanent member of the operative team of social mobilization and public presence. San Sebastián 2011 and Valencia 2011-2014 .




01// Professional works ATELIERMOB Lisbon, Portugal Internship in the architecture office Ateliermob, defined by their founder as “a multidisciplinary platform which develops projects, ideas and research within architecture, design and urbanism”. With a interdisciplinar method of work, Ateliermob develops its activity since 2005 working hand by hand with town hallls, communities and profesional from other disciplines. During this time, I have participated in the most significant projects: rehousing for the slums of Terras da Costa (Almada) and O Flecheiro (Tomar), the project “Anda Lisboa” of urban renewal and strategies of improving accessibility in the streets coordinated by Lisbon town hall, the workshop “Bairro ao Espelho” which invited the children from Sampaio Garrido School to imagine the square in front of the school, the renewal of dwellings or the design of the scenography for the Exhibition Novo Mundo of the Lisbon design museum, among others.

MORE INFO: http://www.ateliermob.com/


TERRAS DA COSTA + Colectivo Warehouse + Ana Catarino


rua do juncal


TERRAS DA COSTA + Colectivo Warehouse + Ana Catarino terras lelo martins



PROMOTION OF PEDESTRIAN ACCESSIBILITY IN LISBON EASTERN + Câmara de Lisboa

Pavimento liso Calçada de vidraço Blocos de betão Pavimento pitonado Pavimento estriado

Cargas/descargas Tomada/largada de pa Faixa de acostagem

Mobilidade condiciona Marcas rodoviárias

Caldeira existente com Caldeira proposta

Paragens de autocarro Sinalização vertical Pilaretes Semaforização

Tampas de infraestrutu Armários técnicos Iluminação

Sentido de trânsito com transportes públic

Sentido de trânsito sem transportes públic

C

E

Ru te em

Processo:

Emp. - 4/DMPO ACESSIB. E SE PEDONAL Morada:

Av. General Roça

SGPI:

2015.6200

Nº. Requisição de Tra

N/A

Designação da Propos

Rua Amiga do Pe

Designação da Peça D

CORES CONVEN Coordenação:

Pedro Homem de Proposta Preliminar:

Ateliermob Proposta Execução:

N/A Colaboração:

Tiago Mota Saraiv Mariana Robalo, I Joana Bastos, Rit Carolina Batlle y F Faria, Jannis Küh Dimensão da Folha:

594x2450mm N

Planta general de intervención en Rua General Roçadas

Nº. Folha Substituída

02

Data de Impressão:

31-OUT-2016


1.70

1.00

Texto BC

1.00

1.37

1.37

+2.80 m

0.50

+2.80 m Prateleiras com Painel Acrilico

0.96

2.70

2.70

0.50

2.17

ESP

+0.00 m

1.94

Projector suspenso

2.72

B

+1.65 m

3.43

+0.00 m

4.51

0.20

+2.73 m

+2.73 m

+0.00 m

Urna de voto em acrilico

2.40

4.00

+1.65 m

1.20

2.63 0.72

1.42

D

3.60

+4.08 m

Tela de Projecção 100x177cm _ formato 16:9 colada à parede Suspenso 43

1.65

+0.60 m

T5 | 49W _ 3000K

+0.00 m

+0.60 m

Suspenso 39

1.01

2.00

a ad str ca

3.00

en

Texto BC

TV

1.73

4.06

Texto BC

2.62

2.06

Texto JD

1.06

2.45

3.60

+4.08 m

2.70

4.51

2.03

1.00

+0.00 m

E

4.00

C 1.20

1.20

7.20

SOM

cabo de aço

+0.00 m

1.20

+0.00 m

+0.00 m

1.80

D Texto JD

cabo de aço

Texto BC

4.20

3.89

cabo de aço

cabo de aço Texto BC T5 | 49W _ 4100K

SOM

Projector suspenso

1.80

8.00

+0.00 m

SOM

1.94

A

F

Texto BC

Texto BC

T5 | 49W _ 4100K

T5 | 49W _ 4100K

+0.00 m

0.90

2.95

+0.00 m

T5 | 49W _ 4100K

cabo de aço

D

4.00

+0.00 m

4.00

3.27

1.31 Máquina da Morte T5 | 49W _ 4100K

Projector suspenso

1.63

Texto BC

2.06

1.15

1.80

+0.00 m

+0.00 m

3.60

2.30

1.10

0.96

Piso 1

Planta general de la intervención

Mesa Existente

Texto JD

T5 |49W _ 4100K

Tela para projecção Suspensa 200x112 _ formato 16:9 horizontal 100cm suspensa do chão

Projector suspenso

74 Texto BC

4.91

19

0.77

0.77

0.77

0.77

1.31

Mesa Sala 02

Cadeira Existente

208

208

212 31

33 32

31

24 PISO 0

Alturas lambril de azulejo: Sala 00: -/-m Sala 01: 0,72m Sala 02: 0,68m Sala 03: 1,65m Sala 04: 1,14m Sala 05: 1,48m Sala 06: 1,48m Sala 07: 1,70m Sala 08: 0,85m Sala 09: -/- m Sala R1: 1,40m Sala R2: 0,90m Sala R3: 0,69m Sala R4: 1,00m

25

17

211

30

ateliermob

22

Rua dos Fanqueiros 235 4ºE | 1100 229 Lisboa | PORTUGAL | Tel.: + 351 218863869 | info@ateliermob.com | http://ateliermob.com | NIF: 507493400

29

ARQUITECTURA

27

ATELIERMOB - Arquitectura. Design e Urbanismo Lda. Andreia Salavessa (OA13888) Tiago Mota Saraiva (OA10032) Técnico Responsável Rita Aguiar Rodrigues Carolina Batlle y Font Inés Sebastián Cristina Romão Mariana Robalo Carlos Silva Marta Viera Paula Miranda António Faria

REQUERENTE MUDE

26

210

FASE Projecto de Execução

Exposição NOVO MUNDO

Março 2017

DESENHO

23

18

PROJECTO

DATA

Planta Geral

LOCALIZAÇÃO Palácio dos Condes da Calheta Jardim Botânico Tropical, Belém, Lisboa

ESCALA 1/100

REF.

ARQ.EX.01

08

08

16

11

10

07

209 208 20

06

14

01

Áreas: Sala 00: 101.29m² Sala 01: 98.6m² Sala 02: 86.3m² Sala 03: 78.85m² Sala 04: 41.80m² Sala 05: 25.00m² Sala 06: 96.68m² Sala 07: 94.67m² Sala 08: 59.13m² Sala 09: 45.87m² Sala R1:41.73m² Sala R2: 26.67m² Sala R3: 50.75m² Sala R4: 48.36m²

11 1

Pd livre máximo: Sala 00: -/- m Sala 01: 5,00m Sala 02: 7,30m Sala 03: 5,97m Sala 04: 4,84m Sala 05: 4,84m Sala 06: 5,97m Sala 07: 5,53m Sala 08: 4,70m Sala 09: -/- m Sala R1: 5,00m Sala R2: 5,00m Sala R3: 3,95m / 4,66m Sala R4: 5,00m

N

ate Rua dos Fanqueiros 235

Planta com Objectos e Marcação Pavimento

Planta districución iluminación Sala 07

Planta dos Módulos

m Sala 07 +1.20 m +0,60 m +0.00 Planta districución altura plintos

ARQUITECTURA

ATELIERMOB - Arquit

Andreia Salavessa (OA Tiago Mota Saraiva (OA Rita Aguiar Rodrigues Carlos Silva Paula Miranda


EXHIBITION “NOVO MUNDO“ + MUDE, Museum de Design



WORKSHOP: PENSAR O BAIRRO, OCUPANDO A PRAÇA! + Sampaio Garrido School


KINDERGARTEN IN HAITI Gonaives, Haití 2015

Work developed during a stay at the College Inmaculée Conception of Gonaives (Haití) of San Viateur´s educational network, during the months from July to October of 2015, inside the program “Juventud Vasca Cooperante” of the Basque Goverment. The summer holidays of the students were used to build to more classrooms for the kindergarten, as well as a kitchen and a space for laundry. Always under the pressure of having to resolve both, the program and the construction as soon as possible due to the high number of children inscribed for the new course, in a context where attend to school is not only a educational opportunity but the safety of eating at least once a day. The low resources lead to a simple construction of concrete blocks. To apport a bit more of flexibility, the division between the classrooms were made by a movil wood partition.


Photographies of the process: inicitial state, construction and clasrrooms in use


DESIGN OF WOOD STRUCTURES Lisbon, Portugal 2017 Collaboration with the photographer of angolan origin and based in Portugal, Monica de Miranda, in the design and construction of different removable wood structures for the exhibition of her works. The structure shown below was designed to an exhibiton in Sabrina Amrani Gallery in Madrid (Spain). It can be use in two differente ways. On one hand, it was created a base of 5 shelves and a box that would funcionate by a simple fixation to the wall, in consonance with the language use in other of her pieces. On the other hand, when necessary, and extra freestanding structure is added so has to work as an independent artistic piece that can be exposed with of the necessity of walls. In this case, the volcanic sand that should be exposed together to the photographies is uses as a counterbalance to DTH02

DTH01

assure the estability of the structure.

MORE INFO:

Fixação em escuadria (45º)

Em caso seja preciso um reforço, realizar na parte interior junto a base, a ficar escondida baixo a areia.

https://monicademiranda.org/

Dupla fixacão- empalme e mecánica

DTH03

0,0

5

0,1

0,05

0,0

5

Tipo 1

Tipo 1

Fixação mecánica a asegurar a estabilidade da união entre planos vertical e horizontal. Pode ser incrementado o número de fixações no caso de precisar Tipo 1- fixação passante Tipo 2- fixação standard

0,05

Corte Tipo 2

0,05

0,1

0,05

Alçado


1,3

DTH02

0,3

0,3

1,02

1,8

2,06

0,26

0,78

0,26

1,04

0,26

1,3

2 Fase 2: autoportante

0,81

1,3

0,8

Alçado COM estructura autoport

Alçado estructura fixada à parede PLANO: Vista frontal con fotografias Referência espacio galeria Sabrina Anrami

ESCALA: 1/25

DATA: 30/05/2017

OBSERVAÇÕES:

DTH03

A Fase 1: fixada à parede

DTH01

Axonometria estructura 07

ESCALA: 1/25

DATA: 30/05/2017

OBSERVAÇÕES: 6/7


BRAND GRAPHIC DESIGN Bilbao, Basque Country, 2016 Here, is shown, the collaboration with the lingerie and accessories stores Zubiri, a familiar basque enterprise founded in 1908 and currently run by its third generation, in the updating of the design of its gift bags. Looking to update and break with the classic image of the design of the previous bag, it was decided to use small handmade black and white illustrations representing the variety of products offered, giving a more dynamic image of the brand. Subsequently the final image was digitized to perform the stamping in bags of 100% organic cotton by screen printing. Until nowadays, more than 500 units have been distributed among Zubiri’s clients.

MORE INFO: http://www.lenceriazubiri.es/



02// Academic works SPACE FOR COLLABORATIVE WORK Thesis Proyect, Valencia 2015

The intervention takes place in Cabanyal, a maritime quarter of the city nowadays abandoned by the public administration. To solve the problems arising from this abandoment the integration of the project is worked in parallel in two ways; urban and human activation.

In that way, the program is re-organized to allow its opening to the neighbourhood so that the activities of the cowork could broke the built boundaries and spread to the street.

The formal intervention is minimal, respecting always the existing alignments and recovering a old industrial building and the square in front of it as the center of the new activity for a better integration. Designed in a industrialised way, both the structure and the final materials are choosen to get a low-cost building of easy construction in a short time.


VEGETACIÓN:

- Especies autóctonas mediterráneas - Vegetación a diferentes alturas - Árboles hoja caduca: sol en invierno- sombra en verano - Aromáticas: olor y color

Plátano de

Morera

Romero

Tomillo

Lavanda

DIRECCIONALIDAD:

Banco con

Aparca

- “Servicios” aglutinados en banda (al igual que los volúmenes), dejando pasos amplios para la aparición de actividades espontáneas - Mobiliario remarca directrices dadas por los volúmenes - Iluminación de orientación remarca el flujo entre los espacios de la intervención

PEATONALIZACIÓN:

- Pavimento continuo al mismo nivel entre la manzana de intervención y la acera sur de Mariá Cuber - Potenciar eje: Iglesia del Rosario - Museo del ArrozAtarazanas - Recorrido peatonal desde estación tranvía


35

CA MOSQUETER ESPAI DE TREBALL COL·LABORATIU

<< 1) Relación de los espacios. Abertura del programa para mayor integración en el barrio. 2) Diagrama de actores y perfiles de usuarios a tener en cuenta en el desarrollo del proyecto.3) Distribución final del programa sobre volúmenes en maqueta.

Secciones longitudinales y alzado representativas del proyecto > >

COWORK





[CO]WORK in PROGRESS!! Muestra temporal actividades realizadas



09

+ +

+

<<

+

Cerramiento

CE08 El sistema constructivo de los diferentes elementos de compartimentación y cierre se han diseñado desde una perspectiva de industrialización que permita una puesta en obra prácticamente en seco, rápida y barata. El sistema resuelve la construcción tanto al interior como al exterior. TE01

08

Para ello se ha jugado con tres tipos de acabado en función de las necesidades del espacio: policarboST01 ST02 nato, osb o pladur/mortero. En el frente del cowork y el atrio del edificio de actividades paralelas el cierre de fachada se realiza con doble hoja de policarbonato multiceldilla con cámara de aire, lo que permite ST03 el paso de luz difusa ST04 CE08 óptima para el trabajo. ST05 En los espacios donde es necesario un mayor control de la luz, la hoja inteior se sustituye por un panel sandwich. Así el volumen norte que rompe el límite de la nave para albergar la cafetería se presenta sólido TE01 y opaco frente a la translucided del cierre deST06 las naves

02 03

TE01

ST07

ST01 ST02

04 ST03 ST04

07

versal cowork e 1:250

ST05

ST06

05

01: Pavimento con acabado de hormigón pulido con resinas epoxy ST07 02: Forjado mixto. Chapa grecada e=1mm + armado de positivos O16mm + 20 cm de hormigón + armadura de reparto O12mm 03: Perfil laminado IPE 240 04: Soporte. Perfil laminado IPE 180 05: Ménsula e=10 mm soldada a soporte 06: Subestructura principal de fachada. Tubo de acero 60x150x5 07: Subestructura interior del panel sandwich conformado in situ. Perfiles tipo C de acero galvanizado unidos por tornillos autoperforantes e= 1mm 08: Panel sandwich conformado in situ: panel madera osb e= 12mm + aislante lana de roca 60mm + Panel hidrófugo con tratamiento de resinas 19mm DETALLE SUMIDERO CUBIERTA ACT.PRL 1/20: D4 para 09: Cinta estanqueidad juntas de panel sandwich 10: Pletina de sujección de la hoja exterior 11: Policarbonato coloreado “opal” multiceldilla e=40mm CE10

11

06 10

ST01

SU01

ST00: viga riostra bajo muro existente. ST01: soporte, perfil IPE 360 acero laminado galvanizado ST02: celosía perfil tipo “L” para solidarización con la estructura preexistente ST03: placa de anclaje del soporte a la losa de cimentación; unión rígida (e = 2 cm) DETALLE ENCUENTRO CIMENTACIONES ST04: losa1/20: de cimentación de hormigón armado. Armado base: diámetro 12 cada 20 cm. (e = 50 cm)

SU02

SU03

D1

SU04

ST01 EXT01: baldosa hidráulica 20 x 20 x 5 EXT02: mortero de agarre (e = 4 cm) ST00: viga riostra muro armado existente. EXT03: solera de bajo hormigón con armadura de reparto ST01: soporte, IPE compactado 360 aceroST02 laminado galvanizado EXT04: terrenoperfil natural SU01 SU02 SU03 SU04 SU05 ST02: celosía perfil tipo “L” para solidarización con la estructura preexistente ST03: deladrillo anclaje del soporte a laylosa de cimentación; rígida (eresinas = 2 cm) CE00:placa fábrica existente. Limpia tratada con mortero unión hidrófugo de ST04: de cimentación de hormigón armado. Armado base: diámetro 12 cada 20 CE01:losa aislante térmico formado por panel rígido de lana de roca hidrofugada de alta cm. (e = 50 cm) densidad CE02: cámara de aire + perfil de acero galvanizado atornillado al paramento existente EXT01: hidráulica 20 x 20 x 5 atornillado a los montantes verticales (e = 2 cm) CE03: baldosa doble placa de cartón yeso, EXT02: mortero de agarre (e = 4 cm) EXT03: solera de hormigón armado con armadura de reparto SU01: gres porcelánico STON-KER EXT04: terreno natural compactado SU02: mortero de agarre (e = 4 cm) SU03: recrecido de mortero para suelo radiante CE00: existente. Limpia y tratada mortero hidrófugo de resinas SU04: fábrica tubo deladrillo polietileno de alta densidad paracon suelo radiante CE01: por panel rígido derígido lana de de alta SU05: aislante aIslante térmico térmico formado térmico formada por panel de roca lana hidrofugada de vidrio densidad SU06: hormigón de limpieza (e = 10 cm) CE02: depropileno aire + perfil de acero galvanizado atornillado al paramento existente SU07: cámara lámina de CE03: placa de de grava cartón(capa yeso, atornillado a los montantes verticales (e = 2 cm) SU08: doble encachado drenante) (e = 45 cm) SU09: terreno natural SU01: gres porcelánico STON-KER SU02: mortero de agarre (e = 4 cm) SU03: recrecido de mortero para suelo radiante SU04: tubo de polietileno de alta densidad para suelo radiante SU05: aIslante térmico térmico formada por panel rígido de lana de vidrio SU06: hormigón de limpieza (e = 10 cm) SU07: lámina de propileno SU08: encachado de grava (capa drenante) (e = 45 cm) SU09: terreno natural

ST01

SU01

EXT01

EXT02

SU03

SU04

SU02

CE01 CE02

SU05

EXT03

EXT04 CE00

SU05

CE01 CE02 CE03

ST02

ST00 ST04

SU06 SU07

SU08

SU09

CE03

D4

D4

DETALLE SUMIDERO CUBIERTA ACT.PRL 1/20:

CE01 ST00: viga riostra bajo muro existente. CE02 ST01: soporte, perfil IPE 360 acero laminado galvanizado CE04 CE03 CE05 ST02: celosía perfil TE02tipo “L” para solidarización con la estructura preexistente CE06 ST03: placa de anclaje del soporte a la losa de cimentación; unión rígida (eCE07 = 2 cm) ST04: losa de cimentación de hormigón armado. Armado base: diámetro 12 cada 20 CE09 ST08 cm. (e = 50 cm) CU08 CU09 CE08

EXT01: baldosa hidráulica 20 x 20 x 5 EXT02: mortero de agarre (e = 4 cm) TE01 EXT03: solera de hormigón armado con armadura de reparto EXT04: terreno natural compactado

CE02 ST06

ST07 ST08

ST08

SU01

04

07

D5

ST07

ST01

ST03

C C C C C 01: Placa de anclaje al pilar 200x300x20mm C 02: Perfil laminado IPE 200 en mensula C 03: Perfil en L para sujección del pavimento C 04: Perfil en U para sujección del pavimento C ST06 de madera 40x 200 x 1300mm 05: Pavimento mediante tablero C 06: Barandilla compuesta mediante perfile en T de acero galvanizado atorn C ST05 07: Pasamanos circular de madera Ø50mm 08: Cable metálico

DETALLE FACHADA NANO-TALLERES 1/20:

CE02 CE03

D5

08

ST04

06

CE04

03

D5

04

DETALLE FACHADA NANO-TALLERES 1/20: CE05

ST01: Perfil metálico laminado IPE 360 ST02 CE01 ST02: Perfil metálico laminado IPE 270 CE02 ST03:Perfil metálico 05 laminado IPE 200 ST03 ST04: Placa de CE03anclaje 200x300x20 mm 06 ST05: Perfil metálico laminado IPE 200 en mensula CE04 CE06 CE07 ST06: ChapaCE05 grecada e = 1 mm CE08 ST07: Capa de hormigón e= 20 cm ST08: MallazoCE09 antifisuración ∅12 cada 25 cm 01 CE10 ST09: Remate perimetral e = 1,5mm ST10: Tirante acero galvanizado e = 1,5mm ST02

08

C C C C C C C C C C C C C C C C C C C C C C C

07

CE01

CE03

ST01

TE01 ST07

ST06

03

ST01: Perfil metálico laminado IPE 360 ST02: Perfil metálico laminado IPE 270 ST03:Perfil metálico laminado IPE 200 ST04: Placa de anclaje 200x300x20 mm ST05: Perfil metálico laminado IPE 200 en mensula 04 ST06: Chapa grecada e = 1 mm ST07: Capa de hormigón e= 20 cm ST08: Mallazo antifisuración ∅12 cada 25 cm 01 ST10 CE02 CE02 ST09: Remate perimetral e = 1,5mm 03 ST01: metálico laminado IPEe360 ST10:Perfil Tirante acero galvanizado = 1,5mm ST02: Perfil metálico laminado IPE 270 CE03 CE03 ST03:Perfil metálico laminado IPE de 200hormigón pulido por resinas epoxi SU01: Pavimento con acabado ST09 200x300x20 mm ST04: dede anclaje SU02:Placa Tablero madera 40x 200 x 1300mm ST05: Perfil metálico laminado IPE 200 en mensula 02 ST06: Chapa e = 1 mm multiceldilla coloreado e= 40mm PAR01: Panelgrecada de policarbonato PAR02 ST07: Capa e=galvanizado 20 cm PAR02: Pefil enhormigón U de acero para sujección panel policarbonato ST03 de 01 CE01: Panel machiembrado policarbonato multiceldillaST08: coloreado opal e =antifisuración 40 ST05 cada 25 cm ST04mm Mallazo ∅12 CE02: Cámara de aire ventilada e= 70 mm ST09: Remate perimetral e = 1,5mm CE03: Panel hidrófugo con tratamiento de resinas fenólicas 19 mm ST01 CE04: Aislante térmico. Lana de roca mineral e = 50 mmST10: Tirante acero galvanizado e = 1,5mm

CU06 CU05 CU04 CU03 CU02 CU01

TE01

08

DETALLE ENCUENTRO CUBIERTA Y FÁBRICA EXISTENTE 1/20:

C C C C C S C C C C C

TE02

CE00: fábrica ladrillo existente. Limpia y tratada con mortero hidrófugo de resinas CU07 CE01: aislante térmico formado por ST03 panel rígido de lana de roca hidrofugada de alta CE09 ST04 ST08 CU08 CU09 densidad CE08 CE02: cámara de aire + perfil de acero galvanizado atornillado al paramento existente ST05 CE03: doble placa de cartón yeso, atornillado a los montantes verticales (e = 2 cm) SU01: gres porcelánico STON-KER ST06 08 SU02: mortero de agarre (e = 4 cm) ST01 ST02 radiante SU03: recrecido de mortero para suelo SU04: tubo de polietileno de alta densidad para suelo radiante SU05: aIslante térmico térmico formada por panel rígido de lana de vidrio ST03 ST04 SU06:07hormigón de limpieza (e = 10 cm) SU07: lámina de propileno ST05 SU08: encachado de grava (capa drenante) (e = 45 cm) SU09: terreno natural

S S S S S S

CU07 CU06 CU05 CU04 CU03 CU02 CU01

CE04 CE05 CE06 CE07

ST01 ST02

TE02

08

D2

DETALLE SUMIDE

CE10

ST01

ST01

DETALLE FACHA

01: Placa de anclaje al pilar 200x300x20mm 02: Perfil laminado IPE 200 en mensula 03: Perfil en L para sujección del pavimento 04: Perfil en U para sujección del pavimento ST06 de madera 40x 200 x 1300mm 05: Pavimento mediante tablero CE01 06: Barandilla compuesta mediante perfile en T de acero galvanizado atornil ST05 07: Pasamanos circular de madera Ø50mm CE02 08: Cable metálico ST04 ST01:CE03 Perfil metálico lamin 06 ST02: Perfil metálico lamin ST03:CE04 Perfil metálico lamin ST04:CE05 Chapa grecada e = ST05: Capa de hormigón ST06: Mallazo antifisuració ST07: Remate perimetral e ST08: Tirante acero galvan

CE05: Panel madera virutas orientadas (osb) e = 12 mm CE06: Pletina de machihembrado de acero galvanizado 05 con acabado de hormigón pulido por resinas epoxi ST02 SU01: con acabado de hormigón pulido por resinas epoxi SU01: Pavimento CE07: Perfiles tipo C de acero galvanizado. Subestructura interiorPavimento panel sandwich. CE08: Tubo de acero 60x150x10 mm. Subestructura principal de Tablero fachada de madera 40x 200 x 1300mm SU02: SU02: Tablero de madera 40x 200 x 1300mmST03 CE09: Panel composite alucobond plegado e = 5 mm CE06 CE10: Carpintería de acero laminado galvanizado con rotura de puente térmico CU01: Panel Teja asfáltica bituminosamulticeldilla BARDOLINE coloreado ONDULINE e= 40mm 02 02 PAR01: de policarbonato PAR01: PanelCE07 de policarbonato multiceldilla coloreado e= 40mm CE11: Vidrio laminar doble cámara de aire 6+ 12 + 6 PAR01 CE08 CU02: Sujección mecánica de la teja asfáltica CE12: Pasamoanos metálico. Cumplimiento altura seguridad huecos h = en 1 m U de PAR02: Pefil acero galvanizado para sujección panel policarbonato PAR02: Pefil en U de acero galvanizado para sujección panel policarbonato CU01: Teja asfáltica bituminosa BARDOLINE ONDULINE CE01: Panel machiembrado policarbonato coloreado opal e = sandwich 40 mm machiembrado policarbonato multiceldilla coloreado opal e CE09 = 40 mm CU03: Panel prefabricado ONDUTHERM: 19 CE01: mmPanel panel aglomerado hidrófugo CU02: Sujección mecánicamulticeldilla de la teja asfáltica

CE01: Panel machiembra CE02: Cámara de aire ve 05 hidrófugo co CE03: Panel CE04: Aislante térmico. La ST01: Perfil metálico lamina CE05: Panel madera virut ST02: Perfil metálico lamina CE06 CE06: Pletina de machihe ST03: Perfil metálico lamina CE07 CE07: Perfilesgrecada tipo C deeac ST04: Chapa = CE08: Tubode dehormigón acero 60x1 CE08 ST05: Capa e CE09: Chapaantifisuración plegada en CE09 ST06: Mallazo CE10: Perfil acero galvan


Alzado por calle Mariá Cuber e 1:250

< < Estructura portante

Por economía de tiempo y dinero se opta por un sistema de estructura metálica y forjados mixtos a base hormigón armado y chapa grecada de un 1mm de espesor. En la rehabilitación de las naves la nueva estructura recupera el módulo y la forma a dos aguas de la estructura preexistente manteniendo así el ambiente industrial. Sin embargo, el pórtico se realiza con perfiles únicos liberando al máximo el espacio. Los pórticos de fachada se arriostran en cubierta para asegurar la intraslacionalidad de la estructura. Interiormente se realizan dos nuevas bandas, continuando una de ellas hasta conformar el espacio de la cafetería, estableciendo en ese punto una junta de dilatación por las restricciones de la normativa. En el edificio de actividades paralelas el criterio establecido es el mismo: estructura metálica mediante perfiles laminados y forjado de chapa metálica

E1

DETALLE SOLIDARIZACIÓN DE LA ESTRUCTURA Pilar fábrica existente Rebosadero Ø60mm

E4

1/15:

DETALLE FORJADO COLAORANTE SALA POLIVALENTE 1/15: Tirante galvanizado RCOL-04.02

Placa rigidizadora superior

Remate Perimetral RCOL-01.02 Armadura base Ø 12 cada 20 cm

IPE 360

IPE 180

IPE 360

Perfil L 100x100x5mm

IPE 330 Aligerado

IPE 240

HEA 180

Material elastomérico IPE 360 Remate Perimetral RCOL-01.02 Material elastomérico

E2

E5

DETALLE PLACA DE ANCLAJE MEDIANERA 1/15 :

Tornillos

Hormigón DETALLE JUNTA DILATACIÓN HA - 30 / B / 20 / IIa

Remate Perimetral Armadura reparto RCOL-01.02 Ø 12 cada 25 cm

1/15:

IPE 270

Material elastomérico HEA 140

IPE 360 IPE 240

Pernos de anclaje

0.50

IPE 270

Pies de pato (separación armaduras)

lb = 0.30 IPE 240

Remate Perimetral RCOL-01.02

Sopanda

Armadura base Ø 12 cada 20 cm

HEA 140 IPE 180

Puntal

HEA 180

HEA 140 IPE 270

IPE 360

IPE 330 Aligerado

L/2

HEA 140 Armadura base Ø 12 cada 20 cm

L HEA 140

0.10

Pernos de anclaje Ø 12 Armadura base Ø 12 cada 20 cm

Hormigón de limpieza Separadores h= 5 cm

HEA 140 Pernos de anclaje Ø 12 Armadura base Ø 12 cada 20 cm Separadores h= 5 cm

E3

DETALLE PLACA DE ANCLAJE UNIÓN RIGIDA 1/15 :

Pernos de anclaje Ø 12

lb = 0.30

0.50

lb = 0.30

0.10 0.50

lb = 0.30

0.10 0.50

Separadores h= 5 cm

Rebosadero Ø60mm

Rebosadero Ø60mm

0.10 Separadores h= 5 cm HEA 140

HEA 140 Rebosadero Ø60mm HEA 140

Rebosadero HEA 140 Ø60mm HEA 140

HEA 140


PHYSICAL REHABILITATION AND HYDROTHERAPY CENTER Elcano factory, Manises 2013

Rehabilitation of an old factory in Manises by transforming it in a center of physical rehabilitation and hydrotherapy. Designed both as a service for physical recuperation and as a leisure space, the intervention is part of a major project of a future expansion of the urban fabric.

The project assumes the original structure and distributes the programme in an organised way by a double standard: public and private spaces, and wet and dry characteristics of them. This way, the dry spaces tip over an interior central garden, while the area of hydrotherapy looks outside to the ravine next to it.

Externally the original appearence of the factory is mostly conversed as a sign of respect to the past.


El Lugar

Planta Implantaciรณn


análisis Programa // Perfiles de Usuario // Schedules

1)

Identification of a big public space limited by the warhouse to be work and the continous ones

4)

División público|privada que se mantiene a la hora de dividir los espacios húmedos y secos

2)

5)

Introduction of the exterior square inside the builiding

Absorción de los flujos internos de movimiento de los usuarios por parte del atrio central

3)

6)

Gradation, higher level, bigger privacity

Uso del propio programa para ligar las naves laterales ahora independientes, potenciando así el uso del espacio libre interior

Estrategia del proyecto


Cota

+10.25 m

+ Terapia Natural + Masaje

Cota

+5.25 m

+ Duchas higiénicas + Piscina hidromasaje 10º,34º,38º + Terma romana + Baño turco + Pediluvio + Duchas térmicas + Tumbona térmica + Sala de rehabilitación + Sala de musculación + Sala mantenimiento + Vestuarios + Aseos

Cota

+ 0 m

+ Zona verde + Cafetería + Area infantil + Aseos públicos + Punto de información + Recepción + Administración + Enfermería + Instalaciones

Axonometría General del Proyecto


Sección Transversal

a-a’

Sección Transversal

b-b’

Alzado longitudinal Este

Sección

Longitudinal d-d’

Planta Primera


01_ Pieza de remate cumbrera sujeta por atornillamiento 02_ Lucernario. Carpintería sobre subestructura de perfiles rectangulares atornillados a las correas de cubierta 03_ Cubierta deck: o,5cm aluminio + 6cm lana de roca + 0,5cm aluminio, Anclaje por tornillo autorroscante 04_ Hueco con carpintería abatible + sensores control de temperatura y condensación 05_ Cerramiento original de fábrica, Eliminación del revestimiento exterior e interior 06_ Pavimento. Recrecido de mortero de cemento por suelo radiante. Tubos polietileno de alta densidad. Aislamiento térmico. Forjado presistente 07_ Tabique palomero ladrillo macizo. 08_ Pasarela de circulación. Chapa perforada métalica apoyada sobre perfile rectangulares. Perfil IPN160 en ménsula unido por soldadura a perfil rectangular atornillado al forjado original. Barandilla compuesta por perfiles metálicos unidos por soldadura + placa metálica como paramento 09_ Guardería. Estructura de madera con aislamiento entre montantes + panelado exterior.

Sección Constructiva


COLLECTIVE HOUSING IN VALENCIA Grupo Antonia Rueda, Valencia 2011

Redesign of a block and a small tower of dwelling in the city of Valencia.

Inserted in a housing complex built in 1972; the intervention respects the continuous visuals created by the original project as well as the footprints of the buildings. On the other hand, given the community nature inherited from the idea of a collective housing, an area of public and common spaces are worked together to the ordinary program in the last block´s height.

Constructively, the exterior is solved by a ventilated façade system of ceramic tiles. In order to cope with the strong sunlight of the city the holes are protected with mobile wooden slat blinds which provides movement to the intervention.


SUSTITUCION BLOQUE Y TORRE _______________________

nalidad

PLANTA GENERAL 1/400

02


BLOQUE PLANTAS

BLOQUE PLANTAS

PLANTA BAJA PLANTA BAJA

1:200 1:200

PLANTA TIPO 1:200 Planta tipo torre PLANTA TIPO

1:200

El espacio público circundante a la intervención residencial trata de dar respuesta a las necesidadaes del lugar; un espacio con una fuerte carga residencial y un colegio. De esta forma se trata de conectar ambos lugares y de dar al tiempo, un espacio al conjunto donde se potencien las relaciones entre los vecinos. A pesar de los distintos materiales en todo momento se BAJA 1:200 trazan caminos continuos de unión entre las zonas.PLANTA Por un lado se cierra el espacio a la calle principal mediante un “bosque” una zona arbolada más densa, con pavimentos más blandos, como el césped o la corteza de pino. En la zona de transición se utilizan más arbustos bajos como la lavanda o rellenos de grava blanca y negra. Por último, el pavimento de la plaza se CUBIERTA 1:200 Planta cubierta PLANTA torre hace continuo, con cambios irregulares en el tipo de baldosa, pero ya con PLANTA CUBIERTA 1:200 un caracter más duro.

ALZADO NORTE ALZADO NORTE

1:200 1:200

BLOQUE PLANTAS Planta tipo bloque PLANTA TIPO

1:200

PLANTA USO COMUN

1:200

Planta espacios comunes bloque PLANTA USO COMUN

1:200

Planta cubierta bloque PLANTA CUBIERTAS

1:200



URBAN RENEWAL OF THE DISTRICT OF RASCANYA Urban planning, Valencia 2011

Team work in which every aspect of a urban renovation was analysed for get up to a real, funtional and economic proposal of urban renewal ot the district of Rascanya in Valencia.

The quartier is studied in social, educational, enviroment, urban and economic terms so that the new urban planning will improve people´s conditions of life. In that way, different phases are estabilished, and the existing buildings were submitted to an intensive research and cataloged for an energy, estetic, mixed, plus or accesibility rehabilitation depending on parameters as the date of construction, solar and thermical conditions or constructive quality.

Besides, each phase of architectonic and urban intervention is accompanied of a educational program and social activities which put the focus on the neighbourghood and its potential as an active agent in urbans renewals.


Tipos rehabilitación

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Tipos rehabilitación

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

ANTES

NIVEL OPTIMO

AHORA

184

154 60 viv/ha DENSIDAD EDIFICATORIA

DUCED BY AN AUTODESK EDUCATIONAL PRODUCT

ANTES

NIVEL OPTIMO

AHORA

29.4

44.4 25 %VIARIO PUBLICO TRAFICO

ativa\renders\huerta carretera.jpg

ANTES

NIVEL OPTIMO

AHORA

70.6

55.6 75 %VIARIO PUBLICO PEATONAL ANTES

NIVEL OPTIMO

AHORA

0.19

m²/h 0.195 0.05 EQUIPAMIENTO SANITARIO ANTES

NIVEL OPTIMO

AHORA

ANTES

184

154 60 viv/ha DENSIDAD EDIFICATORIA ANTES

NIVEL OPTIMO

AHORA

ANTES

29.4

44.4 25 %VIARIO PUBLICO TRAFICO ANTES

NIVEL OPTIMO

AHORA

enders\pasarela1.jpg

ANTES

NIVEL OPTIMO

AHORA

ANTES

NIVEL OPTIMO

AHORA

184

154 60 viv/ha DENSIDAD EDIFICATORIA ANTES

NIVEL OPTIMO

AHORA

29.4

44.4 25 %VIARIO PUBLICO TRAFICO ANTES

NIVEL OPTIMO

AHORA

70.6

55.6 75 %VIARIO PUBLICO PEATONAL ANTES

NIVEL OPTIMO

AHORA

0.19

ANTES

NIVEL OPTIMO

AHORA

ANTES

184

154 60 viv/ha DENSIDAD EDIFICATORIA

FASES DE EJECUCIÓN ANTES

DEMOLICIÓN EDIFICACION REALOJOS 2012-2015

NIVEL OPTIMO

AHORA

29.4

44.4 25 2340 viv %VIARIO PUBLICO TRAFICO 5850 hab ANTES

NIVEL OPTIMO

AHORA

2012-2015

70.6

55.6 75 %VIARIO PUBLICO PEATONAL ANTES

NIVEL OPTIMO

AHORA

0.19

ANTES

NIVEL OPTIMO

1.195

0.38

AHORA

1.19

AHORA

1.19

ANTES

2185 viv 5462 hab

NIVEL OPTIMO

AHORA

0.8

DEMOLICIÓN 0.675 0.058 EDIFICACION 1705 viv EQUIPAMIENTO CULTURAL REALOJOS 2462 hab ANTES

2012-2015

NIVEL OPTIMO

AHORA

0.381

0.381 0.08 EQUIPAMIENTO DEPORTIVO ANTES

NIVEL OPTIMO

AHORA

0.048

0.048 0.105 EQUIPAMIENTO SOCIAL ANTES

0.35

NIVEL OPTIMO

1.5

AHORA

4.38 m²/h

AHORA

ANTES

NIVEL OPTIMO

AHORA

ANTES

NIVEL OPTIMO

AHORA

0.381

0.381 0.08 EQUIPAMIENTO DEPORTIVO ANTES

NIVEL OPTIMO

AHORA

0.048

0.048 0.105 EQUIPAMIENTO SOCIAL ANTES

NIVEL OPTIMO

AHORA

Financiación 100 ANTES

NIVEL OPTIMO

AHORA

ANTES

NIVEL OPTIMO

AHORA

ANTES

NIVEL OPTIMO

AHORA

ANTES

100

NIVEL OPTIMO

100

AHORA

100

NIVEL OPTIMO

AHORA

4.38

NIVEL OPTIMO

AHORA

100

NIVEL OPTIMO

AHORA

100

ANTES

NIVEL OPTIMO

AHORA

100

100 100 ACCESO A AREA > 1HA NIVEL OPTIMO

AHORA

100

100 100 ACCESO A AREA > 10HA NIVEL OPTIMO

AHORA

33.09

3.63 >30% PERMEABILIDAD DEL SUELO NIVEL OPTIMO

AHORA

32.8

16.75 30 % PERSONAS JURIDICAS ANTES

100

100 100 ACCESO A AREA > 1HA

ANTES

ANTES

100

95.8 100 ACCESO A AREA > 5000M²

AHORA

0.048

95.8 100 ACCESO A AREA > 5000M²

ANTES

59.7 100 ACCESO A AREA > 1000M²

NIVEL OPTIMO

59.7 100 ACCESO A AREA > 1000M²

ANTES

4.38

m²/h 0.35 1.5 ESPACIO VERDE x HABITANTE

AHORA

0.381

m²/h 0.35 1.5 ESPACIO VERDE x HABITANTE ANTES

0.8

0.675 0.058 EQUIPAMIENTO CULTURAL

NIVEL OPTIMO

0.048 0.105 EQUIPAMIENTO SOCIAL ANTES

1.19

PRODUCE

m²/h 0.195 0.05 EQUIPAMIENTO SANITARIO

DEMOLICIÓN EDIFICACION REALOJOS

NIVEL OPTIMO

1.195 0.38 EQUIPAMIENTO ESCOLAR

NIVEL OPTIMO

AHORA

0.8

PRODUCED BY AN AUTODESK EDUCATIONAL PRODU

m²/h 0.195 0.05 EQUIPAMIENTO SANITARIO

ANTES

1.195 0.38 EQUIPAMIENTO ESCOLAR

NIVEL OPTIMO

0.381 0.08 EQUIPAMIENTO DEPORTIVO ANTES

0.19

m²/h 0.195 0.05 EQUIPAMIENTO SANITARIO

AHORA

1.19

0.675 0.058 EQUIPAMIENTO CULTURAL ANTES

70.6

55.6 75 %VIARIO PUBLICO PEATONAL

NIVEL OPTIMO

1.195 0.38 EQUIPAMIENTO ESCOLAR

INCREMENTO

AHORA

7530

4938 66% VIVIENDAS NUEVAS ANTES

4390

INCREMENTO

11%

AHORA

4938


03// Research RECO + NATURE + Mariella Gentile Workshop developed during the first edition in Portugal (in the small town of Cadriceira) of the International Festival of Art and Construction on August 2017. The aim of the workshop was to build smaill ephimeral structures with the material given by each place. In that way, only manual tools were asked to the organisation, and all the work were carried out without electricity.

The methodology was quite simple, during a morning and throughout a collective walk, the participants were called to feel and discover the espacial opportunities of the place, as well as the materials that would be able to be use after in the construction.

The structure shown below, O Ninho, was built in the middle of a eucalyptus forest, without any mecanich fixation, and tried to create an intimistic space for meditation by using only material from the eucalyptus (wood, skin, leaves and fruits). The shape and the techniques were alll decided troughout collective experimentation.



COVARRUBIAS CONFESSIONS PROJECT + Poli del Canto Baquera + Derek Van der Buckle Workshop developed during the International Festival of Art and Construction on August 2014 in Covarrubias, Burgos. The workshop tried to lead to discussion humans relations and the way we comunicate and relate, and it´s differences in the urban and rural context. Taking the concept of “confessionary” as the starting point, the result are five different prototypes and a final performance.

As we explained during those journeys: “Under the premise of two big crawns - IFAC and Covarrubias- impacting during a certain time, we proposed a series of neutral spaces built by the development of the concept of the confessionary”. This performative protoypes will grow with people interaction

MORE INFO: https://issuu.com/ines_sebastian/docs/covarrubias_confessions_project



04// Collective work ARQUITECTURA SE MUEVE + open group

Born in Valencia in 2005 Arquitectura Se Mueve (ASM) is formed by students and young architects. Organized as a open and horizontal structure, the group develops its works around five fields: BIOconstruction, university action, citizen participation, REdesign and NETworking.

Always from a critical point of view, concius and committed to the architectural and social reality; around these last years several actions were carried out: design of furniture with recycle material, talks about citizen participation in the university area, design and construction of scenery for ongs, organization of events, housing recovery...

MORE INFO: https://arquitecturasemueve.wordpress.com/


Different activities: participation in a urbanism class at the UPV, design of furniture for Rototom Sunsplash Festival, open day for presentation of the“


THANKS!

INÉS SEBASTIÁN UGARTECHE + (34) 685 77 21 53, Spain //+ (351) 925 775 939, Portugal isebastianugarteche@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.