B
INCH SCALE
0
1
2
3
4
5
6
EPP Ed
Design by Leadfeat CAD Plans by Dz1s 12-OCT-2009 Change A - Horizon .75" and Rudder ex and .50" at the botto Change B - Moved forward .75" at win
Edge 540T
dfeather Dz1sfb
rizontal nose widened r extended .25" at top bottom. 03-NOV-2009 ved aileron hinge line wingtip and 0" at root.
B
A
FUSELAG
ELAGE SPLIT LINE - CUT LAST
CUTOUT FOR 5G ELEVATOR SERVO
1. CUT OU GUIDES T
2. HINGE A
3. ASSEMB FUSELAG ESC, AND
4. COMPL PUSHROD
T OUT ALL PARTS AND TRANSFER FUSELAGE ALIGNMENT ES TO BOTH SIDE OF HORIZONTAL SURFACES.
NGE ALL CONTROL SURFACES.
SEMBLE ALL HORIZONTAL SURFACES FIRST. THEN ADD LAGE VERTICAL UPPER OR LOWER DEPENDING ON SERVO. AND RX LOCATIONS SELECTED.
MPLETE BY ADDING REMAING FUSELAGE PART, RUDDER, HRODS, AND CONTROL HORNS.
OPTIO CUTOU SINGL AILER SERVO
CUTOUTS FOR TWIN 5G AILERON SERVOS
OPTIONAL CUTOUT FOR SINGLE 9G AILERON SERVO
OPTIONAL CUTOUT FOR SINGLE 9G AILERON SERVO
A