Epp edge 540t chg b nested epp

Page 1

INCH SCALE

EPP Edge 540T

Design by Leadfeather CAD Plans by Dz1sfb 12-OCT-2009 Change A - Horizontal nose widened .75" and Rudder extended .25" at top and .50" at the bottom. 03-NOV-2009 Change B - Moved aileron hinge line forward .75" at wingtip and 0" at root.

B

0

1

ailerons A Change 2 3 - Modified 4 5 6 Change B - Fuselage altered for change in assembly process

TYPICAL FUSELAGE ALIGNMENT GUIDES.

PARTS ARE NESTED TO FIT ON A STANDARD 18" X 36" SHEET OF EPP

CUTOUTS FOR TWIN 5G AILERON SERVOS

A

CUTOUT FOR 5G ELEVATOR SERVO

OPTIONAL CUTOUT FOR SINGLE 9G AILERON SERVO

A

1. CUT OUT ALL PARTS AND TRANSFER FUSELAGE ALIGNMENT GUIDES TO BOTH SIDE OF HORIZONTAL SURFACES. 2. HINGE ALL CONTROL SURFACES. FUSELAGE SPLIT LINE - CUT LAST

3. ASSEMBLE ALL HORIZONTAL SURFACES FIRST. THEN ADD FUSELAGE VERTICAL UPPER OR LOWER DEPENDING ON SERVO. ESC, AND RX LOCATIONS SELECTED. 4. COMPLETE BY ADDING REMAING FUSELAGE PART, RUDDER, PUSHRODS, AND CONTROL HORNS.

OPTIONAL CUTOUT FOR SINGLE 9G AILERON SERVO

B


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.