integral Build Bristol Grammar School case study

Page 1

Client: Bristol Grammar School Project: Science Refurbishment Bristol Grammar School (BGS) is one of Bristol’s most prestigious and well known private schools. As part of the school’s eight year plan to modernise its Gothic architecture estate, Integral Build were taken on during the summer recess to carry out a fast track fit out of the science block. The work involved the total strip out and substantial demolition works before construction could start, the raised floor housed state of the art IT and services for each lab bench. The benches themselves were custom built from our specialist supplier. The project was completed safely, on time and on budget for the new school year in September.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
integral Build Bristol Grammar School case study by Integral UK Ltd - Issuu