11. small case study 2 trinity river, ca

Page 1

Short course for UNIVERSIDAD NACIONAL DE INGENIERIA January 26-29, 2016

Planning and Design for Rehabilitation of Rivers Using Large Wood Metodología para Reforestar Ríos Degradados por Actividades Humanas usando Técnicas de Bioingeniería

12.0 Case study 2—Trinity River, California


Course overview Day I (Jan 26)--Foundational topics • Review of information resources (design handbooks and spreadsheets) for large wood • Is wood appropriate for your site?—criteria for screening (Planning)

Day 3 (Jan 28)—Risk, uncertainty and construction • Sensitivity and Monte Carlo analyses • Constructability assessment

• Three design approaches

• Case study II—Trinity River, California

• Key issues for large wood design

• Monitoring

Day 2 (Jan 27)—Designing large wood structures • Case study I—Little Topashaw Creek, Mississippi • Design life for wood structures/selection of design event or condition

Day 4 (Jan 29)--Field trip

Shields Engineering LLC

• Introductions

• Types of wood structures • Findings of recent research on drag and lift coefficients • “Road testing” selected design spreadsheets

2


Shields Engineering, LLC

Trinity River, California

3


Shields Engineering, LLC

An overview of the project

4


Shields Engineering, LLC

A mountain river impacted by gold mining

5


Shields Engineering, LLC

Simplified, straight channel

6


Shields Engineering, LLC

Rehabilitated by constructing complex side channels

7


• Deflector structure • Bar stabilization (bar apex) • Habitat within side channel

Shields Engineering, LLC

Large wood used in three ways

8


Shields Engineering, LLC

Constructing side channels

9


Shields Engineering, LLC

Side channel in 2015

10


Shields Engineering, LLC

Side channel in 2015

11


Shields Engineering, LLC

Side channel in 2015

12


Shields Engineering, LLC

Side channel in 2015

13


Shields Engineering, LLC

Side channel in 2015

14


Shields Engineering, LLC

Side channel in 2015

15


Trinity River Restoration • Gold mining • Dam operation • Flow diversion

• Restoration objective—salmon population • Restoration methods • • • •

Side channel construction Large wood Plantings Partial restoration of flow

Shields Engineering, LLC

• River drastically changed by

16


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.