the tectonic’
The Ashdown Center for Ironworks. Restoration of the Wealden Iron Furnace. Masters Architecture Part II First yr Project
‘reverse engineering a form’
the tectonic’
communal space
node future structures
social space
super structure
rudimentary connections
plan
the wall’
lenticular facade system’
‘1 dimentional screening magnified’
SET village’
lenticular facade system’
‘developing the facade’ concrete foundation
360x1700 stacked wood
as an extra support will be introduced
the facade and holds it in position FACADE SLICED
8mmsteelplate springsystem
360mmspacing
Dérive’
ephemeral ever-moving facade
parallax barriers and lenticular mapping
zumthor’s sound box inspired idea
CAP FLASHING ON SELF ADHERED
MEMBRANE ON TAPERED BLOCKING W/DRIP EDGE
FLUSH BEAM PER STRUCTURAL
VENTILATION HOLES SHEATHING
SINGLE-PLY ROOF MEMBRANE WRAP UP PARAPET WALL AND UNDER CAP FLASHING
DRILLED ANCHOR
CONTINUOUS STEEL CHANNEL (ANCHORED TO CONCRETE
REINFORCED CONCRETE
STEEL STUDS
TRANSOM
GLASS The Ashdown Center for Ironworks. Restoration of the Wealden Iron Furnace. Masters Architecture Part II First yr Project