Muhammad Irshad Ma'ruf's Architecture Portfolio 2019

Page 1


List of Contents

Curriculum Vitae

Project

Thoughts

Bank Aceh Headquarter

Aceh Regional Cardiac Hospital

Peunayong Shophouse

Electro Department O ce


Education 2014 - 2019 : Bachelor of Architecture (S.Ars) GPA : 3.27 Thesis : Aceh Regional Cardiac Hospital at Architecture Department Universitas Syiah Kuala (Unsyiah), Banda Aceh, Aceh

Muhammad Irshad Ma’ruf Phone +6281360880074 E-mail irshadmaruf@yahoo.com Address Jl.Kuricang VI Blok GC 5 no. 8 Bintaro Sektor 3 Tangerang Selatan 15412

2011 - 2014 : High School Degree at Private Senior High School YP. Shafiyyatul Amaliyyah, Medan, North Sumatera

Experiences 2019 : Logistic Manager of Islamic Fashion Festival at CV. Posh Production Banda Aceh, Aceh (Contract)

2018 : Junior Architect

Birthdate 13 August 1996 th

at PT. Arkonin, Jakarta Selatan, Jakarta (Internship) An enthusiastic 23 years old Architecture graduate who interested in architecture that leads to Public Service, Commercial purpose, and Healthcare. Earned the opportunity to design a Regional Cardiac Hospital as a thesis. Experienced in working on LRT (Light Rail Transit) station project for Jabodebek track at a well-managed Architecture Design and Engineering firm. Given the responsibility to manage team to compete in architectural competition at various level from national to international. Very excited to learn new things to come and looking forward to work even practice in any Architecture Design and Engineering firm.

2016 : Surveyor of Rumoh Aceh Local Context Research at Aceh Besar, Aceh for RISTEKDIKTI Lecturer Research Proposal (Contract)

Workshops & Competitions 2019 : Architecture Festival (Post Disaster Children Shelter) Participant at Universitas Kristen Petra, Surabaya

2017 : N30N Architecture Student Workshop Competition (Adaptive Re-use) and Installation (Street Furniture) Participant (Head of Delegates) at Johor Bahru, Malaysia

2017 : Vernacular Documentary (VernaDoc) Veteran at Aceh Besar, Aceh for Exhibition at Tsunami Museum, Banda Aceh

skills

2017 : Lafarge Holcim Awards (Sustainable Construction) Participant 90%

90%

2016 : MATRA Architecture Student Workshop AutoCAD

Adobe Photoshop

50%

Installation (Public Sculpture) Participant at Penang, Malaysia 90%

2015 : Personal Space Workshop ArchiCAD

at Architecture Department, Universitas Syiah Kuala, Aceh

CorelDraw

90%

50%

SketchUp

Organizations

V-Ray

80%

2017 : Architecture Student Association (HIMARSI) Unsyiah

70%

Microsoft O ce

Vice Chairman of Informartion and Communication department at Banda Aceh

Lumion

90%

70%

Sketch

2017 : District Worker (BPR) XIV Indonesian Architecture Student (FK-MAI)

Photography

Member of Talent and Interest department at Aceh Province

social Muhammad Irshad Ma’ruf https://issuu.com/irshadmaruf

Scan here to see my work

Languages Indonesian Native English Upper Intermediate


“ Long term solution to healthcare architecture is to make people take good care of their own health, that mean good architecture shouldn’t work just as a problem solver, but rather as a problem prevention ” Jerry Ong


retold the movement project : bank aceh headquarters location : kuta alam, banda aceh gross floor area : +/- 11.000 m2 floor count : 9 storey and 1 basement

Challenged to design it in ‘Cultural Symbol’ that mean this object should represent any local value in Aceh from any design approaching method. Approach through analogy was the better way to develop and give impact to surround physical environment (Ronald W.Smith, 2006). ‘Rapai Geleng’ dance value applied on this design object through analogy approach in order to give any contrary perspective to surround physical environment that shaped informal form. ‘Rapa’i Geleng’ could give favorable results in term of it applied on sequentiable pattern through it dance move. Because it gives an extreme form that could give much space for every users to have an open air space to rest to get relax or any kind a thing to do besides or in work .


movement sequence transform the dance move to mass form by analogy

right

up-right

left

up-left

east

west


1st floor plan

layout plan

6th floor plan section


site plan


heal as a whole project : aceh regional cardiac hospital location : bandar baru, banda aceh gross oor area : +/- 12.600 m2 oor count : 5 storey This hospital designed in purpose to give a better condition to patient and to environment at the same time. The role of this hospital in giving health to its patient done with an approach by environmental arrangement in intent to provide a better hospital atmosphere to patient as a mental support. Because environment role in patient health take place for about 40 % as a factor (Kaplan, 1993 in Sriti Mayang Sari, 2003) And the hospital responsibilities in giving environmental improvement done by replacing the greening potential of the site to be applied to hospital building and bring it closer to the patient. As it stated that replace the greenery area to the building is one form of energ y efďŹ ciency (Gonzalo Roberto, 2006) that means as less energy property it take part to save environment itself. And heal as a whole concept represent as hospital role to take patient nor environment itself to another level of better condition.


balcony

louvre

mental therapy through visual

t open air ow for non-medical space

mental therapy through environment

mental therapy through visual

b

+/- 30% green space applied on building rooftop

balcony

podium

open air heart gymnastic


layout plan

3rd floor plan

4th floor plan


isometric site plan

ďŹ rst concept sketch


continuation project : re-design of peunayong shophouse location : peunayong, banda aceh gross oor area : +/- 900 m2 number of units : 2 storey and 3 units 3 units of shophouse used as storage from other shopkeeper around and has stood for more than 50 years. Known as the ďŹ rst model of peunayong shophouse unit and one of Aceh cultural heritage, it will be re-design by an approach to pedestrian movement around shophouse to empower it based on pedestrian needs. During the study, it was found that the shophouse can be concluded as meet point of their movement who shop at the market. And it re-designed using Burra Charter method which states that ever y cultural heritage that re-used must maintain its physical character. It was decided that it will be re-used as stop over shop to maintain it value as a shophouse also it will be a junction active overpass crossing. And it will attract people around by selling any food and beverages products along the ramp inside and offer an overpass pedestrian crossing to perform continuation in their movement.


CI

L

ON

V ME P E HIC O E L IN T E T

SI

RC U

AT I

NPO MA T EE HU M

SV

N NT RIA O I T P S DE T PE E E M

SV

E CL HI T VEMEE INT PO FS

SV

SI

TE

IN

FS

T

RR

AN O M TP HU EE M

IN

FS

SV

SV

SV

FS

FS

T

SV

SV

SV

R R

FS

L

ON

SV SV

SV

U RC

I AT

E CL HI ET T E V ME IN PO

RR

FS

RR SV SV

SV

SV

pedestrian movement study diagram air flow

existing shophouse

bamboo shade + pvc roof

louvre roof

shade side bright side

praying room

stop-over shop

dry garden

public bench

louvre wall


n

la rp

o

o dfl

2n

n

la rp

o

o efl

in

n zza

me

n

fl 1st

oo

la rp


isometric site plan


reform the pattern project : re-design of electro department interior of univ.syiah kuala location : darussalam, banda aceh design area : +/- 285 m2 To provide a high quality office space, there is a design phase that must fulfill to reach a better result. Start from data collecting, then space and needs analyzing by user experience, and conceptualize the design by it context. While data collecting, it was found that the space is not well-functioned as it should. And then, it concluded that user experience wasn’t that satisfy for the existing office space. The design concept tend to perform a neatly arranged space by an approach to user activity pattern and contemporary theme. A pattern of its activity that hope to be happen were a loop of activity that wont disturb other activity by not separate it. Compact space design was a demand to this case that it match to a contemporary approach. Contemporary theme will give a neutral and pure atmosphere, tend to use a brigth color also furniture was a main contex of space. Reform the pattern means to reform the activity pattern also reform the atmosphere of it.


toi

let pa

ntr y

ex is

tin

me e ro ting om

g

wo

in po

ac

tiv

or

ity

pa tte

rn

rk

cir

cu

in

lat

se

ion

go

od

pa

ra te

sta tio

n

cir

cu

lat

ion

in

ac

tiv

ity

pa tte

rn

ceiling as a circulation pattern

de

sig

to divide the light into other space

praying room t pa oilet ntr + y re

st

ar

ea

workstation module

wo

cir

rk

cu

ac

tiv

ity

lat

pa tte

rn

workstation circulation

consultation area

main circulation

meeting area

ion

ar

ea

me e ro ting om

nr

es

ult



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.