1 minute read

THE PLACES

PGT Milano 2030

Milano PGT 2030 proposes a new dimension for innovation, better neighborhoods and a network of green spaces. It plans on doing this with several measures:

Advertisement

• 13 nodes of interchange, large public transport infrastructures for connectivity of the peri-urban areas; • 6 areas of special interest in urban voids, for public or general interest, and their functions of strategic nature; • 7 Piazzas from present traffic junctions which require transformations, creating spaces with better surroundings, connectivity and green areas; and • 88 districts to uplift the neighborhoods and ecological corridor in the metropolitan area.

With the help of these new proposals, new environmental strategies can be created at different levels to regenerate the areas in and around the axis GW6. With the presence of 2 districts, a special area, a piazza and in close vicinity of 2 nodes of interchanges, along with the canal Naviglio Grande makes this area of utmost importance. An ecological system can be created in the surroundings along with the upliftment of the neighborhood to make it more green, and the connectivity to the center of the city better

1.7 million sq.m of land to leave unbuilt for the reduction of land consumption in the city

Carbon neutrality for all new buildings, encouraging creation of green roofs and walls

Reduction of maximum building

index for less areas accessible to public transport 3.5 million sq.m of protected agricultural areas, of which 1.5 million sq.m in expansion of Parco Agricolo Sud

Climate Impact Reduction Index to calculate the green integration in urban planning and building interventions

40% share of social housing in new interventions, maximization of rental housing, 9 areas identified for social housing Proposal of 20 new parks linked to urban plans, along with a large metropolitan park connecting new ones to existing ones

Aim to plant 3 million trees in the metropolitan city, after identifying an ecological network, planting and reforestation

Time available to proceed with recovery or demolition of abandoned buildings is 18 months.

This article is from: