ismail akĹ&#x;it
architectural portfolio
curriculum vitĂŚ
web | www.ismailaksit.com e-mail | iaksit20@gmail.com phone | +905327441624
02 | cv
||||| |||| |||| ||| |||| ||| |||| |||| |||
language
adobe illustrator adobe photoshop autodesk autocad autodesk revit graphisoft archicad ms office rhinoceros sketchup vray
efekta | architectural office summer | 2013
interests
internship
eroÄ&#x;lu lounge2 | construction site summer | 2012
istanbul bilgi university | master of architecture 2015 - 2017 on hold
turkish | mother
mechanical watches
skills | human
education
istanbul technical university | architecture 2009 - 2014 completed
skills | technology
20 | november | 1990 denizli | turkey
sketching craftmanship creativity teamwork communication leadership
english | advanced | ielts 6 french | beginner
classical guitar lego
||| |||| |||| |||| |||| |||||
birkitapbiryazar istanbul congress center executive | 2011 - 2013 Arnold & Son workshop istanbul park hyatt macka hotel participant | july 2014 pecha kucha night vol.7 izmir chamber of architects speaker | november 2014 from digital design to physical objects salt galata maker movement workshops participant | april 2016
competitions
activities
IWC watchmaking workshop istanbul four seasons hotel coordinator | october 2012
design the weekend city | nurol gyo february | 2013 participant ankara | chamber of architects | “kent düşleri 8” saraçoğlu neighbourhood project competition june | 2013 finalist adana | chamber of architects | “kent için dönüşüm” project competition august | 2013 participant design atelier kadıköy “TAK” | borders - corners september | 2013 2nd prize çuhadaroğlu aluminum student competition | expo 2016 antalya tower october | 2013 participant koçtaş student competition | “açıkfikir 4” november | 2013 participant
cv |
03
professional
kalyon construction group architect february 2015 - september 2016
beykoz school campus | istanbul | 95.000 sqm project development and coordination .selecting architecture and engineering firms .preparing design inputs for concept and detailed drawings .providing communication between firms .selecting and procurement materials .coordinating construction requirements on site cubuklu urban renewal project | istanbul | 170.000 sqm project development .selecting architecture and engineering firms .preparing design inputs for concept istanbul 3rd airport | airport city masterplan project development .preparing design inputs for concept .presentation and evaluation process may 2015 istanbul 3rd airport | airport city masterplan workshops w. perkins+will and engineering firms august 2015 and october 2015 istanbul 3rd airport | ATC tower competition representing kalyon construction group .presentation and evaluation process november 2015 samandira shopping centre | istanbul | 15.000 sqm project development and design .designing mass concepts .preparing architectural program .preparing floor area calculations .drawing preliminary project levent office | istanbul | 35.000 sqm project development and design .designing mass concepts basaksehir university masterplan | istanbul | 140 ha project development .preparing design inputs for concept
04 | cv
demirce architects architect august - november 2014
folkart life residences | izmir | 45.000 sqm architectural project .preparing drawings with project team mezitli campus | mersin | 65.000 sqm architectural project .preparing preliminary drawings with team .recreating facade design young architects program | istanbul architectural manifesto .preparing concept idea and firm’s presentation
freelance architect
aydin house | izmir | 550 sqm | construction architectural project w. ayse sena cildir and kubra paksoy .concept project .schematic design - preliminary project .permit drawings atabay wooden cabin | izmir | 50 sqm | hold architectural project w. ayse sena cildir and kubra paksoy .designing mass concepts .concept project
cv |
05
06 | content edu
undergraduate project
extra large sports academy istanbul
competition | tak
medium public space istanbul
competition | 5 ocak
2014
content edu
extra large cultural and sports center adana
inter-aks 01
ugrak 03
cityscene 05
project 7
extra large city library and leisure center istanbul adaptiogenesis
competition | koçtaĹ&#x;
small workroom istanbul
project 6
02
large hostel istanbul
puzzle shelf 04
infill - hostel 06
content edu |
07
inter-aks
sports academy | 01 scale | extra large spring 2014 | istanbul graduation project
this building complex, which includes several functions, is articulated to main spine with intent to co-operate successfully. in this way, zoning is related with user groups besides that each function has an active system. sloped platforms are attached from buildings and ground to spine for easier disabled accessebility. sports fields are only connected with public spaces artificial y due to the inward-oriented approach. differentiations are proposed to break inward-orientation. furthermore this differentiations create interaction between inside and outside of buildings. thus, active passive user contrast is exceeded. buildings’ visual impacts are reconsidered to attract users and provide alternative perspectives by level differentiations and platforms. with this complex; it is intented to serve people not only an academic campus for students, but also a sports park for spectators and participants.
08 | inter-aks
zone environment cendere street cendere river
project site
vadi istanbul residences
turk telekom arena skyland tower
tem highway
borders areas indrustrial area topographical borders
forest area
transportation type time route
residential area
bus evyap mosque stop 671 m ~ 7-8 mins metro seyrantepe stop
located within seyrantepe, riverside of cendere, the site is surrounded between turk telekom arena on south-east side and vadi istanbul mix use project on west side. the site has lowest level of cendere valley. it has a potential due to riverside, on the other hand huge level differences cause unintended aspects. in this regard accessing to site is considered major factor for design approach.
1043 m ~ 10-11 mins
inter-aks | 09
approach layout access route
educational buildings public buildings
pedestrian zone
creating spine according to functions differentiating academic and public buildings
separating and specifying access zones
differentiations
walking / jogging trail
proposed walking / jogging trail is linked to running track thus staidum’s inward oriented approach is resolved. spectators may use stadium actively and running track join events easily. steel truss
limiting pedestrian & vehicular zones
titanium zinc facade cladding
reinforced concrete floor
steel braced frame
vehicular zone creating continuity and linearity
walking / jogging trail and cycle lane
walking / jogging trail and cycle lane
academic sports fields
separating mass according to functions placing outdoor sports fields north-south direction titanium zinc cladding
public sports field ways
connecting streets towards to riverside generating public spaces
polycarbonate covering steel wires steel mechanism
movable steel structure and retractable polycarbonate roof allow to use tennis courts as open-air courts and indoor courts independently.
indoor sports hall
climbing wall
vertical sports fields
vertical sports fields include volleyball and basketball fields on ground level and also include outdoor tennis courts on top level. in addition indoor sports hall has a climbing wall on facade.
swimming pool and second indoor sports hall are combined with indoor running track and transformed into sports complex. although complex is divided two parts by a passage, a slopped roof links complex on top level for creating resting and spectating zone.
inter-aks | 1
3d view design decisions
dorm is connected to spine with a walkable slopped roof. foodcourt - which can serve students and visitors - is located on ground level.
academy building leans side of spine by own indoor sports hall and outdoor vertical sports fields. on the other hand, it reaches out to river by cantilever. it is opened to public square with stairs and merged with landscape. decks are elevated and combined with walking / jogging trail to provide wider perspective and recreational areas for users on riverside. public square is enclosed with academy building, spine and tennis courts. besides, it is integrated with academy building stairs and riverside platform to create an impressive landscape between nature and sports activities. tennis courts are designed side by side under a retcractable roof. parking lot and parking garage are located southern part of the site. in that sense, accessible parking and bus parking are also provided in this area.
cubes are distributed site to serve an information desk, f&b kiosk etc. 12 | inter-aks
southern facade of indoor sports hall is functioned as a climbing wall. indoor sports hall and outdoor sport fields are combined together. tennis courts and basketball - volleyball fields are lapped each other to create a compact area and lower ground level area usage. grandstand, with its 3000 people capacity, is created on spine to gain “public space� role. walking - jogging trail is linked to running track and it is elevated to provide space for locker rooms.
cubes are located in outdoor sports fields to serve equipment rooms for guests. skate park is attached complex and it is linked with children playground by passage to extend public activity area. slopped roof of sports complex creates a resting - spectating area from spine level to ground level. children playground is located close to entrance for easy access and visual attraction. inter-aks | 13
sports hall vertical outdoor sports’ courts system detail 1:50
1
4
10
+17.00
sports fields top level
+8.00
outdoor tennis courts base level
+4.00
spine level / sports hall entrance level
0.00
ground level
14 | inter-aks
titanium zinc vapor diffusion retarder steel sheet hdpe / dupont tyvek rockwool steel sheet steel beam steel truss
0.1 cm 0.8 cm 0.1 cm 0.2 cm 8 cm 0.1 cm NPI 80 NPI 500 NPI 300
1 4
10
inter-aks | 15
tennis courts parking garage
+22.00
tennis courts top level
+4.00
spine level / tennis courts entrance level
0.00 -1.00
ground level tennis courts base level / parking garage top level parking garage base level
-4.00
swimming pool sports hall 1
4
10
+4.00
spine level / ramp top level
0.00
ground level
-4.00
pedestrian access level
-8.00
sports hall / running track base level
-13.00
swimming pool base level
16 | inter-aks
inter-aks | 17
academy in academy building, educational areas are integrated with public. besides building is designed outward-oriented to serve local residents an exhibition hall, meeting area and recreational plaza. vertical sports fields are attached to the building to combine practical trainings and theoratical education. meeting hall dining hall
cafe exhibition library classrooms
culture
admin.
academy
sports science
physical education model academy sports fields
0.00 1:500
18 | inter-aks
offices
sports fields
0.00
0.00
+3.00 0.00
+3.00
0.00
0.00 +3.00
+3.00 1:500
0.00
+6.00 0.00
0.00
+6.00 1:500
+6.00 +7.00
inter-aks | 19
academy section perspective
meeting halls are located in cantilever side by side.
spine vertical sports fields food and beverage
20 | inter-aks
vertical sports fields are integrated with academy building.
vierendeel truss is designed for cantilever and bracings support this structure from soil to top.
indoor sports hall is attached to academy building
atriums and stairs are proposed for exhibition and seminar halls.
dorm
daylight
accessebility is considered as main approach for dorm design. a ramp is considered to reaches out from foodcourt to spine. rooms for disabled athletes are easy to access from elevators. gaps are created between 4 different room blocks to provide activity areas such as resting areas, tv-ps rooms and boardgame rooms.
storage
food/beverage
fresh air + accessibility
food/beverage
service dorm guest rest cafe room room
fresh air + accessibility
fresh air + accessibility + entrance / escape
fresh air + accessibility
rest entrance / escape
load bearing elements
+0.00
inter-aks | 21
dorm elevation
1 6 10
+18.00
dorm top level
+6.00
spine level
0.00
ground level
-3.00
cafe / dining hall level
+3.00
+3.00
+3.00
+3.00
+3.00
1
+6.00
4
+6.00 +6.00
+3.00
+3.00
+3.00
+6.00
+9.00 +9.00 +6.00
+9.00
+3.00
+3.00
+3.00
+6.00
+6.00
+12.00
+12.00
22 | inter-aks
+9.00
+3.00
+6.00
10
+3.00
+3.00
+3.00
+3.00
+3.00
+3.00
-3.00
inter-aks | 23
city library and leisure centre | 02 scale | x large autumn | 2013 istanbul with zeynep sen
nowadays, bomonti is transformed into a business district, which conduce toward lack of adaptation and context. exclusivist approaches are creating isolated society in high-rise residential buildings. additionally, in this zone, lack of public spaces can be noticed due to the unplanned growth. in this proposal, one of the 4 sites will be served to the community as a public space which also includes a leisure centre. requests of community will be considered to determine the scope of this centre. library, exhibition hall, sports hall and open-air market will be included in leisure center to create “an attractive zone� between old neighbourhood and new residentials.
24 | adaptiogenesis
site comparison site 1 sections are used for compare to selected sites’ potentials
site 2 site 3
exhibiton hall
library stop
solid - void decisions
plaza
trees
distribution of programs to site
p sto
park
et
outdoor market
inte rac tion
stre
approach is influenced characteristic of selected site which has a nearly rectangular shape and slopped topography. circulation and access are designed with these circumstances. lack of green areas and necessities of residential units are considered to be main concerns.
sports hall
outdoor market
site 4
facade decisions of library pa
ssa
ge
underground exhibition hall adaptiogenesis | 25
masterplan is designed as a whole with all parts, however open-air market is only planned and visualized, also sports hall is not detailed.
circulation is considered to be main factor on design process. continuities of users’ movements and visual interactions create shell, while roof is folded and drilled to maximize natural light.
26 | adaptiogenesis
elevation south
elevation west
elevation east
elevation north
adaptiogenesis | 27
section aa library
section bb library
sections exhibition
28 | adaptiogenesis
1 3
8
south entrance perspective
interior perspective model
adaptiogenesis | 29
ground floor 1:500 +104
0.00
+4.00 (+108) 0.00
1. floor 1:500 +108 +4.00
0.00
0.00
+4.00
0.00
2. floor 1:500 +112
0.00
0.00 +7.00
+4.00
+4.00
+4.00
0.00
30 | adaptiogene-
self-study workspace kid zone information borrow renew return reading hall circulation periodicals wc administration
-1. floor 1:500 +98
exhibition hall 1 exhibition hall 2 entrance information cafe circulation lounge wc administration archive
ground floor 1:500 +98 adaptiogenesis | 31
ugrak
public space | 03 scale | medium september | 2013 istanbul with anÄąl salar | neval tarÄąm | zeynep sen
the second prize winning entry to tasarim atelier kadikoy’s design competition, aims to meet different user types by including various functions, such as taxi stop, bus stop, metro station, telephone booth, cycle and motorbike park. these functions used to create a mess while crossing each other. in this project, functions not only pursue their user-based roles but also provide new oppurtunities. as a design criteria, a single metal pipe is differentiated to define a public space including movable and stable banks, canopies, open-air lounge etc.
32 | ugrak
ugrak | 33
metro
dense pedestrian access waiting area
landscape
interaction with pedestrians
telephone booths
blocking to pedestrian access
cycle and motorbike parks undefined area potential access
leaning areas
bus and taxi stops’ waiting area temporary resting different sizes and types
34 | ugrak
movable and stable banks
push bank for come close to others pull bank for move away from others
bus stop
hard access waiting area
taxi stop
hard access waiting area
banks
limited inadequate
alternative seating
alternative locations and quantities individual or group
canopies
temporary protection from rain and sun
passages
access to bus and taxi stops
ugrak | 35
36 | ugrak
elevation
plan
section
1
7
model
ugrak | 37
puzzle shelf
workroom | 04 scale | small november | 2013 istanbul with zeynep sen
building: two-storey three-bedroom family house. scenario: an architecture student lives with his / her family. place: student’s bedroom and workroom necessities: to create his or her own design personally. to expand bookshelf eventually. to afford and deal with student’s budget. to provide design context after expansions or reductions. to assemble effortlessly and handily without assistance. to vary designs and adapt recent conditions. to clean easily and keep clean constantly.
38 | puzzle shelf
expansions and variations bookshelf sample plans
25 cm
25 cm
joint surface bookshelf sample component component
2 cm 2 cm
25 cm
25 cm
surface component plan and elevation 0.5 cm 0.5 cm
1 cm
1 cm
10 cm
10 cm
1 cm
joint component plan and elevation
size of a regular book is considered to decide shelfs’ size. this square-shaped design allows to expand and reduce capacity. it also creates different spaces for magazines, pocket books and accessories. puzzle shelf | 39
in terms of competition rules, designers had to select products from koctas store except bookshelf. one and only bookshelf was designed by the participants.
vase 1000102786 sofa bed 2000018714
oak parquet 1000125453 wall paper 1000136686
lace pillow 2000018240 painting 2000009434
desk 1000137515 desk lamp 2000015121 chair 1000146442
40 | puzzle shelf
carpet 1000138390 pendant lighting 1000129834 zebre curtain 1000114044
functionality is considered as a major point. it is provided that, the product is not only for books, but also suitable for other objetcs. same parts can be adapted to vary different necessities. besides, colour and material varieties provide alternatives. in this way different, creative, unique design schemes can be applied with easily.
puzzle shelf | 41
urban stage
cultural and sports centre | 05 scale | extra large august | 2013 adana with anÄąl salar | neval tarÄąm | zeynep sen
as public spaces, stadiums serve public rarely, therefore their inward-oriented structure limits activities and organizations. these large scale public buildings may host different, high quality activities and organizations frequently. this concept focuses on questioning stadium notion and effecient usage of a stadium. this questioning is not limited with stadium notion, it also looks for answers about game and sports notions. football pitch is deformed and fragmented to create a complex which includes various sports and cultural activities. in case of respect to memories of citizens, positive effects of stadium are protected and improved by sports and cultural centre. sports activities and dynamic structures will invite people to physical developments, moreover facilities like conference hall, cinemas, theatre will attract people to cultural interactions.
42| urban stage
d n rou g y pl a
ss
mem
acce
ory
arket
deformation
iu s ta d g a s p o rts
re c u lt u e n s p op
centre
ac op es e n-a ir m
sports
+
m me s m o ve m e nt
cultural
design decisions
blici
an
k
urb
pu
c tra g wa l k i n ty
bicycle roads
urban scale: green spine proposal
public spaces green areas
urban analyses relationship with city
open air market and horizontal axes
solid and void generation urban stage
ngo center
sports hall
indoor sports hall
library cultural center
sports museum
south elevation
north elevation
east elevation
west elevation
44 | urban stage
conceference hall + cinema
swimming pool
urban stage football pitch
open air cinema
urban stage | 45
infill - hostel
hostel | 06 scale | large spring | 2013 istanbul
project site was characterized by obsolete low density buildings although it is very close to “divan yolu” which is an ancient road to “sultan’s office”. site was isolated, quiet. this isolation and quietness based on hard access for pedestrians as a consequence of lack of street connections. two buildings - which was located gedik pasa street and dogramaci street - was removed. thus, a passage was created along streets. an elevated hostel was proposed to connect streets and provide passage access.
46 | infill - hostel
turist hareket yönü
li sok . diva na
sucu
baki
sok.
divan yolu
stop tram
main street / divan yolu
street/ divani ali st.
side street / sucu baki st.
~ 3250 people/hour
~ 450 people/hour
~ 75 people/hour
automobile main street / high density tourists, clients, tradesmen, passengers street / low density local residents side street / very low density tradesmen, local residents
divan yolu
divani ali st.
topkapı sarayı aya sofya sultan ahmet touristic / cultural / religious buildings commercial buildings offices and ateliers
gedik pasa cami st. sucu baki st.
divani ali st.
metamorphosis pervititch
googleearth
idea
gedik pasa st.
passage
dogramacÄą st.
increasing density / solid and void / advancement of transportation / decreasing green areas / changes of the streets
approach
two red buildings was removed for creating a new street / passage / connection. volume is splitted by function such as accomodation, administration, lobby / lounge area.
48 | infill - hostel
infill - hostel | 49
ground floor 0.00
1 3
8
A Lobby
0.00
Reception
Administration
lobby/lounge perspective B 18
1
17
2
16
3
15
4
14
5
13
6
12
7
1
8
10
9
Meeting
Hall
10 1
9
12
8
13
7
14
6
15
5
16
4
17
3
18
2 1
10 9
1 8
12
7
13 6
14 5
15
4
16 3
17 2
18 1
0.00
Service Stair Fire Exit
B Breakfast Area
Kitchen
A
1. floor +3.00
1 3
A
8
Lobby
0.00
elevation north
B +3.00 18
1
17
2
16
3
15
4
14 6 7
1
8 9
10
Lounge
5
13 12
10 1
9
12
8
13
7
14
6
15
5
16
4
17
3
18
2 1
elevation south
10 9
1 8
12
7
13 6
14 5
15
4
16 3
17 2
18 1
Service Stair Fire Exit
+3.00
B Breakfast Area
A
50 | infill - hostel
infill - hostel | 51
2. floor +6.00
1 3
section aa
8
A
1 3
8
+6.000
B 18
1
17
2
16
3
15
4
14
5
13
6
12
+6.000
7
1
8
10
9 10 1
9
12
8
13
7
14
6
15
5
16
4
17
3
18
2 1
+6.000
10 9
1 8
12
7
13 6
14 5
15
4
16 3
17 2
18 1
Service Stair Fire Exit
Utility
B
Room Workspace
A
section bb
3. floor +9.00
1 3
A
8
1 3
8
+9.000
B 18
1
17
2
16
3
15
4
14
5
13
6
12
8 9
10
+9.00
7
1
10 1
9
12
8
13
7
14
6
15
5
16
4
17
3
18
+9.00
2 1
10 9
1 8
12
7
13 6
14 5
15
4
16 3
17 2
18 1
Service Stair Fire Exit
Utility
B
Room Workspace
A
52 | infill - hostel
maket
perspektif infill - hostel | 53
beykoz school campus cubuklu urban renewal
residential + commercial 170.000 sqm istanbul project development
mezitli campus
educational 65.000 sqm mersin architectural project
folkart life residences
residential 45.000 sqm izmir architectural project
aydin house
54 | content pro
educational 95.000 sqm istanbul project development and coordination
residential 550 sqm izmir architectural project
atabay wooden cabin
2016
2015
2014
professional
residential 550 sqm izmir architectural project
beykoz school campus schools + conference hall + library + sports hall + swimming pool + dormitories + administration b.
beykoz school campus |
55
cubuklu urban renewal residences + shopping centre + high school + museum + conference hall
56 | cubuklu urban renewal
mezitli campus schools + dormitories + sports hall + conference hall
folkart life residences residences + commercial units
mezitli + folkart |
57
aydin house w. ayse sena cildir and kubra paksoy
atabay wooden cabin w. ayse sena cildir and kubra paksoy
58 | freelance work
activities
pecha kucha night vol.7 izmir chamber of architects speaker | november 2014
IWC watchmaking workshop istanbul four seasons hotel coordinator | october 2012
activities |
59
ismail akĹ&#x;it www.ismailaksit.com iaksit20@gmail.com +905327441624