Dr s01

Page 1

1.5 Section 01 Pullout Drawing: Before, During and After an Earthquake Before

During

After

During Earthquake

After Earthquake

1. 2.

1.

3.

Accessible roof tops throughout Bridge structures connect vertical circulation systems to upper mezzanine level. Site sits opposite the Ranipokhari lake.

2. 3. 4.

Before Earthquake

Emergency response teams set up on the Northern most pontoon. Electricity supply cut, so scheme becomes totally self sufficient. All water purified from lake for use thoughout scheme. Hostels and temporary shelters inhabit spaces normally used for other activities.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.