ARCHITECTURAL PORTFOLIO by Jacob Thomas
PERSONAL DETAILS NAME D.O.B CONTACT EMAIL NATIONALITY ADDRESS
Jacob Thomas 6 march 1990 +48519312192 jacobtimes@gmail.com Indian Naleczowska 03 02-922, Warsaw Poland
“You cannot simply put something new into a place. You have to absorb what you see around you, what exists on the land, and then use that knowledge along with contemporary thinking to interpret what you see”
– Tadao Ando
HELLO, I’m A team player with excellent communication skills and academic qualifications, who has recently graduated with a master’s degree in Architecture from the Cracow University of Technology, Cracow, Poland. Possessing a proven ability to ensure projected architectural designs for functional, safe, economical and meet the needs of the client. Excellent communication skills to keep in touch with clients to ensure that the project designs match their needs. Easy going by nature and ability to get along with both work colleagues and senior managers. Good software skills and ability to make good presentation drawings to the clients.
EDUCATION
SKILLS
MASTER 2016-2017
Cracow university of technology, Cracow, Poland
BACHLOR 2008-2013
The university school of design, Mysore, India
INTERESTS Traveling, Painting Photography, Ukulele Music, Sculpture, Reading, Vollyball
LANGUAGES English Malayalam Tamil German(learning) Polish(basic)
Revit Autocad Sketchup+vray Photoshop Indesign Lumion M.S Office Illustrator Archicad
2
EXPERIENCE SNJ ASSOCIATES, INDIA OCT 2011 - MAY 2012
INTERNSHIP Prepare information regarding design, specifications, materials, and equipment, Direct the production of construction documents, drawings and specifications, Architectural 3d visualization, Presentation.
ARTESO, INDIA MAR 2014 - NOV 2014
ARCHITECT Prepare information regarding design specifications, materials and equipment, Production of construction documents, drawings and specifications, Making quotations, Analyse energy consumption of the building, Architectural 3d visualization, Presentation. Site visit, Client meeting, Office administration.
DAMAS DECORATION, DUBAI FEB 2015 - OCT 2015
ARCHITECT Prepare information regarding design, specifications, materials and equipment, Production of drawings and specifications, Architectural 3d visulization, Presentation. Site visit.
AHR ARCHITECTS NOV 2017 - Present
ARCHITECT ASSISTANT Revit drawings, Concept desgins, facade designs, Team work, Detail Drawings, Conducted research needed to complete architectural projects, Completed design works, Architectural 3d Visualization, Presentation.
OTHER WORKS
Freelance Designer Online furniture designer/3d visualiser (https://www.fiverr.com/jacobthomas532/make-any-3d-furniture-in-24-hours) PUBLICATIONS DECADE BOOK College magezine for celebrating 10 years of students work. AWARDS First in NASA design trophy 2011, India, 2nd in NASA design trophy 2012,India, Labour india student design competition runner up.
3
Academic works
4
Institute of art and design | Kerala | India |
FUNCTIONAL ZON-
Autocad | Sketchup | Photoshop | Lumion |
GENERAL ZON-
Main concept of this project is to make open room class rooms instead of traditional closed classes. also to merge the building with surrounding landscape and site. according to funcitonality the building seperated into 3 main blocks. and each one has easy connectivity between them. wind, sun orientation, climate and contours are taken into consideration. Each blocks are provided with enough ventialtion and given more improtance to the natural lighting. The project consists of the studios, art gallery, class rooms, auditoriums, playgrounds, conference room, out door interaction areas, etc.
5
Section aa
Ground floor plan
First floor plan
6
Play ground view
Exploded view
Entry view
interaction space
7
Park renovation | Wislica | Poland |
Autocad | Sketchup | Photoshop | V-ray
Main concept of this project is to renovate existing park situated in wislica. Park that is currently not being used.main aim to make attractive park for people around the town to gather and have some entertainment and social gatherings. Aim to improve the existing world war 2 memorial statue situated in the park and also to emphasise the history of that monument. Park has designed according to the fucntionality. a unique informal stage provided for people to host some functions or social gatherings. A bridge provided for people to connect from the church side of the road to the other end that is evolved from the current exisiting park. The project consist of stage, seatings, cafeteria, area for people to gather, seating puzzles, etc.
MASTER PLAN
8
CANOPY DE-
AMPHITHEATER SEC-
CAFE MAP
CAFE SECTION
9
Filharmonia | Krakow| Poland |
Autocad | Revit |Photoshop Project aims to provide a Filharmonia center to the city of krakow. The site sitauated near vistula river, krakow, post war area. improtant aspect of the site is it has a clear view to the vistula river. My aim in this project was not minimaze the land modifcation and keep existing natural orientation also provide an iconic building for the citizens in krakow. The main concept of the building based on the functionality. overall it has 5 levels. contains one main auditorium and one chamber hall. Interior spaces arranged accoring to number of people coming to the filharmonia. main feature of the interior space is that spiral staircase that goes to the top level from the ground level. The project consist of Auditorium, chamber room, cloak rooms, class rooms, guest rooms, practising area, library, storage spaces,
SECITON CC
10
Section aa
Ground floor plan
First floor plan
Section bb
Fourth floor plan
11
South elevation
Auditorium view
West elevation
12
Serenity center - yoga and meditation | Krakow| Poland |
Autocad | Revit | Lumion | sketchup | photoshop |
There main concept is two hands are holding a lotus flower. The heart can be visualized as a lotus flower unfolding at the center of a chest, a lotus that opens and contracts according to the light. It is a symbol of peace and yoga and meditation. There are 4 elements that associate with the lotus flower. It will come from mud as an earth element where it’s deeply rooted. It uses space for growing its flower and leaves for growing use space as an element and it grows in water bodies, and this lotus flower is a symbol of fire of transformation for its spirit essence the following meditation interconnect with lots, and therefore our connection with spirituality. Two hands representing it will protect from harm and also help to nurture. The Idea of the Serenity center to cultivate these skills in people and develop it.
Site analysis
General zoning
Schematic section
13
Main activities
View and access points
Differnet zoning
Site plan greenary and water
Car
Exploded view
Service highway
circulation
cycle paths
fire escape
14
Basement floor plan
Ground floor plan
15
section cc
Section dd
Pavement details Landscape slab details
meditation chamber details
exploaded dome view
staircase details
wall section
16
West elevation
North elevation
17
Professional works
18
The site for this project is located in the shoreline of Gulf of Finland in Nevskaya Bay, in north-west side of Sankt Petersburg city, located approx.14 km from the city
Yacht club, hercules marina | Russia | competition
2XU VWDUWLQJ SRLQW ZDV WR ORRN DW D QXPEHU RI ZHOO NQRZQ EXLOGLQJV ZLWKLQ 6W 3HWHUVEXUJ IURP ZKLFK WR LQIRUP RXU ÀUVW FRQFHSWXDO WKRXJKWV :H ZDQWHG WR FUHDWH D center in Lakhta building that was clearly modern but had its roots strongly district. embedded within the history of the city. Our research highlighted a number of similar historical building diagrams that appealed to us fromThe the planning view but atarea the same allowed us the room create special. site, withpoint a total of time approximately 4,7toHa, is something bordered by residential area from the
north and newly developed multi-use Lakhta Center on the east side, with Site Europes current tallest building. site for this project port. is located in the shoreline of Gulf of The access to the site is from the north and in future from east. It has also the direct access to The the waterside and Hercules This is an ideal location for wide range leisure, water sports and recreation activities. Finland in Nevskaya Bay, in north-west side of Sankt Petersburg
1
2
3
4
city, located approx.14 km from the city center in Lakhta district. 13 The site, with a total area of approximately 4,7 Ha, is bordered Site The1 site for this project is located in2 the shoreline of Gulf of Finland in Nevskaya Bay, in north-west side of Sankt city, located approx.14 from the citynewly developed mulbyPetersburg residential area from thekmnorth and centerbrief in Lakhta district. The 3 ti-use multi-use Lakhta Lakhta Center on the east side, with Europes current The site, with a total areaisofaapproximately 4,7 Ha, is bordered by residential area from the norththat and newly developed Center on the east side, with 5 The Hercules Marina wonderful opportunity to create a waterside destination is mindful of its historical St Petersburg context combined with cutting edge tallest building. Europes current tallest building. 4 progressive architecture The access to the site is from the north and in future from east. It has also the direct access to the waterside and Hercules port.to the site is from the north and in future from east. The access Rather than a number of separate buildings within the competition plot we decided that the climate in St Petersburg demanded a different approach if 8 This is an idealsimply locationcreate for wide range leisure, water sports and recreation activities. It has also the direct access to the waterside and Hercules port. 7 we were create something unique. This is an ideal location for wide range leisure, water sports and 2XU VWDUWLQJ SRLQW ZDV WR ORRN DW D QXPEHU RI ZHOO NQRZQ EXLOGLQJV ZLWKLQ 6W 3HWHUVEXUJ IURP ZKLFK WR LQIRUP RXU ÀUVW FRQFHSWXDO WKRXJKWV :H ZDQWHG WR FUHDWH D 6 9 building that was clearly modern but had its roots strongly embedded within the history of therecreation city. Our research highlighted a number of similar historical building activities.
Orientation
The diagram
Orientation
Autocad | Sketchup | V-ray | Photoshop |
Site Site diagrams that appealed to us from the planning view point but at the same time allowed us the room to create something special. The siteThe for this project is located in the shoreline of Gulf of Finland in Nevskaya Bay, in north-west side of Sankt Petersburg city, located approx.14 km from the city The site forbrief this project is located in the shoreline of Gulf of Finland in Nevskaya Bay, in north-west side of Sankt Petersburg city, located approx.14 km from the city
The aerial views of some well known buildings in St Petersburg clearly demonstrate the planning concept of buildings being separated into a composition of two building types; a perimeter building framing and a central ‘feature’ building. The same principle can easily be applied to the Hercules Marina; a central feature ‘yacht club’ framed by supporting functions
center in Lakhta district. Hercules Marina is a wonderful opportunity to create a waterside destination that is mindful of its historical St Petersburg context combined with cutting edge centerThe in Lakhta district. The site,progressive with a totalarchitecture area of approximately 4,7 Ha, is bordered by residential area from the north and newly developed multi-use Lakhta Center on the east side, with The site, with a total area of approximately 4,7 Ha, is bordered by residential area from the north and newly developed multi-use Lakhta Center on the east side, with EuropesRather current tallest building. than simply create a number of separate buildings within the competition plot we decided that the climate in St Petersburg demanded a different approach if Europes current tallest building. 10 The access to the site issomething from the north and in future from east. It has also the direct access to the waterside and Hercules port. we were create unique. Theisaccess to location the site is from the north and water in future from east. It has also the direct access to the waterside and Hercules port. This an ideal for wide range leisure, sports and recreation activities. 2XU VWDUWLQJ SRLQW ZDV WR ORRN DW D QXPEHU RI ZHOO NQRZQ EXLOGLQJV ZLWKLQ 6W 3HWHUVEXUJ IURP ZKLFK WR LQIRUP RXU ÀUVW FRQFHSWXDO WKRXJKWV :H ZDQWHG WR FUHDWH D The Hercules Marina is a wonderful This is an ideal location for wide range leisure, water sports and recreation 11 activities. building that was clearly modern but had its roots strongly embedded within the history of the city. Our research highlighted a number of similar historical building 2 opportunity to create a waterside diagrams that appealed to us from the planning view point but at the same time allowed us the room to create something special. 1. Yacht hangar
1 Orientation Orientation
destination that is mindful of its historical St Petersburg context The brief 13 combined with cutting edge progresTheHercules brief Marina is a wonderful opportunity to create a waterside destination that is mindful of its historical St Petersburg context combined with cutting edge The sive architecture 2 of its historical St Petersburg context combined with cutting edge The Hercules Marina is a wonderful opportunity to create a waterside destination that is mindful progressive architecture 1 12 1 2.
Hotel Drop-off
3.
Sailing academy
4.
Main entrance zone
5.
Hotel service & BoH
6.
Sport zone
7.
Hotel rooms blocks
8.
Parking area
2 Rather than simply create a number of separate buildings within the competition plot we decided that the climate in St Petersburg demanded a different approach if progressive architecture 3 in St Petersburg demanded a different approach if we werethan create something Rather simply createunique. a number of separate buildings within the competition plot we decided that the climate Rather simply create a num-2XU VWDUWLQJ SRLQW ZDV WR ORRN DW D QXPEHU RI ZHOO NQRZQ EXLOGLQJV ZLWKLQ 6W 3HWHUVEXUJ IURP ZKLFK WR LQIRUP RXU ÀUVW FRQFHSWXDO WKRXJKWV :H ZDQWHG WR FUHDWH D 9. Private hotel than marina we were create something unique. 5 10. Yacht – „heart” of the complexbuildings within the building that was clearly modern but had its roots strongly13embedded within the history of the city.4 Our research highlighted a number of similar historical building ber ofclub separate 2XU VWDUWLQJ SRLQW ZDV WR ORRN DW D QXPEHU RI ZHOO NQRZQ EXLOGLQJV ZLWKLQ 6W 3HWHUVEXUJ IURP ZKLFK WR LQIRUP RXU ÀUVW FRQFHSWXDO WKRXJKWV :H ZDQWHG WR FUHDWH D 11. Celebration area / event space to modern us from the view strongly point butembedded at the samewithin time allowed us the to create something special. a number of similar historical building building that that appealed was clearly butplanning had its roots the history of room the city. Our research highlighted competition plot we decided thatdiagrams 12. Harbor 2 diagrams that appealed to us from the planning view point but at the same time allowed us the room to create something special. 1
the climate in St Petersburg demanded a different approach if we were create something unique. 13. Technical area
Water connection with bay, private marina
Semi private zone Central public area
3 1
FUNCTIONAL ZONING
2
5
4
Sailing Academy
Yacht club with F&B
3
The diagram
1.
Yacht hangar
2.
Hotel Drop-off
4
1. Yacht hangar 3 4 The aerial views of some well known buildings in St Petersburg demonstrate 3. clearly Sailing academy 2. Hotel Drop-off planning concept of buildings being separated into a composition of two buildThethediagram Main 3. entrance Sailing academy ing types; a perimeter framing and a in central ‘feature’4.building. The zone same The aerial views of some building well known buildings St Petersburg clearly demonstrate 4. Main entrance zone principle can easily be applied to the Hercules Marina; a central feature ‘yacht club’ 5. Hotel service & the planning concept of buildings being separated into a composition of twoBoH buildframed by supporting functions 5. Hotel service & BoH ing types; a perimeter building framing and a central ‘feature’6.building. Sport zoneThe same 6. Sport zone club’ principle can easily be applied to the Hercules Marina; a central feature ‘yacht 7. Hotel rooms blocks framed by supporting functions 7. Hotel rooms blocks
1. 2.
Main hotel entrance
Hotel access & drop off
Delivery access
Yacht Club entrance
Yacht hangar access
Parking access
Semi private zone Central public area
8
6
13 29
13
1
1
3
2 5
3
4
5
10
4
8 10
7
11
8
ACCESS
Hotel access from harbour
9 7
Yacht hangar
Technical+ storage
4
6
the planning concept of buildings 1 2 The diagram being separated into a composition The aerial views of some well known buildings in St Petersburg clearly demonstrate of twointo building types; a perime3 the planning concept of buildings being separated a composition of two build- 4 ter building framing andThe a central ing types; a perimeter building framing and a central ‘feature’ building. same The diagram ‘feature’ building. The same prinprinciple can easily be applied to the Hercules Marina; a central feature ‘yacht club’ The aerial views of some well known buildings in St Petersburg clearly demonstrate cipleseparated can easily appliedofto the the planning concept of buildings being into a be composition two buildframed by supporting functions ing types; a perimeter building framing and a central ‘feature’ building. The same Hercules Marina; a central feature principle can easily be applied to the Hercules Marina; a central feature ‘yacht club’ ‘yacht club’ framed by supporting framed by supporting functions functions Hotel
8
3
7
Water connection with bay, private marina
Water connection with bay, private marina
8.
Parking area
9.
Private hotel marina 9. Private hotel marina
8.
Parking area
6
7
11
9
6 9
10
12
12
10
11
Yacht hangar
10. club Yacht–club – „heart” of the complex 10. Yacht „heart” of the complex
Hotel Drop-off 11. Celebration area / event space Celebration 3. 11.Sailing academy area / event space 1. Yacht hangar 12. Harbor 4. 12.Main entrance zone Harbor 2. Hotel Drop-off 13. Technical area 5. Hotel service & BoH Technical area 3. 13. Sailing academy 6. Sport zone 4. Main entrance zone
11
1
19
Hotel Yacht club with F&B
Sailing Academy
Yacht hangar
Technical+ storage
ACCESS
Main hotel entrance
Hotel access & drop off
Delivery access
Yacht Club entrance
Yacht hangar access
Parking access
1
Hotel access from harbour
2
20
РАСПОЛОЖЕНИЕ УЧАСТКА
There is also a possibility to access the site by boat but in such a case a proper marina would be required. РАСПОЛОЖЕНИЕ УЧАСТКА Opposite side of a bay is a natural forest territory on a peninsula and further around Volga riverbanks and further Ivankovskoe reservoir lake. This is an ideal location for wide range leisure and recreation activities. SITE LOCATION
SPA resort development | konakovo | Russia | competition
Панорамный вид 1 / Panorama 1
Site
SITE LOCATION Autocad | Sketchup | V-ray | Photoshop |
Панорамный вид 2 / Panorama 2
P2
P2
P1
P1
3
ница в Конаково I Konakovo SPA resort development
Участок / Site Участок расположен близи Волги, в 150 км от Москвы и 2 км от г. Конаково, в месте, где приток Волги река Сучок формирует живописное подобие
1
Месторасположение участка / Orientation
Участок Site project is located in the shoreline of Volga River, 150 km from Moscow The site for /this and 2km from Konakovo town in the bay at the mouth of the Suchok фьорда и затем переходит в широкий залив. Участок общей площадью приблизительно 2,6 га с северной и восточной сторон ограничен жилой застройкой. Заезды на участок предусмотрены с Участок расположен близи Волги, в 150 км от Москвы и 2site, км от г. Конаково, в месте, где приток Волги река Сучок формирует живописное подобие северной и южнойby сторон. River creating a beautiful fiord.The with a total area of approximately 2,6 Ha, is bordered housing from the north and east side. фьорда и затем переходит в широкий залив. Участок имеет непосредственный выход на речной берег. Месторасположение участка / Orientation Участок общей площадью приблизительно 2,6 га с северной и восточной сторон ограничен жилой застройкой. Заезды на участок предусмотрены с Доступ на участок возможен также водным путем, в этом случае для этого потребуется предусмотреть пристань. The access to the site is from the north east and south east. It has also the direct access to the waterside. There is also a possibility to access the site by boat Противоположный берег залива, имеющий форму полуострова, а также берега Волги до Иваньковского водохранилища покрыты естественным северной и южной сторон. лесом. Участок, таким образом, представляет собой идеальное место для организации самых разнообразных видов отдыха и развлечений Участок имеет непосредственный выход на речной берег. but in Доступ suchна aучасток case a proper marina would beэтогоrequired. Opposite side of a bay is a natural forest territory on a peninsula and further around Volga riverbanks возможен также водным путем, в этом случае для потребуется предусмотреть пристань. The site for this project is located in the shoreline of Volga River, 150 km from Moscow and 2km from Konakovo town in the bay at the mouth of the Suchok River creating Противоположный берег залива, имеющий форму полуострова, а также берега Волги до Иваньковского водохранилища покрыты естественным a beautiful fiord. and further Ivankovskoe reservoir lake. This is an ideal location for wide range leisure and activities. лесом. Участок, таким образом, представляет собой идеальное место для организации самых разнообразных видов отдыха и развлечений The site, withrecreation a total area of approximately 2,6 Ha, is bordered by housing from the north and east side.
ОСНОВНОЙ ЗАМЫСЕЛ ГЕНПЛАНА The site for this project is located in the shoreline of Volga River, 150 km from Moscow and 2km from Konakovo town in the bay at the mouth of the Suchok River creating The access to the site is from the north east and south east. It has also the direct access to the waterside. MASTERPLAN MAIN IDEAS a beautiful fiord. There is also a possibility to access the site by boat but in such a case a proper marina would be required. ЭСКИЗНЫЕ ВАРИАНТЫ С УЧЕТОМ РАЗЛИЧНЫХ ВАРИАНТОВ РЕШЕНИЯ СЕТКИ КОЛОНН ГОСТИНИЧНОГО ЗДАНИЯ The site, with a total area of approximately 2,6 Ha, is bordered by housing from the north and east side. Opposite side of a bay is a natural forest territory on a peninsula and further around Volga riverbanks and further Ivankovskoe reservoir lake. SKETCHES OPTIONS BASED ON HOTEL GRID STRUCTURE APPROACH The access to the site is from the north east and south east. - ориентация участка по оси запад-восток ЗАЕЗД ФУНКЦИОНАЛЬНОЕ ЗОНИРОВАНИЕ This is an ideal location for wide range leisure and recreation activities. - уникальное расположение на берегу Волги, It has also the direct access to the waterside. ACCESS FUNCTIONAL ZONING неподалеку отinИваньковского is also a possibility by boat but such a case a водохранилища proper marina would be required. ПРИНЯТЫЙ ВАРИАНТ There С ШАГОМ КОЛОНН 8,1 М to access the site ВАРИАНТ С ШАГОМ КОЛОНН 6 М максимальная адаптация объемноa bayCHOSEN is a natural forest territory on a peninsula решения and further around Volga riverbanks and further OPTION Ivankovskoe lake. OPTION WITH TYPICAL Opposite ROOMS ( side 8,1Mof GRID)OPTION WITHreservoir SPACIOUS ROOMS ( 6M GRID) пространственного к окружающему This is an ideal location for wide range leisure and recreation activities. ландшафту и пространству
Панорамный вид 1 /
Site
- гибкая схема зонирования и благоустройства - гибкая схема планировочного решения гостиницы, с опциональным размещением апартаментов или в виде гостиничного блока, или отдельной «деревни» с собственной зоной посадки/высадки - два варианта шага колонн, задающие два варианта модулей стандартного номера – повышенного благоустройства или более рациональной планировки - для иллюстрации объемно-пространственного Панорамный вид 1 / решения гостиницы был Site выбран вариант 2 гостиничного модуля - разбивка объемно-пространственной композиции на малые формы для ее адаптации к ландшафту - использование элементов скандинавского стиля Panoramaпозволяет 1 гармонично вписать объект в ландшафт Панорамный вид 2 / Panorama 2 - ярко выраженный передний входной двор, формируемый административным зданием - удобный передний двор со стоянкой и зоной посадки/высадки, с ее опциональным разделением на зону для мероприятий и зону для гостей спа - удобное разграничение таких функциональных зон, как пляж, спортивная зона и зона мероприятий - хорошо просматриваемая детская игровая зона - организация здание гостиницы в виде двух спальных блоков с целью максимизации видов на реку Спа-гостиница в Конаково I Konakovo SPA resort development - гибкая организация атриумного пространства с Мероприятия/досуг расположением в нем зоны обслуживания – точек Event/ Entertainment Гостиница + питания, просторного лобби, сигарной комнаты и т.п. стилобат Апартаменты Спа + фитнес Детская площадка - зона спа с собственным открытым пространством Hotel + Podium Apartments Spa + Fitness Kids Playground для придания ей дополнительной уединенности - организация бани-лэнд в виде отдельного здания, Спортивная площадка Технические и Кафе Баня объединенного с зоной спа общим Outdoor sports складские Cafe Banya благоустроенным открытым пространством помещения - причаленный к пристани дебаркадер с плавучей Technical+ storage баней ЗОНИРОВАНИЕ ГОСТИНИЦЫ - гибкая организационная схема ресторана с гибкой HOTEL ZONING инфраструктурой для корпоративного туризма – шатром, террасами и открытой площадкой
Panorama 1
3
3
Спа-гостиница в Конаково I Konakovo SPA resort development
The konakavo spa resort is a competition project. The main idea of the design was to create a unique architecture building that goes with surroundings. we created a roof that is symbolically similar to waves.-we oriented the building to get the maxium view to landscape and lake - proposed massing in maximum suited to a natural countryside landscape of the space around - flexible scheme of a site zoning and landscape designed - flexible scheme of a hotel planning- optional allocation of a luxurious appartments in form of a bedroom block or a separate “village” with its drop off- optional - mass of a complex formed in smaller forms to suit into the landscape
Спа-гостиница а-гостиница в Конаково I Konakovo SPA resort development
- west east orientation of the plot - unique location on a Volga river coast and further Ivancovskoye reservoir - proposed massing in maximum suited to a natural countryside landscape of the space around - flexible scheme of a site zoning and landscape designed - flexible scheme of a hotel planning- optional allocation of a luxurious appartments in form of a bedroom block or a separate “village” with its drop off- optional - two options of a structural and space grid considered, dependent on two different standard room bay modulemore luxurious or more efficient, possible - option 2 was developed to illustrate the hotel scheme - mass of a complex formed in smaller forms to suit into the landscape - skandinavian style inspiration, as a response to the landscape of a location - prominent entry front court formed by an admin building - comfortable frount court with a parking and drop off, optional separate drop offs for the conference zone and Spa&wellness complex - comfortable separation of particular functional zones like beach and sport facilities, and conferencing facilities, - play zone for children foreseen - Two bedroom bloks to maximise views into the river - flexible space of atrium- front of house spaces accommodating F&B facilities, lounge, cigar lounge ect - Spa zone with its own open space- for more intimacy - bania land in separate building with contact with Spa zone - flow sauna- separate platform possibly moored to the pier - flexible scheme of a restaurant with optional flexible infrastructure for MICE- tent, terraces, open space court
Спа-гостиница в Конаково I Konakovo SPA resort development
Панорамный вид 2 / Panorama 2
Основной заезд Main complex access
Зона посадки/высадки гостиницы Hotel drop off
Дополнительный заезд Secondary complex access
Зона посадки/высадки апартаментов и спа Apartments& SPA drop off
Зона посадки/высадки мероприятий и досуга Event drop off Заезд загрузки Delivery access
ЗОНИРОВАНИЕ БЛАГОУСТРОЙСТВА LANDSCAPE ZONING
17 Зона отдыха Rest zone Стилобат гостиницы Hotel podium
Стандартные номера Standard rooms
Спортивная и детская площадки Outdoor sports + Kids play ground
Пляжная зона Beach area
Зона досуга Entertainment area
Апартаменты Apartments
Улучшенные номера Executive rooms
Зеленая зона Green Landscape
Гостевая зона Guest zone
Зона спа и бани Spa + Banya zone
6
21
ПЛАНИРОВОЧНЫЕ РЕШЕНИЯ ГОСТИНИЦЫ HOTEL LAYOUTS
ВАРИАНТЫ РЕШЕНИЯ СЕТКИ КОЛОНН ГОСТИНИЧНОГО ЗДАНИЯ HOTEL GRID STRUCTURE APPROACH ВАРИАНТ 1: СТАНДАРТНЫЙ МОДУЛЬ ПОВЫШЕННОГО БЛАГОУСТРОЙСТВА OPTION 1: SPACIOUS ROOM
Процесс проектирования предполагал проработку двух вариантов сетки колон, задающих разные размеры и пропорции гостиничного номера
Летнее кафе Summer café
Вариант 2 предполагает более типовой шаг колонн 8,1 м, с размещением внутри конструктивного модуля двух гостиничных модулей Достоинства: -Менее плотная компоновка -Более компактное здание Недостатки: -Номера более узкие и глубокие 4,05x9,1 м
Загрузка гостиницы Hotel delivery
Мангальная зона Grill zone
РАЗРЕЗЫ КОМПЛЕКСА DEVELOPMENT SECTIONS
810 cm
B
Гостиничный модуль: 6х6 м Площадь номера: 32,6 м2 Room module: 6x6 m Room area: 32.6 m2
РАЗРЕЗ ПО ОСИ АА
One approach is based on a 6mx6m grid fitting one room module Pros: -This allows to get a spacious and squared proportion room Cons: -More dense structure -Less compact building
Ресторан и производственные помещения ресторана Restaurant zone
СПАЛЬНЫЙ БЛОК НА 26 НОМЕРОВ, ПРИ ШАГЕ КОЛОНН 8,10 М HOTEL BLOCK FOR 26 TYPICAL ROOM- 8.10 M GRID
810 cm
+7.5
100 cm
Банный комплекс Banya complex
ЭТАЖИ +2, +3 LEVELS +2,+3
+16.6
SECTION AA
ВАРИАНТ 2: СТАНДАРТНЫЙ МОДУЛЬ БОЛЕЕ РАЦИОНАЛЬНОЙ ПЛАНИРОВКИ OPTION 2: TYPICAL ROOM
The second approach is based on a more typical grid of 8,1 m which fits 2 module rooms Pros: -Less dense structure grid - More compact building Cons: The rooms are deeper and narrower 4.05x9.1 m
Стилобат с гостиничной частью и апартаментами на верхних этажах Hotel with podium and apartments on top levels
6480 cm
Зона посадки/высадки гостиницы Hotel drop-off
35,1 m2
B’
A
Зона посадки/высадки спа-центра SPA drop-off
Детская игровая площадка Kids playground
ресторан restaurant
Гостиничный модуль: 4,05x9,1 м Площадь номера: 32,5 м2 Room module: 4.05x9.1 m Room area: 32.5 m2
бар bar
16
Спа-гостиница в Конаково I Konakovo SPA resort development
Спортивная площадка Outdoor sports
Улучшенные номера | Executive rooms
32,2 m2
ПЛАНИРОВКА СТАНДАРТНОГО НОМЕРА STANDARD ROOM ARRANGEMENT
Стандартные номера | Standard rooms
загрузка delivery
Вход в вестибюль спа-центра SPA lobby entrance Спортивная площадка Outdoor sports
+0.0 m
2020 cm
810 cm
Зона спа-центра Spa area
+0.0 m
C’
1820 cm
Finally the more efficient option was chosen
C
865 cm
A’
The design process was based on 2 structural grid approaches concerning the room sizes and proportions
965 cm
В итоге за основу был взят модуль более рациональной планировки
Технические и складские помещения Technical rooms and storage
405 cm
8400 cm 600 cm
Пост охраны Security
405 cm
600 cm
Вариант 1 предполагает конструктивный модуль размером 6мx6м, соответствующий одному гостиничному модулю Достоинства: -Более вместительный номер, имеющий форму квадрата Недостатки: -Более плотная компоновка -Менее компактное здание
Шатер для мероприятий Event tent
810 cm
СПАЛЬНЫЙ БЛОК НА 25 НОМЕРОВ, ПРИ ШАГЕ КОЛОНН 6.00 М HOTEL BLOCK FOR 25 SPACIOUS ROOM- 6.00 M GRID
1400 cm
Здание бани Banya house
ЭТАЖ +4 LEVEL +4
15
Спа-гостиница в Конаково I Konakovo SPA resort development
РАЗРЕЗ ПО ОСИ ВВ SECTION BB
+16.6
Парк Park
+7.5
Пляжная зона Beach area
+0.0
+0.0 m
зона бани bath area
РАЗРЕЗЫ КОМПЛЕКСА DEVELOPMENT SECTIONS Спа-гостиница в Конаково I Konakovo SPA resort development
холл lobby
ВИЗУАЛИЗАЦИЯ VISUALISATION
РАЗРЕЗ ПО ОСИ СС SECTION CC
35
+16.6
РАЗРЕЗ ПО ОСИ АА SECTION AA
зона бассейна/термальная зона pool area/thermal area
+13.4
+16.6
+7 +7.5 Главный холл | Main lobby
+0.0 m
C’
+0.0 m
+0.0 m
Номера | Rooms
+0.0 m
Баня | Bath house Точки питания | Food & beverage загрузка delivery
Бассейны и спа | Pools & spa
ресторан restaurant
бар bar
Служебные помещения | Back of house Техническое помещения | Technical
РАЗРЕЗ ПО ОСИ ВВ SECTION BB
- skandinavian style inspiration, as a response to the landscape of a location - prominent entry front court formed by an admin building - comfortable frount court+7.5with a parking and drop off, optional separate drop offs for the conference zone and +0.0 +0.0 m Spa&wellness complex - comfortable separation of particular functional zones like beach and sport facilities, and conferencing facilities, - play zone for children foreseen - Two bedroom bloks to maximise views into the river - flexible space of atrium- front+16.6 of house spaces +13.4 accommodating F&B facilities, lounge, cigar lounge ect - Spa zone with its own open space- for more intimacy +0.0 m - bania land in separate building with contact with Spa zone - flow sauna- separate platform possibly moored to the pier - flexible scheme of a restaurant with optional flexible infrastructure for MICE- tent, terraces, open space court зона бани bath area
РАЗРЕЗ ПО ОСИ СС SECTION CC
зона бассейна/термальная зона pool area/thermal area
номера rooms
e
администр. помещ. administration
администр. помещ. administration
холл lobby
загрузка delivery room бытовая комната social room
Административн. помещения | Administration
Спа-гостиница в Конаково I Konakovo SPA resort development
+16.6
26
холл lobby
холл lobby
+7 +0.0 m
загрузка delivery room
бытовая комната social room
istration
resort development
номера rooms
26
22
Dekabristov Facade development | Russia |
СПЕЦИФИКАЦИЯ МАТЕРИАЛОВ‐ВАРИАНТ ФАСАДА
Autocad | Sketchup | V-ray | FACADE Photoshop MATERIAL REFERENCES ‐ OPTION|
2
ОБЩИЙ ВИД УЧАСТКА GENERAL VIEW OF THE SITE PROJECT OVERVIEW The aim of this exercise is to make façade design proposals for a complex of buildings on Dekabristov Street in Ekaterinburg. The scheme includes 3 buildings of similar height set within a landscaped public realm Our approach is to create a suite of facade types that can be applied in a number of different ways to the development. The intention is to create a development that has variety within each of its buildings but retains a sense unity
Aerial view The aim of this exercise is to make façade design proposals for a complex of buildings on Dekabristov Street in Ekaterinburg. The scheme includes 3 buildings of similar height set within a landscaped public realm Our approach is to create a suite of facade types that can be applied in a number of different ways to the development. The intention is to create a development that has variety within each of its buildings but retains a sense unity
Штукатуркa, цвет белый Painted render ‐ white
Штукатуркa, цвет темно‐серый Painted render – dark grey
Фасадные панели Trespa Trespa
Facade option A
Фасадные панели Trespa Trespa
1
Алюминиевый оконный профиль темно‐ СПЕЦИФИКАЦИЯ МАТЕРИАЛОВ– ВАРИАНТ ФАСАДА Стеклянная балюстрада серого цвета ( 1 этаж, магазины) Glazed balustrade MATERIAL REFERENCES ‐ OPTION Aluminium window frame dark grey‐ Retail FACADE
Окна ПВХ , цвет темно‐серый PCV window frames ‐ dark‐grey
Glazed balustrade
СТРАТЕГИЯ АРХИТЕКТУРНОГО РЕШЕНИЯ ФАСАДА VOLUMETRIC FAÇADE STRATEGY
1
The development is based on three buildings of differing floor plates composed of smaller sections. The proportions of the elevations are long and low. They need to be divided into more aesthetically pleasing proportions
3
2
Each building is divided into a number of smaller masses. The façade of each mass is created having to make 3 design decisions – 1. Choose a primary façade material 2. Choose the window geometry, proportion 3. Choose the balcony and loggia design In step 2 the primary façade material is applied to all blocks but with colour variation to differentiate the individual sections. Each section has its own interpretation of the primary façade material. This could be a change in colour, texture or panel division
4 In step 3 the chosen window geometry and balcony/loggia strategy is applied to each block. To retain the harmony of the complete development but also give each section its own local identity two adjacent sections will always share the same windows or balconies/loggias (but not both)
In step 4 each building is given its own ‘special features’. These entail introducing a local change to the typical condition to highlight prominent corners or strategically important parts of the buildings. Special features include – double height lounges, larger, taller loggias, roof terraces and taller windows
Conceptual diagrams Красный облицовочный кирпич Rustic Rustic red brick
Желтый облицовочный кирпич Sandal wood Sandal wood yellow brick
Facade option B
Декоративный рельефный кирпич Decorative relief brick
Штукатуркa, цвет темно‐серый Painted render – dark grey
Окна ПВХ , цвет темно‐серый PCV window frames ‐ dark‐grey
Алюминиевый оконный профиль темно‐ серого цвета ( 1 этаж, магазины) Aluminium window frame dark grey‐ Retail
23
Стеклянная балюстрада Glazed balustrade x
panorama office park | gydansk | Poland |
Revit | Autocad |
Grabówek
Gdynia Dziaáki LeĞne
Kamienna Góra
Witomino
Redáowo
Maáy Kącik Oráowo
Main Lobby Area
II
II
X
XIII X
BUDYNEK D BUDYNEK C BUDYNEK B
2017.03.07
2016.01245.000
PK-002
Lokalizacja, Plan Zagospodarowania Terenu
The project located in Gydniya, Poland. Main idea of the building is to create a 3 different building block instead of one single block. that way it can be more effient for working conditions and it will be accessable to maximum natural lights. ground floor mainly consist of circulation paths, main lobbies and parking road for the basement. upper levels contains office spaces. Location The area designated for investment is located in Gdynia near the Sw hill, Maksymiliana, Poland. The main road runs in the neighborhood Gdynia and the railway line connecting the Tri-City. In the immediate vicinity of the plot there is Gdynia Arena and some other sports areas. North side of the plot has Riviera Shopping Center. The plot has office complex with functional services on the ground floor consisting of three independent buildings office. The area of the plot defined in the Local Plan.
24
Zestawienie pom.- podziemne_P2 Numer
Typ pomieszczenia
Poziom P2 P2.A.K01 P2.A.K02 P2.A.K03 P2.A.K04 P2.A.K05 P2.A.T01 P2.A.T02 P2.A.T04 P2.A.T05 P2.A.T06 P2.A.Z01 P2.A.Z02 P2.B.K01 P2.B.K02 P2.B.K03 P2.B.K04 P2.B.K05 P2.B.T01 P2.B.T02 P2.B.T04 P2.B.T05 P2.B.T06 P2.B.Z01 P2.C.K01 P2.C.K02 P2.C.K03 P2.C.K04 P2.C.K05 P2.C.T01 P2.C.T02 P2.C.T03 P2.C.T05 P2.C.T06 P2.C.T07 P2.C.Z01 P2.P01 P2.P02 P2.T01 P2.T02 P2.T03 P2.T04 P2.T05 P2.T06 P2.T07 P2.T08 P2.T09 P2.T10 P2.T11 P2.T12 P2.T13 P2.T14 P2.T15 P2.Z01
Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Przestrzeń techniczna Pom. gospodarcze Pom. gospodarcze Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Przestrzeń techniczna Pom. gospodarcze Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Szacht mech. Szacht windy Szacht elektr. Pom. elektryczne Pom. elektryczne Przestrzeń techniczna Pom. gospodarcze Parking Parking Szacht mech. Zbiornik retencyjny Pom. separatora Wentylatornia wind Pom. sep. benzyn Zbiornik retencyjny Rozdzielnia nisk. napiecia Pom. elektryczne Zbiornik retencyjny RG PPOŻ Rozdzielnia nisk. napiecia Studzienka schładzająca Zbiornik wody poż. Pompownia p.poż Pom. sep. benzyn Pom. gospodarcze
Pow. (m²)
LEGENDA OZNACZEŃ GRAFICZNYCH: przegrody wewnętrzne g/k
L'
M
N
P
O
S
C
B A
R
ITG-C-PB-AR-204
ITG-B-PB-AR-203
ITG-A-PB-AR-202
869
290
788
870
134
SŁUP 85 x 50
10 30
250x500
-8.05 m
-8.05 m
SŁUP ø60
250x500 405
405
SŁUP 250x500 ø85
250x500
1170
20
247
18
150 205
SŁUP ø85
SŁUP ø60
2.3
18
15
916
SŁUP ø85
20
785
SŁUP ø85
20 35
28
O
0.8%
250x500
-8.05 m
3.1 Stojaki dla rowerów 2 szt.
-8.05 m
250x500 250x500
odwodnienie punktowe
250x500 250x500
250x500
250x500
brama pożarowa rolowana
SŁUP ø85
250x500
h=40
rzędna posadzki (wyk./konstr.)
ITG-PW-AR608
250x500
250x500
250x500
15
25
15
Ściana zabezpieczenia wykopu
25 1.04 m² 162
18
80
250x500
SŁUP 60 x 100
SŁUP ø85
360x500
250x500
Hol windowy
165 192 372
19
785
20
- wymiary podano w centymetrach, rzędne w metrach
202
-8.07 m
L
L'
M
N
P
R
Architektura - projektant Marian Kuś
S
0.3%
828
809
30
SŁUP 80 x 80
1283
SW-P01 REI120
-8.04 m
30
230
20
334
SW-P01 REI120
EI60
92
78
68 312 68 312 68 312 68 68
85
25
295 45 2515
70
740
15
80
285
300
315
x27.0 8.2 12x1
-1.10 m 11x1 7.3
-1.61 m
x27.0
P1.A.K04 405
Klatka schodowa PW-10
P1.P01
x27.0
7.3 11x1
33.050 m -5.09 m
13x1 8.2
Parking PW-05 x27.0
Parking PW-05
Poziom P1 mgr inż. Paweł Lachowicz nr upr. ABIT-II-7131-12/2000
P2.T12 Studzienka schładzająca 3.2 m² PW-02
-5.15 m
-4.60 m
-4.70 m
2.7%
0.6%
-8.04 m
zespół mgr inż. Damian Kropidłowski mgr inż. Marcin Żak
100 205
30
10x1 7.5
x27.0
x27.0
P2.T13 Zbiornik wody poż. 29.6 m² PW-03
E
C P2 Poziom 29.550 m
B
A D
F
A
B
C
ITG-B-PB-AR-203
ITG-C-PB-AR-204
ITG-A-PB-AR-202
tom / projekt
-8.05 m -8.26 m 2.0%
0.8%
-8.45 m
365
P2.P01 Parking PW-01
330
271
-8.05 m
10x1 7.5
x27.0
x27.0
-8.10 m
7.5 10x1
-8.45 m -8.65 m
Granica działki
C
Parking PW-01
311
Klatka schodowa PW-04
P2.P01
B
7.5 10x1
P2.A.K04
schemat inwestycji
Ściana zabezpieczenia wykopu
-8.90 m
-8.80 m
-8.90 m
-8.90 m
-9.30 m -9.52 m
-9.55 m
75
EI60
12x1 7.4 x27.0
-0.15 m
80
656
150 205
00.B.U02 Pom. usługowe PW-14
+0.00 m = 37.600 m n.p.m
P1.P01 Konstrukcja - sprawdzający
-8.04 m
Hol wejściowy PW-11
51/00/WŁ
Konstrukcja - projektant data / podpis mgr inż. Piotr Kunc nr upr. KUP/0033/PWOK/09
P2.T14 Pompownia p.poż 30.2 m² PW-04
Toaleta PW-13
3010
18
SW-P04 REI120
00.S01
Przedsionek PW-13
135
zespół Martin Hyams Krzysztof Gryczyński Szymon Kachniarz Michał Pawelczyk Katarzyna Falkowska Szymon Bańka
-8.05 m 898
00.K02
x27.0
-0.75 m
375
9.1 18
x27.0 7.4 11x1
ITG-PW-AR-206
00.K01 Klatka schodowa PW-11
7.0 14x1
352/01/SL
-0.90 m
SW-P04 REI120
x27.0
x27.0
00.A.K04
Przedsionek PW-13
Komunikacja PW-11
Pom. porządkowe PW-13
37.600 m Architektura - sprawdzający Michał Kuś
11x1 7.3
2 14x1 7.0
00.A.K05 00.A.K06
PB data / podpis
MA/015/15
Parter -8.05 m
Pom. biurowe PW-17
30 15
239
393
K
01.B.B01 +4.00 m +3.85 m
-8.04 m
h=40
P2.Z01 Pom. gospodarcze 31.7 m² PW-04a
9.1
J
Pom. techniczne ?
7.3 11x1
15
faza projektu
00.A.Z04 250x500
H
01.B.T07
Pom. biurowe PW-17
+4.00 m
320
18
branża
PW-04
ARCH. I KONSTR.
G SW-P02 REI120
01.A.B01 x27.0
+4.00 m
30
P2.T10 RG PPOŻ 10.7 m²
8.1 250x500
68
95 285
BUDYNEK BIUROWY 3T OFFICE PARK W GDYNI PRZY UL. K. GÓRSKIEGO, DZIAŁKI NR 179/2, 179/3
SŁUP ø60
Klatka schodowa PW-10
Pom. biurowe PW-17
275
SŁUP ø85
250x500
8.1
x27.0 7.3 11x1
01.A.K04
01.A.B01
+3.85 m
460
inwestycja
-8.05 m
SŁUP ø85
T +48 22 480 8080 F +48 22 480 8081 www.wspgroup.com
IPOPEMA 138 Fundusz Inwestycyjny Poziom +1 Zamknięty Aktywów Niepublicznych41.600 m
x27.0
+7.65 m
x27.0
Przedsionek PW-10
380
WSP Polska Sp. z o.o. Prosta 68, 00-838 Warszawa
inwestor
Ściana zabezpieczenia wykopu
0.6%
BELKA 30 x 85h
479 -8.05 m
SW-P01 REI120
11x1 7.3
+7.65 m
11x1 7.3
01.A.K05 18
SŁUP ø85
P2.T11 Rozdzielnia nisk. napiecia 44.3 m² PW-02
h=40
400
870
SW-P03 REI120
250x500
Granica działki
250x500
372
1024
250x500
1.1%
250x500
Pom. biurowe PW-17
+8.15 m +7.80 m
7.2 946 -8.05 m
250x500
02.B.B01
02.A.B01 Pom. biurowe PW-17
EI60 670
h=40
250x500
312
300 Klatka schodowa PW-10
+7.80 m
instalacje
7.2
-8.11 m
BELKA 30 x 85h 250x500
x27.0 7.3 11x1
ITG-PW-AR604
02.A.K04 Pom. biurowe PW-17
T +48 52 361 4646 F +48 52 361 4647 www.fort.pl
75
924
SŁUP ø85
-8.05 m
02
Przedsionek PW-10
02.A.B01
Poziom +2 45.400 m
FORT POLSKA
ITG-PW-AR604
02.A.K05
FORT POLSKA Sp. z o.o. ul. Nowotoruńska 8 85-840 Bydgoszcz
30
Zbiornik retencyjny wysokości dwóch kondygnacji
265
30 110 205
SŁUP ø85
221
111 18 26
99
80
AHR Architects Sp. z o.o. ul. Stępińska 9 00-739 Warszawa T +48 22 389 8500 F +48 22 389 8501 ahr-global.com
konstrukcja
1045
61 30
Klatka schodo
x27.0
+11.60 m
385
47
110 205
-8.04 m
-8.05 m
Szacht mech. 8.95 m²
EI60
Pom. biurowe
+11.45 m 01
250x360 SW-P03 REI120
SŁUP ø85
18
BELKA 85 x 85h
SŁUP ø60
Pom.biurowe
-8.05 m
Otwór kompensacyjny systemu oddymiania garażu podziemnego
SW-P01 REI120
0.7%
SW-P03 REI120
250x500
Klatka schodowa
+11.60 m
49.200 m
P2.T09 Zbiornik retencyjny 15.8 m² PW-03
SW-P01 REI120
Otwór kompensacyjny systemu oddymiania garażu podziemnego
250x500
Hol windowy
11x1 7.3
- wymiary szybów windowych do potwierdzenia z Poziom +3 dostawcą na etapie projektu wykonawczego architektura
600
-8.05 m
-8.11 m
285
x27.0
Pom. biurowe
6.3
h=40
30
brama pożarowa EI60
SŁUP ø85
x27.0
7.3 11x1
UWAGI: - projekt architektoniczny należy rozpatrywać łącznie z projektami branżowymi
P2.T01 Szacht mech. 11.8 m²
250x360
312
SŁUP ø85
23 23
68
Stojaki dla rowerów 2 szt.
Klatka schodo
11x1 7.3
+15.40 m +15.25 m
70
BELKA 30 x 85h
250x360
SŁUP ø85
6.3
Pom. biurowe
+15.25 m 80
SŁUP ø85 -8.05 m -8.05 m
Pom.biurowe
+15.40 m
Suma 420
-8.05 m
-8.05 m
SW-P01 REI120
x27.0
x27.0
Klatka schodowa
312
h=40 odwodnienie punktowe
Brama pożarowa EI120
SW-P01 REI120
SŁUP ø85
Hol windowy
300
360x600
SŁUP 60 x 100
0.7%
SŁUP ø85
SŁUP ø85
11x1 7.3
+19.20 m
355
0.7%
PW-01
Pom. biurowe
15
P2.P02 Parking 2976.3 m²
H33+G
h=40
h=40
h=40
x27.0 7.3 11x1 Klatka schodo
Pom. biurowe
+19.05 m
80
SŁUP ø60
6.2
250x500
Szacht mech. 9.29 m²
Pom.biurowe
+19.20 m
380
SŁUP ø85 Stojaki dla rowerów 2szt.
0.8%
-8.09 m
7.1
SW-P02 REI120
Klatka schodowa
+19.05 m
380
500
SŁUP 60 x 100
odwodnienie punktowe
97 .49°
0.9%
0.9%
250x500
250x500
SŁUP ø85
SŁUP ø85
x27.0
7.3 11x1
SŁUP ø85
SŁUP ø60
250x500
SŁUP ø60
11x1 7.3
+23.00 m
+19.20 m
Zależne miejsca parkingowe Poziom P1 24 Poziom +4 Poziom P2 24 53.000 48 m
-8.11 m
SW-P04 REI120
x27.0 7.3 11x1 Klatka schodo
Pom. biurowe
+22.85 m
Pom. biurowe
Poziom +5 15 m 56.800
Parter Poziom P1 Poziom P2
285
250x500
P2.A.K02 Klatka schodowa 19.2 m² PW-04
250x500
Pom.biurowe
5.3
Odwodnienie liniowe
1.3 m²
260
0.5%
12
h=40
Stojaki dla rowerów 5 szt.
63
380
68
15
SŁUP ø60
250x500
Stojaki dla rowerów 2 szt.
250x500
0.5%
250x500
Klatka schodowa
h=40
0.9%
-8.11 m
70 80
285 285
Hol windowy
+23.00 m +22.85 m
Zestawienie miejsc parkingowych
250x500
x27.0
380
SŁUP 60 x 100
250x500 h=40
11x1 7.3
+26.80 m
Pom. biurowe
250x500
25
0.9%
x27.0 7.3 11x1 Klatka schodo
Pom. biurowe
+26.65 m
80
SŁUP ø85
SŁUP ø60
5.3
P2.B.T05 Pom. elektryczne 3.2 m² PW-02
SW-P02 REI120
BELKA 85 x 80h
SŁUP ø60
Pom.biurowe
+26.65 m
360x500
250x500
Poziom +6 60.600 m
Stojaki dla rowerów (parkowanie w pionie) 10 szt.
Klatka schodowa
+26.80 m
Stojaki dla rowerów (parkowanie w pionie) 4 szt.
250x500
x27.0
380
SW-P02 REI120
2515
250x500
Hol windowy
ITG-PW-AR602a
285
200
250x500
11x1 7.3
+30.60 m +30.45 m
80
18 407
SW-P02 REI120 250x500
Pom.biurowe
+30.60 m
Pom. biurowe
Poziom +7 64.400 m
15
EI30
292
EI30
155 290
10x17.5 28.0 25
Klatka schodowa
01
250x500
250x500
P2.C.K03 Przedsionek 7.7 m² PW-04
135
3.09 m² 168
250x500
310
285
0.8%
0.5%
90 205
Hol windowy
+30.60 m
312
15
18
64
25
20
SW-P01 EI120
250x500 SW-P03 REI120
90 205
x27.0 7.3 11x1 Klatka schodo
Pom. biurowe Pom. biurowe
+30.45 m
68
18
267 260
25 25
x27.0
312
297
PW-04
250x500
-8.09 m
BELKA 20 x 80h
505
15
Poziom +8 68.200 m
68
120 230
12
11x1 7.3
+34.40 m
80
4.3 250x500
15
SŁUP ø60
kurtyna dymowa DH60
-8.05 m
607
SW-P01 REI120
Pom. biurowe
+34.25 m
80
SŁUP ø85
250x500
1.02 m² 150
20
98 20
25
ITG-PW-AR602
380
-8.11 m
Stojaki dla rowerów (parkowanie w pionie) 12 szt.
100 220
SW-P03 REI60
380
12
1607 Mocowanie paneli fasadowych mechaniczne powyżej 25m
BELKA 20 x 60h
25 15
3606
125 230
252
175 1.71 m²
312
380
25 12
182
90 205 135 155
290
BELKA 20 x 60h
90 205
25 15 100 EI30
308
25 296
222
222
527
20 x 80h
Pom. elektryczne
180
250x500
EI60
250x500
18
25 65
250x500
1815
3.16 m²
290
110 230 302
P2.C.K02 Klatka schodowa 17.6 m² PW-04
Pom.biurowe
x25.0 7.5
+34.40 m
+34.25 m
68
146
18 BELKA
C2
Klatka schodowa
13x1
ITG-PB-AR-205
EI30
BELKA 2.02 m² 20 x 80h 1099
x27.0 7.3 11x1 Klatka schodo
01 Hol windowy
+34.40 m
D
SW-P02 REI120
250x500
SW-P04 REI120
154
x25.0
Pom. biurowe
Poziom +9 72.000 m
312
12
12x1
30
380
SŁUP ø85
0.41 m² 0.38 m²
255
x27.0
+38.20 m +38.05 m
380
25
250x500
250x500
250x500
Klatka schodo
11x1 7.3
285
290 10 125
0.57 m² 75 12
25
0.7%
7.1
250x500
Pom. biurowe
+39.08 m
+41.557 = +38.15 m
-8.11 m
Nawiew wentylacji bytowej w płaszczyźnie sufitu
250x500
Klatka schodowa PW-18
h=40 Nawiew wentylacji bytowej w płaszczyźnie sufitu
25 68
90 205 870
90
20
2xZH52 245
500
250x500
SW-P03 EI120
0.8%
250x500 SW-P04 EI120
-8.05 m
P2.A.K03 Przedsionek 5.1 m² PW-04
10.A.K02
Przedsionek PW-18
250x500
1.5%
250x500
SŁUP ø85
P2.B.K02 Klatka schodowa 17.6 m² PW-04
6.2
250x500 % 0.4
-8.05 m
SW-P04 EI120
250x500 45
SW-P02 REI120 250x500
EI30
250x500
250x500
360x500 250x500a
SW-P04 REI120 -8.11 m
-8.05 m
0.6%
90 205
0.7%
90 205
250x500
SW-P02 P2.B.K03 REI120 Przedsionek 4.3 m² PW-04 -8.05 m
SŁUP ø45
530
20
-8.05 m
BELKA 20 x 60h
25 15 108
SW-P01 REI120
8 x17.9 27.0
135
EI30
225
SW-P01 REI120
SŁUP ø60
250x500
661 209
25
EI30
SŁUP ø85
7.3 11x1
10.A.K01 +39.08 m
6.1
60 25
290
20
12
2xZH52 SW-P01
REI120
25
250x500
1.18 m²
155
161
205
SW-P04 EI120 15 18 250x500
Szacht mech. 3.85 m²
H33+G
179
BELKA 20 x 60h
10 x17.5 28.0 607
250x500 250x500a P2.A.Z01 Pom. gospodarcze 5.6 m² PW-04a
P2.A.T04 Pom. elektryczne 4.9 m² PW-02
15
x27.0
+42.00 m +41.85 m
68
18
Poziom +11 79.600 m
+41.660 = 79.26 m n.p.m.
+41.55 m
2.0%
2.0%
68
236
Pom. biurowe
11x1 7.3
+41.557 = +41.66 m +41.55 m
15
20
x27.0 7.3 11x1 Klatka schodo
+43.80 m
Ekran akustyczny - wyk. panele z siatki ciętociągnionej
oznaczenie przekroju
80
100 205
161
.3
380
20
205 1.22 m²
18
SW-P03 REI120
P2.T07 Rozdzielnia nisk. napiecia 34.3 m² PW-02
250x500
5.2
2915 20
25 59
0.72 m² 122 12
25
25 321215
5.43 m² 1.09 m²
0.5%
257
250x500a 3.85 m² 233
290
SW-P01 REI120
H33+G
18
302
SW-P01 REI120
255
20
20
EI60
223
Szacht windy 5.69 m²
250x500a
SW-P04 EI120
-8.05 m
360
SW-P03 REI120
Odwodnienie liniowe
250x500
680
18
SW-P01 REI120
Szacht windy 5.66 m²
C1 EI60
18
250x500
0.7%
Odwodnienie liniowe
Szacht windy 6.87 m²
622
SW-P01 REI120
195
0.59 m²
360x500
1.8 m² 76 25
250x500a
1518
BELKA 20 x 85h
125 230
BELKA 20 x 60h
Przestrzeń techniczna 5.73 m²
A4 1.04 m²
15 18 47
SŁUP ø85
250x500a
-8.04 m
250x500a
250x500
+45.80 m +45.65 m
03
wycięcie w stropie powyżej
oznaczenie siatki
A ITG-PB-AR-301
380
1520
5.18 m²
250x500a
500
0.7%
EI30
250x500 250x500
Ściana zabezpieczenia wykopu
250x500a
80 205
EI30
300
BELKA 20 x 60h
SW-P03 EI120
-8.05 m
x27
Poziom +12 83.400 m
+45.80 m
7.5
18
P2.B.K02 Klatka schodowa 17.6 m² PW-04
SŁUP 60 x 100 SŁUP ø45
250x500
200
18
870
P2.A.K01 Hol windowy 9.6 m² PW-04
-8.11 m
Klatka schodo
12x1 6.4
+45.80 m
wycięcie w stropie
P2.C.Z01 Pom. gospodarcze 5.1 m² PW-04a
250x500
65 15
SW-P01 REI120
-8.11 m Odwodnienie liniowe
PW-01
P2.A.Z02 Pom. gospodarcze 20.9 m² PW-04a
342
SW-P04 REI120
-8.04 m
15
P2.P01 Parking 3459.9 m²
15
15
250x500
500
18
0.88 m²
18
250x500
SW-P01
697
-8.05 m PW-04a
18
250
120 205
250x500
250x500a
h=40
SW-P03
5.2 100 220
Pom. biurowe
wymiar liniowy
x27.0
0.8%
BELKA 20 x 60h
18
-8.05 m
.4x 12x16
ITG-A-PW-AR-206
- 0.05 - 20.00
117
2xZH52
0.9%
15 REI120
18
90 205
319
250x500a
SW-P04 REI120
2.9 m²
18
138 230 18 100 220
27.3
E
SW-P01 REI120
Przestrzeń techniczna 11.7 m²
Pom. elektryczne 1.71 m²
18
P2.T08 Pom. elektryczne 10.4 m² PW-02
250x500
SW-P04 378 EI30
B3
SW-P04
SŁUP ø60
zawór hydrantowy
Poziom +10 75.800 m
EI60 175
25
SW-P01 REI120
110 205
REI120 h=40
100 220
SW-P03 EI60
607 10 x17.5 28.0
90 205
EI60
SW-P03 250x500
250x500 100 220
BELKA 20 x 100h 18
SW-P03 EI120
688
Przestrzeń techniczna 14.74 m²
90 205
6386
REI120 Przestrzeń techniczna SW-P01 11.99 m²
SW-P01 REI120
A1 EI60
15
18
175
SW-P01 REI120
464
15
PF-15
25
BELKA 20 x 60h
15 20 45 25
BELKA 85 x 80h
-8.11 m
h=40
BELKA 20 x 60h
P2.B.Z01 Pom. gospodarcze 26.9 m² PW-04a 250x500a
kurtyna dymowa DH60
4.3
0.9%
SŁUP ø85
kurtyna dymowa DH60
175
-8.05 m
SW-P04 REI120
EI60
500
222
270
4980
250x500
kurtyna dymowa DH60
250x500
SW-P03 EI120
P2.B.T04 Pom. elektryczne 4.6 m² PW-02 SŁUP ø85
SW-P04
250x500
0.6%
80 205
P2.A.K04 Klatka schodowa 17.9 m² PW-04
300
15
1815
273
132
250x500
kurtyna dymowa DH60
P2.B.K01 Hol windowy 11.3 m² PW-04
12
25
18
540
155
20
25
SŁUP ø85
15
SW-P04 EI120
237
55 18
5.1 220 Szacht windy 6.56 m²
84 20
25
25 PW-04a
SW-P01 1.59 m²
20
20
B2
500
138 230
617
10 x17.5 27.0
192
5.1 540
221 Szacht windy 6.77 m²
EI60
EI30
SW-P01 REI120
BELKA 20 x 60h
90 205
25
EI60
290
220
BELKA 20 x 60h
135
20
1.12 m²
SW-P04 REI120
155
EI30
2xZH52 15 18 72
SW-P04 EI120
SŁUP ø85
SŁUP ø85
4.2 81 24
209 2xZH52
EI60
25 18
SW-P01 REI120 BELKA 20 x 60h
170
12
0.98 m²
12
Przestrzeń techniczna 25 6.73 m² 210
155
SW-P01 REI120
205
90 205
20
110 230
1.31 m²
243
SŁUP ø60
BELKA 85 x 80h
15 18
BELKA 20 x 60h
870
P2.T15 Pom. sep. benzyn 14.5 m² PW-02
D
20 45 25
0.95 m²
SW-P04 REI120
4.2
250x500a
250x500
232
250x500
REI120
-8.05 m
18
250x500
250x500a
SW-P02
SW-P02 REI120
125 230
250x500a -8.11 m EI30
1.13 m²
250x500a
BELKA 85 x 80h
SŁUP ø85
2.96 m²
15 20 45
SW-P02 REI120
250x500a
BELKA 20 x 60h
200
110 230
SŁUP ø45
250x500 SW-P02 REI120
1.0%
250x500
760
18
500
250x500
18
550
20
407
EI30
557
250x500a
250x500
250x500
250x500
Klatka schodowa PW-18
hydrant ppoż ZH52
250x500
260
500
250x500
12
500
250x500
Szacht windy 5.77 m²
550
P2.B.K05 Przedsionek 11.3 m² PW-04
SW-P02 90 205
110 230
175
2xZH52 1815
120 230
0.95 m² 102 25 15
12
BELKA 20 x 60h
110 205
SW-P01 REI120 326
BELKA 20 x 60h
205
25
BELKA 40 x 80h
25
90 205
REI120 10 x17.5 28.0
SW-P01 REI120 SŁUP 60 x 100
250x500
13.B.K04
+50.48 m Poziom +13 87.200 m
odporność ogniowa H25
SŁUP ø60
P2.C.K04 Klatka schodowa 17.6 m² PW-04 SW-P02 REI120
68
18 15
607
SW-P01 REI120
BELKA 40 x 80h
SW-P01 REI120
25
Nawiew wentylacji bytowej
89 2.59 m²
EI30
15 30
SW-P02 REI120
EI60
6.7 m² 721
50 15 30
P2.B.K04 Klatka schodowa 17.6 m² PW-04
266
657
0.6%
18
50
h=40
369
20
SŁUP ø45
4.1 250x500
0.7%
93
713
SŁUP ø60
250x500 250x500a h=40
250x500a
25
500
SŁUP ø85
250x500
Stojaki dla rowerów 2 szt.
P2.A.K05 Przedsionek 6.7 m² PW-04
250x500
EI60
250x500
2.0%
A ITG-A-PW-AR-202
typ ściany
+38.77 m
155
550
SŁUP 60 x 100 250x500
250x500
Wykończenie posadzki
izolacyjność akustyczna część pełna/przeszklenie
3.3
P2.C.K05 Przedsionek 6.4 m² PW-04 EI30 0.16 m²
EI30
1170
SŁUP 60 x 100
250x500a h=40
6.1
Numer pomieszczenia Nazwa pomieszczenia
Powierzchnia m2 opis przegrody
42/35dB SW-03 REI120
4.1 SŁUP ø85
h=40 0.9%
250x500
Stojaki dla rowerów 2szt.
BELKA 20 x 80h
135
2008
SŁUP ø85
250x500 250x500
SŁUP ø60
podwójny stojak rowerowy
00.A.K01 Klatka schodowa 17.89 m2 PW-01
250x500
250x500 0.9%
250x500
h=40
SW-P03 REI120
250x500a
15.1%
1050
4.1
550
250x500
podwójny stojak rowerowy ścienny
250x500 SW-P04 EI120
500
250x500
SŁUP 60 x 100
I
opis pomieszczenia
250x500
SW-P01
250x500
250x500
H
zawór ze złączką
H33+G
0.7%
0.7%
250x500
250x500a
SŁUP ø60
250x500
G
Wysokość budynku - rzędna punktu zbiegu połaci dachowej
505
927
5.0%
870
3% 0.
0.6%
250x500
ITG-PB-AR-205
250x500
SŁUP 60 x 100
F
F
3.2
250x500a
250x500
250x500
BELKA 85 x 80h
SŁUP ø60
3.3
3.2
SŁUP ø60
250x500
SŁUP ø85
BELKA 85 x 80h
E
ITG-B-PW-AR-207
250x500 SŁUP 40 x 80
SŁUP 60 x 100
250x500
250x500
250x500
250x500
250x500 0.9%
0.8%
SŁUP 60 x 100
500
500
250x500
250x500
0.7%
360x500
D
odwodnienie punktowe/ wpust posadzkowy odwodnienie liniowe
% 0.6
-8.09 m
h=40
SŁUP 60 x 100
250x500
3010 50
SW-P01 REI120
2.3
575
-8.11 m
515
542
H33+G
250x500 h=40
250x500
476
P2.T06 Zbiornik retencyjny 25.0 m² PW-03
Odwodnienie liniowe
-8.11 m
0.6%
250x500
30
-8.11 m
-8.05 m
SŁUP ø60
-8.11 m
250x500 250x500 h=40
Zbiornik retencyjny wysokości dwóch kondygnacji
SW-P01 REI120
SŁUP ø85
C
otwór w ścianie (rzut)
330
250x500
1503
SŁUP ø85
H33+G
-8.11 m
250x500
20
250x500
brama pożarowa EI60
-8.05 m
SŁUP ø85
SŁUP ø85
3.1
SŁUP ø60
h=40 h=40
-8.09 m
Odwodnienie liniowe
SŁUP ø85
250x500
B
linia zabudowy
68
BELKA 85 x 80h
280
odwodnienie punktowe
-8.05 m
Odwodnienie liniowe
SŁUP ø85
SŁUP 250x500 ø85
250x500
-8.05 m
-8.05 m Odwodnienie liniowe
SŁUP ø60
250x500
SW-P01 REI120
1170
20
0.3%
SŁUP ø85 h=40 510
18
2.2
910
2.2
510
15
P2.T05 Pom. sep. benzyn 14.8 m² PW-02
SŁUP ø85
258
258
250x500
250x500
SW-P04 REI120
2586
SW-P04 REI120 SW-P02 REI120
SŁUP ø85
% 1.5
Szacht mech. 29.65 m²
0.7%
20
EI60
0.8%
305
35
18
20 15
279
EI60
SŁUP 250x500 ø85
250x500
1.3 1.2
18
250x500 SW-P01 REI120
1.3 250x500
250x500
SW-P02 REI120
P2.T03 Pom. separatora 13.8 m² PW-02
SŁUP 250x500 ø85
250x500
250x500
530
250x500
1.2
4479
Otwór kompensacyjny systemu oddymiania garażu podziemnego
765
SŁUP 250x500 ø85
SŁUP ø85
-8.05 m
250x500
-8.05 m
535
0.6%
0.6%
500
500
h=40
h=40
20
SW-P03 REI120
SW-P04 REI120
250x500
3.93 m²
A
linia siatki konstrukcyjnej
312
SŁUP ø60
150 205
15 18
SŁUP ø60
455 210
-8.07 m 500
-8.05 m
250x500
granica działki
312
250x500
-8.05 m
linia widokowa
312
250x500
336
izolacja wełna mineralna izolacja twarda
312
250x500
810
żelbet
68
250x500
250x500
EI60
250x500
150 205
42
0.4%
30 30
SW-P01 REI120
30
250x500
1.1
160
535
360x500
SŁUP ø60
SŁUP ø60
Szacht mech. 3.35 m²
470
250x500
250x500
Zbiornik retencyjny wysokości dwóch kondygnacji
30
250x500
870
0.7%
50 10
250x500
20
367
1.1
250x500 -8.05 m
425
SŁUP ø60
SW-P01 REI120
245
232
250x500
P2.T02 Zbiornik retencyjny 47.4 m² PW-03
870 Otwór kompensacyjny systemu oddymiania garażu podziemnego
wykopu
50
SŁUP 85 x 50
870Ściana zabezpieczenia
3010 50
870 14579
30
870
40 20 50 3010 50
1077
500
870
0.7%
870
3010 50
1004
3010 50
870
485
870
3010 50
440
P2.T04 134 Wentylatornia wind 77.4 m² PW-02
ściany murowane
155
L
35 35
K
313
J
390
I
68
H
312
G
68
F
312
E
673
D
677
C
760
B
380
A
9.56 19.17 5.08 17.89 6.70 16.58 12.24 4.87 1.30 17.72 5.62 20.88 11.34 17.60 4.29 17.60 11.30 31.03 13.65 4.57 3.16 21.47 26.92 28.36 17.60 7.71 17.60 6.36 8.91 11.43 1.47 2.02 1.71 11.70 5.08 3459.89 2976.33 66.95 47.44 13.81 77.43 14.83 24.96 34.32 10.44 15.79 10.75 44.29 3.19 29.62 30.22 14.50 31.72 7326.98
-9.55 m
-9.55 m
-9.55 m
-9.55 m
-9.65 m
-10.09 m -10.22 m
BUDOWLANY temat rysunku
RZUT POZIOMU P2 GARAŻ PODZIEMNY
Basement parking
870
870
1004
870
870
1077
A ITG-A-PW-AR-202
kod rysunku
870
E
F
ITG-A-PW-AR-206
ITG-B-PW-AR-207
134
ITG-PB-AR-098 Data wydania
rewizja
A
B
C
D
E
F
2017.12.20 skala
format papieru
1760x841mm
1 : 100
Nazwa
G
H
I
LEGENDA OZNACZEŃ GRAFICZNYCH:
Zestawienie pom. - Parter Numer
Section
Pow.
przegrody wewnętrzne g/k
576 90 205
100 205
18 153
BELKA 45 x 85h
2332
120 205
90 205
290
15 120
1015
BELKA 20 x 60h
135
110 230
4105
125 230
125 230
110 230
125 230
1015
EI30
90
372
OO-10
135 290
podjazd samochodów osobowych części A i B
BELKA 20 x 60h 120 230
120 230
75
120 205
821
rzędna posadzki (wyk./konstr.)
Pas międzykondygnacyjny EI60
A
oznaczenie przekroju
+41.660 = 79.260 m n.p.m.
+39.08 m
Poziom +9 72.000 m
543
642
0.7%
Szacht mech. 5.9 m²
1260
- wymiary podano w centymetrach, rzędne w metrach
OO-10
OO-15 37.58 m
Poziom +4 53.000 m
architektura
T +48 22 389 8500 F +48 22 389 8501 ahr-global.com
37.52 m FORT POLSKA
T +48 52 361 4646 F +48 52 361 4647 www.fort.pl
90 215
120 230
200 300
IPOPEMA 138 Fundusz Inwestycyjny Zamknięty Aktywów Niepublicznych
OO-10
inwestycja
90 221
PRZ ZATOKA
OW YSTANK
A
ARCH. I KONSTR.
PB
Architektura - projektant Marian Kuś
data / podpis
zespół Martin Hyams Krzysztof Gryczyński Szymon Kachniarz Michał Pawelczyk Katarzyna Falkowska Szymon Bańka
200 300
200 301
200 301
OO-4
Pas międzykondygnacyjny EI60
+6.95 m OO-5
51/00/WŁ
Poziom +1 41.600 m
OO-1
OO-3
OO-11
OO-5
+3.95 m
OO-15 OO-15
OO-10 Konstrukcja - projektant data / podpis mgr inż. Piotr Kunc nr upr. KUP/0033/PWOK/09
KIEGO ULGÓRS 1004
870
1977
870
1077
887
870
1840
1004 12124
Konstrukcja - sprawdzający mgr inż. Paweł Lachowicz nr upr. ABIT-II-7131-12/2000
870
975
869
290
1887
788
870
1828
1004
870
975
400
870
1887 zespół mgr inż. Damian Kropidłowski mgr inż. Marcin Żak
obrys kondygnacji podziemnej
schemat inwestycji
ITG-B-PB-AR-203
C B
A D
E
-0.50 m
37.600 m
ITG-C-PB-AR-204
C
+3.15 m
Parter
B
A ITG-A-PB-AR-202
B
OO-2
400
200 300
352/01/SL
37.12 m
-0.54 m
42/35dB SZ-01
Pas międzykondygnacyjny EI60
MA/015/15
Architektura - sprawdzający Michał Kuś
380
3.0%
365
Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
+10.75 m +8.38 m +7.75 m
OO-1
faza projektu
80
branża
37.08 m
42/35dB SZ-01
Szklana balustrada OO-3
Poziom +2 45.400 m
9.1
OO-10
+11.55 m
380
200 300
200 300
OO-10
42/35dB SZ-06
9.1
OO-1
OO-4
T +48 22 480 8080 F +48 22 480 8081 www.wspgroup.com
inwestor
380
1.8%
469
OO-10
WSP Polska Sp. z o.o. Prosta 68, 00-838 Warszawa
37.45 m
BUDYNEK BIUROWY 3T OFFICE PARK W GDYNI PRZY UL. K. GÓRSKIEGO, DZIAŁKI NR 179/2, 179/3
4 x13.3 35.0
678
+14.55 m OO-2
Poziom +3 49.200 m
instalacje
42/35dB SZ-01
-0.02 m 630
Pas międzykondygnacyjny EI60
FORT POLSKA Sp. z o.o. ul. Nowotoruńska 8 85-840 Bydgoszcz
37.50 m
37.33 m
42/35dB SZ-06
SŁUP 40 x 80
Pas międzykondygnacyjny EI60
konstrukcja
7.2 37.39 m
934
00.A.U01 Pom. usługowe 270.2 m² PW-14
+15.35 m
AHR Architects Sp. z o.o. ul. Stępińska 9 00-739 Warszawa
37.56 m 37.57 m
37.60 m
37.48 m
3.3%
BELKA 40 x 70h
20
Otwór kompensacyjny systemu oddymiania garażu podziemnego 37.48 m
+19.15 m
+18.35 m
- wymiary szybów windowych do potwierdzenia z dostawcą na etapie projektu wykonawczego
37.56 m
1.2%
OO-10
OO-10
+22.15 m
37.58 m
37.44 m
BELKA 40 x 70h
+22.95 m
UWAGI: - projekt architektoniczny należy rozpatrywać łącznie z projektami branżowymi
200 301
200 300
200 300
42/35dB SZ-01
0.5%
BELKA 40 x 70h
200 300
37.59 m
+25.95 m
37.53 m
Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
1240
SŁUP 40 x 80
Napowietrzanie pom. transformatorowni
Pas międzykondygnacyjny EI60
+26.75 m
37.55 m
-0.10 m -0.15 m
7.2
Pas międzykondygnacyjny EI60
+29.75 m
380
125 300
83
Pas międzykondygnacyjny EI60
+33.55 m +30.55 m
4166
870
Poziom +5 56.800 m
obrys kondygnacji podziemnej
1.3%
Szacht mech. 11.1 m²
0.4%
OO-13
37.47 m
Pas międzykondygnacyjny EI60
+33.55 m
Poziom +6 60.600 m
1539
OO-15
120 220
223 20
42/35dB SZ-06
Pas międzykondygnacyjny EI60
Poziom +8 68.200 m
37.54 m
42/35dB SZ-06
+34.35 m
42/35dB SZ-01
13
100 205
200 301
00.C.U02 Pom. usługowe 128.1 m² PW-14
934
+34.35 m Pas międzykondygnacyjny EI60
6.3
BELKA 40 x 70h
+38.93 m
Poziom +10 75.800 m
37.56 m
ogrodzenie parkingu rowerowego
600
Poziom +7 64.400 m
37.58 m
SŁUP 40 x 80
200 300
+44.95 m
Poziom +11 79.600 m
ITG-PB-AR-301
Wysokość budynku - rzędna punktu zbiegu połaci dachowej
213
631
885
PW-11
494
+43.80 m
PŻ-30
108
+45.75 m
wycięcie w stropie powyżej
SW-03
880 460
Poziom +12 83.400 m
Strefa lokalizacji szyldów i reklam
wycięcie w stropie
5.3 901
992 76
560
wymiar liniowy
oznaczenie siatki
4.1
120 220
6.3
42/35dB SZ-01
380
zawór hydrantowy - 0.05 - 20.00
117
37.55 m
00.C.K08 Komunikacja 19.4 m² PW-12
778
750
OO-10
200 300
1.3%
1347
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania.
00.B.K07 Korytarz 25.6 m²
murek h=130cm
369 201
hydrant ppoż
380
155
SW-02 EI120
SW-02 EI60
00.C.K03 Przedsionek 4.9 m² PW-13
306
293
00.C.U02.S01 Pom. zapleczowe 35.8 m² PW-14
236
1086
00.B.U01.S01 Pom. zapleczowe 53.7 m² PW-14
PW-11
SŁUP ø60
odporność ogniowa H25
ZH52
841
SŁUP 35 x 80
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania.
42/35dB SZ-06
Wiata ze stojakami na rowery
drzewo
+50.68 m Poziom +13 87.200 m
typ ściany
37.48 m 265
8.1
Szacht mech. 8.74 m²
Wysokość budynku - rzędna punktu zbiegu połaci dachowej izolacyjność akustyczna część pełna/przeszklenie
4960 380
120 230
120 230
260
20 101 20
90 205
539 20 x 80h
00.C.K02 Klatka schodowa 17.6 m² PW-12
BELKA 40 x 70h
BELKA 60 x 70h
Wykończenie posadzki
Powierzchnia m2 opis przegrody
42/35dB SW-03 REI120
380
104
grzejnik kanałowy
292 140
125
EI30
308 382
BELKA 20 x 60h
103
90 205
103 514 103
258
104
80 205
335
BELKA 20 x 60h 120
PW-12
+52.400 = 90.000 m n.p.m.
Numer pomieszczenia Nazwa pomieszczenia
80
870
982
965
3.6 %
263
170
303
147
EI60
20
h=40
80 293
270
335
2.1 %
0.9%
120 220
150 225 90 205 EI60
SŁUP 35 x 80
90 220
SŁUP ø60
1379
18
SŁUP 40 x 80
435
275
SW-02 EI120
BELKA 271
37.57 m
OO-10
804
h=40
37.47 m
BELKA 50 x 70h
H25
574
200 300 SŁUP 35 x 80
SW-02 EI60 h=40
SW-02 REI120
BELKA 50 x 70h
00.C.K07 Korytarz 17.5 m²
podwójny stojak rowerowy
opis pomieszczenia
00.A.K01 Klatka schodowa 17.89 m2 PW-01
6.2 SŁUP 40 x 80
murek h=130cm
1045
665
OO-10 OO-14
90 205
+55.20 m
podwójny stojak rowerowy ścienny
EI30
90 205
118
OO-12
200 300
zawór ze złączką
ZH52
SW-02 EI120
13
SW-02
drzewo
53 870 746
218
216
OO-12
37.44 m
odwodnienie punktowe/ wpust posadzkowy odwodnienie liniowe
ławka 37.56 m
42/35dB SZ-01 239
90 205 13
OO-12 37.57 m
37.54 m
120 205
otwór w ścianie (rzut)
69
200 300
13
115 300
115 300
115 300
115 300
115 300
115 300
115 300
115 300
115 300
115 300
115 300
OO-12
6.2
SW-01 REI120
8.1
0.00 m
-2.18 m
00.C.K09 Hol wejściowy 101.4 m² PW-12
90 220
SW-02 EI30
100 205
660
Dylatacja
90 200 223
OO-12
1.2% SŁUP 45 x 70
00.C.Z01 Pomocnicze 5.7 m² PW-14
SW-01 REI120
barierka ochronna
452
EI60
OO-12
drzwi obrotowe R=140cm
0.00 m -0.15 m
Pom. elektryczne 2.02 m²
12 x18.2 25.0
220
SŁUP 40 x 80
OO-12
37.57 m
SŁUP 35 x 80
BELKA 20 x 80h
Pom. elektryczne 1.71 m²
SW-03
100 205
90 220
SZ-02
EI60
BELKA 40 x 70h
256
1068
SŁUP ø60
OO-10
1.7%
SZ-02 90 220
BELKA 20 x 80h SW-02 EI120
Wycieraczka
0.00 m -0.15 m
OO-12
37.54 m
C4 EI30
100 205
155
1897
OO-12
D ITG-PB-AR-205
C3 EI30
155
“Strefa lokalizacji suszarni ubrań"
00.C.Z05 Szatnia damska 20.6 m² PW-13
h=40
OO-12
155
C2 EI30
SW-03
142
SW-02 REI120
Szacht mech. 2.18 m²
424
127 80 205
179
SW-02 EI120
7.1
Nawiew wentylacji bytowej garażu
178
5.3
OO-12
42/35dB SZ-02
00.B.K03 Przedsionek 3.8 m² PW-13
h=40
5.0%
80 127 205
80 205 23
359
BELKA 20 x 60h
135
120 205 120 205
H25
00.C.K04 Klatka schodowa 17.6 m² PW-12
37.60 m
C1
301
125
140
15
290
120
750
BELKA 45 x 80h
00.B.U01 Pom. usługowe 215.0 m² PW-14
SZ-06
0.00 m -0.15 m
37.40 m
0.9%
bramki kontroli dostępu
00.C.K01 Hol windowy 34.2 m² PW-12
80 205
1420
00.B.T05 Pom. elektryczne 2.9 m² PW-13 EI30
37.54 m
36.77 m
SŁUP 45 x 70
Szacht windy 17.76 m²
EI60
738
SŁUP ø60
boczna kurtyna powietrzna
245
5.2
SW-02 EI120
SW-01 REI120
SW-02 EI120
152
80 205
80 205
00.C.S05 Toaleta damska 1.7 m² PW-13
0.35 m
165
405
116
681
168
00.U01 Pom. usługowe 427.4 m² PW-14
12 x18.2 25.0 300
Szacht windy 5.77 m²
120 230
80 205
90 205
125 230
100 205
90
BELKA 20 x 60h
SŁUP ø60
ZH52
BELKA 20 x 60h
SW-02 EI120
SŁUP ø60
BELKA 20 x 60h
0.00 m
H25
350
SŁUP ø45
00.B.K02 Klatka schodowa 17.6 m² PW-11
SW-01 REI120
155
12 x16.7 27.0
SW-01 REI120
6.1
844
00.K03 Pochylnia 150.4 m²
80 205
00.C.S04 Umywalnia damska 18.2 m² PW-13
00.T15 Pom. techniczne 73.6 m² PW-13
SW-02 EI120
1970
barierka ochronna
12 x18.2 25.0 297
747
-2.18 m
1.83 m²
305
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania.
37.34 m
4.3
00.U01.S01 Pom. zapleczowe 139.9 m² PW-14
318
H25
h=40
13
-2.18 m
1.75 m² 190
80 205
176
00.C.S03 Toaleta męska 1.5 m² PW-13
100 205
SW-03
413
00.C.S01 Toaleta niepełnospr. 5.4 m² PW-13
1.07 m² 12 x17.4 27.0
barierka ochronna
EI60
90 205
136
SW-01 REI120
100 292
Dylatacja
BELKA 20 x 60h
90 205
SŁUP 45 x 70
120 220
9.6 m²
0.00 m 120 205
BELKA 20 x 60h
“Strefa lokalizacji suszarni ubrań"
Szacht windy 22.04 m²
42/35dB SZ-06
142
00.C.S02 Umywalnia męska 20.6 m² PW-13 00.C.T01 Szacht mech. SŁUP 6.3 m² 40 x 80
142
h=40
SW-02 EI60
EI30
177
481
4.3
SW-02 EI60
SW-02 EI120
13
291 758
SŁUP 40 x 80
SŁUP ø60
10
EI30
B3
291
Nawiew wentylacji bytowej garażu
SW-02 EI60
4.2
358
BELKA 20 x 60h
00.B.K01 Hol windowy 73.9 m² PW-11
SW-02 EI120
B4
155
82
00.B.S05 Umywalnia męska 28.6 m² PW-13
H25
00.B.Z02 Szatnia męska 32.2 m² PW-13
300
3.3
SW-02 EI120
PW-12
H25
570
EI60
70 3 92 168
80 205 423
00.C.K10 Korytarz 60.9 m²
BELKA 20 x 80h
481
66
Nawiew wentylacji bytowej garażu
BELKA 70 x 60h
BELKA 20 x 60h
115 300
205
80 205
SŁUP 35 x 80 SW-02 EI60
EI30
h=40
ZH52
40
820
135
180
589
107
376
100 205 110 230
125 230
90 200
EI60
B2
80 205
107
BELKA 20 x 60h
110 230 244
SŁUP ø60
0.00 m -0.15 m
EI30
115 300
115 300 107
80 205
641
193
szafki dwudzielne
107
SW-02 EI120
90 205
PW-13
00.C.Z04 Szatnia męska 15.8 m² PW-13
756
H25
SW-02 EI120
SŁUP 35 x 80
0.00 m -0.15 m
Nawiew wentylacji bytowej garażu
00.B.S04 Toaleta męska 1.6 m² PW-13
107
80 205
641 107
137
265 90 205
EI60
BELKA 20 x 100h
16.1%
450
EI60 403
259
150 225
Dylatacja
103 13
262
150 120 205 EI30
426 80 205
248
90 220
EI30
00.C.T07 Pom. DSO 10.2 m²
80 205
411
131
100 230
150 205
178
EI30
305
SŁUP 35 x 80
36.71 m
8.0%
90 205
90 205 177
90 205
EI3063
3
65
B1
grzejnik kanałowy
Nawiew wentylacji bytowej garażu
SŁUP 35 x 80 36.80 m
3.9%
OO-13 4.2% OO-10
EI60 EI60
634
H25
13
137
90 205
EI60 103
135 20
230 “Strefa lokalizacji suszarni ubrań"
Szacht windy 6.77 m²
00.B.T04 Pom. elektryczne 4.6 m² PW-13
SW-02 EI30
00.A.T05 Pom. elektryczne 2.4 m² PW-13
66 265
13
SW-02 EI60
BELKA 20 x 60h
155
1129
267
24 x16.7 28
300
456
EI30
20
20
154
100 205
H25
SŁUP 40 x 80 EI60
997
90 205
42/35dB SZ-06
00.C.K05 Przedsionek 7.7 m² PW-13
00.C.T09 Centralna bateria 4.5 m² PW-13
SW-02 EI120
1100 L 153
Szacht windy 6.73 m²
155
drzwi obrotowe R=140cm
Szacht mech. 10.17 m²
801
SW-02 EI60
SŁUP 45 x 70
1156
00.C.U01 Pom. usługowe 112.8 m² PW-14
00.C.Z02 Pom. porządkowe 10.9 m² PW-13
SŁUP 40 x 80
h=40 150 205
166 12 x16.7 27.0
SW-02 EI120
SŁUP 40 x 80
BELKA 45 x 80h
37.59 m
5.0%
249
0.00 m
297
SŁUP 40 x 80
0.00 m -0.15 m
EI60
boczna kurtyna powietrzna
00.A.K02 Klatka schodowa 19.2 m² PW-11
36.71 m
barierka ochronna
B5
SW-02 EI30
260
3.3
ZH52 120 205
EI60
5.2
BELKA 45 x 80h
BELKA 45 x 80h
0.00 m
BELKA 20 x 80h
37.58 m
OO-12
h=40
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania. 321
SW-02 EI30
EI60
SŁUP ø60
00.B.Z01 Pom. gromadzenia odpadów 38.9 m² PW-13
155
EI30
90 90 205
SŁUP 80 x 40
226
Nawiew wentylacji bytowej garażu
0.00 m -0.15 m
1100 L
273
372
-0.35 m = 37.25m -0.50 m 150 205
SW-02 EI120
494
BELKA 45 x 80h
90 200 120
12 x16.7 27.0
EI30
EI60
180 205
PW-13
18 10
324
EI30
182 120 205
10
30
ZH52
120 205
BELKA 20 x 80h
00.C.U01.S01 Pom. zapleczowe 39.8 m² PW-14
00.C.Z09 Pom. gromadzenia odpadów 33.7 m² PW-13
PW-11
EI60
297 12 x19.0 27.0
-0.35 m -0.50 m
-0.35 m -0.50 m
-0.35 m -0.50 m
36.77 m
OO-12
150 230
205
bramki kontroli dostępu
00.A.U01.S01 Pom. zapleczowe 25.9 m² PW-14
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania.
00.A.S01 Toaleta 5.1 m²
120
106 211
00.B.K06 Korytarz 69.9 m²
SW-02 EI120
h=40
-2.28 m
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. SW-01 Układ funkcjonalny wg odrębnego EI30 opracowania. 491
370
524 178
BELKA 20 x 60h 105
SW-02 EI60
90 205
13
155
37.10 m 37.10 m
37.20 m 147
EI30
SW-01 REI120
SW-02 EI30
BELKA 70 x 60h SŁUP ø60
SŁUP ø45
-2.41 m
178
136 13
258
125 230
90 205 125 230 125 230
90 205
0.00 m
00.A.K03 Przedsionek 5.9 m² PW-13
200 300 SW-02 EI120
SW-02 EI60
EI30
13
0.00 m -0.30 m
SW-02 EI30
A5
13 x18.5 27.0
SŁUP 35 x 80 SW-02 EI60
278
125 230
171
00.A.K01 Hol windowy 73.6 m² PW-11
SW-01 EI120
Szacht windy 11.82 m²
barierka ochronna
13
135
100 292
12
90 205
BELKA 45 x 80h
120 225
szlaban z kontrolą dostępu
linia zadaszenia powyżej
318
szafki dwudzielne
EI30
SW-02 EI30
EI60
80 205 137
80 205
315
124
5 x15.0 30.0
170
920
Wiata ze stojakami na rowery
bramki kontroli dostępu
00.A.K04 Klatka schodowa 17.9 m² PW-11
BELKA 20 x 60h
168
1.04 m²
60
107
90 205
80 130 298 205
100 205
00.K01 Hol wejściowy 208.4 m² PW-11
135
20
SW-02 EI30
SŁUP 80 x 40
SW-01 REI120
185 247
BELKA 45 x 80h
BELKA 45 x 80h
80 205
80 205
80 205
92 10
415
125 230
92 10 209
EI30
A4
107
62
SW-02 EI60
823
SW-02 REI120
EQ
337 -0.75 m = 36.85m -0.90 m
SW-02 EI30
125 230
90 205
BELKA 20 x 60h
340
123 123
177
462 13 146
20 EI30
62
SW-02 EI60
2.0%
18
BELKA 20 x 60h
194 20 534
20
OO-10
621
EI30
473
SW-01 REI120
00.B.U02.S05 Pom. zapleczowe 23.0 m² PW-13
SŁUP 40 x 80
boczna kurtyna powietrzna 20
EI30
00.A.T04 Pom. elektryczne 4.9 m² PW-13 BELKA 20 x 60h
158
155
4.2 PW-13
560
OO-10
EI30
BELKA 20 x 60h
321
107
EQ
285 133
00.S01 Toaleta 4.8 m²
A3
138 230
A2
SW-02 REI120
SW-02 EI120
163
251
00.A.S06 Toaleta męska 1.7 m² PW-13
125
90 205 288
268
A1
0.00 m -0.15 m
SW-02 EI30
386
“Strefa lokalizacji suszarni ubrań"
36.83 m
25
Szacht windy 11.99 m²
153
200 300
6.1
Strefa lokalizacji zaplecza i pom. sanitarnych lokalu usługowego. Układ funkcjonalny wg odrębnego opracowania.
EI30
10
200 300
0.5%
155
Szacht windy 6.56 m²
EI60
870
270 11 x17.3 27.0
14x17.0 27.0
138 230
5 x15.0 30.0
EI30
100 205
20
5499
192
barierka ochronna
EI30
SW-02 EI120
PW-13
25 120 205
BELKA 20 x 60h
EI30 “Strefa lokalizacji suszarni ubrań" 195
00.B.K04 Klatka schodowa 17.6 m² PW-11
BELKA 45 x 80h
00.K02 Przedsionek 6.4 m² PW-13
5.1
78
537
870
168
240
110
150
00.B.U02 Pom. usługowe 144.1 m² PW-14
drzwi obrotowe R=140cm
00.A.U02a Pom. zapleczowe 106.2 m² PW-14
H25
EI60 333 EI60
298
SW-02 EI120
1100 L
SW-02 EI120
SW-03
grzejnik kanałowy
20
313
20
90 205 20
SZ-06
SW-02 EI30
00.A.S04 Prysznice damskie 15.2 m² PW-13
135
20
SW-02 EI120220
12
SW-02 EI120
106
H25
-0.75 m -0.90 m
EI30
255
355
120 230
h=40
SW-01 REI120
SW-01 REI120
220
BELKA 20 x 60h
20
SW-02 EI120
SW-02 EI120
00.A.K07 Komunikacja 18.3 m² PW-11
106
120 205 EI60
SW-02 EI120
228
00.A.Z04 Pom. porządkowe 8.1 m² PW-13
00.A.S05 Umywalnia męska 22.2 m² PW-13
SW-03
106
SW-02 EI120
109
SW-01 REI120
ZH52
SW-01 REI120
150 205
480
BELKA 45 x 80h
307
20
15
BELKA 20 x 80h
10
SW-02 EI120
80 205
00.B.K05 Przedsionek 8.3 m² PW-13
37.60 m
4.1
818
EI30
260
droga wewnętrzna
870 3144
00.A.K05 Przedsionek 9.1 m² PW-13
ITG-PB-AR-205
00.A.Z03 Szatnia męska 36.3 m² PW-13
20
H25
00.A.T08 Pompownia paliwa 6.5 m² PW-13
00.A.T10 Pom. DSO 13.8 m²
“Strefa lokalizacji suszarni ubrań"
SW-02 EI120
250
90 205
250
D
EI60
90 205
SW-02 EI60 SW-02 EI120
5.1
481
h=40
36.83 m
00.A.T09 Centralna bateria 6.6 m² PW-13
182
340
338
80 205 162
18
600
155
EI60
20
150 205
395
EI60
150 225
0.8%
15
103 411
SŁUP ø60
SŁUP ø45
BELKA 45 x 80h
SŁUP 80 x 40
150 668
90 220
murek h=130cm SZ-02
SW-02 EI120
Dylatacja
SŁUP 35 x 80
BELKA 40 x 70h
00.A.S02 Umywalnia damska 8.5 m² PW-13
114
100 205
15
13 80 205
SW-03
90 205
248
100 205
342
SŁUP 35 x 80
186
245
342
155
152
80 205
h=40
103
BELKA 40 x 70h 62
SW-02 EI60
703
34 80 205
158
BELKA 45 x 80h
15
00.A.K06 Komunikacja 51.9 m² PW-11
SW-02 EI120
SW-02 EI120
90 205
EI30
SW-02 EI60
SŁUP 35 x 80 263
00.B.Z07 Szatnia damska 16.6 m² PW-13
ławka 90 220
EI60
151 -0.75 m -0.90 m
20
160
1028
100 205
20
70
15 20 120 230
SŁUP 40 x 80 37.55 m
00.A.S03 Toaleta damska 2.3 m² PW-13
BELKA 20 x 60h
625
610
OO-10
870
191 36.83 m
zadaszenie
4.1
H25
10
00.B.S03 Prysznice damskie 11.8 m² PW-13
3.2
SW-02 EI120
SW-02 EI120
289
125 300 90 205
OO-12
00.B.S02 Umywalnia damska 7.1 m² PW-13
37/30dB SZ-06
00.A.U02 Pom. usługowe 166.4 m² PW-14 00.A.Z02 Szatnia damska 22.2 m² PW-13
200 300
12
EI30
90 205
102
SW-02 EI120
EI30
BELKA 20 x 60h
00.A.T06 Pom. techniczne 52.7 m² PW-13
h=40 672 SW-02 EI120
00.B.Z04 Pom. porządkowe 4.7 m² PW-13
90 205
00.B.S01 Toaleta damska 1.7 m² PW-13
90 205
drzewo
80
290
838
SŁUP 35 x 80
482
1008
90 205
00.B.T09 Centralna bateria 6.9 m² PW-13
3.1 20
20
464
BELKA 40 x 70h
2.2%
848
150
0.30 m
3.1
00.A.Z05 Pom. gromadzenia odpadów 26.4 m² PW-13
20 90 205
SW-02 EI60
37.20 m 1156
2.3 SŁUP 40 x 80 3.9%
277 289
SŁUP 40 x 80
37/30dB SZ-06
SŁUP ø60
37.00 m
EI60
SW-02 EI120
200 300
200 300
OO-10
200 300
200 300
200 300
OO-10
37.10 m
SŁUP 45 x 70
BELKA 45 x 85h
SŁUP ø60 37.23 m 434
2.2
Murek oporowy
EI30
596 200 300
237
867
OO-10
BELKA 40 x 70h
37.23 m
110 225
120 220
910
OO-10
SŁUP 45 x 70
2.3 5.58 m²
00.B.Z06 Pom. dla matki z dzieckiem 13.4 m² PW-13 37/30dB SZ-01
37.04 m
SŁUP 40 x 80
BELKA 40 x 70h
OO-10
00.C.T10 Pom. tankowania paliw 7.3 m² PW-13
37.02 m 37.04 m
37.21 m
37/30dB SZ-06
3.3%
OO-10
37.02 m 37.02 m
Ogrodzenie parkingu rowerowego
37.22 m
Otwór kompensacyjny systemu oddymiania garażu podziemnego
1.3 00.C.T08 Złącze kablowe SN 3.1 m² PW-13
37.03 m
1.2
00.B.T11 Pom. ochrony 15.1 m² PW-13
PW-13
SŁUP ø60
151
Szacht mech. 8.28 m²
1.2%
36.88 m
00.B.T10 Pom. DSO 7.6 m²
00.B.T07 Pom. teletechn. 6.1 m² PW-13
37.22 m
2.2
37/30dB SZ-01
PW-13 37.21 m
1.4%
PW-13
1.4%
9.9 m²
36.46 m
Otwór kompensacyjny systemu oddymiania garażu podziemnego
37.03 m
2.9%
00.B.T08 BMS 42.3 m²
37.19 m Pom. socjalne
Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
BELKA 40 x 70h
1.9%
1.1%
00.B.Z05 37.20 m
1.5%
200
285
1.2
37.15 m 37.04 m
BELKA 40 x 70h
1.3 37.05 m
37.15 m
211
0.5%
1.1 podjazd samochodów osobowych części A i B
37.05 m
400
SŁUP 45 x 70
37.01 m
37.10 m
36.98 m
200
36.40 m
1.1
322
Otwór kompensacyjny systemu oddymiania garażu podziemnego
37.01 m
obrys kondygnacji podziemnej
7.1
36.90 m 37.00 m
37.00 m
linia zabudowy
380
37.00 m 37.00 m
36.60 m
linia siatki konstrukcyjnej
380
droga wewnętrzna obrys kondygnacji podziemnej
granica działki
380
1667
linia widokowa
380
36.98 m
ITG-C-PB-AR-204
1009
1831
izolacja twarda
380
C
37.08 m
1827
2859
izolacja wełna mineralna
380
37.08 m
1771
żelbet
5240
1091
ściany murowane
560
1841
73.57 m² 19.16 m² 5.88 m² 17.89 m² 9.12 m² 51.92 m² 18.27 m² 5.1 m² 8.46 m² 2.31 m² 15.15 m² 22.24 m² 1.68 m² 57.11 m² 30.36 m² 4.87 m² 2.42 m² 52.72 m² 6.5 m² 6.63 m² 13.79 m² 270.22 m² 25.9 m² 166.38 m² 106.18 m² 22.22 m² 36.29 m² 8.08 m² 26.37 m² 73.86 m² 17.59 m² 3.85 m² 17.59 m² 8.28 m² 69.92 m² 25.59 m² 1.74 m² 7.1 m² 11.77 m² 1.62 m² 28.63 m² 61.31 m² 35.54 m² 4.6 m² 2.88 m² 6.07 m² 42.26 m² 6.88 m² 7.58 m² 15.06 m² 214.99 m² 53.71 m² 144.08 m² 23.02 m² 38.95 m² 32.23 m² 4.73 m² 9.86 m² 13.39 m² 16.56 m² 34.16 m² 17.59 m² 4.89 m² 17.59 m² 7.66 m² 17.54 m² 19.4 m² 101.41 m² 60.94 m² 5.38 m² 20.59 m² 1.47 m² 18.23 m² 1.75 m² 50.34 m² 23.53 m² 0.59 m² 2.02 m² 1.71 m² 10.15 m² 3.12 m² 4.46 m² 7.29 m² 112.82 m² 39.82 m² 128.06 m² 35.81 m² 5.72 m² 10.87 m² 15.77 m² 20.56 m² 33.72 m² 208.39 m² 6.45 m² 150.38 m² 51.65 m² 4.82 m² 4.03 m² 73.6 m² 427.37 m² 139.85 m² 3989.5 m²
80
988
Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Komunikacja Komunikacja Toaleta Umywalnia damska Toaleta damska Prysznice damskie Umywalnia męska Toaleta męska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. techniczne Pompownia paliwa Centralna bateria Pom. DSO Pom. usługowe Pom. zapleczowe Pom. usługowe Pom. zapleczowe Szatnia damska Szatnia męska Pom. porządkowe Pom. gromadzenia odpadów Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Korytarz Korytarz Toaleta damska Umywalnia damska Prysznice damskie Toaleta męska Umywalnia męska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. teletechn. BMS Centralna bateria Pom. DSO Pom. ochrony Pom. usługowe Pom. zapleczowe Pom. usługowe Pom. zapleczowe Pom. gromadzenia odpadów Szatnia męska Pom. porządkowe Pom. socjalne Pom. dla matki z dzieckiem Szatnia damska Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Korytarz Komunikacja Hol wejściowy Korytarz Toaleta niepełnospr. Umywalnia męska Toaleta męska Umywalnia damska Toaleta damska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. elektryczne Pom. DSO Złącze kablowe SN Centralna bateria Pom. tankowania paliw Pom. usługowe Pom. zapleczowe Pom. usługowe Pom. zapleczowe Pomocnicze Pom. porządkowe Szatnia męska Szatnia damska Pom. gromadzenia odpadów Hol wejściowy Przedsionek Pochylnia Pochylnia Toaleta Szacht mech. Pom. techniczne Pom. usługowe Pom. zapleczowe
80
odwodnienie liniowe 37.08 m
1875
00.A.K01 00.A.K02 00.A.K03 00.A.K04 00.A.K05 00.A.K06 00.A.K07 00.A.S01 00.A.S02 00.A.S03 00.A.S04 00.A.S05 00.A.S06 00.A.T01 00.A.T02 00.A.T04 00.A.T05 00.A.T06 00.A.T08 00.A.T09 00.A.T10 00.A.U01 00.A.U01.S01 00.A.U02 00.A.U02a 00.A.Z02 00.A.Z03 00.A.Z04 00.A.Z05 00.B.K01 00.B.K02 00.B.K03 00.B.K04 00.B.K05 00.B.K06 00.B.K07 00.B.S01 00.B.S02 00.B.S03 00.B.S04 00.B.S05 00.B.T01 00.B.T02 00.B.T04 00.B.T05 00.B.T07 00.B.T08 00.B.T09 00.B.T10 00.B.T11 00.B.U01 00.B.U01.S01 00.B.U02 00.B.U02.S05 00.B.Z01 00.B.Z02 00.B.Z04 00.B.Z05 00.B.Z06 00.B.Z07 00.C.K01 00.C.K02 00.C.K03 00.C.K04 00.C.K05 00.C.K07 00.C.K08 00.C.K09 00.C.K10 00.C.S01 00.C.S02 00.C.S03 00.C.S04 00.C.S05 00.C.T01 00.C.T02 00.C.T04 00.C.T05 00.C.T06 00.C.T07 00.C.T08 00.C.T09 00.C.T10 00.C.U01 00.C.U01.S01 00.C.U02 00.C.U02.S01 00.C.Z01 00.C.Z02 00.C.Z04 00.C.Z05 00.C.Z09 00.K01 00.K02 00.K03 00.K04 00.S01 00.T01 00.T15 00.U01 00.U01.S01
S
80
B ITG-B-PB-AR-203
37.08 m
36.68 m
R
80
P
O
80
N
80
M
80
L'
80
36.18 m
L
350
A ITG-A-PB-AR-202
36.18 m
36.06 m
K
80
J
380
I
380
H
380
G
380
F
3820
E
380
D
380
C
380
B
C
F G
H
J
K
L
L'
M
N
P
R
S tom / projekt
BUDOWLANY
Żaluzja pozioma
temat rysunku
Wjazd do garażu podziemnego
RZUT PARTERU
Otwór kompensacyjny systemu oddymiania garażu podziemnego
Wiata ze stojakami na rowery
Pionowe stalowe żaluzje - otwór napowietrzania szachtów dźwigu dla ekip ratowniczych
kod rysunku
Ground floor
ITG-PB-AR-100 Data wydania
rewizja
2017.12.20 skala
format papieru
1760x841mm
1 : 100
S
R
P
O
N
M
L'
L
K
Elevation
J
25
LEGENDA OZNACZEŃ GRAFICZNYCH:
Zestawienie pom. - Poziom +1
L G
przegrody wewnętrzne g/k
J
K
L
L'
M
N
O
P
R
S
Numer
Nazwa
Pow.
ściany murowane
B ITG-B-PW-AR-203
01.A.B01 01.A.B02 01.A.B03 01.A.B04 01.A.B05 01.A.B06 01.A.B07 01.A.B08 01.A.B09 01.A.B10 01.A.B11 01.A.B12 01.A.B13 01.A.K01 01.A.K02 01.A.K03 01.A.K04 01.A.K05 01.A.S01 01.A.S02 01.A.S03 01.A.S04 01.A.S05 01.A.S06 01.A.S07 01.A.S08 01.A.S09 01.A.S10 01.A.S11 01.A.T01 01.A.T02 01.A.T04 01.A.T05 01.A.Z01 01.A.Z02 01.A.Z03 01.A.Z04 01.A.Z05 01.B.B01 01.B.B02 01.B.B03 01.B.B04 01.B.B05 01.B.B06 01.B.B07 01.B.B08 01.B.B09 01.B.B10 01.B.B11 01.B.B12 01.B.B13 01.B.K01 01.B.K02 01.B.K03 01.B.K04 01.B.K05 01.B.S01 01.B.S02 01.B.S03 01.B.S04 01.B.S05 01.B.S06 01.B.S07 01.B.S08 01.B.S09 01.B.S10 01.B.S11 01.B.T01 01.B.T02 01.B.T04 01.B.T05 01.B.T07 01.B.Z01 01.B.Z02 01.B.Z03 01.B.Z04 01.C.B01 01.C.B02 01.C.B03 01.C.B04 01.C.B05 01.C.B06 01.C.B08 01.C.B09 01.C.B10 01.C.B11 01.C.B12 01.C.B13 01.C.B14 01.C.K01 01.C.K02 01.C.K03 01.C.K04 01.C.K05 01.C.S01 01.C.S02 01.C.S03 01.C.S04 01.C.S05 01.C.S06 01.C.S07 01.C.S08 01.C.S09 01.C.S10 01.C.S11 01.C.T01 01.C.T02 01.C.T04 01.C.T05 01.C.T06 01.C.Z01 01.C.Z02 01.C.Z03 01.C.Z04 01.K01
żelbet izolacja wełna mineralna
G
A
B
C
D
E
F
G
H
I
J
K
L
L'
M
N
P
O
R
S
izolacja twarda ITG-B-PW-AR-208
linia widokowa granica działki
870
1004
870
870
1077
870
134
870
870
869
1078
870
134
870
870
linia siatki konstrukcyjnej +50.20 m
rzędna - stan wykończony +55.23 m
+55.23 m
+3.00 m
rzędna - stan surowy
A
+37.60 m n.p.m.
rzędna - wysokość nad poziomem morza
C
B
ITG-A-PB-AR-202
ITG-C-PB-AR-204
ITG-B-PB-AR-203
120
wymiar liniowy +52.40 m
+52.400 = 90.00 m n.p.m. 2.0%
2.0%
4.1
oznaczenie siatki
Wysokość budynku - rzędna punktu zbiegu połaci dachowej
13.B.K05 LEGENDA OKŁADZIN ELEWACJI:
Przedsionek PW-18
BELKA 40 x 70h
-8.45 m -8.90 m
-9.55 m
PW
Architektura - projektant Marian Kuś
data / podpis
200 290
200 290
335
325
355
13
120
1015
278
OO-5
BELKA 20 x 60h
OO-5
25 135 20 290
13
135
3862
25 220
4105 4177
125 230
13
90 205 215
18 27
25
1135
180
200 290
641
115 276
115 276
115 276
115 276
115 276
OO-11
OO-11
OO-11
OO-11
3
102
46
150
16
01.C.S07 Przedsionek toalety 5.9 m² PW-15
90 205
80 205
5.3 102
3
203
16
133
62
892
16
01.C.S08 Toaleta męska 9.5 m² PW-15
h=40 124
80 205
42/35dB SZ-02
90 205
80 205
200 290
OO-5
115 276
OO-11
62
200 290
OO-5
115 276
OO-11
16
887
115 276
OO-11
168
124
80 205
13
SŁUP 35 x 80
h=40
16
115 276
OO-11
8 26 8
90 205 16
345
115 276
13
OO-11
SW-04
SW-04
Aneks kuchenny
01.C.S09 Ustęp 1.3 m²
PW-15
01.C.S10 Ustęp 1.3 m²
PW-15
90 205
01.C.Z03 Pom. socjalne 18.7 m² PW-17
SW-03 32
808
13
503
6.2
01.C.B11 Sala konferencyjna 22.1 m² PW-17
13
SW-03
595
13
801
20 1515
200 290 SŁUP ø60
01.B.S08 Toaleta męska 9.5 m² PW-15
1238
372
892
01.B.S07 Przedsionek toalety 5.9 m² PW-15
SŁUP 35 x 80
90 205
870
155
200 290
629 13
SW-02 EI120
OO-5
1015
EI30
01.C.B10 Sala konferencyjna 35.1 m² PW-17
OO-5
90 205
25 18
50
01.C.K03 Przedsionek PW-10 13 4.9 m²
OO-5
20
20 20 110
12
PW-15
90 205
SW-02 EI120 4.00 m 3.95 0.3 m m²
BELKA 20 x 80h 738
0.66 m²
272
135
90 205 25
568
SW-01 REI120
BELKA 20 x 60h
180
SŁUP 35 x 80
155
01.C.S11 Toaleta damska 6.4 m² PW-15
OO-5
568
160
125 230
20 260
120 230
14 155
12 x17.3 27.0 607
200 290
01.C.S01 Toaleta 5.2 m²
EI30
13
01.C.Z02 Pom. porządkowe 5.2 m² PW-17
4.3
SW-03
180
216
297 11x17.3 27.0
155
663
OO-11
OO-5
13 20
278
90 205
90 205
8 26 8 120 230
60 20 120 230 135 20
98
155
290 20
12
BELKA 20 x 60h
90 205
13
H25
778
OO-11
870
OO-5
124 46 124
OO-5
16
897
412 16 323 20 368 110 23018 110 18230 120 230 60 20
01.C.K01 Hol windowy 27.8 m² PW-16
18
20
267
13
43
D
180 230
25
0.56 m² Szacht mech. 8.27 m²
25
330
200 290
ITG-PB-AR-205
0.42 m²
25
90 205
54 16
62
821
SW-01 REI120
Pom. elektryczne 2.02 m²
297
20
526
90 205
13
SŁUP 40 x 80
290
BELKA 40 x 70h
133
4.00 m 3.85 m
150 12 1.02 m²
16
90 200 18 13
90 205 16
25
C4 EI30
200 290
BELKA 20 x 80h
SW-02 EI120 12
5.3 869
989
115 276
90 205 203
SW-03
16
80 205
296 244
BELKA 20 x 60h
1518 4105 13
422 13
13 13 130
01.B.T05 Pom. elektryczne 2.9 m²
319
127
3 80 205
124
295
SW-03
SŁUP ø60
SŁUP ø60
477
OO-5
102
13
200 290
629
SW-03
349 13
155
102 16
80 205
360
SW-01 REI120
155 3
80 205
180
173
SW-01 REI120
01.C.B12 Sala konferencyjna 17.3 m² PW-17
h=40
8 26 8
150
25
252
Szacht mech. 3.15 m²
20
708
01.C.B09 Sala konferencyjna 17.4 m² PW-17
90 205
180 13
210
EI30
SW-03
689
Dylatacja
154
20 16 62
BELKA 20 x 60h
12 13
187
75 0.44 m²
12
Szacht mech. 1.71 m²
SW-02 EI120
01.C.K02 Klatka schodowa 17.6 m² PW-10
SW-03
0.38 m² 20
SW-04
SŁUP 35 x 80
180
18
1.83 m²
C3
EI30
BELKA 20 x 80h
5.2 13 130
01.B.B10 Sala konferencyjna 16.6 m² PW-17
90 205
12 103
1.07 m²
800 210 Szacht windy 17.76 m²
C2
Pom. elektryczne 1.71 m²
01.C.B13 Sala konferencyjna 15.5 m² PW-17
25 60
SW-02 EI120
25 65
90 205
SW-02 EI120
200 290
SW-03
210
Pom. elektryczne 0.59 m² 180 230
90 205
SW-02 EI120
155
25
Szacht windy 5.77 m²
C1
01.C.B02 Sala konferencyjna 28.9 m² PW-17
310
0.41 m²
245 4.00 m 3.95 m
25
SW-03
13 13
01.C.B08 Sala konferencyjna 17.4 m² PW-17
90 205
1.75 m²
SW-03
01.B.B08 Sala konferencyjna 28.1 m² PW-17
h=40
25
11 x17.3 27.0 270
182
11 x17.4 27.0
145 195
120 230
1215 477
90 205 EI30 ZH52
66 25
90 205
90 205 164
SŁUP 40 x 80
90 205
13 349
13
20
BELKA 20 x 60h
1.09 m²
155 25 12
BELKA 20 x 60h
25
EI60
344
4620
549 EI60
BELKA 20 x 60h
170
246 Szacht mech. 5.43 m²
273
135 135 25 155
25
20
290
BELKA 20 x 60h 90 205
155
11 x17.3 27.0
Szacht mech. 1.03 m²
13
90 205
SW-03
01.B.B07 Sala konferencyjna 32.9 m² PW-17
90 205
25
297 12 x16.7 27.0
209
90 205
20 20
125 230
125 230
300 20
125 230
SW-03
01.B.B09 Sala konferencyjna 16.6 m² PW-17
3.3
Szacht mech. 9.6 m² 800
BELKA 20 x 60h
EI60
SW-03
Szacht mech. 0.59 m² 25 26 18 180
290
14
Szacht mech. 0.88 m²
01.C.B14 Sala konferencyjna 17.1 m² PW-17
20
90 205
H25
SW-03
10
43
260
666
180 230
B3
290
20
Szacht mech. 2.05 m²
01.C.B03 Sala konferencyjna 33.6 m² PW-17
2113 496
110 230
125 230 20
90 200
90 230
BELKA 20 x 60h
235
10
461
155
2015
211
13
SŁUP 35 x 80 80 205
SW-01 REI120
25
Szacht mech. 0.98 m²
13
222
SŁUP ø60
01.C.S06 Toaleta damska 6.4 m² PW-15 SW-03
BELKA 20 x 80h
4.3 992
EI30
210
155 90 12 205
220 13
SŁUP ø60
SŁUP ø60
SW-03
200 290
01.C.Z01 Pom. gospodarcze 5.3 m² PW-17
4.00 m 3.95 m
90 205
638
BELKA 40 x 70h
01.C.B04 Sala konferencyjna 25.9 m² PW-17
OO-5
150 13 890
BELKA 40 x 70h 115 276
115 276
115 276
115 276
452 13
SW-01 REI120
13
254
360
13
BELKA 20 x 60h
01.B.B05 Sala konferencyjna 20.8 m² PW-17
13
90 205
20 170
230
297
244 150
115 276
115 276
115 276
115 276
685
SW-03
155
25
01.C.B05 Sala konferencyjna 24.5 m² PW-17
13
Przedsionek 8.3 m² PW-10
20
01.B.B06 Sala konferencyjna 25.2 m² PW-17
200 290
90 205
SW-04
Szacht mech. 0.35 m²
SW-03
SW-03
666
90 205
379
BELKA 13 40 x 70h
13
341
250 15
174
PW-15
80 205
125 230
OO-5 OO-5 115 276
23
Dylatacja
158 341
20 25 91
93
12 122
13
90 01.B.K05 205
PW-15
01.C.S04 Ustęp 1.3 m²
SW-03
423
90 205
90 205 18
90 205
Szacht mech. 1.05 m²
613
h=40
01.C.K04 Klatka schodowa 17.6 m² PW-10
SŁUP ø60
25
01.C.K05 Przedsionek 7.7 m² PW-10
h=40
SW-03
25
EI30
290 25
110 230
1108 1118
90 205 13
80 205
SŁUP 40 x 80
115 2020 20
13
124 46
13 38 25
45
90 205 596 13
18
3.2 828 839
B2
B4
330
870
SŁUP 40 x 80
32 50
208
200 290
Szacht mech. 11.54 m²
764
1319
15
15
178
h=40 90 205
PW-15
1379
90 205
OO-5
01.B.S10 Ustęp 1.3 m²
Aneks kuchenny
42/35dB SZ-06
240
SW-04
1309
202
197
Dylatacja
124 8 26 8
135 135
20
BELKA 20 x 60h
412
13 182 40
201
181
EI60
BELKA 461 404658 x 70h
341
1593
x16, 28 7
16 379
UW - pr pro
581
13
585
13
498
812
200 290
200 290
Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
OO-5
OO-5
OO-5
- wy dos
219
42/35dB SZ-01
42/35dB OO-5 SZ-06
934
200 290
551
7.1 13
- wy
BELKA 40 x 70h 200 290
01.B.B11 Sala konferencyjna 32.2 m² PW-17
32
6.3
42/35dB SZ-01 PW-15
BELKA 40 x 70h
870
1350 13 28
01.B.S09 Ustęp 1.3 m²
200 290
1122
6.3 01.B.Z03 Pom. socjalne 27.4 m² PW-17
BELKA 40 x 70h
279 28 13 409
25
179
H25
13
BELKA
20
EI60
EI30
SŁUP 40 x 80
409 40 x 70h
Szacht mech. 0.95 m²
20 180 Szacht mech. 1.22 m² Szacht mech. 1 m²
18
20 20 120
4640
870
174 20
20
100 205 90 205
115 276
16
16 323 90 155 205 12 18 93 25
20 199
633
634
332 4664 445
BELKA 20 x 60h BELKA 20 x 60h
115 276
372
BELKA 40 x 70h 870
143
13 304
331
284 86
127
BELKA 20 x 60h
20
125 230
300 90 230 20
18 302
238 12
25
25 50
135
91
SŁUP 35 x 80 01.C.S03 Toaleta męska 9.5 m² PW-15
SŁUP ø60
3.3
SW-03
25
86
01.B.K01 Hol windowy 71.7 m² PW-16
Szacht windy 22.04 m² 210
SW-02 EI120
13
arch
42/35dB SZ-06
832
1120
812
kons
20
125 280
2796 240
FORT
200 290
10
200 290
42/35dB SZ-01
OO-3
200 290
BELKA 40 x 70h
200 290
10
20
SŁUP 40 x 80
10
insta
7.2
678
OO-1
OO-3
OO-1
OO-3
OO-1
7.2
WSP Pros 00-83
934 902
inwe
SŁUP 40 x 80
IPO Za
inwe
42/35dB SZ-06
BU W DZ
BELKA 40 x 70h892
20
B
8.1
C
bran
ITG-C-PB-AR-204
AR
ITG-B-PB-AR-203
259
42/35dB SZ-06
Arch Mari
Arch
Mich
-9.55 m
10
9.1
-9.55 m
-9.80 m -10.15 m
MA/015/15
352/01/SL
OO-5
Architektura - sprawdzający
zespół Martin Hyams Krzysztof Gryczyński Szymon Kachniarz Michał Pawelczyk Katarzyna Falkowska Agata Balbina Drochlińska Jacob Thomas
-9.05 m
-9.55 m
-9.65 m
faza projektu
ARCHITEKTURA
Michał Kuś
-9.05 m
-9.30 m -9.65 m
42/35dB SZ-02
42/35dB SZ-01
Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
OO-5
OO-5
OO-5
9.1
zesp Mart Krzy Szym Mich Kata Szym
261
-9.05 m
76
42/35dB SZ-06
1354
Poziom P2 29.550 m
-8.05 m
7.5 10x1
-8.90 m -9.05 m
OO-11
BELKA 20 x 100h
SW-02 EI120
B5
01.B.K03 Przedsionek 3.8 m² PW-10
224
282
h=40
200 290
Parking PW-01 x27.0
-7.85 m -8.45 m -8.80 m
200 290
P2.P02
Klatka schodowa PW-04
-8.05 m
435
P2.C.K04
Parking PW-01
-8.11 m -8.35 m
OO-11
01.C.S05 Ustęp 1.3 m²
10
P2.P02
Przedsionek PW-04
20
OO-11
80 205
515 branża
P2.B.K05
-8.05 m
290
20 90 205
13 780
OO-5
125 280
x27.0
Klatka schodowa PW-04
x27.0
220
4.00 m 3.85 m
EI30
Szacht mech. 7.24 m²
01.B.Z02 Pom. porządkowe 5.0 m² PW-17
OO-11
4.2
BELKA 20 x 60h
01.B.T04 Pom. elektryczne 4.6 m²
Szacht mech. 5.18 m²
SW-01 REI120
01.B.S11 Toaleta damska 6.4 m² PW-15
42/35dB SZ-06
OO-11
SŁUP 40 x 80
SŁUP ø60
Szacht mech. 1.81 m²
B1
EI30
SW-02 EI120
20
844
868
315
8.1
BELKA 20 x 60h
25
SW-04
90 205
inwestycja
BUDYNEK BIUROWY 3T OFFICE PARK W GDYNI PRZY UL. K. GÓRSKIEGO, DZIAŁKI NR 179/2, 179/3
10x1 7.5
P2.B.K04
10x1 7.5
SZ-06
15
Poziom P1 33.050 m
100
OO-11
h=40
210
602
SZ-02
OO-11
01.B.B04 Sala konferencyjna 20.9 m² PW-17
40 12 47
EI30 90 205
SŁUP 40 x 80
SW-03
1070 2796
15
PW-05
13
01.B.Z01 Pom. gospodarcze 5.1 m² PW-17
OO-11
H25
SW-01 REI120
290
90 205
01.C.S02 Przedsionek toalety 5.9 m² PW-15
32
260 ø60
630
25
01.C.B01 Pom. biurowe 748.9 m² PW-17
868
SŁUP
IPOPEMA 138 Fundusz Inwestycyjny Zamknięty Aktywów Niepublicznych
-4.70 m
13
01.A.B10 Sala konferencyjna 26.6 m² PW-17
SW-03
155
90 205 516
156
8.2 13x1
-4.55 m -4.70 m
200 290
201
Szacht mech. ?
OO-6
-4.54 m
FORT brak stropu na modelu konstrukcji P1.P02 Parking
P1.C.T01 x27.0
SW-03
14
205 20 4.00 m ZH52 3.95 m
EI60
200 290
20
821
118
x27.0 7.5 10x1
Klatka schodowa PW-10
239
zrównanie stropu ze ścianą
-4.55 m
Szacht mech. ?
746
455
x27.0
P1.C.K04
Wentylatornia PW-06
P1.P02 Parking PW-05
Przedsionek PW-10
SŁUP ø45
6.1
SŁUP 35 x 80
OO-11
OO-11
13
01.C.Z04 Punkt dystryb. IT 24.5 m² PW-17
71
P1.T01 Pom. separatora PW-06
P1.B.K05
13x1 8.2
210
32
858 T +48 22 480 8080 F +48 22 480 8081 www.wspgroup.com
WSP Polska Sp. z o.o. Prosta 68, 00-838 Warszawa
inwestor
338
616
01.A.S08 Toaleta męska 9.5 m² PW-15
210 Szacht windy 6.73 m²
801
595
PW-15
13
01.A.Z04 Pom. socjalne 26.6 m² PW-17
SW-03
20
01.B.K02 Klatka schodowa 17.6 m² PW-10
01.B.B13 Sala konferencyjna 38.7 m² PW-17 2720
01.A.B09 Sala konferencyjna 26.6 m² PW-17
h=40
205 25
SW-01 REI120
200 290
200 290
13
13
148
249
h=40
276
SŁUP 35 x 80
164
EI30
25
90 205
1.31 m²
SW-02 EI120 SŁUP 40 x 80
h=40 468
16
01.B.S06 Toaleta damska 6.4 m² PW-15
182
11x17.3 27.0
Szacht mech. 1.8 m²
01.A.Z03 Pom. pomocnicze 17.0 m² PW-17 90 13 205
37/30dB SZ-01
instalacje
P1.T05
P1.T10
01.A.S10 Ustęp 1.3 m²
PW-15
496
x27.0
Klatka schodowa PW-10
124 46
326
Aneks kuchenny 01.A.S09 Ustęp 1.3 m²
13 20
41 12
H25
SZ-02
90 205 16
OO-11
h=40
12 x16.7 27.0
6.2
01.A.S07 Przedsionek toalety 5.9 m² PW-15
62
SW-04
240
139
01.B.B12 Sala konferencyjna 41.6 m² PW-17
616
01.A.T05 Pom. elektryczne 2.4 m²
90 205
80 205
h=40
8.2 12x1
P1.B.K04
133
Zadaszenie
13
01.C.B06 Sala konferencyjna 20.7 m² PW-17
42/35dB SZ-06
PW-15
200 290
T +48 52 361 4646 F +48 52 361 4647 www.fort.pl
16
13
238 218
13
13
SW-01 REI120
200 290
832
01.B.Z04 Punkt dystryb. IT 18.5 m² PW-17
80 205
270
BELKA 40 x 70h
90 205
605
SW-03
FORT POLSKA Sp. z o.o. ul. Nowotoruńska 8 85-840 Bydgoszcz
FORT POLSKA
12x1 8.2 x27.0
01.A.B11 Sala konferencyjna 16.8 m² PW-17
90 205
Parter 37.600 m
-1.10 m
203
01.B.S01 Toaleta 412 5.5 m² PW-15
228
Hol wejściowy PW-12
Szacht mech. ?
3 80 205
13
SŁUP ø60
240
13
62
h=40
SW-03
1135
20
90 205
3 80 150 205
16 102
Szacht mech. 6.75 m² 726
155
Szacht mech. 0.95 m²
18
SŁUP 40 x 80
01.A.B08 Sala konferencyjna 26.4 m² PW-17
20
25
SW-03
01.K01 Komunikacja 47.7 m²
882
x27.0 7.4 12x1
+0.00 m
-0.15 m
200 290
T +48 22 389 8500 F +48 22 389 8501 ahr-global.com
konstrukcja
4.00 m
SŁUP ø45
13
00.C.T01
Klatka schodowa PW-12
+0.00 m
AHR PB TYMCZASOWA ŚCIANKA ZABEZPIECZENIA WYKOPU
00.C.K09
16 102
200 290
Pochylnia PW-11
00.C.K04
102
200 290
00.K04
+0.00 m
AHR Architects Sp. z o.o. ul. Stępińska 9 00-739 Warszawa
Przedsionek PW-13
BELKA 20 x 80h SW-04
150 80 3 205
80 205
13
Szatnia męska PW-13
OO-5
00.C.Z04
Szacht mech. ?
870
Korytarz PW-11
00.C.T01
Umywalnia męska PW-13
Granica działki
00.B.K06 12x1 7.4 x27.0
00.B.S05
400
00.C.K10 Korytarz PW-12
00.B.Z02 Szatnia męska PW-13
135
SW-02 REI120
62
195
SŁUP ø45
515
- wymiary szybów windowych do potwierdzenia z dostawcą na etapie projektu wykonawczego architektura
Przedsionek PW-13
Klatka schodowa PW-11
5.1
786
25
16
Poziom +1 41.600 m
7.3 11x1
11x1 7.4 x27.0
00.C.K05 00.B.K05 00.B.K04
90 205
93 25
EI30
16
13
+4.00 m
7.1
OO-5
x27.0
+4.00 m +3.85 m
x27.0 7.4 11x1
138
124
ITG-C-PW-AR-350
- wymiary podano w centymetrach, rzędne w metrach
13
SŁUP 35 x 80
260
13
Szacht mech. ?
240
12
515
2
Pom. biurowe PW-17
01.C.T01
278
380
01.C.B01
Klatka schodowa PW-10
278
+4.00 m
x27.0
01.C.K04
Szacht mech. 4.18 m² 142
25
1765 2796
503
78
Pom. biurowe PW-17
13
01.A.S11 Toaleta damska 6.4 m² PW-15
01.A.B12 Sala konferencyjna 16.8 m² PW-17
812
01.C.B01 01.B.B01 Pom. biurowe PW-17
11x1 7.3
UWAGI: - projekt architektoniczny należy rozpatrywać łącznie z projektami branżowymi
18
SW-02 EI120
155
Szacht mech. 4.62 m² 497
13
H25
605
01.C.K05 Przedsionek PW-10
Klatka schodowa PW-10
90 200 12 x16.7 27.0
297
25
SŁUP ø60
h=40
SW-03
SW-03
11 x17.3 27.0 155
100 205
27
25
01.A.Z02 Pom. porządkowe 4.2 m² PW-17
SW-03
x27.0
Przedsionek PW-10
01.B.K04
220
160 125 230
SW-01 REI120
90 205
25
267
226 155 18
380
200 290
25
Poziom +2 45.400 m
11x1 7.3
01.B.K05
x27.0 7.3 11x1
236
1.18 m²
20
13
0 K 1
289
200 290
x27
45
.27
244
138 230 60 25
12
4.00 m 3.95 m 226
ZH52
90 205
11x17
+7.80 m
+7.65 m
OO-5
+7.80 m
+7.75 m
Pom. biurowe PW-17
13
+8.15 m +7.80 m
x27.0
02.C.B01
Szacht mech. ?
OO-5
11x1 7.3
02.C.T01
Pom. biurowe PW-17
Pom. biurowe PW-17
870
02.B.B01
Przedsionek PW-10
02.C.B01
265
02.B.K05
125 230
125 230 0.74 m²
161
68 Klatka schodowa PW-10
160
Szacht mech. 1.98 m² 18
01.A.K03 Przedsionek 6.0 m² PW-10
SŁUP ø45
40
100 205
20
140 120 12
18 300 223
01.A.K02 Klatka schodowa 17.6 m² PW-10 200 290
20
18
Poziom +3 49.200 m
x27
161
120 230
x27
25 .27
Przedsionek PW-10
1.22 m² 205
120 155 230 20
.27
SW-01
11x17
02.C.K05 02.B.K04
20
0.72 m² 122 12
25
90 205
11x17
+11.60 m
x27.0 7.3 11x1
530 1.56 m²
1416
2309 EI60
8 25 12
+11.60 m +11.45 m
233
20
27
PW-15
01.A.T04 Pom. elektryczne 4.9 m²
99
Szacht mech. 2.94 m²
01.B.B02 Sala konferencyjna 15.8 m² PW-17
5.2
01.A.S01 Toaleta 5.1 m²
SW-02 EI30
258
+11.60 m
18 47 20
EI60
16 33
x27.0
858
6.1
90 205
11x1 7.3
Pom.biurowe
344
A5
8 268
312
Pom.biurowe
Szacht mech.
EI30
Szacht windy 11.82 m² 210
210
18
x27
380
Przedsionek
.27
Klatka schodowa
OO-5
380 Klatka schodowa
Prezedsionek
380
11x17
Pom. biurowe
200 290
59
68
01
EI30
A4
SW-02 EI120
ITG-PW-AR606a
x27.0 7.3 11x1
20
Poziom +4 53.000 m
01.A.K01 Hol windowy 80.0 m² PW-16
BELKA 20 x 60h
35 12 Szacht mech. 1.04 m²
x27
OO-5
.27
20
11x17
+15.40 m
1011
808 840
PW-15
BELKA 20 x 80h
150 18
01.A.B06 Sala konferencyjna 22.9 m² PW-17
SŁUP 40 x 80
EI30
20
+15.40 m +15.25 m
649
20
BELKA 20 x 60h
3.85 m 3.60 m
SW-02 EI120
EI30
Pom.biurowe
4589
+15.40 m
180 230
18
Szacht mech.
Klatka schodowa
200 290
BELKA 20 x 60h
Prezedsionek
11x1 7.3 x27.0
WM16 42/35dB
123 15
Pom. biurowe
x27
380
Pom.biurowe
312
Przedsionek
380
Klatka schodowa
.27
EI30
13
8x16,7 28
11x17
870
Owc Ż20 Tg
x27.0 7.3 11x1
70
2.9 m² 130
25
H25 EI60
330
162
210 Szacht windy 11.99 m² 540 A3
SW-02 EI120
BELKA 20 x 60h
Poziom +5 56.800 m
EI60
x27
68
.27
67
11x17
+19.20 m
OO-5
+19.20 m +19.05 m
13
182
SW-03
102
SW-04
25 20
SW-03
13
90 205
13
442
314
15 351
210
A2
25
327
13 343
01.A.B07 Sala konferencyjna 17.1 m² PW-17
304
18
BELKA 40 x 70h
47
90 205
90 205 25
11 x17.3 27.0 182
Szacht windy 6.56 m² 20 A1 220
72 0.86 m²
4598
+19.20 m
SW-02 EI120 18
01.A.B01 Pom. biurowe 652.4 m²
1437
x27.0
Pom.biurowe
264
18 174 25 695 14 x17.0 27.0
SŁUP 40 x 80
90 205
8.83°
11x1 7.3
1.01 m² Szacht mech.
145
298
13 11x17 .27 x27 Klatka schodowa
Prezedsionek
312
Pom. biurowe
380
380
Pom.biurowe
13
SW-03
135
90 205
EI60
1.12 m²
SW-03
714
SW-01 REI120
690
25
SW-01 EI120 BELKA 20 x 60h
SW-01 REI120
SŁUP ø45
4.2
106
ITG-PB-AR-205
68
4.00 m 3.95 m 220
65 20 1.04 m²
120
25
h=40
8.83°
200 290
01.A.B04 Sala konferencyjna 23.7 m² PW-17
90 205 240
EI30
13
01.A.K04 Klatka schodowa 20.2 m² PW-10
01.A.B05 Sala konferencyjna 24.2 m² PW-17
378
90 205
90 155 205 13
155 18
SW-01 REI120
605
80 3 205
203
80 205
01.B.K04 Klatka schodowa 17.6 m² PW-10
20 10
SW-02 REI120
SŁUP ø45
330
200 290
330
4.1
SW-03
Szacht mech. 11.97 m²
SW-01 REI120
SZ-06 SŁUP ø60
SŁUP ø45
h=40
H25
Szacht mech. 1.36 m²
D
Poziom +6 60.600 m
BELKA 20 x 80h
290
x27
13 28
326
46 124 8 26 8
90 205
h=40
430
SŁUP 40 x 80
213 ZH52
133 90 16 205
62
SZ-02
611
01.A.Z01 Pom. gospodarcze 4.2 m² PW-17
5.1
Przedsionek
1288
574
BELKA 40 x 70h 90 205
13
01.B.S03 Toaleta męska 9.5 m² PW-15
01.B.T07 Pom. techniczne 20.6 m²
Dylatacja
213
80 205
0.65 m²
1128
180 13 870 187
480 13
124
16
16 323 12
OO-5
568
11x17
+23.00 m
138
140
+23.00 m +22.85 m
Pom.biurowe
16
EI30
138 230
+23.00 m
Szacht mech.
.27
90 205
16
SŁUP 35 x 80
01.B.S02 Przedsionek toalety 5.9 m² PW-15 SŁUP 40 x 80
SZ-02
01.A.S06 01.A.B03 Toaleta damska Sala konferencyjna 6.4 m² PW-15 18.3 m² PW-17 SŁUP 35 x 80
62
SW-03
01.A.K05 Przedsionek 9.1 m² PW-10
OO-5
x27
SW-03
PW-15
80 3 205 150
16 102
SW-02 EI120
18
SW-03
01.A.B02 Sala konferencyjna 34.3 m² PW-17
200 290
OO-5
.27
Klatka schodowa
SW-03
PW-15
SW-04
Poziom +7 64.400 m
3132
312
Prezedsionek
102
80 205
h=40
150
x27
380
380
11x17
Pom. biurowe
80 205 3
219
499
01.B.S04 Ustęp 1.3 m² 01.B.S05 Ustęp 1.3 m²
SW-04
3.2
97
Pom.biurowe
90 133 205
62
zadaszenie nad wejściem
68
.27
16
13
01.B.B03 Sala konferencyjna 21.7 m² PW-17
90 205
868
13
870
11x17
+26.80 m
SŁUP 35 x 80
15
Szacht mech.
01.A.S02 Przedsionek toalety 5.9 m² PW-15
01.A.S03 Toaleta męska 9.5 m² PW-15
20
x27
380
.27
Klatka schodowa
SW-04 200 290
4.1
Poziom +8 68.200 m
584
01.B.B01 Pom. biurowe 782.1 m² PW-17
1372
60 187
13
90 205
415
Pom.biurowe
x27
13
312
Prezedsionek
11x1 7.3
x27.0 7.3 11x1 Klatka schodowa
13
282
242 282
200 290
200 290
BELKA 40 x 70h
200 290
516
01.A.S05 Ustęp 1.3 m²
812
200 290
32
01.A.Z05 Punkt dystryb. IT 24.8 m² PW-17 01.A.S04 Ustęp 1.3 m²
155
Szacht mech.
.27
68 380
Pom. biurowe
+26.80 m
Pom.biurowe
13
90 205
18
11x17
OO-5
x27
380
.27
Klatka schodowa
+30.60 m
+26.65 m
Przedsionek
516
01.A.B13 Sala konferencyjna 24.8 m² PW-17
BELKA 20 x 60h
Prezedsionek
1608 Mocowanie paneli fasadowych mechaniczne powyżej 25m
Pom. biurowe
+26.80 m
x27.0 7.3 11x1 Klatka schodowa
42/35dB SZ-06
836
480
OO-5
Poziom +9 72.000 m
1120
13
68
70
x25.0 7.5
+34.40 m
11x1 7.3
x27.0
13
01.A.B01 Pom. biurowe 652.4 m²
200 290
155
Pom.biurowe
13x1
+34.40 m
11x17
Pom.biurowe
2796 1070
13 858
Szacht mech.
Klatka schodowa
+34.25 m
+30.60 m
Przedsionek
3.1 37/30dB SZ-06
SŁUP 40 x 80
+36.68 m
Prezedsionek
+30.45 m
x27.0 7.3 11x1 Klatka schodowa
SW-03
844
80
20
SW-03
x25.0
+30.60 m
x27.0
BELKA 40 x 70h
40
200 290
200 290
200 290
200 290
186
1750
812
7.5
312
Pom.biurowe
SŁUP 35 x 80
838
12x1
Pom. biurowe
380
Przedsionek
OO-5
20 20
11x17
x27.0 7.3 11x1 Klatka schodowa
OO-5 37/30dB SZ-01
20
346
92
Poziom +10 75.800 m
11x1 7.3 x27.0
OO-5
1874
68
+34.40 m
OO-5
15
x27.0
OO-5
37/30dB SZ-01
1176
11x1 7.3
3.1
+39.09 m
870
Pom.biurowe
Klatka schodowa PW-18
380
Przedsionek
OO-5
32
1318
10.C.K02
Przedsionek PW-18
+38.78 m
312
x27.0 7.3 11x1 Klatka schodowa
380
+38.20 m
Wysokość budynku - rzędna punktu zbiegu połaci dachowej
10.C.K01
305
x27.0
2748 Mocowanie paneli fasadowych mechaniczne powyżej 25m
+39.08 m
246
Pom.biurowe
200 290
2.0%
480.0000 Przedsionek
200 290
2.0%
380
Klatka schodowa
244
+41.660 = 79.26 m n.p.m.
+41.55 m
x27.0 7.3 11x1
11x1 7.3
42/35dB SZ-01
SŁUP ø60
SŁUP 40 x 80 32
948
37/30dB SZ-06 200 290
Poziom +11 79.600 m
OO-5
2.3 2.2
620
11x1 7.3
+42.00 m
OO-5
2.3
h=40 426
OO-5
380
SŁUP ø60
SŁUP 40 x 80 37/30dB SZ-06
2808
x27.0
OO-5
1.3
2.2
Ściana ażurowa - wyk panel z siatki SZ-08 ciętociągnionej aluminiowej (np: Mevaco Romb 62x30x2) – poziom techniczny na dachu
OO-5
37/30dB SZ-01
37/30dB SZ-06
42/35dB SZ-01
81
Ekran akustyczny – wyk. panel z siatki SZ-07 ciętociągnionej - poziom techniczny na dachu
+43.80 m
+43.75 m
OO-5
1.3
BELKA 40 x 70h
405
SZ-06 Ściana kurtynowa
+43.80 m Pom.biurowe
OO-1
652.4 m² 34.33 m² 18.34 m² 23.74 m² 24.17 m² 22.9 m² 17.12 m² 26.37 m² 26.63 m² 26.59 m² 16.79 m² 16.79 m² 24.78 m² 80.03 m² 17.6 m² 6.04 m² 20.16 m² 9.12 m² 5.1 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 47.36 m² 30.36 m² 4.87 m² 2.42 m² 4.17 m² 4.2 m² 17.02 m² 26.59 m² 24.78 m² 782.08 m² 15.78 m² 21.7 m² 20.88 m² 20.84 m² 25.21 m² 32.94 m² 28.11 m² 16.64 m² 16.64 m² 32.2 m² 41.55 m² 38.66 m² 71.66 m² 17.6 m² 3.85 m² 17.6 m² 8.28 m² 5.54 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 50.38 m² 35.54 m² 4.6 m² 2.87 m² 20.59 m² 5.06 m² 5.04 m² 27.41 m² 18.52 m² 748.94 m² 28.92 m² 33.61 m² 25.94 m² 24.52 m² 20.69 m² 17.44 m² 17.44 m² 35.1 m² 22.09 m² 17.34 m² 15.53 m² 17.14 m² 27.84 m² 17.6 m² 4.89 m² 17.6 m² 7.66 m² 5.2 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 5.9 m² 9.48 m² 1.27 m² 1.27 m² 6.36 m² 46.54 m² 23.53 m² 0.59 m² 2.02 m² 1.71 m² 5.34 m² 5.2 m² 18.68 m² 24.47 m² 47.73 m² 4045.5 m²
OO-6
Poziom +12 83.400 m
Przedsionek
OO-3
319
6.4
+45.80 m
OO-1
1.2
290
Ślusarka aluminiowa i obróbka blacharska, SZ-05 kol. RAL 7039 QUARZGRAU
.3
OO-3
108
ITG-C-PW-AR-209
x27
OO-1
01.B.T01 Szacht mech. 8.8 m² Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
37/30dB SZ-06
12x1
x27.0 7.3 11x1 Klatka schodowa
37/30dB SZ-01
1.2 216
380
Panel włóknocementowy ryflowany SZ-04 "Equitone Linea LT-20" kol. szary
ITG-C-PW-AR-204
200 290
OO-3
1568
H
37/30dB SZ-01
OO-5
Ściana wentylowana - spiek kwarcytowy SZ-02 "Laminam-Blend Nero"- kol. antracytowy Panel włóknocementowy SZ-03 "Equitone Tectiva Te20" - kol. szary
Pom.biurowe
200 290
Poziom +13 87.200 m
C Przedsionek
200 290
+49.73 m
88
+49.73 m
27.3 .4x 12x16 Klatka schodowa
200 290
Ściana wentylowana SZ-01 panel włóknocementowy "Equitone Natural N 154", kol. jasny beż
Klatka schodowa PW-18
200 290
+50.48 m
200 290
13.B.K04
Pom. biurowe Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Toaleta Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. gospodarcze Pom. porządkowe Pom. pomocnicze Pom. socjalne Punkt dystryb. IT Pom. biurowe Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Toaleta Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. techniczne Pom. gospodarcze Pom. porządkowe Pom. socjalne Punkt dystryb. IT Pom. biurowe Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Sala konferencyjna Hol windowy Klatka schodowa Przedsionek Klatka schodowa Przedsionek Toaleta Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Przedsionek toalety Toaleta męska Ustęp Ustęp Toaleta damska Szacht mech. Szacht windy Pom. elektryczne Pom. elektryczne Pom. elektryczne Pom. gospodarcze Pom. porządkowe Pom. socjalne Punkt dystryb. IT Komunikacja
Kons mgr 51/00/WŁ
Kons mgr
A
schemat inwestycji
ITG-A-PB-AR-202
870
870
869
1078
870
134
870
870
zesp mgr mgr
810
A
B
C
sche
B ITG-B-PW-AR-203
J
K
L
L'
M
N
O
P
R
S
B
tom / projekt
C
D
E
F
G
H
J
K
L
L'
M
N
P
R
S
WYKONAWCZY temat rysunku
PRZEKRÓJ D-D
Ściana wentylowana panel włóknocementowy "Equitone Natural N 154", kol. jasny beż
ITG-PW-AR-205 Data wydania
First floor
LEGENDA OKŁADZIN ELEWACJI:
kod rysunku
rewizja
tom
BU
tema
RZ
2018.02.04
12256 2859
skala
1:100
1844
kod
Ściana wentylowana - spiek kwarcytowy "Laminam-Blend Nero"- kol. antracytowy
format papieru
1700x841mm
2862
ITG
Data
201
skala
1
Panel włóknocementowy "Equitone Materia 400" - kol. ciemny szary
Strefa lokalizacji szyldów i reklam
Panel włóknocementowy ryflowany "Equitone Linea LT-20" kol. szary
+57.20 m
Ślusarka aluminiowa i obróbka blacharska, kol. RAL 7039 QUARZGRAU Numer
Ściana kurtynowa
350
760
Ekran akustyczny – wyk. panel z siatki ciętociągnionej - poziom techniczny na dachu Ściana ażurowa - wyk panel z siatki ciętociągnionej – poziom techniczny na dachu
1450
+50.48 m
B
C
D
E
F
G
H
I
J
A
L
L'
M
N
P
O
R
S
C
B
ITG-A-PB-AR-202
870
K
ITG-C-PB-AR-204
ITG-B-PB-AR-203
1004
870
870
1077
870
134
870
870
869
1078
870
134
870
870
2744 1004
870
870
2744
2859
1831
703
1847
870
2859
1012
20
13
498
200 290
OO-3 OO-1 OO-3
124 46 124
319
13
OO-1
90 205
90 205 18
OO-3 OO-1
13
100
12
BELKA 20 x 60h
178
135 20 290 135
568
25 25
25
4085
160
13
90 205 12
25 Szacht mech. 0.42 m² Szacht mech. 0.3 m²
18
EI30
200 290
02.C.K03 Przedsionek 4.9 m² PW-10
155
90 205
16
8 26 8
46 90 205
SŁUP 35 x 80
200 290
71 80 205
3
OO-1
02.C.S07 Przedsionek toalety 5.9 m² PW-15
319
124
304
102
46
140
629
SW-03
SW-04
3 102 16
200 290
02.C.B05 Sala konferencyjna 32.6 m² PW-17
13
OO-3
25
0.56 m²
90 205 180
SW-02 EI120
13
20
140
3015 45
BELKA 20 x 60h
135
272 EI30
50
20
7.80 m 7.75 m 215 ZH52 18 27 90 205
112 20
12 Szacht mech. 8.27 m²
BELKA 20 x 80h
150
OO-3
125 230
550
125 230 120 230
120 230 135 20
290 180 20
90 205
62
18 Szacht mech. 0.66 m²
155
519
294
222 125 230 18
20
260 120 230
80 20
267
25 90 205
738
4.3
203
16
195
OO-1
122 25
370
EI30
290 18
110 230 244
110 230 120 230 80
90 205
BELKA 20 x 60h
12 98 20
150
90 205
90 205
155
16 19
5.3
PW-15
02.C.S09 Ustęp 1.3 m²
PW-15
OO-3
200 290
801
20
42/35dB SZ-01
90 205
02.C.B06 Sala konferencyjna 20.3 m² PW-17
200 290
OO-1
13
SW-04
02.C.S10 Ustęp 1.3 m² 354
02.C.Z03 Pom. socjalne 17.2 m² PW-17
595
1127
13
90 205 180
16
16
503
02.C.S08 Toaleta męska 9.5 m² PW-15
90 205
80 205
354
13 278
02.C.S01 Toaleta niepełnospr. 5.2 m² PW-15
SW-03
SW-03 660
180
1135
821
2796
1924
585
13
OO-3
42/35dB SZ-01
200 290
OO-1
200 290
OO-3
870
42/35dB SZ-01
200 290
BELKA 40 x 70h
228
BELKA 40 x 70h
OO-1 200 290
200 290
6.3
SŁUP 40 x 80
02.B.B07 Sala konferencyjna 32.2 m² PW-17
200 290
6.3
200 290
200 290
20
1399
h=40 90 205
SW-03
13
25
OO-4
PW-15
200 290
180 205
25
182
12x17.3 27.0
D
SW-03
297
270 11 x17.3 27.0
Aneks kuchenny 205 02.C.B07 Sala konferencyjna 18.0 m² PW-17
200 290
ITG-PB-AR-205
SW-01 REI120 25
EI30
2.02 m²
12
284
16
02.B.S08 Toaleta męska 9.5 m² PW-15 PW-15
02.B.S09 Ustęp 1.3 m²
16
200 290
C4
EI30
SW-02 EI120 02.C.K01 Hol windowy PW-16 Pom. elektryczne 45.5 m²
BELKA 20 x 80h 150 1.02 m²
SW-03 42/35dB SZ-06
6.2 42/35dB SZ-01
629
02.C.B04 Sala konferencyjna 35.7 m² PW-17
h=40
13
200 290
13
90 205
210 Szacht windy 17.76 m²
C3
80 205
90
02.B.S07 Przedsionek toalety 5.9 m² PW-15
16 54
180
Szacht mech. 1.83 m² 18 Szacht mech. 1.07 m²
SW-02 EI120
h=40
278
62
103
175 Szacht mech. 1.75 m²
BELKA 20 x 80h
7.80 m 7.65 m
12
155
02.C.B08 Sala konferencyjna 17.8 m² PW-17 13
90 205
02.B.S10 Ustęp 1.3 m²
25
86
870
OO-4
200 290
60 12
210
EI30
80 205
13 168
25
25
13
133
Szacht mech. 3.15 m²
707 1.5%
13
56
199 90 200
02.B.T05 Pom. elektryczne 2.9 m²
h=40
800
252
SŁUP 35 x 80
90 205
870
16
SW-03
155
C2
25
SŁUP 40 x 80 8.38 m
H25
SW-01 REI120
800
207
143 4105 14 150 14
1.5%
200 220
SW-03
SŁUP 35 x 80
124
OO-9
591
13
3.3
270
210
SW-01 REI120
165
180
200 290
02.C.S06 Toaleta damska 6.4 m² PW-15
200 290
25
Pom. elektryczne 1.71 m² 1103
173 Szacht mech. 1.71 m²
H25
SW-01 25 REI120
02.C.Z01 Pom. gospodarcze 5.3 m² PW-17
13
BELKA 20 x 80h
11 x17.3 27.0
02.C.Z02 Pom. porządkowe 5.2 m² PW-17 02.C.S11 Toaleta damska 6.4 m² PW-15
OO-4
203 205
80 205
Aneks kuchenny
02.B.Z03 Pom. socjalne 27.4 m² PW-17
195
65 12 0.4 m²
SW-02 EI120
OO-9
25 273
BELKA 20 x 60h 20
18
20 90 15 220 188 12 25 125
90 205
222 20
1755 2205
870
14 90 205
8.20 m
5.2
02.B.B06 Sala konferencyjna 37.7 m² PW-17
173
80 205
11 x17.3 27.0
C1
SW-02 EI120 25
20
639
90 205
16
SŁUP 35 x 80
182
Szacht windy 5.77 m²
25
EI60
237 0 80 205
13
SW-02 EI120
90 205
5.3
0.38 m²
200 290
90 205
62
OO-1
OO-3
832
42/35dB SZ-06 812
1120
832
80 280
02.B.B10 Pom. biurowe 337.5 m² PW-17
OO-8
32
870 970
1924
1004
870 1890
2859
40
7.2
120 230
203
1.5%
90 205
8 26 8 104 124
16
240
13
14
8.2%
02.C.K02 Klatka schodowa 17.6 m² PW-10
0.41 m²
75 13 154 0.44 m²
PW-15
0 80 152 205
Szacht mech. 9.6 m²
25
145
15
4368 4123
OO-9
621
4712
4620 18
125 230 12 90 205
12 121 58 12 51 12 54
90 205
90
46
104
25
7.80 m 7.75 m 209
BELKA 20 x 60h
Pom. elektryczne 0.59 m²
8.20 m
SW-04
SW-03
BELKA 20 x 60h
BELKA 40 x 70h 15 18
1.5%
OO-9
266 13 346
SŁUP 40 x 80
14 208
100 225
200 220 180
SW-02 EI120
BELKA 60h 1220 x144
18
20
SW-04
152 80 0 205
ZH52 14
14
25
1015
870
OO-9
13 211
300
BELKA 20 x 60h
8.20 m 8.05 m 629
26 18 20
Szacht mech. 5.43 m²
PW-15
02.C.S05 Ustęp 1.3 m²
104
16
87
1.5%
568
20 25 91 250 122 15 12
BELKA 20 x 60h
90 205
20
110 230
Taras zielony
90 242
OO-4
13
246 140
135 290 20 90 205 16 62
332
02.B.Z02 Pom. porządkowe 5.0 m² PW-17 h=40
OO-9
90 205
90 205 90 205 EI30
404 18
254
306
297 170
135 155 20 90 205 164
02.B.S11 Toaleta damska 6.4 m² PW-15 SŁUP 35 x 80
844
SŁUP 40 x 80
42/35dB SZ-06
7.2
13
836
42/35dB SZ-06
SW-03 20
892
200 290
200 290
42/35dB SZ-01
200 290
OO-7
200 290
200 290
200 290 42/35dB OO-2 SZ-06
32
2796 1884
200 290
BELKA 40 x 70h
238
208
516
209
SŁUP 40 x 80
870
SW-03
02.A.B04 Sala konferencyjna 28.9 m² PW-17 0
BELKA 40 x 70h
934
PW-15
529
780
OO-2
OO-7
OO-2
OO-7
42/35dB SZ-06
BELKA 40 x 70h 439
OO-1
SŁUP ø60
C ITG-C-PB-AR-204
952 870
42/35dB SZ-01
h=40
1908 1004
870
239
80 280
8.1 259
239
Szacht mech. 251.03 m² 245
66
SW-02 EI120
13
90 205
02.B.B08 Sala konferencyjna 16.3 m² PW-17
42/35dB SZ-06
SŁUP 40 x 80
OO-8
12
25
EI30 7.80 m 7.75 m
ZH52
BELKA 20 x 60h
90 205
8.1
Pionowe stalowe żaluzje Wentylacyjny otwór fasadowy systemu oddymiania garażu podziemnego
200 220
554
02.A.S08 Toaleta męska 9.5 m² PW-15 h=40
25
870
02.A.S07 Przedsionek toalety 5.9 m² PW-15
7.1
90 205
Czerpnia centrali wentylacyjnej lokalu usługowego
4.2
4.3
PW-15
02.A.Z03 Pom. socjalne 28.9 m² PW-17
838
25 182
182
11 x17.3 607 27.0
25
461
904
SŁUP 35 x 80
Załuzja pozioma 200 220
210
270
270
11 x17.3 27.0
Szacht mech. 7.24 m²
161 278
16
308
46 124
13
02.A.S10 Ustęp 1.3 m²
02.A.S11 Toaleta damska 6.4 m² PW-15
200 290
170
125 230 125 230
125 230
230 25 Szacht mech. 1.8 m² 290 177
43
SW-01 REI120 Szacht mech. 0.88 m²
652
8.4%
210
155
155
90 205
62
02.B.B05 Sala konferencyjna 17.0 m² PW-17
90 205
180
203
930 25
13
870
SŁUP 40 x 80
591
133
Szacht mech. 1.05 m²
B3
25
20
25
38
20 Szacht mech. 0.98 m²
02.C.K04 Klatka schodowa 17.6 m² PW-10
1.5%
Szacht mech. 1.81 m² 18
1.09 m²
SW-01 REI120
1.5%
20
B2
EI30
20
SW-03
EI60
B4
02.C.S04 Ustęp 1.3 m²
SW-04
EI30
Szacht mech. 0.35 m² 25
EI60
BELKA
25
80 205
SW-03
80 205
B1
1120 20 x 100h EI30
13 16
106
02.B.K01 Hol windowy 71.5 m² PW-16
0
13
111 120 230 203
110 230
13 38 25
90 200
20
90 230
300
BELKA 20 x 60h
150 98
90 205
BELKA 20 x 60h
13 278
02.B.B09 Sala konferencyjna 16.3 m² PW-17
90 205
8 26 8
3 80 205
SW-04
13 870
A
C
B
OO-3
OO-10
+0.00 m
102
200 220
1.5%
177
H25
90 205
120 230
91
80 205
Aneks kuchenny 02.A.S09 Ustęp 1.3 m²
90 205
SW-03
OO-10
SW-04
16
h=40
02.A.B05 Sala konferencyjna 16.8 m² PW-17
+3.15 m +0.00 m
102
02.B.B04 Sala konferencyjna 36.3 m² PW-17
16
124
13
155 18 93 25 135 290 15 140 25 244 13 38 150 90 205 102
14 150 987
431 93 8.42 m
676
02.A.B03 Sala konferencyjna 44.6 m² PW-17
02.A.T05 Pom. elektryczne 2.4 m²
90 205
200 290
schemat inwestycji
SW-03
+3.15 m
150 80 3 205
124
62
639
02.B.K05 Przedsionek 8.3 m² PW-10
Szacht mech. 1.22 m² Szacht mech. 1 m²
SW-02 EI120
B5
Szacht mech. 5.18 m²
SW-03
20
SW-01 REI120
Szacht mech. 0.95 m² 180 13
104
80 205
h=40
02.C.K05 Przedsionek 7.7 m² PW-10
SW-03
221
EI30
EI30
13
20
13 90 205
135
25
101 16
37/30dB SZ-01
zespół mgr inż. Damian Kropidłowski mgr inż. Marcin Żak
OO-1
80
38
24
EI30
1488
+4.00 m
278
OO-5
+3.95 m Pas międzykondygnacyjny EI60
13
SŁUP 35 x 80
290
7.80 m 7.65 m
76
45
SŁUP 40 x 80
180 Szacht mech. 4.18 m²
SŁUP 35 x 80
SŁUP 40 x 80
145
20
1.5%
4589
25
25
SW-02 EI120
25 142
25
14
BELKA 40 x 70h
1994
4696
4660
812
02.B.K03 Przedsionek 3.8 m² PW-10
BELKA 20 x 60h
208
13 90 205
240
13
7.1
OO-5
+3.95 m 80
13
326
278
605
02.A.B06 Sala konferencyjna 16.8 m² PW-17
+6.95 m
Pas międzykondygnacyjny EI60
SW-02 REI120 90 205
13
80
80
+6.95 m
90 205
18
EI30
H25
mgr inż. Paweł Lachowicz nr upr. ABIT-II-7131-12/2000
100
40 1247
EI60
25
SW-02 EI120
SW-03
Konstrukcja - sprawdzający
Pas międzykondygnacyjny EI60
SW-01 REI120
210 155
667
50
Szacht mech. 24 1.18 m²
260
20
200 290
+7.80 m
+7.75 m
Pas międzykondygnacyjny EI60
Szacht mech. 4.62 m²
155
200 290
02.A.Z02 Pom. porządkowe 4.2 m² PW-17 90 205
+8.42 m +7.75 m
OO-1
870
OO-3
OO-1
+10.75 m
OO-3
Szklana balustrada +10.75 m
14
SW-01 BELKA REI120 20 x 60h
Szacht mech. 1.31 m²
20
150
675
1.5%
870
SŁUP 40 x 80
80 0 205
213
1831
200 220
182 11 x17.3 27.0
210
02.B.K02 Klatka schodowa 17.6 m² PW-10
02.A.S01 Toaleta niepełnospr. 5.1 m² PW-15
18
25
165
12
3.2
02.B.S06 Toaleta damska 6.4 m² PW-15
13
H25
7.80 m 7.75 m 270
249
6.1
270
497
205
90 205
801
42/35dB SZ-01
141 90 0 205
62
46
323 12 90 205 290
Szacht mech. 2.94 m²
BELKA 20 x 60h
568 13 272
1.5%
870
214
230
135
607 11x17.3 28.0
11x17.3 28.0
172
25
25
Szacht mech. 6.75 m²
607 11 x17.3 27.0
SW-02 EI120
300 1.5%
SW-03
SW-01
164
EI30 726
870
20 22
25
EI30
14
14
104
SW-02 EI30
290
SW-01 REI120 Szacht mech. 0.74 m²
90 205
25
618
5.2
460
4664
181
90 243
02.A.T04 Pom. elektryczne 4.9 m²
90 205 302 161
355
870
OO-2
3.3
66 16
02.C.S03 Toaleta męska 9.5 m² PW-15
8.38 m
90 205
607
0.95 m²
20
7.80 m 7.65 m
BELKA 40 x 70h
181
BELKA 20 x 60h
675
7.6%
12
20
Szacht mech. Szacht mech. 0.72 m²122 121.22 m² 205
16
14
95
125 230 90 200
90 230
20
Szacht windy 11.82 m² 210
60 25
57
870
87 594
1.5%
870 568
4640
Szacht mech. 1.84 m²
BELKA 20 x 60h
13
Taras zielony
272
160
220 125 230 160
12
7.80 m 7.75 m 226
ZH52
62
h=40
BELKA 20 x 60h 8.3%
2010
193
A5
223 67 159
20 123 15
20 Szacht mech. 1.98 m²
SW-02 EI120
155
12
291
1.5%
EI30
25
02.B.T04 Pom. elektryczne 4.6 m²
8.20 m 8.05 m
8.20 m
200 290
02.A.K03 Przedsionek 6.0 m² PW-10
80 152 205
16 104
8.20 m
SW-02 EI120 02.A.K01 Hol windowy 50.1 m² PW-16
530
231
SŁUP 40 x 80
EI30
BELKA 20 x 60h
13
02.C.Z04 Punkt dystryb. IT 19.4 m² PW-17
16
200 220
BELKA 20 x 80h
25
6.2
Konstrukcja - projektant data / podpis mgr inż. Piotr Kunc nr upr. KUP/0033/PWOK/09
104
SW-04
210
125 230
300 18
EI30
20
20
SW-03
90 205
244
298 18
138 230
20 47
80 205
205
124
870
1436
326 90 205 0
90 205
18 174 25 135
18
02.B.S01 Toaleta niepełnospr. 5.5 m² PW-15
SW-03
Czerpnia centrali wentylacyjne holu wejściowego
135
20
132
20
25 64
Szacht mech. 2.9 m²
238
140 12 120
BELKA 20 x 60h BELKA 20 x 60h
16
13
8 26 8
20
SŁUP 40 x 80
90 244
13 1437
OO-1
02.A.K02 Klatka schodowa 17.6 m² PW-10
133
A3 EI30 1023 7.80 m 7.65 m
210 18
90 205
02.B.B02 Sala konferencyjna 30.9 m² PW-17
1.5%
90 205
BELKA 20 x 60h
SW-02 EI120
267
+11.60 m
200 290
25
Szacht windy 11.99 m²
6.1
80
80
OO-4
+11.55 m Pas międzykondygnacyjny EI60
02.A.B02 Sala konferencyjna 38.2 m² PW-17
SW-02 EI120
210
A2 EI60
SW-02 EI120
OO-3
80
OO-2
+11.55 m Pas międzykondygnacyjny EI60
SW-01 REI120
155
540 210
A1
Szacht mech. 1.56 m²
51/00/WŁ
676
25 290
11 x17.3 27.0 270
182
25
220 25 Szacht windy 6.56 m²
507
02.C.B02 Sala konferencyjna 22.5 m² PW-17
382
870
SŁUP 35 x 80
1575
80 205
13 124 46 124
323 18
11 x17.3 27.0
EI60
72 20
Szacht mech. 1.04 m²
352/01/SL
zespół Martin Hyams Krzysztof Gryczyński Szymon Kachniarz Michał Pawelczyk Katarzyna Falkowska Szymon Bańka
13
5.1 18 Szacht mech. 1.01 m²
180 205
870
data / podpis MA/015/15
180
870
1166
02.C.S02 Przedsionek toalety 5.9 m² PW-15
02.B.Z01 Pom. gospodarcze 5.1 m² PW-17
ZH52 99
4.2
90 205 415
20 155
240
90 205
145
80
+14.55 m
H25
SW-03
A4
+14.55 m
13
25
Szacht mech. 11.97 m²
SW-01 REI120
7.80 m 7.75 m
15
13
BELKA 20 x 60h
200 290
605
Architektura - sprawdzający
Pas międzykondygnacyjny EI60
138
690
13
PB
Architektura - projektant Marian Kuś
Michał Kuś
Pas międzykondygnacyjny EI60
16
1.5%
SW-01 EI120 BELKA 20 x 60h
Szacht mech. 1.12 m²
SW-03
62
SW-01 REI120
02.B.K04 Klatka schodowa 17.6 m² PW-10
4.1 1834
SŁUP 40 x 80
02.A.Z01 Pom. gospodarcze 4.2 m² PW-17
h=40 62
SW-02 EI120
BELKA 20 x 80h
faza projektu
ARCH. I KONSTR.
+15.40 m
+15.35 m
196
25
125 230
OO-3
80 0 205 152
16 104
EI30 220 ZH52
4598
OO-1
20
155
568
200 290
65
35
+18.35 m
+15.35 m
200 290
4589
Pas międzykondygnacyjny EI60
+18.35 m
80
80
branża
Pas międzykondygnacyjny EI60
OO-3
ITG-PB-AR-205
+19.20 m
+19.15 m
OO-1
D BUDYNEK BIUROWY 3T OFFICE PARK W GDYNI PRZY UL. K. GÓRSKIEGO, 5.1 DZIAŁKI NR 179/2, 179/3
+22.15 m
+19.15 m
OO-3
80
80
Pas międzykondygnacyjny EI60
+22.15 m
104
02.A.S06 Toaleta damska 6.4 m² PW-15
SW-04
246 25 Szacht mech. 0.65 m² Szacht mech. 1.04 m²
SW-01 REI120
02.A.K04 Klatka schodowa 17.6 m² PW-10
inwestycja
Pas międzykondygnacyjny EI60
0 90 205
EI30
611
02.A.B07 Sala konferencyjna 34.3 m² PW-17
+23.00 m
+22.95 m
80 205 0
205
138 230
46
870
IPOPEMA 138 Fundusz Inwestycyjny Zamknięty Aktywów Niepublicznych
+25.95 m
+22.95 m
16
90 205
02.A.K05 Przedsionek 9.1 m² PW-10
SW-03
inwestor
+25.95 m
133 12
62
8.42 m
SŁUP 35 x 80
80 205
155
200 290
16
18
200 290 13
T +48 22 480 8080 F +48 22 480 8081 www.wspgroup.com
h=40
6016
SW-03
25 80 205
90 205
18
WSP Polska Sp. z o.o. Prosta 68, 00-838 Warszawa
OO-3
Pas międzykondygnacyjny EI60
OO-1
+26.80 m
+26.75 m
Pas międzykondygnacyjny EI60
80
80
+26.75 m
02.A.S02 Przedsionek toalety 5.9 m² PW-15
SŁUP 40 x 80
PW-15
36
SŁUP 35 x 80 02.A.S03 Toaleta męska 9.5 m² PW-15
37/30dB SZ-01
15 97
OO-1
80
80
200 290
4.1
+29.75 m
42/35dB SZ-06
h=40
16
SW-04
instalacje
Pas międzykondygnacyjny EI60
+29.75 m
02.B.S03 Toaleta męska 9.5 m² PW-15
3.2
90 205
13
+30.60 m
+30.55 m
Pas międzykondygnacyjny EI60
13
SW-04
56
80 205
90 205
SŁUP 35 x 80
32
02.A.B01 Pom. biurowe 725.0 m² PW-17
PW-15
02.A.S04 Ustęp 1.3 m²
200 290
590
90 205
PW-15
164
8 26 8
02.A.S05 Ustęp 1.3 m²
90 205
844
T +48 52 361 4646 F +48 52 361 4647 www.fort.pl
13
02.C.B01 Pom. biurowe 670.4 m² PW-17
42/35dB SZ-06
42/35dB SZ-01
200 290
SW-04
16
836
13
480
200 290
FORT POLSKA
808
90 205
1015
13
02.A.Z04 Punkt dystryb. IT 24.8 m² PW-17
02.A.B08 Sala konferencyjna 24.8 m² PW-17
870
FORT POLSKA Sp. z o.o. ul. Nowotoruńska 8 85-840 Bydgoszcz
Pas międzykondygnacyjny EI60
+33.55 m
OO-3
821
h=40 SW-03
13 32
1271
200 290
SW-03
PW-15
02.B.S05 Ustęp 1.3 m²
187
516
BELKA 20 x 60h
+30.55 m
OO-1
1196
+33.55 m
OO-3
80
80
80
Pas międzykondygnacyjny EI60
+33.55 m
1135 180
20
SW-03
Pas międzykondygnacyjny EI60
246
108 812
OO-2
13
90 205
868
13
13
02.B.Z04 Punkt dystryb. IT 24.8 m² PW-17 02.B.S04 Ustęp 1.3 m²
497
02.B.B01 Pom. biurowe 344.7 m² PW-17
1134
42/35dB SZ-06
02.B.S02 Przedsionek toalety 5.9 m² PW-15
516
499
124
3.1
SW-03
13
13
02.B.B03 Sala konferencyjna 29.0 m² PW-17
SW-03 870
242
200 290
200 290
838
844
584
OO-9
20
13
BELKA 40 x 70h
80
konstrukcja
20
h=40
SŁUP 40 x 80
SŁUP 35 x 80 2796 1070
37/30dB SZ-01
1011 840
2796 1108
812
948
BELKA 40 x 70h
200 290
37/30dB SZ-06
+34.40 m
+34.35 m
OO-1
858
OO-2
+34.35 m
OO-3 37/30dB SZ-01
13
OO-4
OO-1
246
T +48 22 389 8500 F +48 22 389 8501 ahr-global.com
+37.35 m
OO-3 200 290
AHR Architects Sp. z o.o. ul. Stępińska 9 00-739 Warszawa 3.1
200 290
OO-1
200 290
OO-3
1318
SŁUP ø60
SŁUP 40 x 80
20
844
architektura
37/30dB SZ-01
2.3
40
944
SŁUP 40 x 80
32
+38.20 m
OO-1
2.3 2.2
82
870
37/30dB SZ-06
150
1004
+39.08 m
+38.15 m
OO-3
1.3 37/30dB SZ-06 BELKA 40 x 70h
335
SŁUP ø60
63 870
Wysokość budynku - rzędna punktu zbiegu połaci dachowej
Pas międzykondygnacyjny EI60
OO-1
1.3
290
290
760
2.2
2744
Pas międzykondygnacyjny EI60
+39.00 m
OO-3
1750
37/30dB SZ-01 REI120
1450
+41.660 = 79.260 m n.p.m.
OO-1 200 290
200 290
200 290
200 290
200 290
200 290
OO-2
1.2
37/30dB SZ-06 37/30dB SZ-06 BELKA 40 x 70h
226
350
+41.95 m
+41.15 m
OO-4
OO-3
1765
1.2
+34.35 m
OO-2 200 290
OO-4
1568
+43.80 m
80
OO-2
37/30dB SZ-01 37/30dB SZ-01
310
80
1351
OO-4
Pas międzykondygnacyjny EI60
+44.95 m
80
37/30dB SZ-01
1842
+45.80 m
200 290
1000
1164
1857
Strefa lokalizacji szyldów i reklam +45.75 m
200 290
2859
870
200 290
1307
134
200 290
870
02.A.B01 02.A.B02 02.A.B03 02.A.B04 02.A.B05 02.A.B06 02.A.B07 02.A.B08 02.A.K01 02.A.K02 02.A.K03 02.A.K04 02.A.K05 02.A.S01 02.A.S02 02.A.S03 02.A.S04 02.A.S05 02.A.S06 02.A.S07 02.A.S08 02.A.S09 02.A.S10 02.A.S11 02.A.T01 02.A.T02 02.A.T04 02.A.T05 02.A.Z01 02.A.Z02 02.A.Z03 02.A.Z04 02.B.B01 02.B.B02 02.B.B03 02.B.B04 02.B.B05 02.B.B06 02.B.B07 02.B.B08 02.B.B09 02.B.B10 02.B.K01 02.B.K02 02.B.K03 02.B.K04 02.B.K05 02.B.S01 02.B.S02 02.B.S03 02.B.S04 02.B.S05 02.B.S06 02.B.S07 02.B.S08 02.B.S09 02.B.S10 02.B.S11 02.B.T01 02.B.T02 02.B.T04 02.B.T05 02.B.Z01 02.B.Z02 02.B.Z03 02.B.Z04 02.C.B01 02.C.B02 02.C.B04 02.C.B05 02.C.B06 02.C.B07 02.C.B08 02.C.K01 02.C.K02 02.C.K03 02.C.K04 02.C.K05 02.C.S01 02.C.S02 02.C.S03 02.C.S04 02.C.S05 02.C.S06 02.C.S07 02.C.S08 02.C.S09 02.C.S10 02.C.S11 02.C.T01 02.C.T02 02.C.T04 02.C.T05 02.C.T06 02.C.Z01 02.C.Z02 02.C.Z03 02.C.Z04
42/35dB SZ-06
1884
tom / projekt
OO-3
OO-1
OO-3
200 290
42/35dB SZ-01
200 290
OO-1
200 290
OO-3
temat rysunku
200 290
BUDOWLANY
200 290
9.1 200 290
9.1
B
OO-1
ITG-B-PB-AR-203
ELEWACJA WSCHODNIA
870
1004 2744
870
1976
I
H
G
F
E
D
C
894
B A ITG-A-PB-AR-202
B
C
D
E
F
G
H
J
K
L
L'
M
N
P
R
S
kod rysunku
ITG-PB-AR-300 Data wydania
rewizja
2017.12.20 skala
format papieru
841x420mm
2nd floor
26
Worldwide trading material | Dubai | U.A.E |
Autocad | Sketchup | V-ray | Photoshop |
Manager office Design proposal for worldwide trading material
Worldwide trading material reception
Manager office
Custom light fixture details
Reception
Manager office
27
Manager office
Furniture layout plan
Reflected ceiling layout plan
SITE PHOTOS
Waiting area
Reception
Office spaces
Waiting area
Manager office
Reception desk
Custom lights
Manager office
28
photography
art work
29
ART
30
Thank you JACOB THOMAS jacobtimes@gmail.com Phone no. +48519312192