CASE STUDY
THE CLIENT Five Rivers Environmental are specialists in ecological contracting including ecological mitigation works, habitat creation and habitat management. They had been awarded the contract for ecological mitigation on several ancient woodlands as part of the High Speed 2 (HS2) rail link construction between London and Birmingham. They created three compounds in rural Warwickshire and Five Rivers https://fli-fi.co.uk/construction-internet-wifi/
had already attempted to create connectivity for each site but had quickly recognised that 3G and LTE (4G) coverage was poor and 5G coverage was close to zero right where they needed it. Five Rivers engaged Fli-Fi to provide them with sufficient internet connectivity and WiFi on each site to meet their requirements and ensure they could operate effectively.