JAKE J. HENDERSON DESIGN PORTFOLIO
“There is a spirit of enthusiasm and expression of competence that accompanies Jake’s work ethic. His contributions are purposeful, and his interpersonal relationship to the staff, and moreover, the University, has been respectful.” - Leonard S. Thomas, Senior Planner, University of Cincinnati Architect’s Office
“Jake is an enthusiastic, hard working person that is willing to take on any task that is asked of him. He views all challenges as a means to learn and improve. He would be a valuable asset to any organization.” - Michael Miyasato, Architect, University of Cincinnati Architect’s Office
2
CONTENTS ACADEMIC WORK EXAMPLES BUSINESS DISTRICT MASTER PLAN INFILL HOUSING MASTER PLAN DESIGN WITH NATURE OVER-THE-RHINE REDEVELOPMENT PLAN PROFESSIONAL WORK EXAMPLES
CAMPUS TRANSPORTATION HUB
DESIGN-BUILD PATIO DESIGN
TRANSIT ORIENTED DEVELOPMENT MASTER PLAN
MICO-APARTMENT CONCEPT DESIGN
STORE DESIGN & DOCUMENTATION
PARK RENOVATION
RESIDENTIAL ADDITION
HAND RENDERINGS
ACADEMIC WORK
PLEASANT RIDGE BUSINESS DISTRICT C I N C I N N AT I , O H Pleasant Ridge is a predominantly residential neighborhood in Cincinnati, Ohio with a small business district occupied primarily by long-standing, independent businesses. It is one of the most diverse, dispersed and durable communities in the greater Cincinnati region. Pleasant Ridge has a few staple businesses that attract people from around Cincinnati - Molly Malones Irish Pub, Everybody’s Records, and Pleasant Ridge Chili Parlor. Unfortunately, Pleasant Ridge has seen a decline in their business district with several vacancies and a transition to “big box development” with large parking lots; destroying the communities historic urban fabric and in essence, the community’s unique walkable character. Our studio visited the community, met with several business owners and community council members to develop a strategy to reinvigorate the business district. Luckily, the Pleasant Ridge business district’s distinctive historic character is only moderately marred by late 20th century planning failures and still has hope to turn its fortunes around. Therefore, the primary goal of our revitalization plan was to rebuild and reinforce that character.
PLEASANT RIDGE BUSINESS DISTRICT
GREATER CINCINNATI PLEASANT RIDGE
DOWNTOWN
STUDY AREA
PLEASANT RIDGE BUSINESS DISTRICT C I N C I N N AT I , O H
MASTER PLAN Project Goals: - Preserve the historic architectural character - Increase walkability - Develop a wayfinding system unique to Pleasant Ridge - Create an identity for the district - Create additional public space - Relieve traffic congestion - Create additional parking areas - Plan buildings of mixed-use that will bring people to the district. The site chosen for redevelopment was a triangle shaped block bounded by Ridge, Montgomery and Woodford Roads. The site sits right in the heart of the business district and is currently occupied by two one-story buildings, a gas station, and several parking lots. Through direct observations, the intersection of Montgomery and Ridge Roads act as the main culprit for traffic congestion in the community. The master plan is a new-urbanist approach in the design by creating a dense, walkable development of mixed-use buildings, an arts center, and restaurants that create an area of entertainment for the community. The plan is pedestrian oriented with outdoor dining, wider sidewalks, and a centralized public space. Traffic calming elements such as street trees and a median are designed to slow traffic down through the area and encourage drivers to stop and enjoy what the district has to offer.
INFILL HOUSING DESIGN
C I N C I N N AT I , O H WOODRUFF ROAD
MASTER PLAN
AL
LE
Y/
AC
CE
SS
RO
AD
For my third year spring studio, we were challenged to develop a plan for a new housing development for the residents of Anderson Township, east of downtown Cincinnati. This project presented many challenges in picking a suitable area for development. Anderson Township is predominantly built out and contained very few suitable sites with adequate space and topography to build upon. The site must also be within reasonable proximity to major roads for good access to the township’s amenities, businesses, and educational institutions. Our group selected a site off of Woodruff Rd., a highly developed road with only single-family development.
L O C AT I O N M A P
PARK
WOOD
RUFF R
OAD
PROJECT SITE I-275
PLAYGROUND/ PARK
INFILL HOUSING DESIGN SKETCH-UP MODEL The loop shape of this design integrates well with the existing subdivisions surrounding the site and gives Anderson Township another form of housing to attract residents of all ages to their community. The infill homes in this design feature private courtyards, a gazebo, playground, alley roads for rear garages, and a centralized public greenspace meant to encourage social interaction. The design principles of the plan focus on livability, walkability, and density.
C I N C I N N AT I , O H
D E S I G N W I T H N AT U R E
C I N C I N N AT I , O H
T R A I L S I D E N AT U R E C E N T E R M A S T E R P L A N Built in 1939, the Trailside Nature Center is the oldest of the five Cincinnati parks nature centers, as well as the only city nature center located in an urban park - Burnet Woods. The Trailside Nature Center has a nature library, crafts room, meeting space, exhibits, and the Wolff Planetarium, the oldest planetarium west of the Allegheny Mountains. The nature center is located next to Burnet Woods Lake, a popular fishing spot for the neighborhood since 1875. Behind the center is a large park with swing sets and a shelter. In recent years, the site behind the center has been under-utilized and unpopular with local residents; an ambiguous open space with very few amenities, making the site subject to various criminal behavior.
TRAILSIDE NATURE CENTER
PROJECT SITE
NATURE EDUCATION The objective of the sustainable landscape design studio was to create a new vision for the Trailside Nature Center site- a park centered around natural playground spaces and outdoor classrooms while integrating a natural site drainage system... blurring the lines between the natural and built environment.
BURNET WOODS LAKE
TRAILSIDE NATURE CENTER
D E S I G N W I T H N AT U R E
C I N C I N N AT I , O H
T R A I L S I D E N AT U R E C E N T E R M A S T E R P L A N The new vision for the Trailside Nature Center site is a multi-functional, Along the paths, users will encounter spaces to play, relax, exercise, and educate. sustainable park with a creek that flows through the site. The park is a Textured paths, colorful landscaping, and natural elements such as boulders, inspire linear design focused on promoting physical activity and environmental the users to walk. The park’s creek serves as a natural riparian corridor for waterIIthat Sustainable Landscape Design education with paths that weave in and out; opening up into natural overflows from Burnet Woods Lake. The park’s creek is designed to redirect the water Jake Henderson Urbanlines, Planning | University of Cincinnati playgrounds, a large open space, outdoor classrooms, and a zen garden. through the site instead of flowing into the city’s sewer relieving burden on the Professor David P. Whittaker The parks curved paths flow together to mimic the flow of water and the sewer infrastructure while stopping pollution of the city’s waterways. Trailside Nature Center - Burnet Woods, Cincinnati OH natural curves of the environment.
TRAILSIDE CREEK PARK
PATIO
BROOKLINE AVE
DECK TEA HOUSE
NATURE CENT
ER
ZEN GARDEN
PARK RIPARIAN CREEK SHELTER
ARCHITECTURAL SCULPTURE WET DECK NATURAL PLAYGROUND
ROCK WALL NATURAL PLAYGROUND
CLIMBING BOULDERS
SWING SET IMAGINATION PLAYGROUND CLIMBING BOULDERS
SCALE: 1’=20’ IMAGINATION PLAYGROUND
OVER-THE-RHINE URBAN DESIGN STUDIO U N I V E R S I T Y O F C I N C I N N AT I REDEVELOPMENT PLAN Over-the-Rhine, or OTR as it is commonly referred to, is a historic urban neighborhood located a short mile north of downtown Cincinnati and just over a mile south of the University of Cincinnati. OTR is believed to be the largest, most intact urban historic district in the U.S. with over 943 historic buildings contributing to its historic designation. Its intact 19th century urban architecture and overall physical character is commonly mistaken for parts of Brooklyn. In fact, many movies that try to portray 19th century New York City, film in the streets of OTR. The historic district contains the largest collection of Italianate architecture in the U.S. Since 2000, OTR has been experiencing rapid revitalization, with many historic buildings being rehabilitated for mixed use development. The neighborhood’s original physical characteristics: 3-5 story walk up buildings with commercial storefronts, narrow streets, wide sidewalks that create walkability, and high density, lend itself to be the perfect combination of an urban neighborhood and entertainment district. Its centralized location between the two largest employment hubs in the region - downtown and the university, make OTR ideal for the new streetcar line and revitalization. Findlay Market, an urban farmer’s market, and Washington Park are the two main attractions for the community, as well as the anchors for economic, social, and recreational growth. Despite years of revitalization, the majority of OTR, particularly the northern half, is struggling with crime, vacancies, and blighted infrastructure. Liberty Street creates a physical separation between OTR’s northern and southern halves. The southern half has seen years of investment, slowly becoming the hottest entertainment district in Cincinnati. Known as the Brewery District of OTR, the northern half suffers from massive amounts of crime and blight. For this project, we devised a plan for how to best connect the southern and northern halves of OTR.
C I N C I N N AT I , O H
OVER-THE-RHINE
C I N C I N N AT I , O H
URBAN DESIGN STUDIO U N I V E R S I T Y O F C I N C I N N AT I A N A LY S I S - O P P O R T U N I T I E S A N D C O N S T R A I N T S Over-the-Rhine is a prime example of how highway development destroys density and walkability in older communities. Liberty Street, the main arterial road that diagonally cuts through Over-the-Rhine, acts as a physical barrier between the northern and southern halves of the neighborhood.
BASE MAP
The planning process for our studio simplified into 3 project phases: 1. Physical Analysis (Site Visits, Public Meetings, and Map Making) 2. Concept Development & Design 3. Final Master Plans, Designs, & Presentation Documents
C O N S T R A I N T S O V E R L AY
O P P O R T U N I T I E S O V E R L AY
BUILDINGS
POOR LIGHTING CONDITIONS
STREETCAR ROUTE
PARCELS
RECENTLY NEW DEVELOPMENT
MAJOR NODES OF ACTIVITY
OVER-THE-RHINE DISTRICT BOUNDARY
BROKEN STREET GRID
OPPORTUNITY CORRIDORS
STUDY AREA
LIBERTY STREET (HIGH TRAFFIC BARRI-
OVER-THE-RHINE URBAN DESIGN STUDIO U N I V E R S I T Y O F C I N C I N N AT I MASTER PLAN
C I N C I N N AT I , O H
My team developed a master plan that focused on connecting Washington Park and Findlay Market, the two main destinations for social and economic activity. The plan aims to create a pedestrian and bicycle oriented corridor between the two locations, along with infill development that offers a variety of housing types. Mixed-use buildings are proposed along both sides of Liberty Street, along with a road diet for Liberty Street to close the physical gap between north and south OTR
OPEN/ GREEN SPACE RESIDENTIAL MIXED-USE MIXED-USE/ COMMERCIAL COMMERCIAL STREETCAR LINE AND STOPS GATEWAY ENTRANCE LIBERTY STREET
CONCEPTUAL ISOMETRIC The isometric drawing serves as a quick massing model to analyze the existing physical composition of the corridor between Washington Park and Findlay Market and how it relates to the proposed buildings.
OVER-THE-RHINE
C I N C I N N AT I , O H
F I N D L AY M A R K E T U R B A N P L A Z A - S I T E P L A N
A
A
After conceptual development of a master plan, our team was assigned to develop a particular site that would serve as the foundation for the master plan. Findlay Market, the northern anchor of our master plan, is in need of several improvements. At this point in its evolution, Findlay Market is utilized solely as a farmers market. We envision the market to function as a major public space for the community. The closest public park is Washington Park, which has drawn economic development to south OTR. Development of a plaza where the current parking lot of Findlay Market sits, would give much needed civic space for north OTR. The plaza’s east and west boundaries would be defined by two mixed-use, 4-5 story buildings. Retail along the bottom floor would constantly engage the plaza with customers. An underground parking garage would be planned under the plaza to accommodate the loss of the existing surface lot.
PROFESSIONAL WORK NATIVE GRASSES RIVER ROCKS
1'-0"
SIDEWALK
SIDEWALK CURB
1'-6"
ROADWAY
1'-0"
4' TO 6' (TYP)
VARIES
BIOFILTRATION SOIL MIX
2" GEOTEXTILE FABRIC OPEN GRADED AGGREGATE 4" PERFORATED PIPE 2" GEOTEXTILE FABRIC EXISTING SUBGRADE
BIOSWALE SECTION
T R A N S P O R TAT I O N P L A Z A U N I V E R S I T Y O F C I N C I N N AT I SITE DESIGN
C I N C I N N AT I , O H
O V E R - U T I L I Z AT I O N
SITE AERIAL
While working with the University Architect’s Office, I worked on a site concept for expanding a campus bus shelter into a small transportation plaza. The photographs on the right show the existing bus shelter at its current location and typical capacity. The bus stop is unique in that it serves several transportation systems: Metro, UC Shuttle, Greyhound, Megabus, and Barons Bus. The premise behind this project was to design a small plaza for the existing transit shelter thatSITE CONCEPT UNIVERSITY AVE BUS STOP receivesUNIVERSITY much more utilization than what it was OF CINCINNATI originally designed for.
Updated 04/21/14
T R A N S P O R TAT I O N P L A Z A U N I V E R S I T Y O F C I N C I N N AT I RENDERING In this design, I step the plaza down into three different planes in order to work with the site’s contours. Several benches are to be added to address the need for more seating space. The plaza is intended to be heavily landscaped with ornamental grasses and juniper shrubs that stay green year-round; giving the plaza much needed softer edges, as well as enhancing the user’s experience.
C I N C I N N AT I , O H
PAT I O D E S I G N DESIGN - BUILD While working with a custom home builder, Michaelson Homes LLC., I designed several hardscape patios. I chose to highlight this specific project in which I had a lead roll in the design process; creating a sketch-up model of the new patio and trellis. In addition, I had the privilege of working for several weeks with a stone mason in constructing the stone seat walls and chimney.
IN-PROGRESS PHOTOS
C I N C I N N AT I , O H
O A K L A N D C I T Y M A R TA S TAT I O N AT L A N TA , G A C L I E N T: C I T Y O F AT L A N TA - O F F I C E O F P L A N N I N G SCOPE OF WORK: MASTER PLANNING & RENDERINGS
O A K L A N D C I T Y M A R TA S TAT I O N
AT L A N TA , G A
TRANSIT - ORIENTED DEVELOPMENT
M A R TA R A I L M A P During my time working for the City of Atlanta, Office of Planning, I worked on several transportation projects with the Metropolitan Atlanta Rapid Transit Authority (MARTA). I was fortunate enough to be involved with the planning and design process of the redevelopment of the under-utilized parking lots of the MARTA rail station in Oakland City. Oakland City is a neighborhood located southwest of downtown Atlanta. Its MARTA station is only 3 stops south of downtown and 4 stops north of Atlanta’s international airport (the busiest airport in the world). Geographically, Oakland City is a prime redevelopment area for its central location to the downtown and airport. In addition to the Oakland City Station, MARTA aims to partner with private developers to turn many of the agency’s parking lots into mixed-use developments. Before any public meetings, any planning or design, a initial survey was conducted to gain public input on the types of improvements the Oakland City residents would like to see. More than 100 people responded to the survey in which 80% of respondents identified the neighborhood’s greatest amenity gap to be its lack of coffee/ boutique shops. Desire for sit-down restaurants and grocery stores followed closely, at 77% and 67%. Respondents were clear in their support for new mixed-use developments, with 60 percent in favor. It was time for the City of Atlanta and MARTA to begin the planning process.
L O C AT I O N M A P PROJECT SITE
OAKLAND CITY
O A K L A N D C I T Y M A R TA S TAT I O N
AT L A N TA , G A
TRANSIT - ORIENTED DEVELOPMENT
I was commissioned by the City of Atlanta’s Office of Planning to produce two architectural renderings of a proposed transit-oriented development located at the Oakland City MARTA Station. In collaboration with Peter Drey, principal architect at the architectural firm D+E=Design+Environment, I developed two conceptual renderings that show what could potentially be built on the existing parking lots of the station.
MASTER PLAN
PROJECT PHASES PHASE 1
OAKLAND DR
2B
1A
BEL
2D
MP
2A
N LTO
2E
S RD
2A
W
1B
Developed in Collaboration with D+E=Design+Environment
CITY
2A 2C
SW
LAND
2-3 Story Apartment Building along Lee St - Option for 1st floor retail
(1C)
Surface Parking Lot
(2A)
(3) 4 Story Mixed-Use Buildings along Campbellton Rd. SW
(2B)
Open space for recreation
(2C)
New Transit Plaza for MARTA
(2D) 2E
OAK
(1B)
Station Entrance
2E
LEE ST
Townhomes along Oakland Dr.
PHASE 2
CA
1C
(1A)
MAR TA S TATI ON
3-Level Parking Structure
(2E) New Bus Shelter and Loop/ Drop-off
O A K L A N D C I T Y M A R TA S TAT I O N
TRANSIT - ORIENTED DEVELOPMENT
Aerial-view rendering of proposed mixed-use development & transit plaza
AT L A N TA , G A
O A K L A N D C I T Y M A R TA S TAT I O N
AT L A N TA , G A
TRANSIT - ORIENTED DEVELOPMENT
Street-level rendering of proposed mixed-use building at the intersection of Campbellton Rd. SW and Lee St. SW
M I C R O - A PA R T M E N T C O N C E P T D E S I G N C L I E N T: C O L U M B U S D E V E L O P E R SCOPE OF WORK: - CONCEPTUAL BUILDING DESIGN - RENDERING Less is more: Nothing could be more true with space. In a world with population on the rise, traffic congestion, and a lack of affordable housing, the use of space has never been so consequential toward quality of life. The micro-apartment, typically a one-room, self-contained living space, designed to accommodate a sleeping space, living space, bathroom, and kitchenette, all within 50–350 square feet, maximizes the space needed for modern living luxuries. Micro-apartments not only maximize profits for developers and landlords, but can also provide affordable living accommodations. A young real-estate entrepreneur asked me to design a 250 square foot micro-apartment building that he could present to prospective developers. In particular, he was interested in developing micro-apartments near the Ohio State University, where many graduate students are willing to sacrifice living space for higher quality kitchen appliances and plumbing facilities. The majority of rental housing near the university consists of outdated, converted two-story houses with inadequate appliances and plumbing, or over-priced, cheaply built mixed-use developments. 25'-0"
9'-714"
8'-7"
6'-0"
ADJACENT APARTMENT CABINETS ABOVE
2'-0"
BRICK FACADE
16" DEEP WARDROBE/ TV SPACE 2' W FRIDGE 18" W D/W 20" W STOVE 5'-1112"
23" W KITCHEN SINK 2' DEEP KITCHEN CABINETS
6'-0" WINDOW
FOLD DOWN FULL BED
KITCHEN / DINING
BATHROOM
TOTAL SF: 250
ENTRY 16" DEEP BED STORAGE CABINET (TYPICAL SIZE)
ADJACENT APARTMENT
3'-6"
FOLD DOWN DINING TABLE
2'-0"
10'-0"
LIVING / SLEEPING
M I C R O - A PA R T M E N T C O N C E P T D E S I G N C L I E N T: C O L U M B U S D E V E L O P E R SCOPE OF WORK: - CONCEPTUAL BUILDING DESIGN - RENDERING Hand-drawn rendering of a 4-story micro-apartment building on a typical 0.25 acre lot near Ohio State University.
P-9
MMERCIAL FLOORING LON IMPERIAL TEXTURE SOFT WARM GRAY 1/8"
ACRYLIC PAINT BENJAMIN MOORE REGAL SELECT COLOR: SIMPLE WHITE SHEEN: FLAT
SS-01
3
ACRYLIC SOLID SURFACE MATERIAL 4 5 DUPONT CORIAN NOCTURNE COLOR: BLACK FINISH: SEMI-GLOSS
P
10
11
12
1
P
1
P
BACK OF HOUSE SHELVING
2. BACK OF HOUSE TECH RA MIRROR PROVIDED BY GENERAL NOTE ASSEMBLE TECH RACK TO MILLWORKER. G.C. TO TECHNICIAN. REFER TO D PROVIDE BLOCKING AS 1. REFER TO OWN REQUIRED, SEE 3. DETAIL TYPICAL STOCK ROOM FIN SIGNAGE WOR A11/A-502. NON-SALES DOORS: P-3,
1
4. ALIGN
SEE ROOM SHEET FIN A-1 TYPICAL2.TOILET P-4, CEILING: C-03.
5. H.C. ACCESSIBLE CASHWR 6. EQ.
EQ.
SIGNAGE ABOVE . REFER T
7. (54) PRODUCT STORAGE T
8. NEW HOOK STRIP. REFER T SS 01
9. NEW UTILITY HOOK. REFER
10. NEW DOOR MIRROR WITH ADDITIONAL INFORMATION
EXISTING NEUTRAL PIER BEYOND
11. NEW MOP HOLDER. REFER
STOREFRONT SYSTEM AS SPECIFIED 0204-00
FINISH FLOOR 0'-0"
HPL 06
0443-00
0405-00
0405-00
HPL 06
0450-00 0445-00
0405-00
0405-00
0441-00 0303-00 0445-00
G12 A-502 TYP.
HPL 06
12. NEW PAPER TOWEL HOLDE
13. NEW TOILET TISSUE DISPE
14. NEW MIRROR ABOVE SINK
15. NEW RETRACTABLE LAVATO INFORMATION.
16. 42" METAL GRAB BAR. REF
17. 18" VERTICAL METAL GRAB INFORMATION.
ADJACENT TENANT (N.I.C.)
K
40'-6" OVERALL LEASE LINE SCALE: 1/4" = 1'-0"
1
P
24
1
4
17
SHELVING
ELEVATION
SCALE:0445-00 0303-00 0441-00 0405-00 1/4" = 1'-0"
24
0405-00
19 EQ.
0300-00
0405-00
G9 A-502
12" 0445-00 0450-00 0405-00
0405-00
0405-00
0441-00 0445-00
19'-105 8"
5'-0"
6
EXISTING NEUTRAL PIER BEYOND STOREFRONT SYSTEM AS SPECIFIED
MALL COMMON FINISH FLOOR AREA (N.I.C.) 0'-0"
HPL 06
CL OF GLAZING 6
0443-00
7
0204-00
18
4'-9"
H6
27. LANDLORD-SPECIFIED TILE
8'-15 8"
EQ.
6"
1'-67 8"
16
15
0450-00 0445-00
E6
14
27
CL
0405-00
26. 44" WIDE CLEAR EGRESS P
TOILET ROOM 102
26'-55 8"
5'-107 8"
LLTO LL
LLTO LL
MALL SERVICE CORRIDOR (N.I.C.)
8'-112" LLTO LL
2'-23 8"
13
H1 A-201 E1
T 02 GR 01
12 9
HPL 06 0320-00
E60405-00
25. NOT USED.
SS 01
CL OF GLAZING
12"
21'-512" OVERALL LEASE LINE
0833-00
0443-00
5 10
11
0204-00
G12 A-502 TYP.
24. MIRROR PROVIDED BY MIL REFER TO BLOCKING DETA
B.O. SOFFIT 9'-0" A.F.F.
0441-00 0445-00
TH 8" 3'- PA SS E R EG 20
0
36 x 18 x 96 36 x 18 x 96 PIPP SHELF PIPP SHELF
100
HPL 06
STOREFRONT SYSTEM AS SPECIFIED
0405-00
26
SALES
0405-00
0405-00
-0
HPL 06
0405-00 0450-00 EQ. 0445-00
5'-3"
3'-6"
1
0300-00
0405-00 EQ.
00
0300-00
2
B.O. CEILING 12'-0" A.F.F. B.O. SOFFIT 11'-0" A.F.F. B.O. SOFFIT 10'-6" A.F.F.
1
20
03
0405-00
23
0443-00
21 P 1 TECH RACK
FACP
3 SAFE
MALL STORAGE (N.I.C.)
MICRO FRIDGE
101
P
0300-00
22
STOCK ROOM
1
ALIGN 7 3'-8" EGRESS PATH
J9 A-502
P
EQ.
0204-00
SOFFIT A.F.F.
23. END PANEL ON OPEN ENDS
EQ.
SOFFIT " A.F.F.
22. ALIGN FLOORING TRANSITI
MIRROR PROVIDED BY MILLWORKER. G.C. TO PROVIDE BLOCKING AS REQUIRED, SEE DETAIL A11/A-502.
EQ.
EQ.
21. MICROWAVE/REFRIGERATO
0300-00
8
30'-0"
00
P
19. SEE TYPICAL LAVATORY/SH
20. START TILE (FULL TILE) CEN
ELEVATION
03 00 -
SGH.CGL CRASH GRAPHIC CENTERED ON GLASS AT HEIGHT SHOWN, TYP.
18. 36" METAL GRAB BAR. REF
J
H6
10'-6"
CEILING " A.F.F.
ON
KEY NOTES
9
B.O. SOFFIT 9'-0" A.F.F.
0833-00
ON
H FLOOR
B.O. CEILING 12'-0" A.F.F. B.O. SOFFIT 11'-0" A.F.F. B.O. SOFFIT 10'-6" A.F.F.
As a production designerC-03 for Shremshock 24" X 48" SUSPENDED CEILING US GYPSUM Architects, my primary role was production of MARS CLIMAPLUS SQUARE EDGE COLOR: WHITE 050 construction drawings and documents for retail ACT GRID: 15/16" GRID - AX (STOCK/RR) - WHITE and restaurant clients. Highlighted here are construction drawings from a complete tenant build-out of an existing mercantile space in an G12 A-502 existing TYP. interior shopping center.
RIAL SCHEDULE HPL 06
8
1.
MARS CLIMAPLUS SQUARE EDGE COLOR: WHITE 050 ACT GRID: 15/16" GRID - DX/DXL (SALES) - WHITE
H FLOOR
7
0813-00
UPER WHITE LL
6
R E TA I L R O L L - O U T: CEILING ON BOTH SIDES OF DOOR FRAME C-01 GYPSUM AND& ALUMINUM - D E S I G N D EP V1E L O P M EUS NGYPSUM TBOARD P 3 24"W X 24"I SUSPENDED - C O N S T R U C T I O C-02 N DRA N G S CEILING US GYPSUM
RE
RE
5. G.C. TO CLEAN EXISTING F
STOREFRONT
2
D ALUMINIUM
0 BLACK LL
4. SEE SHEET A-201 FOR SA
S T O R E D E S I G N & D O C U M E N TAT I O N
INATE APPLIED TO WOOD BASE.
K TER CEILING " A.F.F.
REQUIRED PRIOR TO TURN INCLUDING MILLWORKER.
SHEEN: SEMI-GLOSS
3 5/8”x23 5/8” : 1/8"
MATR CAPACITYSIGNAGE CALCULATION FIXTURE ID
TYPEFIXTUR
H1
H8
STOREFRONT DETAIL
SCALE: 3" = 1'-0"
1
SCALE: 3" = 1'-0"
2
3
4
5
6
STOREFRONT DETAIL
7
8
S T O R E D E S I G N & D O C U M E N TAT I O N
9
CLEAR TEMPERED GLASS AS SCHEDULED
G
4000 Luxottica Place, Mason, OH 45040
a
6 Creamery Brook, East Granby, CT 06026
p
+1 (513) 765-6000
p
+1 (516) 393-2484
CONSULTANT PROJECT # 160713
STOREFRONT SYSTEM, AS SPECIFIED
EXISTING MALL BULKHEAD DO NOT DISTURB
10
a
2 1/4"
4"
K
LEASE LINE
BLADE SIGN ABOVE - REFER TO STOREFRONT ELEVATION
2'-4" HOLD LEASE LINE
EQUAL 3'-8 1/8"±
1/2" CLEAR TEMPERED GLASS (TYP.)
1/2" CORIAN ON 3/4" F.R.T. PLYWOOD OVER 3 5/8" METAL STUDS, TYP.
SS 01
1
FRT BLOCKING AS REQUIRED
H8
EXISTING NEUTRAL
PIER 2'-4" HOLD EXISTING LANDLORD COLUMN A11 A-501
D
A1
NEUTRAL PIER DETAIL 1 ENTRY DOORS AS SCHEDULED
A5 A-501
2
A1
3
A-501
LINE OF SOFFIT ABOVE
2 1/4"
STOREFRONT SIGNAGE DRAWINGS TO BE SUBMITTED UNDER SEPARATE COVER H1
LEASE LINE (1) LAYER 5/8" TYPE 'X' GYP. BD. OVER 3 5/8" METAL STUDS, TYP.
A5
RECESSED LIGHT FIXTURE, REFER TO REFLECTED CEILING PLAN
4 LINE LEASE
5
P
1
93 4"
LINE OF STUD BEYOND
4"
METAL STUD FRAMING - REFER TO STRUCTURAL DRAWINGS
1
T.O. STOREFRONT GLAZING 9'-0"CLEAR A.F.F. STOREFRONT 1/2"
LINE OF STOREFRONT PORTAL ABOVE
2'-03 4"
2'-0 3/4"
METAL REFER DRAWIN
SS 01
3'-812"
7
REFER DRAWIN ATTACH
SYSTEM AS TEMPERED SPECIFIED GLASS (TYP.) 1/2" CORIAN ON 3/4" F.R.T. PLYWOOD OVER 3 5/8" METAL STUDS, TYP.
10"
STOREFRONT ENTRY DETAIL 6
B.O. SOFFI 11'-0" A.F.F
PUSH THRU SIGNAGE. REFER TO STOREFRONT ELEVATION AND SHOPS DRAWINGS FOR SIZE AND SPECS.
P
A-501
SCALE: 1/2" = 1'-0"
9 3/4" H8
DIAGO REFER STRU DRAW
B.O. CEILING 12'-0" A.F.F
6"
A-501
REFER TO STRUCTURAL DRAWINGS FOR ATTACHMENT DETAILS
METAL STUD FRAMING REFER TO STRUCTURAL DRAWINGS
SS 01
BOX BEAM ABOVE - REFER TO STRUCTURAL DRAWINGS
B.O. (E) MALL BULKHEAD 12-0 1/2" A.F.F.
B.O. SOFFIT
3'-8 1/2"
SCALE: 1 1/2" = 1'-0"
SHADED AREA INDICATES EXISTING MALL CONSTRUCTION
FINISH FLOOR 11'-0" A.F.F. 0'-0"
PUSH THRU SIGNAGE. REFER TO STOREFRONT ELEVATION AND SHOPS DRAWINGS FOR SIZE AND SPECS.
1/2" CORIAN ON 3/4" F.R.T. PLYWOOD OVER 3 5/8" METAL STUDS, TYP.
3'-1"
(4) DUSTPROOF STRIKES INSTALLED AT BOTH OPEN AND CLOSED POSITIONS. REFER TO DETAIL E5 FOR INSTALLATION INSTRUCTIONS. COORDINATE FINAL LOCATION WITH PM. HOLD OPEN TO BE 90° TYPICAL. G.C. TO VERIFY DOOR HANDLES DO NOT CONFLICT WITH ADJACENT STOREFRONT IN OPEN POSITION.
BOX BEAM - REFER TO STRUCTURAL DRAWINGS
T.O. ENTRY DOORS 9'-0" A.F.F.
2" 3"
T.O. STOREFRONT BASE 0'-6" A.F.F.
A-501
H11 A-501
2" 2"
B.O. (E) MALL BULKHEAD 12-0 1/2" A.F.F.
3/4" METAL REVEAL
EQUAL 3'-8 1/8"± CRASH GRAPHICS CENTERED ON GLASS AS SHOWN, (TYP.)
(1) LAYER 5/8" TYPE 'X'
GYP. BD. OVER 3 5/8" ENTRY DOORS METAL STUDS, TYP. AS SCHEDULED
P
2'-4" HOLD
DIAGONAL BRACE REFER TO STRUCTURAL DRAWINGS
EXISTING MALL FINISHES BEYOND
3 3/4"
5'-0"
EXISTING NEUTRAL PIER
B.O. SOFFIT 11'-0" A.F.F.
E
LEASE LINE
IVES FS13 DOOR STOP TO BE LOCATED BEHIND DOOR TO STOP DOOR AT 90°. COLOR: US26D (SATIN CHROME)
2 1/4"
1/2" CLEAR TEMPERED GLASS (TYP.) REFER TO STRUCTURAL DRAWINGS FOR ATTACHMENT DETAILS 6'-0"
SS 01
ENTRY DOORS AS SCHEDULED
4"
2 1/4" 3 3/4" 4"
1/4" GAP
LEASE LINE
B
WALL
EXISTING MALL FINISHES BEYOND
LINE OF SOFFIT ABOVE
2 1/4"
LINE OF SOFFIT ABOVE
FOR FRAMING SIZE, GAUGE, AND CONFIGURATION, REFER TO STRUCTURAL DRAWINGS
STOREFRONT ACCESSORY BEYOND
STOREFRONT SILL DETAIL
COLUMBIANA CENTRE
2'-0 3/4"
3'-8 1/2"
1/2" CLEAR TEMPERED EXISTING TENANT GLASS SEPARATION
SHADED AREA INDICATES EXISTING MALL CONSTRUCTION
BOX BEAM - REFER TO STRUCTURAL DRAWINGS
NOTES: NOTHING IS PERMITTED TO BE ATTACHED TO, SUSPENDED FROM, OR PENETRATE THE METAL DECK ABOVE UNLESS SPECIFICALLY DETAILED. EVERYTHING MUST BE ATTACHED TO THE TOP CHORD OF JOIST OR STRUCTURAL STEEL.
1'-6"
9 3/4"
LAYOUT: A-501
(1) LAY GYP. B METAL
(1) LAYER 5/8" TYPE 'X' GYP. BD. OVER 3 5/8" METAL STUDS, TYP.
8
P 91
P
10
03.02.1
DATE: GLASS 1/2"ISSUE CLEAR TEMPERED
EXISTING NEUTRAL PIER BEYOND TO REMAIN
LEASE LINE
STOREFRONT PORTAL BEYOND
C
SS 01
9 3/4"
P:\SGH\160713 SGH-Columbiana Centre Columbia, SC\A-501_01238.dwg
DIAGONAL BRACE REFER TO STRUCTURAL DRAWINGS
LAYOUT: A-401
PLOTTED: 3/3/2017 - 10:15 AM
F
SCALE: 3" = 1'-0"
(PR) 3'-0" DOORS
LEASE LINE
SALES AREA
BOX COLUMN - REFER TO STRUCTURAL DRAWINGS
EXISTING NEUTRAL PIER BEYOND TO REMAIN
1/2" CLEAR TEMPERED GLASS, BEYOND (E) TENANT
STOREFRONT PORTAL BEYOND
SEPARATION WALL
SS 01
ENTRY DOORS, AS SCHEDULED
2'-0 3/4"
(E) TENANT SEPARATION WALL
2 1/4"
C
MALL MATCH FLOORING
6'-0"
NEW 3/4" BLACK METAL REVEAL
FOR FRAMING SIZE, GAUGE, AND CONFIGURATION, LINE OF REFER SOFFITTO STRUCTURAL DRAWINGS ABOVE BOX BEAM ABOVE - REFER TO STRUCTURAL DRAWINGS STOREFRONT BUILT UP BOX COLUMN SYSTEM AS REFER TO STRUCTURAL SPECIFIED DRAWINGS
3'-8 1/2" 3 3/4"
OPP./SIM.
LINE OF SOFFIT ABOVE
G
TENANT FLOORING
E9
DETAIL AT DOOR SILL
LEASE LINE
MALL (E) LANDLORD COMMON COLUMN AREA
SALES AREA
LEASE LINE
BY DAT MALL SA COMMON COLUMBIANA CENTREAR AREA
MARK DESCRIPTION
B
A1
A A-401
2 1/4" 4"
A-501
FLOOR 0'-0"
T.O. ENTRY DOORS & GLAZING 9'-0" A.F.F.
BOX BEAM ABOVE - REFER 5/8" TYPE 'X' GYP. TO STRUCTURAL DRAWINGS BD. OVER 3 5/8" METAL STUDS, TYP. NOTES: P 1 NOTHING IS PERMITTED TO BE 3 ATTACHED TO, 5/8" METAL SUSPENDED FROM, OR PENETRATE THEATMETAL STUDS 16" DECK ABOVE UNLESS SPECIFICALLY O.C. DETAILED. EVERYTHING MUST BE ATTACHED TO THE TOP CHORD OF JOIST OR STRUCTURAL STEEL.
3'-2 1/2"
BOX COLUMN REFER TO STRUCTURAL DRAWINGS
BUILT UP BOX COLUMN REFER TO STRUCTURAL DRAWINGS
D
ATTACH PER MANUFACTURES SPECIFICATIONS
E5 SCALE: 6" = 1'-0"
SS 01
A
FINISH FLOORREFER TO FINISH SCHEDULE
1
EQ.
3'-6 1/2"
A1
USER: JHENDERSON
BOX BEAM ABOVE - REFER TO STRUCTURAL DRAWINGS
H
MALL MAT UNDER ST
SEAL
FINISH F
FINISH FLOOR - REFER TO FINISH SCHEDULE
5/8" TYPE 'X' GYP. BD. OVER 3 5/8" METAL STUDS, TYP.
B.O. (E) MALL BULKHEAD 12'-0 1/2" A.F.F.
P:\SGH\160713 SGH-Columbiana Centre Columbia, SC\A-401_01238.dwg
EQUAL 3'-8 1/8"± STOREFRONT SYSTEM AS SPECIFIED
A11 A-501
SLOPE WHERE REQUIRED AT RECESSED ENTRY 1/2" PER FT., MAX.
E
PLOTTED: 3/3/2017 - 10:15 AM
2'-4" HOLD
A10 A-401
P
USER: JHENDERSON
NEW 3/4" METAL REVEAL
A5 A-401
LINE OF SOFFIT ABOVE
EQ. EQ.
8'-0" B.O. BLADE SIGN
MALL SERVICE DOORS (N.I.C.)
ENTRY DOORS & SIGNAGE
J
AT
A-401
6"
A1
A-401.1
6"
F
A5
7400 W. Campus Rd. Suite 150 New Albany, OH 43054 BLACK VIN t: 614 545 4550 | f: 614 545 4555 | shremshock.com STRIP (TYP Gerald S. Shremshock, Architect 4"H META Timothy J. Shremshock, Architect BASE AS
RAIL. REFER TO DOOR SCHEDULE
3'-8 1/2"
LEASE LINE
SGH-PT-I: PUSH-THROUGH, FACE-LIT & EDGE-LIT LETTERS WITH INDOOR DISK. REFER TO SEPARATE SIGNAGE DRAWINGS. CENTER ON STOREFRONT AS SHOWN
3'-4 1/2"
R E TA I L R O L L - O U T: -STOREFRONT DESIGN - D E TA I L I N G Many of my projects at Shremshock involved detailing new storefronts NEW BLACK 3/4" using client design sketches and METAL REVEAL SGH-BL-2: ILLUMINATED BLADE SIGN. pallets. The storefront REFER TOmaterial SEPARATE SIGNAGE 1'-9 1/2" EQ. DRAWINGS. CENTER ON STOREFRONT AS SHOWN. G.C. TO COORDINATEhere is modest in size, highlighted BLOCKING W/ SIGN VENDOR. SS 01with black metal finishes but sleek EQ. EQ. and push-thru, back-lit signage. A structural engineering consultant was used to specify beam and column locations, sizes, and connections to the storefront framing and bracing to the existing mall structure.
TEMPERED STOREFRO
Shremshock Architects, Inc. LEASE LIN
(PR) 3'-0" DOORS
EQUAL 3'-8 1/8"±
6'-0" E5
19'-10 5/8" A-501 LL TO LL SIGNAGE ABOVE REFER TO STOREFRONT ELEVATION
A1
P
2'-4" HOLD
A5
A10
A-401
A-401
E9
(E) NEUTRAL PIER
COLUMBIANA CIRCLE COLUMBIA, SC 29212 SPACE #1235 3.0 TYPE: PREMIUM
SGH STORE #: 1238
STOREFRONT SYSTEM, AS SPECIFIED
A-501
STOREFRONT BASE 0'-6" A.F.F.
STOREFRONT DRAWN BY: JJHBASE
0'-6" A.F.F.
0'-0" AUTHORIZED FOR:
A5
D1
STOREFRONT SECTION AT ENTRY 2
3
SCALE: 3/4" = 1'-0"
4
SEE FOR ATTA TYP.
ELM/KMM REVIEWED BY:FLOOR FINISH
FINISH FLOOR 0'-0"
SCALE: A-301 3/4" = 1'-0"
1
1
100 BEYOND
STOREFRONT SYSTEM, AS SPECIFIED
5
A10
STOREFRONT PLAN SCALE: & ELEVATION3/4" = 1'-0"
STOREFRONT SECTION AT DISPLAY WINDOW 6
7
8
9
10
STO
P L AY G R O U N D R E N O VAT I O N C L I E N T: K N O X C O U N T Y L E A R N I N G C E N T E R SCOPE OF WORK: - CONCEPT DESIGN - RENDERING - CONSTRUCTION DRAWINGS The Knox County Learning Center, located in Mount Vernon, Ohio, provides special education services for grades kindergarten through 12. Over the years, the school has received less state funding and in consequence, has not had the funds to maintain and upgrade the school playground. In desperate need of an upgrade, the school’s superintendent and representatives from Habitat for Humanity, reached out to my firm for help. They requested plans to renovate the existing playground to better serve the students and faculty. Without the ability to compensate, our firm had little resources to take on the project. Disregarding the inability to receive compensation, I saw the project as an exciting opportunity to make a positive impact on a community that is truly in need of a great outdoor space that would enrich the students’ educational experiences; that for me is compensation enough. The Knox County Learning Center community requested to replace half of the playground’s asphalt surface with a new lawn area, an outdoor classroom space, and shaded areas for older students to hang out. They wanted to keep the existing basketball court and playground equipment area for the younger students. Working with the school’s superintendent, Habitat for Humanity, and other members of the community, I was able to design a new playground that the community takes pride in and cherishes as their own. After a few design concepts, meetings, and site visits, I believe the final plan (right) embodies all that the community desires in a playground space for students and faculty of all ages.
MOUNT VERNON, OH
P L AY G R O U N D R E N O VAT I O N
MOUNT VERNON, OH
C L I E N T: K N O X C O U N T Y L E A R N I N G C E N T E R SCOPE OF WORK: - CONCEPT DESIGN - RENDERING - CONSTRUCTION DRAWINGS After the development of a final design for the playground renovation, the Knox County Learning Center needed a construction drawing set for implementing the improvements. In order for the school to afford the construction costs of the project, the project was broken up into two phases: Phase 1: -Demolition and clean-up -Laying down grass seed for the new lawn area In-Progress Photo:
Phase 2: -Plantings: new trees, shrubs, and flowers -Brick sign -Replacement of playground equipment To the right is the site planting plan for phase 2. PLAN NORTH
PLANTING PLAN
1/8" = 1'-0"
RESIDENTIAL ADDITION
C I N C I N N AT I , O H
SCOPE OF WORK: - CONCEPTUAL DESIGN - CONSTRUCTION DRAWINGS I am currently working on a residential addition freelance project for a single family residence in Cincinnati, Ohio. The project consists of a new two-car garage, breezeway, retaining walls, an in-ground pool, facade improvements, and a new driveway. The new garage and breezeway is designed to match the architectural character of the existing home.
SITE PLAN
FLOOR PLAN
RESIDENTIAL ADDITION SCOPE OF WORK: - CONCEPTUAL DESIGN - CONSTRUCTION DRAWINGS
C I N C I N N AT I , O H
PERSPECTIVE DRAWING
PERSPECTIVE DRAWING
THANK YOU
C O N TA C T PHONE: (770) 789-3719 EMAIL: JAKEHENDERSON121@GMAIL.COM