Visble “Trapion� gabions faced with ballast stone similar to existing boundary wall packed with inert material from demolitions to engineers specification. Kerb Edge, Bulbs, herbaceous and shrub planting

Path - Marshalls Tegular Buff

Native woodland understorey planting, Bulbs, shrubs and trees.

Tree Pit

Buff asphalt path construction with PCC 50mm Square edged kerbs laid flush.

Look out mound. Finished gradients at a maximum 1:3 with smooth flowing contours and transitions. Topsoils: 150mm for grass, 450mm for shrubs and 900mm for trees. Sub-soild to be placed if present from excavations down to a maximumdepth of 1m below finished levels Build - up : Compacted layers of inert demolition material to engineers specification.

Grass Banks at 1:3 gradient.

Grass Banks at 1:3 gradient.

Grass Banks at 1:3 gradient.

Coloured asphalt access Coloured asphalt access Coloured asphalt access pathswith PCC 50 mm pathswith PCC 50 mm pathswith PCC 50 mm Squareedged kerbs Squareedged kerbs Squareedged kerbs

Coloured asphalt access pathswith PCC 50 mm Squareedged kerbs