Year 1 Pavilion : Axonometric
B(Arch) + DPS Portfolio
James Read +44 (0) 7501 272 642
readjamessm@gmail.com
SELECTED WORKS (26)
Los Angeles - AA Visiting School : LA Is No Place Nevada, USA - Hyperloop Campus Competition
Ghachok, Nepal - Mahendra High School Wisconsin, USA - Taliesin Site Visit
(28)
Lock Tay, Scotland - Pontoons Architizer One Drawing Challenge 2019 Montserrat - National Trust EcoPlay
(6)
Somerset - Drawing Matter Archive Visit Berlin - AA Visiting School - Urban Phoenix 2023
(36) (1,4)
(20) (10) (32) (34)
The Nottingham Contemporary - Competition Loughborough University - First Year Pavilion Flitwick - Water Lane Development Liverpool - Circuit Community Library
Hertfordshire - Tewin Church Enfield - The Productive Landscape Institute Tottenham - 1000 Artists Live Here Mayfair - Brompton & Harefield Wimpole Street Imperial College, Charing X - Reynolds Building Homerton University Hospital - Elective Centre Bournemouth, RBCH Pathology Laboratory
KEY: (x)
Page Number
Ongoing
Studios: University (Design Studio) Dennis Sharp Architects (Practice) Ansell + Bailey Ltd. (Practice)
As a Graduate Bachelor of Architecture Student at Loughborough University, I’m enthused about creating Architecture by learning from architectural history, and confronting the Climate Emergency through pragmatic adaptive re-use and integration of circular economies into existing building typologies. My experience stretches from speculative research to delivering Technical Drawing and Detail Design Packages on commercial projects.
Photograph: Complete Intervention
Year 1 Pavilion
Testing Element Manufacturing Methods
Proposed Block Plan
Finished Construction: Functioning as Charity Shop
Proposed Elevation
SCAN ME
Proposed Garden Bridges Isometric
Garden Bridges Across the Auto-Bahn
ICC Berlin - Too Alive To Be Empty AA Visiting School Scholar 2023: Berlin
Urban Masterplan
Speculative Site Plan (hand-drawing + AI)
Axonometric Pet Allotments 1:50 @ A1 0
Concept Sketch : Garden Bridges (hand-drawing + AI)
1
2
3
4
Exploded Axonometric 1:250 @ A1 5
10m
Parti Diagram: Allotment kit of parts
Expatriot Populations of ICC Member Countries
13,301 3605 16,410 England 27,015 India 13,450 Ireland 1,500 New Zealand 900 Pakistan 1,400 South Africa 640 Sri Lanka 25900 Afghanistan Australia
Bangladesh
West Indies
3715 3405 15,000 200 Netherlands 290 Oman 400 940 Scotland UAE 2330 USA 20,500 Zimbabwe Canada
Namibia
I.C.C. Berlin
Nepal
Afghanistan
Australia
Bangladesh
England
India
Ireland
New Zealand
Pakistan
South Africa
Sri Lanka
West Indies
Zimbabwe
Canada
Namibia
Nepal
Netherlands
Oman
Scotland
UAE
USA
Demographic Case for a Cricket Stadium
Fitting a stadium in the I.C.C.
LEGEND Berlin I.C.C Green Spaces
North Elevation 1:2500
Concept Neighborhood Section: Messe, Berlin
Roof in closed position
Exhaust Columns for Bio-Gas Production (Water Vapour Only)
Pressure control valve
Initial fermentation / storage tanks Sorting hoppers
Smoke break Digester fleet ~ 200 cubic meters each
Space for Market Trucks leave through underpass
Pipes to Exhaust Vents
Section A-A 1:1250
Waste to Energy Journey
Concept Section: Basement - Biomüll conversion
Location Plan (1:500 @ A1)
Psycho-Geographical Map: The Lee Valley
Graduation Project Incubator A TABLE FOR 1000 PEOPLE Memories of Markfield: Concept Model
“A Thousand Artists Live Here”: Superstudio Concept 1890s annotated Plan
1970’s annotated plan
Exploring uses of modular ‘Pets’
discussions with the group on physical model scale, as well as digital model contents. We also received feedback on site plans, sections and elevations. Our learning from this week consisted of challenges we faced during the physical modelling process, including bowing MDF sheets, A3 Mapping: Exploring possibilities of the physical model and introducing pragmatic discipline into our decisions around site model form scale and material.
A3 Mapping: Exploring scale possibilities of the physical model
Working Model: Roof form mapping, in aid of both physical and digital models
Roof Shapes Study
MDF Gluing process
Working Model: Roof form mapping, in aid of both physical and digital models
MDF Glueing
MDF Gluing process
Final Physical Plaster* Model (1:500) *Cost sponsored by Saint-Gobain Formula
Pylon Structure Concept Model
Final Model: Table Module
Typology Study : Electricity Pylons
Nauli/O’Donnell inspired Journey Map
Proposed Section: A Table for 1000 People
1:200 4m
0
4m
8m
12m
16m
20m
Final Render: Accessible Entry Gantry
Table Utensils The site’s geometry itself was highly conducive to iteration into forms of knife fork and spoon. The main concerns of this design being ‘stackability’ and mass-production, due to the volume of cutlery required for such a meal.
Utensil Development
Cutlery 3D Printed Prototypes + Iterations
1:50 Sectional Model
Grad. Project: The Productive Landscape The Lee Valley Institute for Data and Food
GROUND FLOOR PLAN 0
10
20
50
100m
50
100m
SCALE : 1:500 @ A1
FIRST FLOOR PLAN 0
10
20
SCALE : 1:500 @ A1
Proposed Interior Perspective: Glasshouse
SECOND FLOOR [PLANTING] PLAN 0
10
20
SCALE : 1:500 @ A1
50
100m
Electrical Pylons Map
TIMBER CEILING JOIST
Max 160 mm
DOUBLE GLAZING TO WINDOW
TIMBER CEILING JOIST
Min 30°mm
SEELING ROPE
Min 30°mm
TIMBER CEILING JOIST EPDM GLAZING GASKET 12GA ALUMINIUM CLOSING FOAM INSULATION PISTON FOR WINDOW OPENING OPERATION
MARINE PLYWOOD TOPSOIL LOAM (200-400 MM)
TREATED STEEL CLADDING FOR WATERPROOFING LIGHTWEIGHT TIMBER SUPPORT STEEL FRAME
WATERPROOF GREEN MEMBRANE FILTER FLEECE
70MM SCREED AT 1:50 GRADIENT MOISTURE MEMBRANE 12GA ALUMINIUM DRAINAGE GUTTER LIGHTWEIGHT CONCRETE PREFABRICATED SLAB TREATED CLT CLADDING TO SUPPORT COLUMN RIGID FOAM INSULATION
TURF HOOK
STRUCTURAL STEEL SUPPORT COLUMN HYRID STEEL SUPPORT COLUMN GALVANISED STEEL CURTAIN RAIL 250MM STEEL I-BEAM
SOIL RETAINING BARGE BOARD TIMBER CEILING JOIST
PVC STRIP CURTAIN
Floor Detail
Glasshouse ramp concept
Glasshouse Roof Detail
Axonometric Glasshouse floor Buildup
0 SCALE : NTS
Section Collage vs. Final Section
0.1 0.2 0.3 0.4
SCALE 1:5 @ A3
0.5m
1m
Topographical Map
Technical Drawing Package
Sketch Collage
Final 1:500 Site Model
Exhibition Installation @ Los Angeles Athletic Club
LIVE
Los Angeles: Experimental Lab. AA Visiting School Scholar 2022: Downtown L.A.
Proposed Layout: “L.A. Is No Place”
Theatre facade UFOs
DTLA Triptych
RIBA STAGE
Render: Proposed Exterior Perspective
SCAN ME
LIVE
Montserrat EcoPlay
Marketing Poster: Inspired by Georgia O’Keefe
Initial Development Sketches
Proposed Building Section
EcoPlay : A place for all the family and visitors to explore, discover and learn about the unique endemic ecology of Monserrat and celebrate the special culture of this Leeward Caribbean Island. It is designed as a launchpad into the ecospace for discovery and social events with story telling and music at its heart.
Montesori inspired development strategy
151.4 151
151
148.6
147.6 146.8
144.1 143.7
Proposed Site Section
N
N
Carribean Sea Prevailing Wind - Easterly
Site Analysis: Climate and Topographical Data
MONTSERRAT
SITE
Salem
Olveston Estate Road
Salem Road Montserrat National Trust
ALTITUDE : 63m
CLIMATE : Aw
mm: 883 / inch: 34.8
C: 26.3 / F: 79.4
mm inch 5.5 140
F 95
C 35
86
30
120
4.7
77
25
100
3.9
68
20
80
3.1
59
15
60
2.4
50
10
40
1.6
41 3
5
20
0.8
32
0
0
0.0
01
02
03
04
05
06
07
08
09
10
11
12
Exploring Partitionable classrooms
RIBA STAGE
THIS DRAWING IS PROTECTED BY COPYRIGHT - FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES REPORTED TO THE ARCHITECT IMMEDIATELY.
PURPOSE OF ISSUE: (I)Info/Comment (S)Sign Off (P)Planning (B)Building Control (T)Tender (C)Construction (F)Final Revision
Rev
Rev Date
Revision Description
04/02/2022 Initial Issue for comment
/
Dormakaba supporting rail system
Drawn/ Checked
Purpose of Issue
I
JR/JS
THIS DRAWING CHECKED ON
PURPOSE O
Rev
R
/
04
Flexible headplate for deflection Dormakaba supporting rail system
Dormakaba Moveo movable partitions
Supports attached to soffit at 700mm intervals
Asbestos !
X
CDM
Dormakaba Moveo movable partitions
50mm acoustic insulation
Acoustic barrier performance to be continued in ceiling void
Rail carrying partitions
Asbestos !
X
Flexible headplate for deflection
DRAFT Supports attached to soffit at 700mm
intervals First Floor Practice Rooms plan (NTS @performance A3) : Acoustic barrier to be continued in ceiling void
CDM (TBC) New suspended ceiling
First F
50mm acoustic insulation Existing window sill containing Asbestos, configuration unknown
2x 15mm GYPROC Soundbloc boards
A
Dormakaba Moveo Partition System
Existing window sill containing Asbestos, configuration unknown
2x 15mm GYPROC Soundbloc boards
25mm & 36mm GYPROC Drywall screws
New suspended ceiling (TBC)
Rail carrying partitions
01
Dormakaba Moveo Partition System
(05)011
25mm & 36mm GYPROC Drywall screws
70x70mm steel support with base plate and flexible head plate
70x70mm steel support
A
70x70mm steel support with base plate and flexible head plate
70x70mm steel support
Acoustic Sealant both sides
Acoustic Sealant both sides
Existing window upstand construction up to an estimated height of 900 mm
Existing window sill
Timber joist for plasterboard fixing
Existing window upstand construction up to an estimated height of 900 mm
Asbestos below !
Asbestos
X
Asbestos below !
CDM 2x 15mm Gyproc Soundbloc Board
!
X
CDM
X CDM
Existing window sill
Timber joistGyproc for plasterboard boards cutfixing to sit flush to existing window upstand
Rendered and painted finish to Gyproc Soundbloc Partition
Asbestos !
X
Steel column base plate 2x 15mm Gyproc Soundbloc Board
Existing single glazed unit
CDM
Gyproc boards cut to sit flush to existing
window Legend : upstand ! X
CDM
finish to Gyproc CDMRendered risk. Pleaseand referpainted to relevant section of CDM Design Audit Review
Notes :
Existing single glazed unit
Soundbloc Partition
Legend !
Steel column base plate
X
1. All levels refer to FFL levels 2. This drawing is to be read in conjunction with the following - Fire Strategy layout, Acoustic strategy report, Str Eng drawings and M&E drawings
0
200
400
600
800
1000mm
100
150
200
250mm
For 1:20 scale 0
Proposed Window Junction Detail Plan 01
Window junction detail section A-A (05)011 1:20 @ A3 01
Window Junction detail plan view (05)011 1:5 @ A3
CD
Notes :
1. All 2. Th Ac
Window Junction For 1:5 scale FOR COMMENTProposed Proposed Window Junction Details Detail Section 21042 (05)011 /
02
Window Junction detail plan view (05)011 1:5 @ A3
50
CDM
First Floor practice rooms
02
Imperial College London CX Reynolds Building
Window junction detail section A-A (05)011 1:20 @ A3 Ansell & Bailey Ltd Chartered Architects
99-101 Farringdon Road
London
JOB NUMBER
DRAWING NUMBER
Jan 2022
1:5 / 1:20 @A3
DATE
SCALE
EC1R 3BN
020 7387 0141
REV
architects@ansellandbailey.com
FOR
Propose First Floo
Imperial CX Reyn
Ansell & Baile
Proposed Programme Axo
Staff Common Room THIS DRAWING IS PROTECTED BY COPYRIGHT - FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES REPORTED TO THE ARCHITECT IMMEDIATELY.
Smart working spaces Student Support Hub Mulit-faith Prayer Room
PURPOSE OF ISSUE: (I)Info/Comment (S)Sign Off (P)Planning (B)Building Control (T)Tender (C)Construction (F)Final Revision
Rev
900 3600
JR/JS
Purpose of Issue
I
800
1500
1500
1200 1500
2400
900
725
600
1000
All tables parallel to windows, enabling wide access corridors however a more limited capacity.
Tables Transversal to windows and Parallel to top wall. Benefits include generous arrival spaces however there is limited accessibility in the centre.
02
Option 1 - Capacity 228
1500
1000
1500
850
850
900
1100
850
1500
850
1500
900
900.6
Option 2 - Capacity 162
(09)006 NTS @ A3
(09)006 NTS @ A3
950
01
3500
1000
1000
2100
900 1000
Practice / Examination Rooms
900
1500
Lobby
Drawn/ Checked
Revision Description
900
725
Library
Rev Date
14/12/2021 Initial Issue for comment
1500
/
1500
LIVE
Imperial College Reynolds Building
Exterior Collage Exploration
ICSM Learning Suite Student Breakout Space
03
04
Option 3 - Capacity 174
(09)006 NTS @ A3
AV Area AV Screen Partition Main Works
Option 4 - Capacity 174
(09)006 NTS @ A3 Key Plan 1:1250
Legend :
Reynolds Bar / Cafe
Most tables parallel to windows except specific areas, allows for optimisation of capacity and circulation
Tables parallel to windows and transversal to top wall. Distance from window wall allows for better view of screens, however capacity is negatively affected
Space Syntax: Screen Isovist exploration to ensure coverage Notes :
1. This drawing is based upon Trust Record Drawing CXRB-01. 2. All levels refer to FFL levels 3. This drawing is drafted to reflect our design intent proposals for the project as per the Client's brief. It reflects the conceptual design at this stage and is NOT a Construction drawing. 4. further input required from the M & E , Structural and specialist consultants ( as applicable ).
N
FOR COMMENT
Proposed GA First Floor Learning Suite Layout Options Imperial College London CX Reynolds Building Ansell & Bailey Ltd Chartered Architects
99-101 Farringdon Road
London
21042
(09)007
JOB NUMBER
DRAWING NUMBER
Dec 2021
NTS@A3
DATE
SCALE
EC1R 3BN
020 7387 0141
/ REV
architects@ansellandbailey.com
World-Class Entrance Music Practice Rooms New Gymnasium Performing Arts Studio
Proposed Site Section
Interior Collage Exploration
RIBA STAGE
Technical Roof Details
Revit Coordination Model
Concept Renders
LIVE
Homerton Hospital - NEC THIS DRAWING IS PROTECTED BY COPYRIGHT - FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES REPORTED TO THE ARCHITECT IMMEDIATELY.
PURPOSE OF ISSUE: (I)Info/Comment (S)Sign Off (P)Planning (B)Building Control (T)Tender (C)Construction (F)Final Revision
LIFT L 16 5.1 sqm
RDS-V1121A RDS-T0151A Touch Down Wc 1.8sqm 2.9sqm RDS-W1594 Linen 2.7sqm
Curtain Track
10 152 49 4.9 sqm
CORRIDOR 152 C7 10.5 sqm
52
54
UP
56
Shelving
Shelving
Shelving
72
CLIFDEN CENTRE
Shelving
Shelving
Shelving
Ped
Shelving
Ped
DN Ped
Shelving Shelving
4730
F a l l 2°
F a l l 2°
Skylight Skylight Skylight
ll
2°
F a l l 2°
Fa
19
18
17
10
11
12
16
15
14
13
Rwp
Rwp
TURPIN SUITE
TEMPLAR WARD
THOMAS AUDLEY
NEONATAL SCBU
JOSHUA WARD
C.H.U.S.E.
CWHB
DWN
BEVAN WARD
GOWNING 152 39 3.3 sqm
PART OF TEMPLAR WARD
UP (From Ground)
W.U.
MV.U.
W.U. W.U. MV.U. CEILING HATCH
H.W. FRIDGE
E.C.U. SOUTH
EDITH CAVELL WARD
PICTON
SUITE
N.I.C.U.
DN
DN
UP
UP
DN
LIFT
LIFT
DN
DN
UP
UP OL
OL
OL
RWP
RWP
SVP
CWHB
WP
PRE ASSESSMENT
PRIESTLEY WARD
2012 WARD RWP
SVP
LINEN
MATERNITY
RWP
MEDICAL / ELECTRICAL DEPARTMENT
STORE
BRETT WARD
CONOLLY WARD
OPERATING THEATRES
RECOVERY DW
FR
DELIVERY UNIT
Trough
DELIVERY
RDS-R0902 Expand Dirty Decon 4.7sqm
Dwn
STAIRCASE
RISK MANAGEMENT
DN
ramp
STEAM GENERATOR
CLINICAL CODING A/C UNIT
DN
radiator
BOOKINGS
OPD2
DOWN
DN
DAY STAY
radiator
VOID
UP
DOWN
LANDING
VEND
Cooler
VEND
Water
VEND
QUARTER
radiator
ENDOSCOPY
STARLIGHT VEND
Water Cooler
CASH
radiator
CHATTERS DINING
UP CAT ladder from roof space
radiator
DN
ROOM BOILER 91.56 Sq M
PC POINT PC POINT PC POINT
ENDOSCOPY
Trays
Coffee Coffee
Hot Food
Salad Bar
Chilled Cabinet
E.L.M.H.
Water Cooler
TV
DAY STAY
SAFE
SAFE
SAFE
SAFE
CAB
SAFE
CAB
CAB
CAB
CAB
RACK
RACK
RACK
143 20
1 RACK
RACK
2 3 4 5 6 7 8
AC UNIT
142 31
Demolished existing partition
H O M E R T O N
O N R T M E H O
R O W
E O V G R
Notes : 1. This drawing is based upon Trust Record drawing "HUH-1F-FIRE PROTECT_Bind_2021-02-10" received 20/10/2021. 2. All levels refer to FFL levels 3. This drawing is to be read in conjunction with the following - NBS specifications, Door and window package, Floor finishes package, Internal wall setting out package, Str Eng drawings and M&E drawings 4.Internal plant layout indicative only, proposal being developed by RSP.
RDS-W1585A Endoscopy Storage 12.7 sqm
1500
DOWN
ESTATES DEPARTMENT UP
LINE OF NEW PATHOLOGY BUILDING
Refrigerated Display Drinks
3no. work sinks RDS-R0904 4no. RAPIDAER™ CLEAN DECONTAM'N Endoscope Reprocessors 152 40 RDS-R0902 12.0sqm DIRTY DECONTAM'N EDC Endoscope 152 41 Drying Cabinet 16.5sqm
RDS-R0904 Expand Workstation Clean Decon 3.4sqm
Theatres Store (Stationary) 13.8 sqm
1500
Corridor 16.2sqm
Female Staff Change 30.0 sqm
1200 46 half-height lockers
wc wc
wc cistern
wc cistern
wc cistern
surgeon 2
1500
1545 RDS-N0108 Theatre 5 51.5 sqm (HBN 55sqm)
1500
wc
wc
1600 zone
1000 zone
2
2500
Male Staff Change 25.3 sqm
wc cistern
RDS-N0224 Scrub 4.5 sqm (HBN 7sqm)
RDS-M0254 Theatres Staff Office
wc
wc
2500
anaesthetist
RDS-Y0642A Disposal Hold 6.6 sqm
2
S
70
Ped
Shelving
Ped
DN
I.T.U
wc cistern
wc cistern
RDS-T0522 Preparation 10.7 sqm (HBN 12sqm)
18 sqm (HBN 19sqm)
LOBBY 153 41 24.3 sqm
68
62 64
Shelving
Ped
UP
PATHOLOGY
700
Anaesthethic
2500 RDS-T0522 Preparation Lobby 9.2 sqm 8.3 sqm (HBN 12sqm)
60
Ped
Ped
Ped
Shelving
UP
Rwp
Legend : RDS-G0407 Exit Bay
20 half-height lockers
RDS-G0407 Exit Bay
Dn
1545
26.8sqm (6 Person @ HSE 11m3 per person)
RDS-D0434-03 Theatres Staff Rest Room 45.0sqm (11 Person @ HSE 11m3 per person)
New Ward
Urology
New Diagnostic Suite
Existing Walls
New Endoscopy Suite
Proposed Walls
New Gynae Consulting Area
Proposed Extension
Staff Accommodation / Offices Plant / Services / Risers New Waiting Area Day Surgery Unit
0
LIFT LOBBY LIFT 153 25 6.7 sqm L 18 3.1 sqm ?
FOR PLANNING
2.5
N
Homerton University Hospital Elective Centre Ansell & Bailey Ltd Chartered Architects
5.0
7.5
10
12.5m
For 1:250 scale
Proposed GA Plan Block 5 First Floor
STAIRS S 18 12.9 sqm
Proposed GA Plan Block 5 First Floor
50
UP
DO
DN
Up
01
48
strge
RWP
RDS-Y0436 Dirty Utility (T5) IPS Cupboard 7.8sqm 2.7sqm
5
surgeon
1600 zone
PREPARATION 155 53 6.4 sqm ENT MACHINE STORE 155 54 5.4 sqm
RDS-N0108 Theatre 4 55.6 sqm (HBN 55sqm)
UP
DN
Low level Wall
Courtyard Below
Up
RDS-X0221 Procedure 27.1 sqm
CWHB
1000 zone
Tray Store 23.1 sqm
46
DN
Low level Wall
2500 D
11.1sqm
44
DN
Dwn
Up
E
RDS-N0224 Scrub 7.8 sqm (HBN 7sqm)
R O A D
LIFT
TRANSFER HATCHES CWHB 152 37/38
Courtyard 1
DIRTY UTILITY 152 43 3.5 sqm
Riser 1.8 sqm
Urology
THEATRE 3 155 50 37.3 sqm
C L I F D E N
DWN
GOWNING 152 36 3.3 sqm
PROCEDURE ROOM 152 44 31.5 sqm
RDS-W1585-02 Store 6.6sqm
2
THEATRE 2 Laser Surgery 155 46 39.1 sqm
Key Plan (NTS @a3)
Courtyard 2
RDS-T0535 Clean Utility 12.0sqm
Anaesthethic 17.2 sqm (HBN 19sqm)
anaesthetist
PREPARATION 155 42 B 9.7 sqm
PROCEDURE RM 01 NEGATIVE PRESSURE 152 35 23.4 sqm
66
CWHB
5
Pediatrics
PREPARATION 155 42 A 9.7 sqm
PATIENT WC 152 32 3.3 sqm
2
THEATRE 1 Lead-lined for X-Ray 155 41 39.1 sqm
152 30 1.8 sqm
PATIENT BAY 8 152 31 12.0 sqm
UP
2500
25 33
RDS-Y1510A Exit / Parking RDS-Y0436 Cleaners Bay Dirty Utility 4.9 sqm 9.4 sqm (T3 + T4)
UTILITY 155 52 6.4 sqm
152 28 1.8 sqm
UP
RDS-G0171 Parking Bay (tbc)
Bay 19.0 sqm
I P
DN
2
POST ANAESTHETIC RECOVERY STAGE 1 155 37 71.0 sqm
UROLOGY EQUIP. STORE ANAESTHETIC SCRUB 155 43 155 45 155 44 7.4 sqm 12.5 sqm ANAESTHETIC 7.1 sqm 155 47 12.7 sqm Exit / Parking
JR/JS JR/JS
UP
D
ANAESTHETIC 155 38 SCRUB 12.5 sqm 155 39 7.1 sqm
CLEAN UTILITY 155 40 7.4 sqm
2970
IPS Room 1.6 sqm THEATRE CORRIDOR 155 C6 102.1 sqm
DAY SURGERY UNIT 1389.2sqm
08/04/2022 Revised Theatres, Gynae Layout 11/04/2022 Issue for Planning
G H
152 26 1.8 sqm
UP
RDS-G0180-03 Hoist
RDS-V1643 Wc 6.3sqm
I I I
DN
S
Sluice 155 DS1 4.8 sqm
RDS - B0305 Single Bedroom 21.4sqm
JR/JS JR/JS JR/JS
UP
2
STORE 155 35 7.4 sqm
D E F
wc
CORRIDOR 152 C8 10.3 sqm
In-Patients Ward 301.8sqm
RDS - W1584-04 Clinical Store 15.7sqm
TOILET 155 30 3.4 sqm
152 34 1.8 sqm
CORRIDOR 152 C5 33.2 sqm
Worktop
RDS - B0305 Single Bedroom 21.4sqm
CAT LADDER PLANT ACCESS
PROCEDURE RM 02 152 46 23.0 sqm
Wall-mounted workstation
RDS-V1643 Wc 6.3sqm
EAST STAIR S17 21.0
UP
Curtain Track
RDS - W1584-04 Equipment Store 29sqm
wc cistern
LINEN STORE 152 47 2.7 sqm
RDS-V1643 Wc 7.8sqm RDS-G0180-01 Resus Trolley
RECOVERY STAGE 2 155 27 67.1 sqm 2no. beds, 7no. couches
I
EXTENSION
Curtain Track
I
JR/JS
radiator
RDS-P0627A Ward Pantry 11.0sqm
RDS - B0405 4-Bed bay 53.8sqm
JR/JS
22/02/2022 Revised Urology, Reception and Endoscopy areas 24/02/2022 Revision for comment 02/03/2022 Revised wall hatches 21/03/2022 Revised Theatres layout, Endoscopy Area
20
Curtain Track
PATIENT BAY 9 152 33 4.9 sqm
BEVERAGE BAY 152 48 3.4 sqm
152 50 1.8 sqm
16/02/2022 Refer to revision clouds for updates
PATIENT BAY 7 152 29 5.2 sqm
CAT ladder from roof space
152 52 1.8 sqm
I I
C
PATIENT BAY 5 152 25 5.2 sqm PATIENT BAY 6 152 27 5.2 sqm
RDS-V0725A PATIENT BAYS 11 152 51 4.9 sqm
JR/JS JR/JS
B
RISER 2.0 sqm 152 02
WASH AREA 2.4 sqm
STAFF BASE 152 C4 27.1 sqm
STORE 152 45 4.0 sqm
2350
LOBBY 152 C3 9.0 sqm
BED BAYS FOR INPATIENTS 152 24 17.8 sqm
PATIENT BAYS ENDOSCOPY 440.0sqm
RDS-W1594-01 Linen RDS - C0522-04-3 RDS - TBC RDS-B92514A 1.0sqm Patient Discharge Patient Bay 2 Lounge 4.3sqm Consent 8.8 sqm RDS-V1121A 6.6sqm (3 places) WC 1.6sqm
08/12/2021 Initial Issue for comment 15/02/2022 Revised layout following user group meetings 1
RDS-W1594-01 Linen 3.7 sqm
radiator
Patient Bay 4 152 22 4.9 sqm
/ A
radiator
Patient Bay 3 152 20 4.9 sqm
Wall-mounted workstation
RDS-V1121A Wc 1.8sqm
MALE GOWNED WAITING 155 03 23.9 sqm
152 23 1.8 sqm
Purpose of Issue
Ped
DRUGS STORAGE 4.0 sqm CORRIDOR 155 C2 2.3 sqm
152 21 1.8 sqm
Drawn/ Checked
Revision Description
dn
Curtain Track
RDS-V0922A Dis. Wc 3.9 sqm
CWHB
CPBD
RDS-Y0331A Dirty Utility 12.0sqm
Service Duct
RDS-Y0431 Dirty Utility 6.0 sqm
Rev Date
Ped
RECOVERY STAGE 2 155 27 56.0 sqm 4no. couches
Patient Bay 2 4.3sqm
RDS-G0180-01 Resus
GYNAE INTERVENTIONAL DIAGNOSTICS 205.1sqm
RDS-T0151A Touch Down 5.3 sqm
PROPOSED 1st FLOOR EXTENSION 37sqm GIA
Treatment room 2 16.2 sqm
RDS-V1643 Wc 7.8sqm
RDS - C0522-04-2
WC 1.6 sqm
CWHB
Refrigerated Display Drinks
RDS - B0405 4-Bed bay 53.8sqm
4.6sqm
RDS-X0145 Treatment room 4 17.5 sqm
single storey cabin
Curtain Track
COUNSELLINGRDS - C0522-04-1 152 18 Patient 5.7 sqm Bay 1
RDS-X0145 Treatment room 3 17.5 sqm
HEIGHT 1250mm
wc
PATIENT CHANGE 155 02 23.9 sqm
2100
2100 RDS-J1255-01A Admissions Lounge 14.4sqm (7 places + 1 Wheelchair)
Service Duct
Curtain Track
COUNSELLING ROOM
Dis. WC 152 17 4.9 sqm
RDS-V1121A Patient WC 1.8sqm
CWHB
HEIGHT 1250mm
Dis. WC 3.3 sqm
Curtain Track
TOUCHDOWN BASE
Dis. WC 3.3 sqm
RDS-V1121A Patient WC 1.8sqm
CWHB
CORRIDOR 152 C3 74.3 sqm
Change 2 3.1 sqm
Corridor
Treatment room 1 20.3 sqm
RDS-Y1510A 152 16 Cleaners RDS-V0922A RISER Dis. WC 152 152 15 15 4.9sqm 0.5 sqm 3.7sqm
Change 1 4.5 sqm
Staff Staff Dirty Utility WC WC 2.3sqm 2.3sqm 4.6 sqm
FEMALE GOWNED WAITING 155 01 25.1 sqm
RISER 154 08 2.9 sqm
CORRIDOR 154 C4 46.2 sqm
RDS-T0538 Clean Utility 8.1sqm
RDS-W0540 Store 6.3sqm
LV DISTRIBUTION ROOM 152 14
RDS-Y0642A Disposal Hold 152 15 9.4sqm STORE 155 DS5 1.3 sqm
NEPTUNE DOCKING STATION (tbc) 156 09
DIS BD CBD 156 40 1.3 sqm
IT Hub 154 04 8.2 sqm
RDS-Y0431 Dirty Utility 8.6sqm
RDSRDSRDSC0522-04 C0522-04 C0522-04 Recovery Recovery Recovery 3 1 2 6.7 sqm 6.7 sqm 6.7 sqm
CWHB
2070
Worktop
LIFT 6.4 sqm
RDS-M0254 OFFICE RDS-M0252 156 02 Theatres Office Staff Office (13 Person @ HSE 11m3 (2 Person @ HSE 11m3 per per person) person) 54.5 sqm 8.5sqm Ladder Up TOILET 155 24 2.3 sqm TOILET 155 25 2.3 sqm CORRIDOR 155 C1/C4 DIS. WC 37.0 sqm BEVERAGE NURSE 155 28 BAY (tbc) BASE 4.4 sqm
1500
RDS-X0145 Treatment room 2 17.5 sqm
WC 1.6 sqm
NORTH STAIR S 16 27.3 sqm
RDS-P0711A BEV. BAY 156 20 3.4 sqm
CORRIDOR 156 C3 38.1 sqm
RISER CUPBD 156 41 3.0 sqm
RDS-X0145 Treatment room 1 17.5 sqm
CWHB
Rev
radiator
CORRIDOR 156 C2 23.7 sqm
Dn
Up
RISER 154 03 3.6 sqm
WC 1.6 sqm
1275
LIFT LOBBY
CWHB
LIFT LOBBY 154 02 10.7 sqm
CWHB
1950
RDS-C0235
CORRIDOR 156 C1 37.0 sqm
CWHB
wc
CORRIDOR 155 C1 20.1 sqm
CWHB
RDS-V1121A MALE Consulting 4 TOILET 12.2sqm 156 06 2.7 sqm
FEMALE TOILET 156 06 2.3 sqm
CWHB
RDS-X0145-01 Procedure Room 3 16.0 sqm
wc cistern
S 15
CWHB
RDS-V1121A GYNAE CONSULTING WC 156 24 217.0sqm 2.3sqm RDS-G0180-01 Resus RDS-M0252 Gynae Office (1-2 Person @ HSE 11m3 RDS-T0535 RDS-X0145-01 per person Store / Clean Procedure 6.2sqm 2400 Utility Room 4 RDS-M0724 w/Ultrasound 13.4 sqm Interview Room 16.0 sqm 6.8 sqm
RDS-V0922A Dis. WC 3.9sqm
M DIS WC 156 08 5.0 sqm
CWHB
RDS-X0145-01 Procedure Room 2 w/Ultrasound 16.0 sqm
wc cistern
UP
RDS-J0232-02 Reception ~25.7sqm
wc
wc cistern
STAIRS
F DIS WC 156 07 5.0 sqm
CWHB
RDS-X0145-01 Procedure Room 1 16.0 sqm
wc
DN
RDS-C0235 RDS-C0235 RDS-C0235 Consulting 1 Consulting 2 Consulting 3 12.0 sqm 12.0 sqm 12.0 sqm
wc cistern
CWHB
RDS-J1155 WAITING 156 05 ~79.0sqm
RDS-X0145 GI Physiology Treatment Room 18.2 sqm
WC 1.6 sqm
99-101 Farringdon Road
London
21040
(01)011
H
JOB NUMBER
DRAWING NUMBER
REV
Dec 2021
1:250@A3
DATE
SCALE
EC1R 3BN
020 7387 0141
architects@ansellandbailey.com
(01)011 1:250 @ A3
Proposed Plan
Technical Roof Details
Proposed Interior Experience Render
The Nottingham Contemporary
Proposed Plans
Concept Images: Lace Cave (Midjourney ai)
Timber Cave Assembly Axonometric
i don’t see a traffic warden This is the place!
H
EEEC
SCR
so what if we all ate together?! should be ok...
hey boys! do you want to try my baklawa?
we left the car and explored the site...
we discover a building hosting 33 kitchens - serving tottenham’s online food delivery market!
THE STREET IS ALREADY HOME TO A DOZEN KITCHENS SERVING THE FAST FOOD AND GREASY SPOON MARKETS.
a quick selfie for the restaurant’s facebook!
“A THOUSAND ARTISTS LIVE HERE”
we could re-imagine neufert’s tables as infinite we could seat 1000 artists!
the tables adapt to the occasion, allowing for maximum flexibility
the whole area is now connected! come and see my home!
the sun sets on mt. donovan; North london’s ‘recycling’ centre, and we see another mountain: london’s ‘great new neighborohood’
sun’s gone down...
I don’t like the waste, but i disagree with that... The Fridge - A hybrid home inside an abandoned ice cream factory, supplying the Lee Valley rave scene...
these corridors go on forever...
time to party!
THE COUNTRYSIDE PYLONS NOW CARRY A NEW FORM OF HUMAN ELECTRICITY. THESE THEN DESCEND ONTO THE PAVEMENT AT MOMENTS AT EXISTING EMPTY AND TAKEN LOTS. HERB AND FLOWER GARDENS SKIRT THE PATH FOR USE IN THE TAKEAWAY KITCHEN MEALS.
what a lovely meal!
what a street!
Graphic Novel: The Table For 1000 People