University Of Arizona McKale Arena

Page 1


i06

i07

i07 DRAWING

i09

1

i08 i06 DRAWING

1

i08 DRAWING

1

i10 i15

SIGN LOCATION PLAN i11 i12

i16 i14

i17

i13

MCKALE ARENA GRAPHICS ACTIVATION

Tucson, AZ

DESIGN DEVELOPMENT PACKAGE

Admin Lobby Rendering

12


NOTE: DI will fabricate slat wall off site and install as unit in field.

NOTE:Contractor to paint finish wall.

Ceiling Condition: 2’ – 0” Gyp around perimeter with 2’ x 2’ lay-in ceiling at center 2

1” thick aluminum chanel letter lit. Face lighting and white halo back. Pin mount 1 1/2” away from wall.

PAGE

17'-6"

15

Access power in Ceiling Typical

4"

8'-8"

2"

5"

Power location Face to have paint receptive vinyl. Returns painted white.

8'-0"

10'-0"

10' - 0"

8’-0” Tall x 8’-8” Wide x 5” Deep

1'-0"

1” thick MDF slats painted to match (P-1) PMS 200, (F-1) gloss; Mounted to wall with adhesive. 4'-4"

1

Sign Detail

Scale: 3/8" =1'-0"

2

Left Side View Scale: 3/8" =1'-0"

3

Reverse Halo lit cap sign, White LED

Location Elevation

Tucson, AZ

DESIGN DEVELOPMENT PACKAGE

Flush mount to wall with adhesive.

Scale: 3/8" =1'-0"

* POWER NEEDED BEHIND SIGN CABINET 120V 5 AMP NEED ACCESS FOR REMOTE POWER SUPPLY & TO BACK OF SIGN.

MCKALE ARENA GRAPHICS ACTIVATION

3/4” thick MDF slats painted to match (P-1) PMS 200, (F-1) Gloss

Sign Type: i07 Event Level Elevator Lobby (West)

* PROVIDE ONE CIRCUIT (2#12CU, 1#12CU GRD, 3/4”C, 20A/1P BREAKER) FOR THE POWER; CIRCUIT IPCB-77

14



i09

i08

i10 i14 i11 i15 i12

i13

i13

DRAWING

4

i16 i13

DRAWING

i13

DRAWING

1

5

i13

SIGN LOCATION PLAN

MCKALE ARENA GRAPHICS ACTIVATION

Tucson, AZ

DESIGN DEVELOPMENT PACKAGE

Men’s Basketball Locker Room Vestibule

25






Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.