Tadepalliguedm report

Page 1

Housing

A L L

f o r r

e

p

o

r

t

demonstration site at

Tadepalligudem,Andhra Pradesh CODE: 1140514330897 May 2016


2

3 Housing for All

Housing for All

P reface The newly carved out state of Andhra Pradesh, a region with rich cultural traditions and geographical diversity, intends to promote and execute affordable housing projects for the benefit of its citizens in general and the EWS & LIG category people in particular. These projects are spread across 13 districts of the state, and the nodal agency, the Andhra Pradesh State Housing Corporation Limited,(APSHCL) intends to usher in a new way to conceive, build, and manage subsidized public housing projects. As a part of its effort to create a vibrant living environment for its occupants and optimize land use, APSHCL invites architects to form a Panel of Consultants who can be assigned the consultancy for the development of specific projects. Information collected for each site will be distributed to the pool of architects enabling them to make an optimized design for each particular site. Place left purposefully


4

5 Housing for All

S ummary A sustainable city is also one that offers a good quality of life for all. A key aspect of this is in ensuring that the housing is available and affordable.it is not just about providing good housing but it is also about creating a total good quality living environment around where we live. The planning of residential housing layout takes into account not only the physical layout and architecture of housing blocks but also how schools, shops, medical facilities, parks, places of worship, and work area are within easy access,which enhance the quality living of the community.

Housing for All

C ontents Preface Summary 1. SIte Introduction.....................................................6-11 1.1 Inroduction to the city 1.2 Location of the site 1.3 Surroundings pf the site 1.4 Rules & regulations 1.5 Proposed scenario 2. Site Planning............................................................12-21 2.1 Objective of the design 2.2 Key design strategies 2.3 key design principles 2.4 Concept plan 2.5 Design evolution layers 2.6 site plan 2.7 proposed sections 2.8 conceptual landscape scheme 3. Cluster & Unit design...............................................22-29 3.1 Cluster design 3.2 Cluster deisgn Illustrations 3.3 Unit design 3.4 Unit design Principles 3.5 Construction technologies 4. Cost estimation.......................................................30-31 Annexure-1.....................................................................32-38 Annexure-2....................................................................39-43


6

7 Housing for All

Housing for All

1. 1 Introduction

to the city

Tadepalligudem is a city in West Godavari district of the Indian state of Andhra Pradesh. It is a municipality and the mandal headquarters of Tadepalligudem mandal in Eluru revenue division.

1.

Site introduction

The Town is bounded by Tadepalligudem Mandal, Pentapadu mandals. As of 2011 census, the mandal had a population of 103906 with 27192 households. The total population constitute, 51378 males and 52528 females, a sex ratio of 981 females per 1000 males. 9,086 children are in the age group of 0–6 years, of which 4,563 are boys and 4,523 are girls. There are 54,483 literates.

1. 2 Location

of the site

The proposed site is located near kondraprolu, which is 8kms form the main city. It is located very near to the main highway NH-5 which connects the major parts of the state. The Kondruprolu layout is away from 5 K.Ms from the municipal limits. Frequent number of auto services in every 15 minutes time and also 2 trips of RTC Bus services are available for the layout and connected the T.P.Gudem town to T.P.Gudem rural villages.

Tadepalligudem Town is consists in Tadepalligudem Assembly constituency, which in turn represents Narsapuram Lok Sabha constituency of Andhra Pradesh.

Area Development Plan Amravati new capital city of Andhra Pradesh is newly proposed to construct and the proposed site is apart from 120kms and No. of job opportunities occurred to the un employed persons and also the proposed site is comes under the Costal corridor for future development to the peoples. In this town there is big Whole sale onion market. Recently NIT college is sanctioned and commenced during the year 2015 -16.There is a lot of scope of development of thr city, there is a strong need of housing requirement in the city. Map showing Location of the proposed site


8

9 Housing for All

1. 3 Surroundings

Housing for All

of the site

The site is surrounded with other lower income housing like rajiv gruha kalpa etc. It sits in between of the agricultural fields. The surroundings lacks main basic social infrastructure which is required for the kind of population. A main road leading to the kondraprolu passes adjecent to the site and one more road connecting to other villages is passing through adjacent to one side of the site.

1. 4 Rules & There are few small scale industries surrounding and located near to the site. Mostly there are agricultural feilds surrounding the site. There is no exisitng flora on the site.The land is mostly flat. The height difference between the highest and lowest point is 4m

Regulations

SPECIAL REQUIREMENTS FOR LOW INCOME HOUSING IN URBAN AREAS Minimum Frontage: the minimum frontage of the plot shall be 3.6m in width. Density: Mixed developments for small towns – 75-100 DU per HA For cities – 100-125 DU per HA For Metropolitan Cities – 125-150 DU per HA Height of the Building: Shall not exceed 15m. Buildings up to the height of 15m, there is no need to provide lifts. Housing for the low-income group shall preferably be up to a maximum of two storeys. General Building Requirements: Carpet area of multipurpose room shall not less than 12.5 sq.m First room shall not be less than 9.0 Sq.m with minimum width of 2.5m Second room shall not be less than 6.5Sq.m with minimum width of 2.1m

Map showing Surroundings of the site

Glimpses of the site, surrounding low cost housing, site condition

Water closet/bath rooms: The size of independent water-closet shall be 0.90sq.m with minimum width of 0.9m The size of independent bathroom shall be 1.20sq.m with minimum width of 1.0m The size of combined bathroom& water closet shall be 1.80sq.m with minimum width of 1.0m Balcony: Minimum width shall be 0.9m shall not be more than 1.2m Basement: No basement floor shall be allowed. Minimum Height: habitable room & Kitchen - 2.6m Bathroom & Corridor 2.1m Circulation area: Shall not exceed 8sq.m/dwelling unit, including staircase. Roads & path ways: The area under roads & pathways should not exceed 20 % of the total land area. Pedestrian pathway width shall be: 3m & houses are accessible from one side only pathway width -2m Internal Road Width – 6m


10

11 Housing for All

Housing for All

Social Infrastructure requirement (URDPFI guidelines)

Site Social Infrastructure requirement

The URDPFI guidelines suggest a specific social infrastructure requirements for a particular community or neighbourhood level according to the anticipated population of the place.

The proposed site for developmet is about 39.44 acres, with a reuirement of about 4128 units. The total population proposed in the site is about 18,500 ppl. the social Infrastructure requirement for the proposed population is about

1. 5 Proposed

scenario

According to the existing situation and the according to the regulations the following land utilization of the site is proposed. More important is given to the open spaces. Only 30% of the total site is under the built coverage.

Proposed design programm Primary school (G+2 structure) - 2550 sqm Dispensary (G+1 Structure) - 600 sqm Women Skill Development centre (G+1 Structure) -600 Sqm Community hall - site 1200 sqm built- (g+1)- 1300 sqm Local Shopping area (G+1 Structure) - 2000 sqm Central Park - 650 Sqm (there are many Cluster parks) Maidan -5000 sqm Religious facility- 675 Sqm. Residential Built Block - 450 sqm G+3 -52 structures G+4 - 60 Structures Mix-Use Built Block- 450 sqm- G+4- Structures (provided along the main road)

1) Senior Secondary School(VI toXII)- 1.80 Ha 2) Dispensary - 0.08 to 0.12 Ha 3) Community hall, mangal karyayala, barat ghar/ library- 2000 sqm 4) Neighbourhood park - 1.00 Ha 5) Neighbourhood Play area - 1.50 Ha 6) Local shopping including servicecentre - 4600 sqm 7) Post office counter without delivery - 85 sqm 8) Bank with extension counters with ATM facility 8a Floor area for counters 75 sqm 75 sqm 8b Floor are for ATM 6 sqm 6 sqm


12

13 Housing for All

Housing for All

2. 1 Objective of the

design

Flexibility

2. Public Realm

To evolve a framework within which a progressive development can occur with ease and efficiency.

The public realm embraces the external places in our townshipe which is accessible to all

Feasibility

2.

To ensure development within a given legal fiscal and organisational framework in a realistic time frame.

Site planning

Indigenous built for suitable lifestyles Indigenous built form provide a setting for a continuation of fundamental values of the society. From the clues of Indian cities and towns, the level of the publicness and the degree of privacy are maintained through a spatial order.

2. 2 Key Design

Strategies

1. Movement The majo strategy of community was to develop/ enhance walkability.and develop a friendly neighborhood with pedestrian activity. creating pause points, with community facilities.

3.Central Core The major public facilities are centred to the development creating a central core(heart) of the community, and the community spine being the lung spaces of the community. 4. Mixed Use + Density By taking the present growth trends of urbanisation and density, the key of any sustainable habitat is achieved by developing an mixed use development.


2.4 Concept plan

14 Housing for All

Vehicular movement Pedestrian movement

5. Identity Housing the housing development does blend with the exisitng built fabic, the identity is generated with the help of making spaces more legible, and with a people friendly public spaces

2. 3 Key Design

principles

1. Universal access The design ensures the access to the differently able people. The street ensures ramps at the junctions and other required places , tactile paving along the foot paths and other major public pathways. 2 unit in each block are designed for the specially challenged, the toilets , door width are changed designed in order suit their requirements, about 5% of the total units are of differently able friendly units.

6. people centric design To create an dwelling where ever dweller can enjoy the space. share - care- grow. so the design lies in defining space which are people centric, rather than ecnomic centric.

3.Pedestrian friendly environment The movement design in the site ensures a safety environment for the pedestrians, Dedicated walkways are provided on the either side of the road, the inner plazas and the main community spine do not allow the vehicular movement in it, The shaded walkways ensures a safe walking environment for the people.

4.Work-Live concept 2. Women & children Safety The Spaces are designed in such way that , they don’t end up any dead zones, all the areas are activated with lots of different activities, the community spines assure a safer walking pathways for the women, the concept of Eyes on the street is explored with active spaces like mix-use buildings along main road and balconies along the internal roads are designed to ensure the safety of women and children

The housing neighborhood ensures the coexistence of the work place and the living spaces as the housing community is located far away from the town, the provision of mix-use typology, shopping centre, skill development centres helps in training and running of businesses within the neighborhood. the skill development centre helps in empowerment of the women.

green network Residential Mix-use Public functions Entry Points

15 Housing for All


16

17 Housing for All

2. 5 Design Evolution Movement

Housing for All

Layers Vehicular movement

Pedestrian movement

Walkability and Pedestrianisation was a major strategy to be developed in the whole site, which is non barrigated and accessible by all.

Green network

Semi-Public green Public open space

Planning an integrated network of landscapes, creating an network, knitting up major chunks of open spaces.

Figure ground

Built-use

Built and open relationship, gives us the idea of open and built ratio.

The diversified built use have been acheived in the design with giving importance to the mix-use and public functions

Public space Network

Semi-Public green Public open space

The public spaces are interlinked in a network along the green network, which opens up to a bigger public space.

Building Heights

G+1 structure G+3 structure G+4 structure

The built helight map enables us to get the development built height scenario.


plan

12

1. Mix-use edge 2. Residential 3. community Shared spaces 4. central node 5. temple complex 6. community centre 7. Local shopping centre 8. Maidan 9. school 10. health centre 11. skill development centre 12. services

2.6 Site

11 9

10

8

1

2

4 5

3

7

6

12

18 19

Housing for All Housing for All

2. 7 Proposed road

Sections


20

21 Housing for All

2. 8 Conceptual

Housing for All

Landscape scheme

Orchids

Road Avenues

Community Garden

• • • • •

• • •

Tamarindus indica (Tamarind) Azardica indica (Neem) Alstonia Scholaries Terminalia Catappa, Badam Terminalia arjuna

We have to bring back the use of the native trees in replace of Unique Trees. The advantage of we being a rich tropical country is being misused by designers. The culture an arid ecosystem containing palms are being retrofitted here in India.

Karipatta Emblica Officinalis Gaertn, Amla, Citrus Lemon

Are we safe using the vegetables or fruits we buy in the market today? It has all become business where the purity of the food is bargained. So, community garden is collective effort from the dwellers, a healthy and a responsible way of producing food.

The advantage of having developing an orchid- Provides food for the community. The quality of the surroundings is improved. We are nurturing our own native species, which is of less maintenance. • • • •

Mangifera indica (Mango) Cocos Nucifera, Coconut Desi Syzygium Cumini, Jamun, Neredu Guava

Community Gatherings like Play Area, Maidan etc. The quality of the air matters. Our lift expectancy is reduced rationally by the amount of the pollution in the environment. Plants that are of less maintenance should be a priority. Azardiracta indica , a good dust absorber .

Tadepalligudem – A hot and humid climate where summer becomes unbearable to live. The shading trees play major role in this climatic condition.

If you have a lot of space, you could also plant the peepal tree as it generates extraordinary amounts of oxygen and has immense medicinal value. The community gardens can be a flexible space which can be used for various functions such as for the playground, community gathering, kids play area, sports facility. the community spaces will encourage a active lifestyle to the people, it will help in building a togetherness feeling in the children and people. proposed conceptual kitchen garden scheme for clusters

proposed conceptual scheme for maidan

Street furniture The street furniture is created with local materials and energy saving methods, which would decrease the consumption of the people in the site.


22

23 Housing for All

Housing for All

3. 1 Cluster

3.

CLuster and Unit

Design

design


24

25

Cluster Module Housing for All

Housing for All

3. 2 Cluster design

Illustrations


26

27 Housing for All

3.3 Unit

Design

Housing for All

3.4 Unit Design

Principals

Design ideology indian-ism(indian urbanism)

01| Vaastu ancient indian science(science of orientation and placement)

Using the traditional indian house module, the multi-usability (flexibility) of a house, which is seen in an traditional indian house, where the space is used for several activities, a living space becomes a dining & kitchen, a bed room at night.

In keeping with the people’s desire for a strictly Vastu compliant houses, the placement of spaces in the house are in synch with the plan of the Vastu Purusha Mandala (the ancient Indian science of orientation and placement).Thus apart from positioning the main areas of the house according to the elements.

So the influences are seen in the space modulation, where there is privacy, yet creating a visual balance in the coherent living space. the sketch explains the detail of how we modulated in privacy of certain spaces with its shared spaces and influences of building materials and components like doors windows etc.

02| passive cooling techniques openess as the indian From the influences of many housing, our design has unobstructed cross ventilation paths. the orientation of the building does give the advantage in the space being shaded, and the uniform open spaces between the building creates a breating room to the buildings.

03| common wall use of common wall helps us providing a shared wall, which can reduce the building cost parameters, and also has the below strengths

04|introvert and extrovert towards openspaces Through the intro-extrovert spaces, we wanted to enhance the livability of each of the unit ,by making these spaces openable to public greens, enhancing the house opening towards these open spaces

05| Use of solar power Solar panels can be used to generate a portion of your home’s power in order to reduce your dependency on traditional power sources.


28

29 Housing for All

Housing for All

3.5 Construction

technologies

combination of both conventional and precast techniques for construction Conventional method of construction is used economical but it needs the time for concrete to get its strength.Meanwhile the shuttering should be removed after 21 days for beams of slabs.so to minimize this time we can replace only slabs or slabs of beams with the conventional columns & beams number of hollow core slabs. which can be directly layed as per the alignment of the drawing in very short time avoiding the time required for providing of shuttering and removal of shuttering . with this method we can really saves the time for casting of slab so the construction of conventional & pre cast method can be implement to save time & to cut the cost of the structure keeping the structure more stable and durable.

Rain water drainage and harvesting system -Rainwater colleccted from rooftop of each building by PVC pipes. - Harvesting pit provided ateach building , ove flow external rainwater channel. - Rainwater channel provided along the all roads , Harvesting pits provided at roads required areas to harvest the maximum rain-water.

Sanitary system

water supply and distribution system

1) Sewage drainage collected by underground piping system. 2) Sewage is connected to sewage treatment plant by underground piping system. 3) Sewage is connected to sewage treatment plant by underground piping and providing manholes at constant intervals. 4) sewage treatment plant provided at the suitable location , Although the this system is costly but we can use the recycled water coming from stop to external gardening & flushing , as the environment concerns it the best system to use.

1) Elevatedwater tank constructed at the highest level of site. 2) Underground water piping laid to each house to feed the water. 3) HDPE piping shall be used as the cost is economic. 4) This system shall be planned in economic way reduce the cost as much as possible.

Solar system for street lighting and housing 1) Although the initial cost of the system shall be costly compared to general system ,it repays the cost of electricity in long run. 2) The system shall be planned in economic way to reduce the cost as much as possible

concstruction details of built structure Foundation- Reinforced Concrete roofing , Cast in situ. Structural Members: Reinforced Concrete Plinth Beams, Pre cast Cement Concrete filler slabs with 40 grade mix by supporting beams of RCC M70 mix (RMC). The structural Beams will support the Roof Slab Passses as shown in diagram. where the spans will be sub divided into 1200x3000mm .

Floor screeding Screeding a floor is the sinmple act of applying a well blendedd mixture of ordinary portland cement with graded agregates and water to a floor base , in order to form a sturdy sub - floor that is capable of taking on the final floor finish or act as afinal wearing surface.

Reference image showing efficient road side walk design for strom water


30

31 Housing for All

Housing for All

4.1 Summary of S.No

4.

Cost

Estimation

Costs

Particulars

Cost Per Unit (In Rs)

Cost Per Block (In Rs)

4,58,017.25

1,46,56,552

Total Amount (In Rs)

1

Civil works

2

Water Supply & sanitary

40,000

12,80,000

14,33,60,000

3

Electrical

30,000

9,60,000

10,75,20,000

4

BT Roads (332118 sft)

5

Landscape (429324 sft)

6

Amenities

78,537.94

Total

4,98,17,700

35,43,63,200

Total cost 205 cr.

5,36,65,500

Primary school (27,438 sft) Community Hall (16140 Sft) Skill Development centre (6456 sft) Commercial (28720 sft)

1,64,15,33,824

Total cost per unit 5,51,467

1,74,23,130 1,20,24,300 14,913.11

6,06,06,870 48,09,720 2,15,40,000

5,51467

205,65,03,894

refer detailed estimate in annexure-2


32

33 Housing for All

Housing for All

Annexure-1

Sheets


34

35 Housing for All

Housing for All


36

37 Housing for All

Housing for All


38

39 Housing for All

Housing for All

Annexure-2

Estimation


40

41 Housing for All

Housing for All


42

43 Housing for All

Housing for All


44

45 Housing for All

Housing for All



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.