Portfolio Mohammad Jawad Rezaie (Jawad) Post Graduate Student @ The University of Adelaide 0450498757 Jawad.rezaie90@gmail.com https://www.linkedin.com/in/jawad-rezaie-23b423143/
STUDIO CULTURES 2020 Final Review
MEtroland Reimagining Port Adelaide Train Station
Contents
Wave and Bubble ...........................................1-4
The Urban Nest ...........................................15-20
The City Supply ..............................................5-8
The Sound Collision ...................................21-33
Eco-House ....................................................9-10
The Culturla Centre ....................................34-40
Carving the Landscape ................................11-14
Wave & Bubble
Semester2, Year3, 2018 Design 1V, Individual
The site is Mosley Square located at Glenelg, SA. This is very large and one of the busiest place in Glenelg because of Jetty and Tram. Keys
The aim was to test the notation of landscape as a “void” or “ boundary”. After visiting the site, many features such as wave, bubble, movement captured attention
1-Bridge 2-Ramp 3-Healing Space 4-Architectural feature1(wave and bubble shading) 5-Water Play area 6- Architectural feature2( wave and refelction ) 7-Active edges with seating spaces and shading 8-Transport hub(tram line)
Design Process & Concept Ideas
Exprementation
Observation
Abstraction
3D View3-capturing the active-edges on the site and the type of activities that are offered
Site Section1 1:400
Colley Terrace
S2
Site Section2
2
1:500
3 7
4
1
2
S1
5 6
Jetty Road
S1 2
2
2
8
section2-Details 1:50
7
Grass Site Plan S2
1:500
Silver Grey Granite Stone Paving
Keys These experiments and their abstract drawings informed design ideas and a proper concept that makes connection to the site. While having the theory of “ void” or “boundary” , the abstract drawings has lead to the generation of a new concept “ A Manifestation of Wave and Bubble” .
This concept has been supported in all parts of the project through 3D visualisations , light and shadow, form and materials. To promote activities and walking on site , the tram line is pushed back to create such space. The other reason for this decision is that the tram was perceived as main disturbing element in Mosley Square.
1-Bridge 2-Ramp 3-Healing Space 4-Architectural feature1(wave and bubble shading) 5-Water Play area 6- Architectural feature2( wave and refelction ) 7-Active edges with seating spaces and shading 8-Transport hub(tram line)
1
Exterior View of location 4
7-Active edge
2
4. Intigration of wave and bubble
3
6 -Interior views of “Reflecting Structure” that projects light and Shadow in the form of wave
4
The City Supply Overpopulation Health & Longlife A piece of painting received from Poutney Grammar School -Year 4 student . The student painted her/his imagination about future.
Semester1, Year3, 2018 Rep3, Group Work
Concept Ideas and Sketches
My role in the group • Leading the group in the design process • Generate the digital model in Rhino • Create the facade in Grasshoper • Rendering & Visualization Sketches generated from coloured shapes
The title was given by tutor . Our task as a group of 4 was to interprete the painting and combine the outcome with the given topics
Sketches generated from the shapes and curves in black
The sketches generated from openings and black outlines This is the final option
The integration of painting and the topic to a single ideas was the most challenging part of this task. It took days after many iterations and division between group members As a group we challenged ourselves and finally approached to a conclusion that reflects our ideas. A green tower that responds to population growth through increasing pollination in agricultural zones. This can help to provide more food. facade pattern
Final Form ( City Supply)
5
Programs
Physocal Model Laser cut
Facade
Structures
6
The City Supply
7
Scenarios Keys 1: Typical Agricultural level that attracts honey bees and increase pollination in the entire city and agricultural zones. This leads to more food production, which is responding to population growth. 2: How natural light gets into the green buildng through its facade
2: Monitoring/Research/ Residential space
3
2 8
3
Eco-House
Work Experience @ JPE July-2018 , Individual
Carpenter Road, Parafield Gardens
Owner Lifestyle
The Project Brieve • • • •
North orientaiton to capture maximum sunlight Good shading and minimal opening to the west Rainwater Tank Vegetable garden(10 m Sq)
•
Graphic Desinger and need a private area for working in the house to meet with clients Entertaining
ls R
D
Ca rp
en ter
Ro
ad
Blu eh il
•
Site Plan 1:1000
Ground Floor Plan 1:200
East Elevation 1:100
9
Experiencial 3Ds & Visualizaion The aim is to capture the materiality , natural light and situation of the house in the landscape
1: Exterior View
3: View from Carpenter Road
10
2: Exterior View-Capturing the Backyard
Carving the landscape
Semester1,Year2, 2019 Desging Studio III, Individual
The site is located in a the small township of Myponga which is 60 Km south of Adelaide. Well known for its agricultural history, and Myponga Reservoir.
The design focus was to have: 1)Bring outside landscape to inside , 2) Respond to food production , 3)How human movement happen on the site and broader ladscape
Residential Local business Education Main Transit Local Traffic
The council is keen to celebratie this opportunity and attract tourism . A new town hall, visitor centre, food production area will be the epicentre of that. Myponga, SA
Ma in
So uth
Ro
ad
Reservoir
sen Han St
Key View
Existing Hall
t on S s n i ch Hut
Site Plan 1:2000 @ A3
11
Design Process Digital Exploration
A. Site as a solid mass
B. Stage1 Carving (negative space)
E. Stage4 Level 1 Carving
F. Stage5 creating positive space
Mass Modeling
12
C.Stage2 Carving(negative space)
G. Programs/ Puplic/ Private/Circulation
D.Stage3 creating positive space
H. Programs. Puplic/ Private/ Circulation
Water Feature Courtyard
Section 1:200 @ A0
13
18 19
Axonometric View
Proposed Lake Exhibition/Dining
14
8
The Urban Nest
Semester2, Year4, 2019 Studio Urbanism, Individual
The site location is at the corner of Norther Terrace and West Terrace, Adelaide, South Australia
The proposed project responds to the needs of Adelaide CBD. Providing accomodation and spaces for commercial activities.
Site Plan 1:2000
NRAH
Tram stop
Project location
SAMRI
MID SCHOOL
Uni SA WEST
15
Tower1
Tower2
84m maximum height limit
DESIGN PROCESS
rint
footp
Podium
1. EXTRUSION
3. EXTRUSION
4. BALANCING THE HEIGHT
ce
No rt
hT err ace
2. DIVISON
a err T t s
We
Legends Residential Food and drink Office Core/vertical circulation Parking
HERITAGE BUILDING
1 bed 2 bed 3bed Gym and pool
No
rth
5. Programs
6. Vertical Circulation
ce
Ter rac e
st We
ra Ter
7. Modulation 8. The over all mass and geometry
16
Food production for restaurants
Level 2
Level 1
Level4-tower1 1:200
Basement
Level5-tower1 1:200 17
West Elevation 1:400
18
Level4-tower2 1:200
North Elevation 1:400 19
Level5-tower2 1:200
Section 1:400 20
The Sound Collision
Semester1, Year4, 2020 Studio Culture, Individual
The Regional Context
The site is located at Port Adelaide railway station close to a very busy and noisy Commercial Road. Thats how the project concept is inspired by the Sound surrounding the station.
Port Adelaide is a place of cultural and commercial activities, which is connected to the Adelaide CBD by railway. Adelaide CBD is the epicenter of cultural and commercial activities in SA. This proposal perceived such connection as an opportunity Location Plan to imagine the Port Adelaide train the second destination of Regional Context of Port Adelaide Trainstation Station cultural activities in South Australia.
Location Plan 1:10000
1
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
21
• •
Site Investigation
Site Mapping
Site Mapping- A bigger Picture of Port Adelaide
A Big Picture of Port Adelaide
WATER
Port Adelaide Buildings/Housings Commercial Activities
Landscape & Leisure
A place of Art and artists A place of commercial Acitvites
Railway Major Transits
• • • •
The Centre of SA’s Business District The Centre of Important Insititutions The Centre of Festivals The Centre of Performing Arts and Musics
Adelaide CBD
Location Plan
23
22
Scale:1:10000
Studio CulturesCultures- 2020-Final 2020 Studio Review Rezaie.M.JawadA1691163 Rezaie.M.Jawad- A1691163
The Sound Collision As the traffic noise is one of the main intangible elements of the site, it has been looked from a different perspective. Instead of considering sound’s frequency from one direction in previous options, now it has been looked from both direction, Commercial road and Train Station itself. These sounds travel in X and Y direction and collide with each other in some point, which I call it Sound Collision.
Desing Options Option
E
A different analysis of Sound frequency /Collision
As the traffic noise still remains one of the main intangible elements of the site, it has been looked from a different perspective. Instead of considering sound’s frequency from one direction in previous options, now it has been looked from both direction, Commercial road and Train Station itself. These sounds travel in X
Commercial Road
and Y direction and collide with each other in some point, which I call it Sound Collision.
Train
Flow of the sound after collision
Collision
Outcome 13
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
23
The 3D Geometry of Sound Collision
Desing Options Iteration and 3D form from Option
E Form Generaton
Traing approaching
People speaking
Train and heavy traffic noise
14 19
24
Studio Cultures2020-Final Studio Cultures2020 Review Rezaie.M.JawadA1691163 Rezaie.M.JawadA1691163
Design Concept and its surroundings
Final Form
Shopping Car Park
Developed form in the site context -South Eastern View
e ntr
Local b
pin
p ho
S
e gC
usiness
Local b
usiness
Fast Food
18
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
25
The Programs
Programs Programs and Their Location in the Design Proposal
Workshop and Training
Circulation Space
26
Virtual Art/Exhibtion
Performing Art /Performing Space
Circulation Space
Open Public Space/ Play Space and Landscaping
20
Handcraft/Production Space
Circulation Space
Drone Station
Sevice space
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
Section and Circulation
Sections Section1 Reveling the Circulation and Surroundings
Section1 -1:400@A3
Spiral Stair
Spiral Ramp1
23
Spiral Ramp2
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
27
Section and Programs
Sections Section2 Reveling the Programs
Drone Station
Hand Craft Space/Production Space
Performing Art /Performing Space
Virtual Art /Exhibition Space
Workshop and Training Space
Section2 -1:400@A3 Ground Level Landscaping /Open Public Space
Play Space for Extreme Activities
24
28
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
3D Interior- Performing Space
3D View
Performing Space
30
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
29
3D Exteri
3D View 30
Reveling the landscape and public space in Southern Side
Reveling the landscape and public space in Southern Side
28
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
3D Exterior - The Landscape and Public Space
3D View
Reveling the landscape and public space
27
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
31
3D Exterior
3D View 32
Overview of the Hub within the Site Context
Over View of the Hub Within the Site Context
26
Studio Cultures- 2020-Final Review Rezaie.M.Jawad- A1691163
In addition to the two cores, few columns are placed in angle to provide extra stracThis Project is inspired by the work of other architects like Rem Koolhas and Christian Semester1, Year4, 2020 tural support for the building. In Upper floors, a system of trusses are used to provide KerezCultural who put theCentre structures at the centre of their Deigns. The Bordeaux Villa and the The Advanced Construction, Individual both vertical and lateral stablity . This will be discussed more in next pages. House with One Wall are great examples how architect use structure to achieve such The site is located at 135-139 West The main focus of this course was to engage us with Advanced Cad/BIM tools the andsite technologies Furthermore, location and its surrounding parkland has its own impact on the complexOPTIONS design. DESING Terrace, Adelaide CBD. such as Revit, Rhino, Grasshopper, Kramba and Lady Bug. Firstly, Developed Massing Concept project which are explained infor following diagrams. A responsive facade is proposed to Like wise , in this proposal , it is attemped something challenging from structural pera Cultural Centre in Rhino and grasshopper . Secondly, Developed structural concept in Rhino and reduce energy consumption. A response to the Climate Change! spective to have a complex structural system. The Vertical circulation(Core) is used as grasshopper . Thirdly, moved both concepts to a BIM software like Revit using Rhino Inside Revit. the main structural sytem to hold the building.
OPTION1
Organic form with Grasshopper
B. Extruded foot print
A. Foot print
D. Transforming the frame of the view from orthogonal to OPTION2 MASSING AND PROGRAMS panoramic to capture the park land and other institutions.
Structural Concept: Vertical Circulation as Primary Stractual Element. MASSING AND PROGRAMS
C. Vistas and Views to the parklands
E. Panoramic view frame translated into AND ENVELOPE / DIGRID FACADE CONCEPT 3DMASSING geometry/form/volume.
F. Setback: The extruded footprint is reduced and comSTRUCTURE / a system of counterweight pressed to have more open space in the ground level
=
+ OPTION3
STRUCTURE / a system of shell and digrid
Panelling concept
Massing Concept
MASSING AND ENVELOPE / RESPONSIVE FACADE CONCEPT
Proposed Caltural Centre
STRUCTURE A system of cores and trusses
Assessment 1: Structural Concept ARCH 7033 Advanced Construction (M) Rezaie.MJ (a1691163)
Assessment 1: Structural Concept ARCH 7033 Advanced Construction (M) Rezaie.MJ (a1691163)
33
Design Rhino & Grasshopper
BIM Work Flow Rhino Inside
Documentation Revit
+
Flow of the Truss system from Rhino To Revit. This definition works for mosts of the structural and architectural categories and elements.
Flow of the Responsive(Parametric) Facade from Rhino To Revit Rhino Inside provides different options of tranisition for the users. This option is a quick way of importing categories from Rhino to revit. This option is used here to transfer the facade from Rhino to Revit as Curtain Panel. There should be a better way but I am a new user of Rhino Inside Revit and also the Plug-in is still under modification. From my personal perspective, Rhino Inside-Revit gives dramatic flaxiblity and coordination between the Design and Documentation environment.
1 34
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
Alfred Street A07,8 2
3 A06
Mary Street
West Terrace
A06
A08
A08
A05
A05
A08
Ground Level 1:200
1
Wright Street
2
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
35
2
3 A06
A06
A05
A05
Level3 1:200
2 3
36
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
3
2 A06
A06
A010
A010
A010
A010
3
Section1 1:200
5
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
37
A05 A05
4
Section2
5
1:200 6
38
Section3 1:200
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
Wright St
6
North Elevation
Alfred St
West Terrace
7
1:400
East Elevation 1:400
Alfred St
8
South Elevation
Marry Street
9 8
West Elevation 1:400
Wright St
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)
39
10
12 40
Structural System
11
3D1
Responsive Facade -South East View 3D3
9
Structural System an Architecture 3D2
13
Responsive Facade -North West View 3D4
Assessment 2: Developed Construction Model ARCH 7033 Advanced Construction (M) Student: Rezaie, M.Jawad (a1691163)