Portfolio 2018-23

Page 1

CONTENT

01 02 04 05 03 TEMPLE OF GRAVITY & MUSEUM FOR NATURAL FORCES TEXTILE EXPERIENCE CENTER MISCELLANEOUS SIJIN RESIDENCE 36 SQUARE 09 03 11 19 15 ACADEMIC PROJECT ACADEMIC PROJECT INTERNSHIP PROJECT DIGITAL ILLUSTARTIONS PROFESSIONAL PROJECT

01 TEXTILE EXPERIENCE CENTER

Location: Jodhpur, Rajasthan

Area: 80,000

Despite Rajasthan’s arid surroundings, the state is commonly come from the colourful clothes worn by Rajasthanis, which rock, and scrubby trees. Nevertheless, there is still a need for their treasure. A Textile Experience Centre is a facility that supports industry research, promotion, and education. The centre offers professionals from the industry can come together to advance ing at the grey surface with red walls center provide space for

03

ACADEMIC PROJECT II

IX-X II

80,000 sq m

Category: Educational, Cultural

commonly described as “vibrant” or “colorful”—euphemisms that which enliven the desert and break up the monotony of the sand, for the people on the ground to be given a platform to display supports regional textile artists and concentrates on textile offers a collaborative setting where academics, students, and advance knowledge and strengthen the industry, while standfor the interaction and promotion for and within the people.

SEM-
YEAR-2022-23

“Why dont you just leave this profession” I asked

“Since my identity is a legacy from my ancestors, it has greater value to me than money.”
04
SEM- IX-X
YEAR-2022-23
ACADEMIC PROJECT II
II
05
ISOMETRIC VIEW
YEAR-2022-23
ACADEMIC PROJECT II SEM- IX-X II

Spaces like BAAZAR ,EXHIBITION AREA,contibutes to the culture of Rajasthan’s textile where people can have a sense oc community, belonging and spreading.

RESEARCH & INCUBATION CENTER WITH TRAINING CENTER creates a space for learning and promote the local textiles of rajasthan’s and helps the artisans for earning .

BAAZAR ,CAFETERIA, AMPHITHEATER cause interaction between users which also act a connection between different activities , spaces & users

ACCOMODATION AREA, CAFETERIA for the lesuire of users visiting the center to learn , promote or invest.

06
FLOOR PLAN
GROUND
SEM-
YEAR-2022-23 1 2 6 3 4 5
ACADEMIC PROJECT II
IX-X II
1. Exhibition area & administration 2 Training center 3. Incubationa & research block 4. Accomodation 5. Cafeteria 6. Market area
07
FRONT ELEVATION SECTION AA’ SECTION BB’
LVL +0MM LVL +0MM LVL +0MM LVL -600MM LVL +6250MM LVL +6250MM LVL +8250MM LVL +8450MM LVL +6450MM LVL +3450MM LVL +9350MM LVL +3350MM
ACADEMIC PROJECT II SEM- IX-X II YEAR-2022-23
08
VIEW OF TRAINING CENTER VIEW OF HOSTEL BLOCK VIEW OF EXHIBITION AREA
YEAR-2022-23
ACADEMIC PROJECT II SEM- IX-X II
VIEW OF CENTER BAZAR

TEMPLE OF GRAVITY & MUSEUM FOR NATURAL FORCES

Location: Auroville, Tamil Nadu Area: 6300

Through this project we aim to sensitize people to the delicate fects. Also, to urge the people to gain knowledge about our energy for our existence Gravitational Force. We a species have neglected ture and natural energy sources. While, religion has created gods daily basis. Only a handful of us that are scientists and hobbyists

02
09

6300 sq m

Category: Education

balance of nature, the reasons for climate changes and its efenergy sources and forces of nature and to acknowledge the reason neglected the acknowledgement of Gravity and other forces of nagods that represent these forces and we acknowledge them on a hobbyists have the scientific knowledge of Gravity and Forces of Nature.

PROJECT II SEM-V II YEAR-2020
ACADEMIC

The same way how gravity falls at the center

The spherical ramps are around the cylinderical installation area

Spherical tube like form designed by the idea of orbit.

Form developed through process

GROUND FLOOR PLAN

FIRST FLOOR PLAN

1. Entrance

2. Administration

3. Manager room

4. Auditorium

5. Spherical ramps (circulation)

7. Ground surface

8. Installation space

5. Spherical ramps (circulation)

7. Ground surface

8. Installation space

9. Cafe

10. Kitchen

11. Exhibition room

SECTION
10
SEM-V
YEAR-2020
ACADEMIC PROJECT II
II
VIEW FROM THE MUSEUM ENTRANCE VIEW FROM THE INSIDE OF MU- VIEW FROM THE SURROUNDING OF MUS

SIJIN KUMAR RESIDENCE

Location: Chennai, Tamil Nadu Area: 1500 sq m

With its work in the fields of art, architecture, sign studio committed to creating a sustainable tive process fosters the development of more compassionate In order to create modern spaces that are connected to al building craft with new forms of expression, allowing the ing spaces that enrich oneself by allowing materials, textures, sign techniques that consider the needs of the client, their

03
11

Category: Residence

Team: Bayhauz design studio

and construction, Bayhauz is a collaborative deliving environment. Its innovative and collaboracompassionate and contextually relevant design skills. traditional practices, Bayhauz believes in fusing traditionrichness of materials to create impressions, and co-creattextures, and colours. One project completed using the same detheir budget, and offer suitable solutions is Sijin’s residence.

INTERNSHIP PROJECT II YEAR-2022

WARDROBE STUDY

GROUND FLOOR PLAN

WARDROBE

DINNING

FIRST FLOOR PLAN

12

SECTION AA’

SECTION BB’

DETAIL AT X- JACK ROOF DE-

INTERNSHIP PROJECT II YEAR-2022 LVL +0.75 LVL +3.75 LVL +6.75 LVL +7.65 PARENT'S BEDROOM TOILET PARENT'S BEDROOM MASTER BEDROOM BALCONY UTILITY
+0.75
+3.75
+6.75
+4.65
+7.65 PARENT'S BEDROOM WARDROBE DINNING MASTER BEDROOM WARDROBE STUDY ENTRANCE LOBBY
LOBBY
LVL
LVL
LVL
LVL
LVL
STUDY ENTRANCE
I-SECTION BRICK ARCH DETAIL X RCC CONCRETE

NORTH ELEVATION

EAST ELEVATION

GROUND FLOOR FIRST FLOOR TERRACE GROUND FLOOR FIRST FLOOR
13
TERRACE
INTERNSHIP PROJECT II YEAR-2022
VIEW FROM THE FRONT VIEW FROM THE SIDE

04 36 SQUARE

Location: Kota, Rajasthan Area: 2100 sq m

The hotel 36 Square is situated in Kota City’s busiest central ent wanted something French with a light pastel aesthetic, France. It was work to mould the small details onto the given

14

Category: Hospitality Team: Kothari Architects

central area. Kota is an emerging city in development. The cliso they were inspired by the facades from there trip to given wall.

PROFESSIONAL PROJECT II YEAR-2023

GROUND FLOOR PLAN

TYPICAL FLOOR PLAN

OTS

TOILET-4

15 UP LIFT 5'x6' 9" SPACE FOR TRANSFORMER UP LIFT 6'-6"X6'-0" BAKERY/EATERY 22'-0" X 37'-0" GROUND FLOOR DN MANDIR STORAGE ELECTRICAL PANEL SIDE ENTRANCE DOWN TO BASEMENT PASSAGE FEMALE TOILET MALE TOILET UP KITCHEN 33'-3X13'-7" RESTAURANT 33'-8"X18'-8" MEETING AREA 24'-2 X 28'-11" RECEPTION AIR CURTAIN WASH AREA 7'8"X9'3" TANDOOR 7'3"X9'4" STORAGE DISPLAY COUNTER DISPLAY DISPLAY COFFEE UP UP AC OUTDOOR UNIT UP PARTITION WALL PARTITION WALL PARTITION WALL BUSINESS CENTER 11'-10" X 18'-9" OFFICE 5'-0"X 10'-9" TOWER AC UP LVL +4" LVL ±0 LVL ±0 LVL ±0 LVL ±0 LVL ±0 LVL ±0 ROOM-7 12'2"x11'3" ROOM-2 12'1.5"x11'7" ROOM-8 10'11.5"x10'6" ROOM-11 13'10"x10' TOILET-9 5'0"x7'2.5" TOILET-10 5'0"x7'2.5"
8'0"x4'1" TOILET-12 5'x7'0" 5' WIDE CORRIDOR 4'5" WIDE CORRIDOR 4' WIDE CORRIDOR TOILET-1 5'0"x8'3" TOILET-2 5'0"x9' O.T.S 5'0"x3'0" SLIDING DOOR BALCONY TOILET-8 7'7.5" x4'11" ROOM-1 11'9"x11'7"
12'2"x11'3"
10'7.5"x14'9"
10'x10'9"
10'x10'3.5" ROOM-6 11'11"x11'3" ROOM-4 11'11" 11'3"
TOILET-11
ROOM-3
ROOM-9
ROOM-12
ROOM-5
2'8"x4'8"
5'x7'5.5"
5'x7'0" TOILET-6 5'x7'5.5" BALCONY Balcony Balcony TOILET 7 4'1" 9' Closet TOILET-3 8'9.5" 4'5" W1 D2 D1 D2 D2 D2 D2 D/W2 D2 D2 D2 D2 D2 D2 D2 D1 D/W1 D1 D1 D1 D1 V V V W1 W3 W2 W4 W4 W1 V D/W2 D/W1 ROOM-10 10'7.5"x14'9" THIRD FLOOR D1 D1 D1 DUCT SETI SETI TOILET PASSAGE 5'-8"X9'-0" LOUNGE 11' x 10' 17'-6" LIFT 6'-6"X6'-0" 4'-0" BED ROOM 16'2" x 11' 2'-6" 4'-0" 2'-0" NICHE GLASS WALL @6'-6" HEIGHT 3'-0" HT CONSOLE 5'-2" WALL UPTO 4' HEIGHT FG FG BED ROOM 11'-7"X15'-7" TOILET 5'-8"X9'-0" BED ROOM 11'-7"X15'-7" FG UP LIFT 5'x6' 4'-4" 4'-2 1 2 4'-4 1 15'-6" 10"
TOILET-5

ELEVATION

DETAIL AT X

PLASTER DETAIL

LVL±0 LVL +3'-0" LVL +3'-0" LVL +3'-0" LVL±0 LVL +3'-0" 8'-7" 8'-1" 1'-7" 3'-6" 14'-9" 4'-0" LVL ±0 LVL +3'-6" LVL +14'-9" LVL +30'-3" LVL +40'-11" LVL +51'-7" LVL +62'-3" LVL +77'-4" LVL +73'-4" LVL +3'-6" LVL ±0 LVL +14'-9" LVL +30'-3" LVL +40'-11" LVL +51'-7" LVL +62'-3" LVL +77'-4" LVL +73'-4" 1'-4" 4" 9" 6" 3" 9" 4" 9" 3" 3"
PROFESSIONAL PROJECT II YEAR-2023
FRONT
SIDE ELEVATION
16 0" 6"1" 9'-10 1 2 " 1" 6" 4" 6" 1" 8'-9 1 2 " 1" 6" 6" 1" 13'-0" 1" 6" 1" 1'-11" 1'-10" 1'-10" 1'-10" 3'-10" 1'-10" 1'-10" 1'-10" 3'-10" 2'-3" 3'-3" 2'-3" 3'-3" 7'-1" 5'-6" 10'-6" 7'-4 1 2 " 7'-4 1 2 " 10'-6" 5'-6" 7'-1" 1'-10" 1'-10" 7'-31 2 " 6'-3 1 2 " 5'-6" 5'-0" 6" 1" 9'-91 2 " 6" 1" 5'-0" 5'-6" 7'-31 2 " 6'-3 1 2 " 1'-10" 1'-10" 1'-10" 1'-10" 1'-10" 1'-10" LVL +1'-1" LVL +1'-1" LVL +1'-5" LVL +1'-5" LVL +1'-5" LVL +1'-5" LVL +1'-8" SMOKE DETECTOR MACHINE TRAP DOOR LVL +1'-11" LVL +6" 9'-3" 4'-5 1 2 " 2'-4 1 2 " 5'-91 2 " 6'-11" 4'-11" 6'-11" 6'-11" 6'-11" 5'-91 2 " RA SA 9'-8" 1" 5" 9" 1"5" LVL +1'-11" LVL +1'-11" GROOVES @3" 4'-6" 3'-0" LVL +1'-5" PROFILE LIGHT PROFILE LIGHT 3" 1'-10" 1" 1'-10" 10" 3" 1" 8" 10" 1" 1" 8'-2" LVL +1'-1" 1"1" 1" 1" SMOKE DETECTOR MACHINE TRAP DOOR LVL +1'-11" LVL +6" 9'-3" 4'-5 1 2 " 2'-4 1 2 " 6'-11 2 " 6'-11" 4'-11" 6'-11" 6'-11" 6'-11" 5'-91 2 " RA SA 9'-8" 1" 5" 9" 1" 5" LVL +1'-11" LVL +1'-11" GROOVES @3" 4'-6" 3'-0" LVL +1'-5" PROFILE LIGHT PROFILE LIGHT 3" 1'-10" 1" 1'-10" 10" 3" 1" 8" 10" 1" 1" 8'-2" LVL +1'-1" 1"1" 1" 1" 8" LVL +8'-3" LVL +9'0" LVL +8'-3" LVL +8'-3" LVL +8'-3" ROPE LITE 8" 1" 5'-5" 1"8" 1"8" 2'-6" 1" 8" 3'-2 1 2 " 6'-5" 3'-2 1 2 " 3'-8" 3'-8" 3'-8" C B B D A C D A 1'-5" 1'-11" 1'-1" 9" 5" 1'-10" 1" 1" PROFILE LIGHT 1" 8" 1" 1" 1 2 1'-6" 1'-6" 1" 1" 6" 1" 6" 1"
FALSE CEILING PLAN
DETAIL SECTION CC SECTION BB SECTION AA

SECTION BB

SECTION BB

SECTION CC

SECTION CC’

SECTION AA

X

DETAIL X

SECTION CC

SECTION AA

SECTION DD

SECTION BB

SECTION BB’

SECTION BB

SECTION CC

DETAIL X

DETAIL X

DETAIL X

DETAIL X

DETAIL AT X

DETAIL AT Y

SECTION CC

SECTION DD

SECTION DD

DETAIL X

SECTION DD

SECTION DD’

SECTION AA’

SECTION AA

SECTION BB

SECTION CC

DETAIL X

PROFESSIONAL PROJECT II YEAR-2023 1'-5" 1'-11" 1'-1" 6" 1'-1" 1'-11" 9" 5" 1'-10" 9'-9" 1" 1" 1" PROFILE LIGHT PROFILE LIGHT FLUTED 1'-10" 1" 1" 1" 1" 1" 1" 8" 5'-7" 8" 1" 1" 1 2 " 1" 1'-6" 1'-1" 1'-6" 1'-8" 1'-6" 1'-6" 1'-6" 1'-6" 1'-1" 1'-1" 1" 1" 1" 1" 1" 1" 1" 6" 1" 13'-0" 1" 6" 1" 1'-11" 6" 1" 8'-91 2 " 1" 6" 6" 1" 9'-101 2 " 1" 6"
1'-5" 1'-11" 1'-1" 6" 9" 5" 1'-10" 1" 1" PROFILE LIGHT PROFILE LIGHT FLUTED 1'-10" 1" 1" 1" 1" 1" 1" 1'-6" 1'-1" 1'-6" 1'-6" 1'-6" 1'-6" 1'-1" 1" 1" 1" 1" 1" 1" 6" 1" 13'-0" 1" 6" 6" 1" 8'-91 2 " 1" 6" 6" 1"
1'-5" 1'-11" 1'-1" 6" 1'-1" 1'-11" 9" 5" 1'-10" 9'-9" 1" 1" 1" PROFILE LIGHT PROFILE LIGHT FLUTED 1'-10" 1" 1" 1" 1" 1" 1" 1'-6" 1'-1" 1'-6" 1'-8" 1'-6" 1'-6" 1'-6" 1'-6" 1'-1" 1'-1" 1" 1" 1" 1" 1" 1" 1" 6" 1" 13'-0" 1" 6" 1" 1'-11" 6" 1" 8'-91 2 " 1" 6" 6" 1" 9'-101 2 " 1" 6"
DETAIL
DETAIL
1'-5" 1'-11" 1'-1" 6" 1'-1" 1'-11" 9" 5" 1'-10" 9'-9" 1" 1" 1" PROFILE LIGHT PROFILE LIGHT FLUTED 1'-10" 1" 1" 1" 1" 1" 1" 8" 5'-7" 8" 1" 1" 1 2 " 1" 1'-6" 1'-1" 1'-6" 1'-8" 1'-6" 1'-6" 1'-6" 1'-6" 1'-1" 1'-1" 1" 1" 1" 1" 1" 1" 1" 6" 1" 13'-0" 1" 6" 1" 1'-11" 6" 1" 8'-91 2 " 1" 6" 6" 1" 9'-101 2 " 1" 6"
X
6" 1'-1" 1" PROFILE LIGHT PROFILE LIGHT FLUTED 1'-10" 1" 1" 1" 1" 1" 5'-7" 8" 1 2 " 1" 1'-1" 1'-6" 1'-8" 1'-6" 1'-6" 1'-1" 1'-1" 1" 1" 1" 1" 13'-0" 1" 6" 1" 1'-11" 8'-91 2 " 1" 6" 6" 1" 9'-101 2 " X
8" 5'-7" 8" 1" 1" 1 2 " 1" 1'-6" 1'-1" 1'-6" 1'-6" 1'-6" 1'-1" 1" 1" 1" 1" 6" 1" 13'-0" 6" 1" 8'-91 2 " 1" 6" 6" 1"

SECTION AA’

(+38'-4")

4'-0"

FIFTH FLOOR

SEVENTH FLOOR SIXTH FLOOR

LIFT LOBBY MACHINE ROOM KITCHEN WASH AREA LOBBY DINE AREA TERRACE MACHINE ROOM LIFT LOBBY LIFT LOBBY LIFT LOBBY LIFT LOBBY LOUNGE WASHROOM LOUNGE WASHROOM LOUNGE WASHROOM BEDROOM SERVANT ROOM ENTRANCE TERRACE TERRACE FORTH FFL. (+0) 13'-0" FIFTH FFL. (+13'-0") 10'-8" SIXTH FFL. (+23'-8") 10'-8" SEVENTH FFL. (+34'-4") 8'-4" EIGHTH FFL. (+42'-8") 10'-8" TERRACE (+53'-4") 4'-0" PARAPET (+57'-4") 4'-0" PARAPET (+38'-4") 4'-0" PARAPET (+27'-8") SECTION AA' 13'-0" 10'-8" 10'-8" 19'-0" 10'-8" 10'-8" 10'-8" 10'-8" 10'-8" FORTH FFL. (+0) 10'-8" FIFTH FFL. (+10'-8") 10'-8" SIXTH FFL. (+20'-8") 10'-8" SEVENTH FFL. (+31'-4") 10'-8" EIGHTH FFL. (+42'-0") 10'-8" TERRACE (+52'-8") LOBBY NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING LOBBY LOBBY LOBBY LOBBY 18 19 22 14 18 1 8 12 9 18 1 8 12 9 4'-6" 3'-7" 10mmØ5"c/c 8mmØ7"c/c 10mmØ5"c/c 8mmØ7"c/c 10mmØ5"c/c 8mmØ7"c/c 7" 10" TERRACE
PARAPET
TERRACE 6'-11"X 3'-10" 4'-6" 4'-2 1 2 LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-4" 4'-2 1 2 4'-4 1 2 15'-4" NEW BUILDING OLD BUILDING LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-4" 4'-2 1 2 4'-4 1 2 15'-4" LVL +34'-4" NEW BUILDING OLD BUILDING LVL +21'-4" LVL +23'-8" UP UP DN UP DN LVL +32'-0" UP UP B B' C B B' A A' C C' B B' A A' C C' 1 8 9 12 14 15 18 1 8 9 12 14 15 18 3'-10" 4'-0" 10'-8" MACHINE ROOM W.T LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-6" 4'-2 1 2 4'-4 1 2 15'-4" LIFT 5'x6' UP DN LVL ±0 NEW BUILDING OLD BUILDING LOBBY LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-6" 4'-2 1 2 4'-4 1 2 15'-4" NEW BUILDING OLD BUILDING LOBBY LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-4" 4'-2 1 2 4'-4 1 2 15'-4" NEW BUILDING OLD BUILDING LIFT 6'-6"X6'-0" TERRACE 6'-11"X 3'-10" 4'-4" 4'-2 1 2 4'-4 1 2 15'-4" LVL +34'-4" NEW BUILDING OLD BUILDING DN LVL +21'-4" LVL +23'-8" UP UP UP DN UP DN LVL +32'-0" UP UP LVL +13'-0" LVL +10'-8" B B' A A' C C' B B' A A' C C' B B' A A' C C' B B' A A' C C' 1 18 1 14 15 18 1 8 9 12 14 15 18 1 8 9 12 14 15 18 7'-3" 3'-10" 4'-0" 10'-8" 17
FORTH FLOOR

PROFESSIONAL PROJECT II YEAR-2023

SECTION BB’ SECTION CC’

MACHINE ROOM LIFT LOBBY LIFT LOBBY TERRACE 10'-8" 10'-8" NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING NEW BUILDING OLD BUILDING LOBBY LOBBY LOBBY 14 18 1 8 12 9 18 1 8 12 9 10mmØ5"c/c 8mmØ7"c/c 10mmØ5"c/c 8mmØ7"c/c 3'-7" LOBBY DOOR TO NEW BUILDING DOOR TO NEW BUILDING DOOR TO NEW BUILDING DOOR TO NEW BUILDING SECTION BB' SECTION CC' LIFT LOBBY LANDING LOBBY LOBBY LANDING MACHINE ROOM LOBBY LOBBY FORTH FFL. (+0) 13'-0" FIFTH FFL. (+13'-0") 15'-5" SIXTH FFL. (+28'-5") 10'-8" SEVENTH FFL. (+39'-1") 14'-3" EIGHTH FFL. (+53'-4") PARAPET (+57'-4") 4'-0" OLD BUILDING NEW BUILDING BALCONY BALCONY BALCONY BALCONY BALCONY FORTH FFL. (+51'-9") SIXTH FFL. (+73'-1") 10'-8" SEVENTH FFL. (+94'-5") 10'-8" EIGHTH FFL. (+105'-1") 10'-8" TERRACE (+115'-9") FIFTH FFL. (+62'-5") 10'-8" 10'-8" 4'-0" PARAPET (+119'-9") FORTH FFL. (+51'-9") SIXTH FFL. (+73'-1") 10'-8" SEVENTH FFL. (+94'-5") 10'-8" EIGHTH FFL. (+105'-1") 10'-8" TERRACE (+115'-9") FIFTH FFL. (+62'-5") 10'-8" 10'-8" 4'-0" PARAPET (+119'-9") FORTH FFL. (+0) 6'-0" 13'-0" 11'-9" 10'-9 11'-9 LOBBY 1 10 1 10 9 12 9 12 11 18 11 14 13 14 13 14 5'-5" 3'-3" 8mmØ7"c/c 10mmØ5"c/c 5" 5'-5" 4'-6" 4'-3" 10mmØ5"c/c 8mmØ7"c/c 5" 8mmØ7"c/c 10mmØ5"c/c 5" 3'-4" 3'-1" 7" 10" 7" 10"
ZOOM IN DETAIL OF STAIRCASE

DIGITAL ILLUSTRATIONS

18 05

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.